Arcelor Mittal Nippon Steel India Limited - Gujarat

45700448 tender for services of rt & paut for piping in coke 27022056 10 10 10 radiographic test as per scope 40,000 in 20 phased array ultrasonic testing (paut) 24,000 in email : dibyashree.priyadarshini@edu.amns.in contact : name : dibyashree priyadarshini item details : scope of work general information: • this job includes gamma radiography of all pipe and structure weld joints, regardless of service differences. • pipelines are laid over above ground pipe racks, catering to various media and utilities for coke oven facilities. • pipe materials include carbon steel (cs) and stainless steel (ss) with outer diameters ranging from 15 mm to 3424 mm at elevations of 0 30 meters. • these pipelines are of various grades and standards and are welded with different types of pipe fittings as applicable. amnsi scope: • power source: single location. • selection of weld joints: as per ndt offering report (document no. amns cobp/bop 19). contractor’s scope for radiography work: • procedure qualification: conduct rt and/or paut procedure qualification at the site. • permit acquisition: secure the necessary permits before commencing rt activities. the permit holder and applicant must be from the contractor’s team. • safety compliance: adhere to all safety norms as stipulated by amnsi policy. ensure personnel working at height possess valid height passes. • ppe provision: supply all mandatory and required personal protective equipment (ppe) for workers and staff. • dark room setup: establish a dark room at the cobp premises, equipped with radiography viewers, densitometers, and other necessary equipment as per asme <(>&<)> api standards for film review. • certification: ensure radiographers possess barc approved certification prior to commencing work. • equipment availability: maintain necessary equipment such as radiation dosimeters, sirens, red light speakers, and calibration reports, ensuring they are available before each rt session. • safety vehicle: utilize a safety vehicle for camera movement on site. • documentation: share job safety analysis (jsa) and hazard identification and risk assessment (hira) documents before starting work . • safety standards: comply with all safety standards approved by amnsi. prohibit the use of damaged or non standard ppe items on site. • radiographic testing: perform rt using ir 192 or other applicable sources approved by amns qc. typically, rt will be conducted at nighttime. • radiographer certification: ensure rt radiographers are asnt–snt–tc–level i certified by barc. interpretation must be performed by a qualified asnt–level ii certified by barc. • film quality: utilize afga make d5/d7 film or equivalent from kodak <(>&<)> laser company. if desired sensitivity and contrast are not achieved, use higher grade films from relevant manufacturers to meet required standards. • radiation safety: use rt batch during rt performance with a safe radiation distance. employ fluorescent lights for area barricading. • dark room and pit room: the contractor is responsible for arranging both dark room and pit room facilities. page 2 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121822 date 10.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details • site safety: barricade the rt radiography working area and arrange all necessary items, lights, etc., to ensure safety at the site. • sop/methodology: submit the standard operating procedure (sop) and methodology for radiography testing to amnsi for review and approval. • personnel documentation: provide cvs and copies of level 1/2 certificates for key personnel. surface preparation: • eliminate any significant surface irregularities that could impede the accurate interpretation of radiographic results. condition of film: • ensure all films used for radiography are in pristine condition and within their useful life as indicated by the manufacturer’s expiry date on each film box. discard any unmarked film boxes. lead intensifying screen: • use 0.1 mm or 0.2 mm screens for gamma radiation. all screens will be of the cassette loaded type. radiographic density: • apply only a single film viewing technique. • the transmitted film density through the radiographic image of the penetrometer and the area of interest shall be between 2.0 to 3.0. • the density of the radiograph anywhere through the area of interest shall not vary more than –15% to +30% from the density through the penetrometer. calibrated densitometer: • a calibrated densitometer shall be used to measure the density of the radiographic films. geometrical un sharpness: • geometrical un sharpness of the radiograph shall not exceed the following material thickness limits: table material thickness (mm) ug max (mm) under 50 0.510 radiography technique: 1. for up to 2 inch diameter – double wall double image technique (dwdi elliptical). however, dwsi (superimpose) can be used where space is constrained. 2. for above 2 inch diameter up to 10 inch diameter – double wall single image technique (dwsi). swsi can be preferred where space is available. 3. for above 10 inch diameter – single wall single image technique (panoramic swsi). diagnostic film length: • swsi (panoramic): one exposure with film overlap to a minimum of 25 mm on both sides. • dwsi: for wall thickness schedules up to sch 120, a minimum of 3 equidistantly spaced (120 degrees) exposures are required with a minimum overlap of 25 mm in the diagnostic area. the standard maximum length of film shall be 300 mm for proper storage, handling, and review. • dwdi (elliptical): a minimum of two exposures at 90° apart. radiographic sensitivity: • the astm wire type penetrometer shall be used to indicate radiographic sensitivity. film sensitivity for radiography films shall be as per asme sec v (table – 276). placement of penetrometer: • the penetrometer shall be placed across the weld so that the wires are normally at 90° to the seam, with the thinnest wire to the outside of the diagnostic film length. the penetrometer will be placed on the source side or film side depending on the job condition. • film markings should include unit number, segment, welder number, date, line number, and joint number. film processing: • film processing will be manual in a room with a temperature of 18 to 22°c. 1. development time is 3 to 5 minutes in the developer solution. 2. following development, an acetic acid stop bath is required for 1 to 2 minutes with agitation for the first 10 seconds. 3. films are to be fixed for at least twice the clearing time or 5 to 10 minutes, whichever is greater. page 3 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121822 date 10.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 4. films shall be interpreted dry. 5. washing will be for at least 10 minutes in running water. viewing and storage of radiographs: • viewing facilities shall be provided in a subdued background lighting of an intensity that will not cause troublesome reflections on radiographic films. sufficient equipment, including instruments and densitometers, shall be available in a temperature controlled room. acceptance criteria: • acceptance standards for radiographic films for piping work shall be as per approved drawing/contract documents/asme b 31.3/asme b 31.1/asme sec viii/ asme sec v /as per discussion with concern person in charge from quality on a case by case basis. records to be submitted: • the designated engineer assigned by the resident engineer shall handle documentation. the following records shall be submitted: o radiographic interpretation report. o safety permits to carry out/perform rt. o relevant documents pertaining to the operator and interpreter’s barc licenses. phased array ultrasonic testing (paut) procedures and scope 1. introduction phased array ultrasonic testing (paut) is a sophisticated non destructive testing (ndt) method used to detect internal flaws in materials. this document provides a comprehensive outline of the paut procedures and scope, ensuring compliance with asme section v and section viii standards. 2. scope of work the scope of work includes the inspection of welds, pressure vessels, and other critical components. the primary objectives are: • inspection of welds: to detect and evaluate internal flaws such as cracks, lack of fusion, and porosity. • material integrity evaluation: to ensure the structural integrity of pressure vessels and pipelines. • compliance verification: to confirm that the inspected components meet asme <(>&<)> api standards. 3. equipment and materials • paut system: the system should include phased array probes, ultrasonic flaw detectors, and data acquisition systems capable of high resolution imaging. • calibration blocks: asme compliant calibration blocks must be used for system calibration to ensure accuracy and reliability. • software: advanced software for data analysis, imaging, and reporting. 4. personnel requirements • certification: inspectors must hold asnt level ii or iii certification in ultrasonic testing. • training: personnel must have specific training in paut and be familiar with asme <(>&<)> api codes and standards. • experience: inspectors should have a proven track record of conducting paut on similar components. 5. detailed procedures 5.1 preparation • documentation review: review component drawings, specifications, and previous inspection reports. • surface preparation: clean the inspection area to remove any debris, grease, or contaminants that could interfere with the testing process. 5.2 calibration • system calibration: calibrate the paut system using asme compliant calibration blocks. ensure the system is set up correctly for the specific inspection requirements. • sensitivity check: perform sensitivity checks to verify the system’s ability to detect the smallest relevant flaws. 5.3 scanning • probe positioning: position the phased array probe on the inspection area. ensure proper coupling between the probe and the surface. • sectorial scanning: conduct sectorial scanning to cover the entire weld or component. adjust probe angles and focal laws to optimize page 4 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121822 date 10.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details detection. • scan plan: develop a detailed scan plan outlining the scanning strategy, including probe positions, angles, and coverage areas. 5.4 data acquisition • signal recording: record ultrasonic signals and create a detailed scan plan. ensure all relevant data is captured for analysis. • data storage: store the acquired data securely for subsequent analysis and reporting. 5.5 data analysis • flaw detection: analyze the recorded data to identify any indications of flaws. use advanced software tools to enhance the accuracy of flaw detection. • comparison with standards: compare the results with the acceptance criteria specified in asme section viii <(>&<)> relevant api standard. document any deviations or non conformities. 5.6 reporting • report preparation: prepare a detailed report including: o component description: detailed description of the inspected component, including material specifications and dimensions. o calibration details: information on the calibration process, including calibration block details and sensitivity checks. o scan plan and parameters: detailed scan plan, including probe positions, angles, and coverage areas. o results and findings: comprehensive analysis of the inspection results, including identified flaws and their locations. o conclusion and recommendations: summary of the findings and recommendations for any necessary corrective actions. 6. acceptance criteria • flaw evaluation: flaws detected must be evaluated against the acceptance criteria outlined in asme section viii <(>&<)> relevant api standards • reporting non conformities: any indications exceeding acceptable limits must be reported and addressed promptly. 7. safety and compliance • safety regulations: ensure compliance with all relevant safety regulations and asme codes. • personal protective equipment (ppe): use appropriate ppe during inspections to protect personnel from potential hazards. • environmental considerations: take necessary precautions to minimize environmental impact during the inspection process. 8. project specific requirements • project timeline: adhere to the project timeline as specified in the tender documents. ensure all inspections are completed within the agreed timeframe. • site access and coordination: coordinate with the project management team to ensure access to inspection sites. follow all site specific safety and operational protocols. • documentation and reporting: provide regular updates and interim reports as required by the project management team. ensure all final reports are submitted in the specified format and within the agreed timeframe. • quality assurance: implement a robust quality assurance program to ensure all inspections meet the highest standards of accuracy and reliability. conduct regular audits and reviews to maintain compliance with asme <(>&<)> api standards and project requirements. • client communication: maintain open and transparent communication with the client throughout the project. address any concerns or issues promptly and professionally. 9. inspection schedule and duration • inspection schedule: develop a detailed inspection schedule in coordination with the project management team. the schedule should outline the specific dates and times for each inspection activity. • duration of inspections: estimate the duration of each inspection activity based on the complexity and size of the components being inspected. typical durations are as follows: o weld inspections: approximately 2 4 hours per weld, depending on length and accessibility. page 5 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121822 date 10.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details o o pressure vessel inspections: approximately 1 2 days per vessel, depending on size and complexity. o pipeline inspections: approximately 1 3 days per section, depending on length and accessibility. • contingency planning: include contingency plans in the schedule to account for potential delays or unforeseen issues. ensure flexibility to accommodate any changes in the project timeline qualifications for subcontractors in paut 1. certification and training • asnt certification: subcontractors must have personnel certified to asnt level ii or iii in ultrasonic testing (paut). this certification ensures that the inspectors have the necessary knowledge and skills to perform paut. • specific paut training: personnel should have specialized training in paut techniques, including the use of phased array probes and advanced data analysis software. 2. experience • proven track record: subcontractors should have a documented history of successfully completing paut projects, particularly in similar industries or applications. • project references: provide references from previous clients to demonstrate experience and reliability in performing paut. 3. equipment and technology • advanced paut systems: subcontractors must use state of the art paut equipment, including phased array probes, ultrasonic flaw detectors, and data acquisition systems. • calibration tools: access to asme compliant calibration blocks and other necessary tools to ensure accurate and reliable inspections. • software proficiency: proficiency in using advanced software for data analysis, imaging, and reporting. 4. compliance with standards • asme code compliance: ensure all procedures and inspections comply with asme section v and section viii standards. • safety regulations: adherence to all relevant safety regulations and industry best practices. 5. quality assurance • quality management system: implementation of a robust quality management system to ensure consistent and high quality inspections. • regular audits: conduct regular internal audits and reviews to maintain compliance with industry standards and project requirements. 6. personnel competency • continuous education: commitment to continuous education and training for personnel to stay updated with the latest advancements in paut technology and techniques. • competency assessments: regular competency assessments to ensure inspectors maintain the required skill levels. 7. project management • effective coordination: ability to coordinate effectively with the main contractor and project management team to ensure smooth execution of the inspection schedule. • timely reporting: capability to provide timely and detailed reports, including interim updates and final inspection reports....

