Western Railway - Gujarat
40560325 auction sale of condemned, u / s, abandoned staff qtr at jrs ( unit: 02 nos. ) , aml ( 20 units ) , vdh ( 04 units ) , nvs units 13 units ) , bim ( 01 unit ) under jurisdiction of sse works bilimoria, lot comprises of 1 ] brick masonary qty: 97.834 cum, 2 ] rcc slab : 35.42 sqm , 3 ] wooden door 28 nos. = 57.92 sqm ) , of various sizes such as : i ) 1.00 x 2.00 ( 10nos ) . ii ) 1.90x 1.05 : 16 nos., iii ) 1.00x 2.00 : 02 nos. 4 ] wooden window: ( 19 nos = 25.30 sqm ) of various sizes of various sizes : i ] 0.9x 1.2 , qty : 09 nos. ii ] 1.34x 1.05, qty: 08 nos. , iii ] 0.9x 1.2, : 02 nos. 5 ] ac sheets: 378 sqm, 6 ] rails 69 lbs : 220.836 rm, 7 ] rails 52 kg : 14.4 rm, 8 ] g.i. sheet 2x10x6 mm: 120 sqm . mode of delivery by lot, to be sale on as and where is basis, note: 1 ] purchasers are requested to see site / qtrs . before bidding. 2 ] whole structures to be dismantled by the purchaser and after clearing / disposing off all debris from railway premises, purchaser will be allowed to take delivery of his material. 2 ] the items and material lying outside the building boundary line are not a part of a auction .3 ] electric wires and other materials lying inside the building shall be handed over to custodian by purchaser during dismantling structure. 4 ] while dismantling the structure care should be taken that adjacent building, common walls and other common members should not be damaged. 5 ] the structure above ground level is to be considered for auction. excavation below ground level is not allowed. 6 ] all safety majors should be taken by purchaser to avoid any unusuall at works site. 7 ] barricading / protection shall be provided by purchaser to avoid any accident., 8 ] if any accident / unusuall occurs at work, purchaser alone will bare full responsibility and railway officials will not be responsible for such unusuall happening. 9 ] during dismantling work safety of running tracks, railway property & railway staff as well has his own labour should be ensured by purchaser and dismantling work shall be carried out with full safety measures of working staff and others, 10 ] fdp 80 days....