Western Railway - Gujarat

46948929 supply of transparent face shield made of acrylic sheettransparent face shield made of acrylic sheet,transparent face shield made of acrylic sheet, size 12x9, thickness 2mm, heat and scratch proof , light weight, conform to [is: 8521:1977, part 1, reaffirmed 2007] with face shiled carrier for attachment with safety helmet [ warranty period: 30 months after t he date of delivery ] ]...

Bridge And Roof Company India Limited - Gujarat

46790642 tender for supply & delivery of consumable items for our composite works (wp 10) for lupech (j 18) project, iocl, gujarat refinery, vadodara, gujarat 1hp single phase submersible pump no. 1.00 2 2hp single phase submersible pump no. 1.00 3 2 hose jointer no. 2.00 4 safety shoes tiger make pair 16.00 5 2 pvc hdpe pipe mtr. 30.00 6 stand fan no. 1.00 7 line tester no. 2.00 8 tube tight 20watt no. 2.00 9 safety shoes for officer pair 10.00 10 cold galvanizing spray paint 500ml no. 15.00 11 pad lock 65mm no. 20.00 12 masking tape no. 10.00 13 rccb 63amp4pole30ma no. 15.00 14 rccb 25amp4pole30ma no. 15.00 15 cutting plier 8 no. 2.00 16 self screw 8mm x 25mm no. 100.00 17 safety helmet green no. 30.00 18 screw driver 8 no. 4.00 19 15mm brass ball valve no. 10.00 20 teflon tape no. 50.00 21 15mm ms tee no. 4.00 22 1/2 x 3/8 ms socket no. 4.00 23 15mm ms coupling no. 10.00 24 ms nipple 15mm x 100mm no. 10.00 25 16amp top no. 1.00 26 flexible copper wire 4sqm x 3core mtr. 300.00 27 hdpe tarpaulin sheet 18 x 24 no. 4.00 28 tensioner sealer with pvc strip no. 1.00 29 ifr shuit coverall no. 3.00 30 rustolene ltr. 15.00 31 nylon web sling belt 5ton x 6mtr long no. 4.00 32 nylon web sling belt 10ton x 8mtr long no. 2.00 33 nylon web sling belt 3ton x mtr long no. 4.00 34 hammering spanner 46mm ring type no. 2.00 35 pressure gauge 700kgs no. 1.00 36 s s ball valve 15mm for hydrotesting pump no. 2.00 37 hex nipple ss 304 for hydrotesting pump no. 2.00 38 hex nipple ss 318 for hydrotesting pump no. 2.00 39 connector ss 1 x 2 for hydrotesting pump no. 2.00 40 rubber o ring for hydraulic jack no. 8.00 bridge and roof co. (i) ltd. annexure – b page 2 of 2 ref.: bandr/71139/enq/cons/26 schedule of quantities& rates (soqr) sl. no. description unit qty. rate (inr) amount (inr) 41 calling bell no. 4.00 42 cotton waiste kg 20.00 43 32amp x 5pin socket y type no. 2.00 44 32amp x 5pin plug no. 2.00 45 air pressure pipe mtr. 15.00 46 ht nut & bolt 12mm x 100mm no. 2.00 47 universal joint kit for hydra no. 1.00 48 ag 5 cutting wheel no. 50.00 49 ag 5 flap wheel no. 10.00 50 ss sim plate 400mm x 640mm no. 1.00 51 tyre & tube for cycle set 4.00 52 soldering iron no. 1.00 53 soldering paste no. 10.00 54 spring patta 1no for cos hydra no. 1.00 55 centre bolt no. 4.00 56 main bolt 8mm x 2mm no. 1.00 57 exide battery 12volt forb co bolero no. 1.00 58 green oil paint ltr. 2.00 59 writing brush no. 6.00 60 cotton hand gloves pair 100.00 61 nut & bolt 8mmx40mm no. 180.00 62 nut & bolt 6mmx40mm no. 180.00 63 water pipe hose nozzle no. 1.00 64 hose clamp 18mm no. 2.00 65 pvc hose pipe 3/4 di whip check...