Arcelor Mittal Nippon Steel India Limited - Gujarat

45051315 tender for rt, pwht & paut for coke oven bop piping 27021335 10 10 30 phased array ultrasonic testing (paut) 24,500 in 20 post weld heat treatment (pwht) 6,500 in 10 radiographic test as per scope 73,500 in email : ayush.patel@amns.in contact : name : ayush patel item details : gamma ray radiographic for interplant piping (ipp): general information: ø this job includes gamma radiography of all pipes weld joints irrespective of difference services. ø pipelines laid over the above ground pipe racks, which cater various media <(>&<)> utilities to coke oven facilities. ø pipe materials includes cs/ss with outer diameter of pipes varies from 15 mm to 3424mm at elevation of 0 30 mtr. ø these pipelines shall be of various grades and standards and welded with different types of pipe fittings as applicable. amnsi scope: ø power source single location. ø selections of weld joints. contractor’s scope for gamma radiography work: ø before the start up of rt job, a permit shall be taken. ø permit holder and applicant shall be from contractor side. ø vendors must follow all safety norms as per amnsi policy. ø people working at height must have valid height pass. ø all mandatory <(>&<)> required ppes for workers and staff shall be provided by the contractor. ø contractors shall follow all safety standards approved by amnsi. ø damaged, non standard ppes items shall not be allowed to use at site. ø rt shall be done with ir 192 source and other applicable source approved by amns qc. ø generally, rt will be taken at nighttime. ø rt radiographer shall be qualified asnt–snt–tc – level – i certified by barc. ø qualified asnt– level ii certified by barc, shall do the interpretation. ø rt film quality – the vendor shall use afga make d5/d7 film or equivalent film of kodak <(>&<)> laser company. however, in cases where the desired sensitivity and contrast are not achieved during film interpretation, the vendor must produce radiographic testing (rt) of joints using higher grade films from relevant manufacturers to meet the required standards. ø rt batch shall be used during perform of rt with safe radiation distance. ø florescent light shall be used for area barricading. ø dark room arrangement shall be in contractor scope. ø pit room arrangement shall be in contractor scope. ø rt radiography working area shall be barricaded, and all other things, light etc. required to ensure safety at sites shall be arrange by vendor. ø vendors shall share sop/methodology for radiography testing to amnsi for review and approval. ø vendor shall share key personnel cvs and copy of certificates level 1/2. page 2 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119676 date 02.09.2024 submission date 10.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details surface preparationø any significant surface irregularities, which may interfere with the interpretation of radiography, shall be removed. condition of filmø all films to be used for radiography shall be visibly in perfect condition and within the period of usefulness as indicated by the manufacturer date of expiry marked on each individual film box. unmarked film boxes shall be discarded. lead intensifying screenø for gamma radiation 0.1 mm or 0.2 mm shall be used. all screens will be of the cassette – loaded type. radiographic densityø only a single film viewing technique shall be applied. ø the transmitted film density through the radiographic image of the penetrometer and area of interest shall be between 2.0 to 3.0. ø the density of the radiograph anywhere through the area of interest shall not vary more than –15% to +30% from the density through the body of penetrometer. ø calibrated densitometer shall be used to measure density of the radiographic films. geometrical unsharpnessgeometrical un sharpness of the radiograph shall not exceed the following material thickness. material thickness (mm) ug max (mm) under 50 0.510 radiography technique1 for up to 2 inch dia – double wall double image technique (dwdi elliptical). however, dwsi says superimpose can be used where space is concerned. 2 for above 2 inch dia upto 10 inch dia – double wall single image technique (dwsi). swsi can be preferred where space is available. 3 for above 10 inch dia – single wall single image technique (panoramic swsi). diagnostic film lengthi) swsi (panoramic) one exposure with film overlap to minimum 25 mm on both the sides will be used. ii) dwsi for wall thickness schedule upto sch 120, a minimum of 3 equidistantly spaced (120 degree) exposures required with minimum overlap of coverage in the diagnostic area to be 25 mm. standard maximum length of film shall be 300 mm long for proper storage /handling/review. iii) dwdi (elliptical) minimum number of exposures is to be two at 90° apart. radiographic sensitivityø the astm wire type penetrometer shall be used to indicate radiographic sensitivity. film sensitivity for radiography films shall be as per page 3 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119676 date 02.09.2024 submission date 10.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details asme sec v (table – 276). placement of penetrometer ø penetrometer shall be placed across the weld so that the wires are normally at 90° to seam, with the thinnest wire to the outside of the diagnostic film length. penetrometer will be placed on source side or film side depending upon the job condition. ø mention film marking with unit no/segment/welder no / date / line no./ joint no. film processingø film processing will be manual in a room having temperature 18 to 22° c. i) development time is 3 to 5 minutes in developer solution. ii) following the development acetic acid soap bath is required for 1 to 2 minutes with agitation for the first 10 seconds. iii) films are to be fixed for at least twice the cleaning time or 5 to 10 minutes whichever is greater. iv) films shall be interpreted dry. v) washing will be for at least 10 minutes in running water. viewing and storage of radiographsø viewing facilities shall be provided in a subdued background lighting of an intensity that will not cause troublesome reflection on radiographic films with sufficient codgent / instruments / densitometer in temperature controlled room. acceptance criteriaacceptance standard to radiographic films for piping work shall be asme b 31.3/asme sec viii case to case basis. records to be submittedø the designated engineer assigned by resident engineer shall do documentation and following records shall be submitted: radiographic interpretation report. safety permits to carry out/perform rt. relevant documents pertaining to operator, interpreter’s license of barc. post weld heat treatment post weld heat treatment shall meet the requirements of para 331 of asme b31.3 and technology provider guideline for project. for ibr systems, post weld heat treatment shall be as per ibr. item note : gamma ray radiographic for interplant piping (ipp): general information: ø this job includes gamma radiography of all pipes weld joints irrespective of difference services. ø pipelines laid over the above ground pipe racks, which cater various media <(>&<)> utilities to coke oven facilities. ø pipe materials includes cs/ss with outer diameter of pipes varies from 15 mm to 3424mm at elevation of 0 30 mtr. ø these pipelines shall be of various grades and standards and welded with different types of pipe fittings as applicable. amnsi scope: ø power source single location. ø selections of weld joints. contractor’s scope for gamma radiography work: page 4 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119676 date 02.09.2024 submission date 10.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details ø before the start up of rt job, a permit shall be taken. ø permit holder and applicant shall be from contractor side. ø vendors must follow all safety norms as per amnsi policy. ø people working at height must have valid height pass. ø all mandatory <(>&<)> required ppes for workers and staff shall be provided by the contractor. ø contractors shall follow all safety standards approved by amnsi. ø damaged, non standard ppes items shall not be allowed to use at site. ø rt shall be done with ir 192 source and other applicable source approved by amns qc. ø generally, rt will be taken at nighttime. ø rt radiographer shall be qualified asnt–snt–tc – level – i certified by barc. ø qualified asnt– level ii certified by barc, shall do the interpretation. ø rt film quality – the vendor shall use afga make d5/d7 film or equivalent film of kodak <(>&<)> laser company. however, in cases where the desired sensitivity and contrast are not achieved during film interpretation, the vendor must produce radiographic testing (rt) of joints using higher grade films from relevant manufacturers to meet the required standards. ø rt batch shall be used during perform of rt with safe radiation distance. ø florescent light shall be used for area barricading. ø dark room arrangement shall be in contractor scope. ø pit room arrangement shall be in contractor scope. ø rt radiography working area shall be barricaded, and all other things, light etc. required to ensure safety at sites shall be arrange by vendor. ø vendors shall share sop/methodology for radiography testing to amnsi for review and approval. ø vendor shall share key personnel cvs and copy of certificates level 1/2. surface preparationø any significant surface irregularities, which may interfere with the interpretation of radiography, shall be removed. condition of filmø all films to be used for radiography shall be visibly in perfect condition and within the period of usefulness as indicated by the manufacturer date of expiry marked on each individual film box. unmarked film boxes shall be discarded. lead intensifying screenø for gamma radiation 0.1 mm or 0.2 mm shall be used. all screens will be of the cassette – loaded type. radiographic densityø only a single film viewing technique shall be applied. ø the transmitted film density through the radiographic image of the penetrometer and area of interest shall be between 2.0 to 3.0. ø the density of the radiograph anywhere through the area of interest shall not vary more than –15% to +30% from the density through the body of penetrometer. ø calibrated densitometer shall be used to measure density of the radiographic films. page 5 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119676 date 02.09.2024 submission date 10.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details geometrical unsharpnessgeometrical un sharpness of the radiograph shall not exceed the following material thickness. material thickness (mm) ug max (mm) under 50 0.510 radiography technique1 for up to 2 inch dia – double wall double image technique (dwdi elliptical). however, dwsi says superimpose can be used where space is concerned. 2 for above 2 inch dia upto 10 inch dia – double wall single image technique (dwsi). swsi can be preferred where space is available. 3 for above 10 inch dia – single wall single image technique (panoramic swsi). diagnostic film lengthi) swsi (panoramic) one exposure with film overlap to minimum 25 mm on both the sides will be used. ii) dwsi for wall thickness schedule upto sch 120, a minimum of 3 equidistantly spaced (120 degree) exposures required with minimum overlap of coverage in the diagnostic area to be 25 mm. standard maximum length of film shall be 300 mm long for proper storage /handling/review. iii) dwdi (elliptical) minimum number of exposures is to be two at 90° apart. radiographic sensitivityø the astm wire type penetrometer shall be used to indicate radiographic sensitivity. film sensitivity for radiography films shall be as per asme sec v (table – 276). placement of penetrometer ø penetrometer shall be placed across the weld so that the wires are normally at 90° to seam, with the thinnest wire to the outside of the diagnostic film length. penetrometer will be placed on source side or film side depending upon the job condition. ø mention film marking with unit no/segment/welder no / date / line no./ joint no. film processingø film processing will be manual in a room having temperature 18 to 22° c. i) development time is 3 to 5 minutes in developer solution. ii) following the development acetic acid soap bath is required for 1 to 2 minutes with agitation for the first 10 seconds. iii) films are to be fixed for at least twice the cleaning time or 5 to 10 minutes whichever is greater. iv) films shall be interpreted dry. v) washing will be for at least 10 minutes in running water. viewing and storage of radiographsø viewing facilities shall be provided in a subdued background lighting of an intensity that will not cause troublesome reflection on radiographic films with sufficient codgent / instruments / densitometer in temperature controlled room. acceptance criteriaacceptance standard to radiographic films for piping work shall be asme b 31.3/asme sec viii case to case basis. page 6 of 6 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119676 date 02.09.2024 submission date 10.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. shashimita gupta contact email shashimita.gupta@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details records to be submittedø the designated engineer assigned by resident engineer shall do documentation and following records shall be submitted: radiographic interpretation report. safety permits to carry out/perform rt. relevant documents pertaining to operator, interpreter’s license of barc. post weld heat treatment post weld heat treatment shall meet the requirements of para 331 of asme b31.3 and technology provider guideline for project. for ibr systems, post weld heat treatment shall be as per ibr. ...

Indian Oil Corporation Limited - Gujarat

43474245 bids are invited for custom bid for services operations maintenance contract at iocl kandla foreshore terminal, haulage, housekeeping and canteen contract at kandla foreshore terminal, job based activities operational activities 1.1 providing services in s&d block like providing drinking water, sorting of challans and other documents, filing of acknowledgements, collection, handling & help in disposal of samples, ar3a documents handling, handling of e lock and related accessories, etc. minimum 26 mandays of service per month i.e. 1 semi skilled labour for a month. 1.2 providing services in tlf like assisting in taking retention samples as per iqcm, shifting of daily retention samples to sample room, assisting in taking 2 hourly density as per iqcm, helping in checking of samples for colour, appearance, water presence etc., qc related works and attending to loading related issues, etc and all others works as directed. minimum 26 mandays of service per month i.e. 1 semi skilled labour for a month. 1.3 supervisor providing 1 supervisor for supervising various operational and maintenance activities, maintaining attendance record, re conciliation of monthly statutory payments, submission of bills, completion of gate pass formalities of haulage workers and any other work as directed. providing 1 supervisor for wagon loading and unloading at bg siding and all other works related to tlf and bg siding, minimum 60 mandays of service per month i.e. 2 skilled labours for a month., 1.4 control room operational activity assisting in control room activities like attending control room related issues like attending leakages, daily water draining from atf tanks & strainers, assisting in the operations of the fast flushing, salvaging oil spillage if any, assisting in gauging, sampling of tanks before and after receipt, assisting in lining up of tanks and pipelines in pump house manifolds for receipt or dispatch, assistance in tank water draining, assistance in product pump operation, assistance in product line flushing for grade changeover(work includes, connection of hoses from watre line, dismentling/connection of blinds, flanges etc as per direction of officer incharge) and any other work as directed by control room officer. after completion of above works the workman shall assist in any other work like tank farm operation (tank gauging, sampling, water draining), pipeline lining operation, pump house operation etc as per direction of control room officer. unloading & loading tank wagons: unloading: assisting in the quality & quantity checks of tws, connecting & disconnection of hoses and unloading of tank wagons at railway siding as instructed by tank wagon officer/control room officer. on placement of wagons, open the manhole cover as per advice & master valve, remove tw bottom blind flange/dummy plate, connect hose to the tw bottom to the product line & opening of master/bottom valve. ensure that appropriate gasket all the nut bolts are applied, open bottom valve of the tank wagon and also the valve of the pipeline at riser/header. bonded trays and buckets to be kept under while opening flanges. also bonded clips to the unloading hoses to be ensured. after unloading disconnect the hose pipe from the tank wagon without spillage and blinding of the risers, close bottom valve and master valve along with header/riser valve and blank the open ends of the hose pipe and also the headers / risers, uplifting of hoses from designated stand and keeping hoses to designated stand with both ends blind. cleaning of gantry after unloading operation. no open/spilled oil at bg gantry drain to be ensured. loading: on placement of wagons, open manhole covers, checking & draining of leftover product in metallic electrically bonded buckets/half cut drums, if any , place the loading arm. closing of master valve & bottom audco valve. discharge header packing & sealing in all 4 dummies. monitoring of loading & topup of tank wagons, product wise as per ctcc dips. after loading, loading arms to be removed & fastened to its designated place. checking of density /temperatures, as per advise of bg officer. draining water if found. again topping up of wagon as per ctcc dip. proper gaskets to be provided at manhole covers and to be properly sealed to ensure zero leakage. positioning of swing ladders at proper place. after loading/ unloading full bg gantry to be cleaned properly. no nut bolts and no open/spilled oil to be ensured in bg gantry. maintaining record of tank wagon fittings, dip, density and temperature as per instruction of bg officer/control room officer in iocl prescribed format. in case any leakage is reported outside terminal premises then the same to be attended by deputing adequate no. of workmen as and when advised. since, the placement of tank wagon can be irrespective of sunday/ holiday, operating days to be considered as all the calendar days of the month. payment will be done as per the actual unloading. the work requires work at height up to 5 m on top of wagons. minimum 8 nos. semi skilled workers with prior work experience in unloading 50nos. tank wagons are required to be engaged. in case 2 wagons are placed simultaneously then at least 16 nos. semi skilled workmen should be working in both the tank wagons for simultaneous unloading of the same. transhipment of sick wagons outside including necessary transportation of equipments to wagon site out side, complete connected documentation & railway formalities shall also be included in the subject work. the contractor shall have to arrange necessary vehicle for attending any issue in rake outside if required., minimum 720 mandays of service per month i.e. 24 nos. semi skilled labours per day, minimum 720 mandays of service per month i.e. 24 nos. semi skilled labours per day. 1.5 ows/etp operation: assisting in operation of etp, operation of etp pumps and other machineries, cleaning of pumps motors of etp, ows, cleaning of the complete ows floor and nearby areas and jobs as directed by safety officer. after completion of above works the workman shall assit in any other work like tank farm operation (tank gauging, sampling, water draining), pipeline lining operation, pump house operation etc as per direction of control room officer. minimum 26 mandays of service per month i.e. 1 semi skilled labour for a month., 1.6 ethanol, bio diesel, sick tt, bridging tt etc unloading: assisting in the operation of ethanol tt unloading. climbing the tt with adequate safety ppes and precautions, taking dips of all the compartments, sampling from each compartment, connection of nitrile hoses with the unloading coupling of the tt using non sparking tools only and proper bonding of the flanges and tt, co ordinating with pump house for unloading and completing the operation with no leakage. after completion of above works the workman shall assit in any other work like tank farm operation (tank gauging, sampling, water draining), pipeline lining operation, pump house operation etc as per direction of control room officer. minimum 26 mandays of service per month i.e. 1 semi skilled labour for a month. ethanol and bio diesel pump house operation: assisting in the operation of ethanol and bio diesel pump house for tlf loading operation. work includses lining up fro tlf laoding, pump operation as per tlf demand, unkeep pf ethanol and biodeisel pump manifold, etc. after completion of above works the workman shall assit in any other work like tank farm operation (tank gauging, sampling, water draining), pipeline lining operation, pump house operation etc as per direction of control room officer.minimum 26 mandays of service per month i.e. 1 semi skilled labours for a month. maintenance activities 1.7 maintenance of all valves i.e. gate valves, globe valves, butterfly valves, plug valves, rosov, dbbv, ball valves, nrvs, etc installed in all product tanks, tlf gantry and tw gantry, product pipelines, manifolds of fst, nfst and bg pump house, piggable manifolds, receipt manifold, auxillary receipt manifold, vkpl manifold and all other manifolds within the control of terminal as per the schedule and as and when directed by designated officers. regular preventive maintenance of the valves to be carried out as per pre defined schedule and checklist including gland sealing, freeness of handwheel and valve, lubrication of stem threads, bonding across flanges etc for keeping the valve in operating condition all the time. after completion of above works the workman shall assit in any other work like tank farm operation (tank gauging, sampling, water draining), pipeline lining operation, pump house operation etc as per direction of control room officer. minimum 104 mandays of service per month i.e. 4 semi skilled labour for a month. 1.8 cleaning of all product strainers installed in the suction pipeline of all pumps including isolating the pipeline containing the strainer, salvaging the product, opening the cover flange of the strainer, checking and cleaning of the strainer basket and replacement in case the basket gets damaged, restroring the cover plate with appropriate gasket, grease and nut bolts and flushing the bottom of the strainer in appropriate metallic barrel to avoid any spillage. total 80 strainers to be cleaned in a quarter. after completion of above works the workman shall assit in any other work like tank farm operation (tank gauging, sampling, water draining), pipeline lining operation, pump house operation etc as per direction of control room officer.minimum 52 mandays of service per month i.e. 2 semi skilled labour for a month., 1.9 checking of pontoons, drains, auto bleeder vents, legs, gauge well, sleeves, mechanical seal, rim seal, rolling ladder, bonding connection, drains of the floating roof tanks and replacement of pontoon rubbers, gauge well rubber sheet, mechanical seal fabric, etc as and when advised by concerned officer. greasing of the rolling ladder. checking of roof vents of cone roof tanks and replacement of vent meshes as and when advised by concerned officer. after completion of above works the workman shall assit in any other work like tank farm operation (tank gauging, sampling, water draining), pipeline lining operation, pump house operation etc as per direction of control room officer.minimum 26 mandays of service per month i.e. 1 semi skilled labour for a month. 1.10 checking and rectification of glanding and termination of all instruments and equipments installed in the terminal related to tas and ensuring proper working of all the instruments/equipments. these equipments/instruments include batch controller, dcv, pd meter, earthing relay, densitometers, temperature transmitter, pressure transmitter, radar gauges, aops, mst, actuators of rosov, dbbv and mov, process and safety plc, plc modules, master actuator stations, mfm and all other instruments/equipment installed within the terminal. after completion of above works the workman shall assit in any other work like tank farm operation (tank gauging, sampling, water draining), pipeline lining operation, pump house operation etc as per direction of control room officer.minimum 52 mandays of service per month i.e. 2 semi skilled labour for a month with diploma in instrumentation. 1.11 checking of pumps including checking of foundation bolts, oil cups and oil level, coupling condition, pump casing, motor bearings and their greasing, pressure gauges, motor cooling fan, vibration of the system, temperature of the bearings, etc. after completion of above works the workman shall assit in any other work like tank farm operation (tank gauging, sampling, water draining), pipeline lining operation, pump house operation etc as per direction of control room officer.minimum 26 mandays of service per month i.e. 1 semiskilled labour for a month. 1.12 additional manpower as & when required including sundays and declared holidays for kandla foreshore terminal. item based activities 2.1 calibration of tank trucks, tlf metering system through mobile prover, storage tanks as per advise of concerned control room officer. at least 1 no. unskilled workmen to be deployed for tt calibration, 4 nos. unskilled workmen to be deployed for tlf loading point calibration and 2 no unskilled workman for assitance in storage tank calibration., 2.2 tank cleaning: after de commissioning & de gassing of the tank, tank bottom to be cleaned with the help of corporation provided pressure pumps. sludge to be collected and removed to the designated sludge pit with the vaccuum pump provided by the contractor. no oil/ sludge to be ensured inside tank/ tank dyke. tank bottom to be cleaned thoroughly till the satisfaction of the concerned officer. no dust/oil traces/ sludge to be remained inside tank bottom. to be ensured that no sludge will be disposed in the tank farm or any other area in the terminal except the bio remediation pit. taking all necessary precautions like use of safety ppes, scaba, etc before entering the tank. shifting of all the eqipments needed for the entire process, like hoses, barrels, etc from a place inside the terminal to the tank cleaning site, making necessary connection of the hoses from tank to pipeline and from water source to tank and collection of residual water and dirt safely into the barrels and shifting to a place as directed by iocl officials (inside the terminal) shall be in the scope of the contractor and all the consummables like water, nut bolts, gaskets, grease, etc shall be supplied by iocl. apart from the above all other wiping materials, cloth, etc shall be arranged by the contractor. the work to be carried out as and when directed by concerned officer. at least 10 unskilled workmen to be deployed for 4 days for the work. a) 20 kl underground tank (3 tanks in 3 yrs) b) 70 kl aboveground tank (1 tank in 3 years) c) 200 kl aboveground tank (2 tank in 3 years) d) tanks upto 40 meter dia (6 product tanks + 3 water tanks) e) tanks beyond 40 meter dia (except atf tanks) f) atf tanks yearly cleaning (above 40m dia) 2.3 shifting of hoses includes opening of flange , fixing blind flange ( if required), shifting to nominated place within terminal or to jetty or any other place between terminal to jetty, supply and fixing of gasket , bonding wire , nut bolt etc 3/4 hose 8/12 hose 2.4 assistance in pigging operation the job includes , shifting of pig from/to store to pig launcher at terminal or jetty end, cleaning of pig, opening / closing of launcher/receiver barrel, salvaging of leftover product in pig launcher/receiver before & after completion of pigging operation monitoring of pig movement throughoput the operation, monitoring of nitrogen pressure at terminal & jetty end , monitoring of water level in cooling tower , ( minimum 4 persons to be deployed throughout the cycle). vehicle for persons transportation from terminal to jetty & viceversa to be arranged by contractor. 2.5 hydrotesting, elongation and electrical continuity test of all product hoses used in tank wagon unloading, tanker loading and unloading, ethanol and bio diesel loading unloading as per direction of designated maintenance officer or designated safety officer. hydrotesting, elongation and electrical continuity test of 3/4 hose hydrotesting, elongation and electrical continuity test of 8 hose, 2.6 testing of pressure vacuum valves installed in floating roof tanks and ethanol tanks as per direction of designated maintenance officer or designated safety officer. work includes dismentling of valves from tank, fixing dummy on tank, shifting of valves from tank top to tank bottom at testing bench. shifting of valve from testing bench to tank top and re fixxing of valve on tank. total quantity :...

Department Of Atomic Energy - Gujarat

41197544 bids are invited for radiography film viewer with carrying bag (q3) , radiography film optical density measurement device(densitometer) with 0.01 least count and 0 5d ran (q3) , optical film density measurement step wedge comparison film strips. (q3) total quantity : 6...

Gujarat State Petroleum Corporation Limited - Gujarat

33365240 supply of hydraulic fracturing services on call out basis with chemicals / consumable and pumping unit services for cb onn 2000 / 1 and cb on / 2 blocks in gujarat, india chemicals/consumables/material/hf unit/personnel for hf jobs in gujarat i frac pump unit ,blender, electronic data acquisition system , electronic pressure transducer , densitometer , frac tank , portable laboratory cabin , high pressure fracture manifold , sand silo ,liquid additives system ,fluid transfer pumps and hoses , high pressure piping, 15000 psi working pressure , water filtering ,basket containing sufficient , air compressor ,4 lp hose .annulus pump ,tree saver/ whit (well head isolation tool) 1 antifoam agent 2 stabilizer 3 delaying agent 4 breaker 5 bactericide 6 slurriable gaur 7 cross linker 8 activator 9 potassium chloride...

Indian Oil Corporation Limited - Gujarat

25719675 procurement of inspection instruments viz . , digital pull off adhesion tester , table mounted radiographic film viewer and digital densitometer for iocl gujarat refinery , vadodara . , list of item ( s ) / work ( s ) as per tender documents , item serial no . 0010 of enquiry cum scope of supply & technical specification of tender , item serial no . 0020 of enquiry cum scope of supply & technical specification of tender , item serial no . 0030 of enquiry cum scope of supply & technical specification of tender...

Health And Family Welfare Department - Gujarat

22985563 purchase of instruments/ equipments/ chemicals/ glasswares/kits/b models etc. for biochemistry department, 245. 2, 4 dinirophenyl hydrazine(dnph) powder 246. 2, 6 dichlorophenol indophenol 247. 2,7 dichloro flurescine 248. acetic acid glacial 249. acetic acid 1 % 250. acetocetate ethyl ester 251. acetocetate methyl ester 252. acetone 253. acrylamide (for electrophoresis) 254. agarose powder (h) (for electrophoresis) 255. agarose powder (l) (for electrophoresis) 256. agarose powder (m) (for electrophoresis) 257. alanine (ß alanine) aminoacid powder (for biochemistry) 258. alanine (d alanine) aminoacid powder (for biochemistry) 259. alanine (dl alanine) aminoacid powder (for biochemistry) 260. alanine (l alanine) aminoacid powder (for biochemistry) 261. alfa naphthol powder 262. alfa naphthol solution 263. alanine transaminase (alt) estimation kit in serum by mod. ifcc without p 5’ p, u.v. kinetic, method 264. alkaline phosphatase (alp) estimation kit in serum by amp buffer pnpp, kinetic method 265. aspartate transaminase (ast) estimation kit in serum by mod. ifcc without p 5’ p, u.v. kinetic, method 266. alumina powder 267. amberlite irc 504 powder 268. amido black powder 269. ammonia liquor 270. ammonical silver nitrate solution 271. ammonium chloride powder 272. ammonium molybdate 273. ammonium molybdate reagent 274. ammonium oxalate 275. ammonium sulphate 276. aniline powder 277. antimony trichloride 278. arginine (d arginine) aminoacid powder (for biochemistry) 279. arginine (l arginine) aminoacid powder (for biochemistry) 280. aspartic acid (d aspartic acid) aminoacid powder (for biochemistry) 281. aspartic acid (dl aspartic acid) aminoacid powder (for biochemistry) 282. aspartic acid (l aspartic acid) aminoacid powder (for biochemistry) 283. barbituric acid powder 284. barfoeds reagent 285. barium chloride powder 286. benedicts reagent (qualitative) 287. benzene 288. benzidine hydrochloride powder 289. benzoic acid 290. benzidine reagent solution 291. benzidine hydrochloride solution 292. bilirubin estimation kit in serum by dmso colorimetric endpoint method 293. bilirubin powder 294. biuret reagent (total protein estimation kit), for estimation of total protein in serum or plasma 295. boric acid powder 296. bovine albumin powder 297. bromine 298. bromine water (concentrated) 299. bromo cresol green powder 300. bromo cresol green reagent (albumin estimation kit)for estimation of albumin in serum or plasma 301. bromophenyl blue 302. butan 1 ol (n butanol) 303. calcium carbonate powder 304. calcium chloride 305. calcium estimation kit in serum by ocpc colorimetric end point method 306. casein powder 307. cedal 308. cetylpyridinium chloride powder 309. chloroform 310. chloroform isoamyl alcohol 311. cholesterol estimation kit in serum by chod/pap, enzymatic, end point method 312. cholesterol powder 313. chondroitin sulphate 314. chlorophenol red indicator 315. chlorophenol red indicator solution 316. citric acid powder 317. cobalt acetate powder 318. conc. hydrochloric acid 319. conc. sulphuric acid 320. conc. nitric acid 321. coomassie blue powder 322. copper acetate 323. copper sulphate powder 324. creatinine estimation kit in serum by colorimetric alkaline picrate endpoint method 325. creatinine powder 326. cysteine (l cysteine) aminoacid powder (for biochemistry) 327. cystine (l cystine) aminoacid powder (for biochemistry) 328. deae cellulose 11 powder 329. deae cellulose 52 powder 330. deionised water (distilled water) 331. denatured spirit 332. dextrose / d glucose powder 333. diacetyl monoxime 334. dichloro indophenol indicator 335. diethyl ether (ether solvent) 336. didyhrophenyl hydrazine(dnph) powder 337. dimethyl yellow indicator solution 338. dimethyl yellow powder 339. dinitro benzene powder 340. diphenylamine powder 341. disodium mono hydrogen phosphate powder 342. dna extraction kit 343. deionised water 344. dowex 3 powder 345. edta disodium powder 346. egg albumin powder 347. ethanol 348. ethylene dichloride 349. fast red 7b powder 350. ferric chloride powder 351. ferrous sulphate 352. fibrin crystals 353. formalin 40% 354. free fatty acid 355. fructose powder 356. galactose powder 357. gelatine powder 358. glucose estimation kit in plasma or serum by god/pap enzymatic, end point method 359. glutamic acid (l glutamic acid aminoacid) powder (for biochemistry) 360. glutamic acid (d glutamic acid aminoacid) powder 361. glutamic acid (dl glutamic acid aminoacid) powder 362. glycerin 363. glycine (aminoacid) powder 364. hdl cholesterol estimation kit by precipitation, followed by chod/pap, enzymatic, end point method 365. histidine (l histidine) aminoacid powder 366. histidine (d histidine) aminoacid powder (for biochemistry) 367. hplc water 368. hydrogen peroxide (50%) 369. hydroxy proline (l hydroxy proline) aminoacid powder (for biochemistry) 370. iodine powder 371. iodine 1% solution 372. iso leucine (l iso leucine) aminoacid powder (for biochemistry) 373. iso leucine (dl iso leucine) aminoacid powder (for biochemistry) 374. isopropanol 375. jack bean meal (urease) powder 376. lactic acid 377. lactose powder 378. lead acetate power 379. lead carbonate powder 380. lens cleaning solution 381. leucine (d leucine) aminoacid powder 382. leucine (l leucine) aminoacid powder (for biochemistry) 383. leucine (dl leucine) aminoacid powder 384. litmus paper blue 385. litmus paper red 386. lysine (l lysine ) aminoacid powder (for biochemistry) 387. lysol 388. maltose powder 389. mercuric sulphate 390. methanol 391. methionine (d methionine) aminoacid powder 392. methionine (l methionine) aminoacid powder (for biochemistry) 393. methionine (dl methionine) aminoacid powder 394. methyl melonic acid powder 395. methyl violet powder 396. methyl violet indicator solution 397. muraminidase (lysozyme) powder 398. napthalene black powder 399. n hexadecane powder 400. nicotinamide dinucleotide(nad+) powder 401. ninhydrin powder 402. nitro blue tetrazolium powder 403. n octadecane powder 404. normal saline 0.9% 405. ortho phosphoric acid 406. oxalic acid 407. pandys reagent 408. parrafin wax 409. pepsin 1:10000 410. peptone powder 411. ph indicator strip 412. ph tablet ph 4 (buffer tablet) 413. ph tablet ph 7 (buffer tablet) 414. ph tablet ph 9.2 (buffer tablet) 415. phenol crystals (carbolic acid crystals) 416. phenol liquid (carbolic acid liquid) 417. phenopthelin powder 418. phenolphthalein indicator solution 1% 419. phenyl alanine (d phenyl alanine) aminoacid powder 420. phenyl alanine (l phenyl alanine) aminoacid powder (for biochemistry) 421. phenyl alanine (dl phenyl alanine) aminoacid powder (for biochemistry) 422. phenylhydrazine hydrochloride 423. phluroglucinol powder 424. phosphorus estimation kit in serum by fiske and subbarow, colorimetric endpoint method 425. picric acid powder 426. picric acid aqueous saturated solution 427. p nitroanilline 428. polyacrylamide powder (for electrophoresis) 429. ponceau s powder (for electrophoresis) 430. potassium dichromate 431. potassium dihydrogen phosphate 432. potassium ferricynide 433. potassium hydroxide powder 434. potassium iodide 435. potassium oxalate 436. proline (d proline) aminoacid powder (for biochemistry) 437. proline (d proline) aminoacid powder (for biochemistry) 438. resorcinol 439. rna extraction kit 440. rnaase powder 441. sephadex, g 10 powder 442. sephadex g 200 powder 443. serine (d serine) aminoacid powder 444. serine (l proline) aminoacid powder (for biochemistry) 445. serine (dl proline) aminoacid powder 446. silica gel 447. silver nitrate powder 448. sodium acetate powder 449. sodium azide 450. sodium barbital powder 451. sodium bicarbonate powder 452. sodium carbonate 453. sodium chloride powder 454. sodium citrate powder 455. sodium dihydrogen orthophosphate 456. sodium dodecyl sulphate powder 457. sodium heparin powder 458. sodium hydroxide pallets 459. sodium hypobromite 460. sodium hypochlorite (5%) 461. sodium nitrite powder 462. sodium nitroprusside crystals 463. sodium oxalate powder 464. sodium sulphate anhydrous powder 465. sodium tangstate powder 466. sodium torucholate powder 467. sodium toruglycocholate powder 468. starch powder 469. sterillium 470. sucrose powder 471. sulphanilic acid 472. sulphosalicylic acid powder 473. sulphur powder 474. tartric acid 475. thiosemicarbazide 476. threonine (d threonine) aminoacid powder 477. threonine (l threonine) aminoacid powder (for biochemistry) 478. threonine (dl threonine) aminoacid powder (for biochemistry) 479. thymol crystals 480. thymol blue indicator 481. thymol blue indicator solution 482. toludine blue o powder 483. toluene 484. topfers reagent 485. tri sodium citrate powder 486. trichloroacetic acid powder 487. triglyceride estimation kit in serum by gpo/pap enzymatic, colorimetric endpoint method 488. triglyceride powder 489. tris buffer 490. tryptophan (d tryptophan) aminoacid powder 491. tryptophan (l tryptophan) aminoacid powder (for biochemistry) 492. tryptophan (dl tryptophan) aminoacid powder (for biochemistry) 493. tyrosine (d tyrosine) aminoacid powder (for biochemistry) 494. tyrosine (l tyrosine) aminoacid powder (for biochemistry) 495. tyrosine (dl tyrosine) aminoacid powder (for biochemistry) 496. urea estimation kit in serum by urease gldh, enzymatic u. v. kinetic method 497. urea powder 498. uric acid powder 499. valine (d valine) aminoacid powder (for biochemistry) 500. valine (l valine) aminoacid powder (for biochemistry) 501. valine (dl valine) aminoacid powder 502. vanillin 503. vitamin a acetate ester 504. vitamin a palmitate ester 505. vitamin c (ascorbic acid) 506. xylene powder 507. chromatography unit for thin layer chromatography 508. glass distillation apparatus 509. atomizer (sprayer) 510. autoclave electric 511. balance (weighing machine) 512. balance (weighing machine) 513. balance open pan 514. balance semi micro 515. binocular research microscopes 516. boiling water bath 517. bottle top dispensers 518. calibrated weight 5 g 519. calibrated weight 10 g 520. calibrated weight 100 g 521. cellulose acetate strips 522. centrifuge machine 523. chromatographic chamber 524. cleaning brush for test tubes 525. colorimeters (digital) 526. constant temperature water bath 527. cork borer set 528. deep freeze 529. densitometer 530. desiccators large size 531. desiccators small size 532. digital copier machine 533. double glass distiled water plant 534. electronic weighing balance 535. electrophoresis power pack for agarose gel electrophoresis 536. electrophoresis apparatus with power pack for agarose gel electrophoresis 537. electrophoresis apparatus with power supply for paper page agarose 538. file cabinet 539. flame photometer (digital) 540. fluroscence microscope 541. fume cupboards 542. hair dryer 543. high speed refrigerated centrifuge machine 544. homogenizer 545. hot air oven 546. hot plate with thermostat 547. incubator electric with thermostat 548. lcd projector with remote 549. magnetic stirrer 550. metal distilled water plant (table model) 551. micropipette fixed volume 552. micropipette, fixed volume 553. micropipette, fixed volume 554. micropipette, fixed volume 555. micropipette, fixed volume 556. micropipette, fixed volume 557. micropipette, fixed volume 558. micropipette, fixed volume 559. micropipette, fixed volume 560. micropipette, variable volume 561. microscopes (monocular) 562. ph meter (digital) 563. pump vacuum 564. refrigerator 565. semi auto biochemistry analyzer 566. spirit lamp (alluminium) 567. steel cupboard 568. steel trolly 569. test tube holder 570. test tube rack 571. test tube rack 572. thermocycler machine 573. thermometers 0 2500c 574. thin layer plate of silica gel 575. tlc separation chamber 576. urinometer (digital) 577. u.v. spectrophotometer 578. votex mixer 579. beaker 580. beaker 581. beaker 582. beaker 583. beaker 584. beaker 585. beaker 586. beaker 587. conical flask 588. conical flask 589. conical flask 590. conical flask 591. conical flask 592. conical flask 593. conical flask 594. conical flask 595. conical flask 596. cover slip 597. dispensing bottle 598. dropper bottle 599. dropper bottle 600. glass rods for specimen mounting 601. glass slide for microscope 602. graduated centrifuge tube 603. measuring cylinder 604. measuring cylinder 605. measuring cylinder 606. measuring cylinder 607. measuring cylinder 608. measuring cylinder 609. measuring cylinder 610. bottle dispenser 611. paper chromatography kit 612. pasteur pipette 613. reagent bottle 614. reagent bottle 615. reagent bottle 616. reagent bottle 617. reagent bottle 618. reagent bottle 619. reagent bottle 620. reagent bottle 621. reagent bottle 622. reagent bottle 623. reagent bottle 624. reagent bottle 625. rectangular clear glass tank with glass lid 626. rectangular glass chromatography developing tank 627. test tube 628. thin layer chromatography kit 629. volumetric glass pipette 630. volumetric glass pipette 631. 16 gb pen drives 632. 8gb pen drives 633. 4 gb pen drives 634. alluminium foil 635. alluminium foil 636. anti virus software 637. bio tips (microtips) 638. bio tips (microtips) 639. calibrated weight 0.5gram 640. calibrated weight 10gram 641. calibrated weight 1gram 642. cotton roll 643. eppendorf tube 644. eppendorf tube 645. filter paper 646. gloves 6 size 647. gloves 6 size 648. gloves 6.5 size 649. gloves 6.5 size 650. gloves 7 size 651. gloves 7 size 652. gloves 7.5 size 653. gloves 7.5 size 654. gloves acid proof 655. gloves disposable plastic 656. graph paper 657. permenent marker 658. plastic dropper bottles 659. stainless steel tray 660. tissue paper roll 661. whatman filter paper no 1 662. whatman filter paper no 3 663. filter paper ...

Health And Family Welfare Department - Gujarat

17043074 e tender for equipments / instruments and laboratory items: 102 hemoglobin meter sahlis or hellige (with spaces) 103 knee hammer 104 rat blood pressure and other isolated tissue heart rate variability software both clinical and preclinical 105 critical flicker fusion appratus 106 pupillometer 107 pharmacokinetic model 108 3d display model 109 mannequins 110 computer 111 xerox machine with printer and scanner 112 uniocular oil immersion microscope 113 micrometer eye piece 114 lovibond comparator 115 anaerobic apparatus 116 laser thermometer : 50 100°c 117 laser thermometer : 50 200°c 118 binocular microscope 119 biosafety cabinet 120 cc camera for student demonstration for ot 121 analytical balance 122 hot air oven (more than 200 litres) 123 urinometer calibrated 124 elisa (demonstration) 125 boiling water bath 126 complete chromatography unit for paper &tlc 127 densitometer with computer 128 digital slr camera 129 videography camera (camcoder) 130 articulated skeleton set. 131 video cassette recorder 1 each 132 demonstration eye...

Health And Family Welfare Department - Gujarat

13672092 purchase of instruments / equipments / chemicals / glasswares / kits / models etc. for microbiology department, 101 calibration plate for real time pcr 102 calibration plate for real time pcr 103 calibration plate for real time pcr 104 centrifuge 16 tubes 105 centrifuge 8 tubes 106 centrifuge with brushless motor 107 centrifuge tubes with caps 108 chiller insulated ice box 109 co2 incubator 110 colony counter digital 111 deep freeze 112 deep freeze 113 densitometer 114 electrode set 115 electronic weighing machine 116 electrophoresis gel casting tray 117 electrophoresis gel casting tray 118 electrophoresis power supply unit 119 elisa plate reader 120 elisa plate washer 121 elisa printer 122 filter for elisa reader 123 filter for elisa reader 124 filter for elisa reader 125 gel comb set 126 halogen lamp 127 halogen lamp 128 halogen lamp 129 heating elements 130 heating elements 131 heating elements 132 horizontal gel electrophoresis unit 133 horizontal gel electrophoresis unit 134 hot air oven 135 hot air oven 136 hot air oven 137 incubator (non microprocessor) 138 incubator (non microprocessor) 139 incubator stainless steel 140 incubator stainless steel 141 incubator stainless steel 142 inspissator 143 lcd projector 144 metal loop holder 145 microcentrifuge 146 microcentrifuge 147 microcentrifuge 148 micropipette electronic 149 micropipette fixed volume 150 micropipette fixed volume...

University Of Agriculture And Technology - Gujarat

11304176 supply of laboratory/farm instruments /apparatus / equipment etc mini tractor, rotavator,tanker, trailer, cultivator, leaf area meter, lux meter, muffle furnace, yoders apparatus, altimeter, grs densitometer, digital vernier caliper, self propelled platform, submersible motor with pump, pedestal fans, reversible plough, scientific mill/blixer/grinder/blender, evaporator concentration, portable autoclave, microwave oven, rotary shaking, mincer, sausage filler, meat bowl chopper, elisa plate reader, membrane filtration unit, digital grain moisture meter, squirrel cage induction motor trainer, control panel, slip ring induction motor trainer, control panel, dc shunt motor, portable flue gas analyser, solar powermeter, digital light meter, moisture analyzer, ro plant, 4ultrasound probe, milking machine, adjustable cultivator, disc harrow,levelers, submersible motor, solar water heater, refrigerator, aonla shredding machine, juicer machine, mini tractor, animal multiple use trolley, motorized tooth rasp, operation table cum trolley, instrument trolley, large animal suction pump, heat induced epitope retrieval, fume hood, seed grader, mobile v.b. elevator, cultivator, bund former, sprayer pump, blade harrow....

Government Of Gujarat - Gujarat

6222640 radiation physics lab1 collimeter / beam alignment test tool. 2 grid alignment test tool. 3 focal spot test tool 4 digital x ray pulse couter or timer 5 digital mas meter 6 densitometer including all cables &power adaptor 7 x ray test pattern high precision radiation physics lab1 wide range digital 1 kvp meter 2 screen/film contact mesh 3 standard aluminium attenuator 4 direct reading pocket dosimeter 5 copper filtration 6 21 step aluminium wedge physics lab 1 high precision star x ray test pattern 2 digital iron chamber survey meter...