Department Of Heavy Industry - Gujarat

46771404 tender for supply and delivery of consumable materials for composite works wp 10 iocl site vadodara gujarat; 1 1hp single phase submersible pump no. 1.00 2 2hp single phase submersible pump no. 1.00 3 2 hose jointer no. 2.00 4 safety shoes tiger make pair 16.00 5 2 pvc hdpe pipe mtr. 30.00 6 stand fan no. 1.00 7 line tester no. 2.00 8 tube tight 20watt no. 2.00 9 safety shoes for officer pair 10.00 10 cold galvanizing spray paint 500ml no. 15.00 11 pad lock 65mm no. 20.00 12 masking tape no. 10.00 13 rccb 63amp4pole30ma no. 15.00 14 rccb 25amp4pole30ma no. 15.00 15 cutting plier 8 no. 2.00 16 self screw 8mm x 25mm no. 100.00 17 safety helmet green no. 30.00 18 screw driver 8 no. 4.00 19 15mm brass ball valve no. 10.00 20 teflon tape no. 50.00 21 15mm ms tee no. 4.00 22 1/2 x 3/8 ms socket no. 4.00 23 15mm ms coupling no. 10.00 24 ms nipple 15mm x 100mm no. 10.00 25 16amp top no. 1.00 26 flexible copper wire 4sqm x 3core mtr. 300.00 27 hdpe tarpaulin sheet 18 x 24 no. 4.00 28 tensioner sealer with pvc strip no. 1.00 29 ifr shuit coverall no. 3.00 30 rustolene ltr. 15.00 31 nylon web sling belt 5ton x 6mtr long no. 4.00 32 nylon web sling belt 10ton x 8mtr long no. 2.00 33 nylon web sling belt 3ton x mtr long no. 4.00 34 hammering spanner 46mm ring type no. 2.00 35 pressure gauge 700kgs no. 1.00 36 s s ball valve 15mm for hydrotesting pump no. 2.00 37 hex nipple ss 304 for hydrotesting pump no. 2.00 38 hex nipple ss 318 for hydrotesting pump no. 2.00 39 connector ss 1 x 2 for hydrotesting pump no. 2.00 40 rubber o ring for hydraulic jack no. 8.00 ... more in document...

Department Of Heavy Industry - Gujarat

46753563 supply and delivery of consumable materials in single bid system in connection with misc civil works for epcm units at iocl wp 14 project gujarat refinery vadodara gujarat; 1 safety shoe (tiger make) pair 27.00 2 safety helmet green (udayogi) nos 55.00 3 3 mtr measurement tape nos 14.00 4 30 mtr measure tape nos 1.00 5 line tester (taparia) nos 1.00 6 screw driver 825 nos 1.00 7 earthing pipe nos 3.00 8 63 amp panel board nos 1.00 9 4 sqmm x 3 core copper flexible cable mtr 100.00 10 2.5 sqmm x 3 core copper flexible cable mtr 200.00 11 16 amp 3 pin male socket nos 25.00 12 electrical rubber mat nos 1.00 13 fire bucket nos 1.00 14 fire extinguisher co2 nos 1.00 15 safety jacket green zip type nos 12.00 16 lifting clamp 2.5 ton nos 4.00 17 nylon lifting belt 3 ton x 6 mtr long nos 1.00 18 nylon lifting belt 6 ton x 6 mtr long nos 1.00 19 16 mm p.p rope kg 13.00 20 12 mm x 3 mtr wire rope siling nos 1.00 21 pvc industrial tape roll 75.00 22 safety helmet red (udayogi) nos 1.00 23 safety shoe (udayogi make) pair 15.00 24 hacksaw blade 1 x 12 nos 5.00 25 hacksaw blade 1/2 x 12 nos 10.00 ... more in document...

Western Railway - Gujarat

46710416 supply of iow inspection kitiow inspection kit,iow inspection kit with 26 items inspection equipment list [(1) magnifying glass 100 mm 1 n o. , (2) freemans pocket steel tape with bubble & belt clip 3 meter long. 1 no. (3) freemans glass fiber ta pe 30 meter long 1 no. (4) inspection mirror with handle (5)inside caliper 10 long 1 no.(6) outside calipe r 10 long 1 no.(7) prismatic binocular (olympic/nikon) falcon 10x50 or similar 10x zoom. 1 no.(8) shim f eeler gauge 4 01 nos. (9) chisel 01 nos (10)safety helmet (11)welding gauge (12).heavy duty laser plumb bob with hook string and runner. (13).concrete test hammer (14).digital coating thickness gauge fo r ferrous metals. measuring range: 0 1250 muhm (15) .laser targeting distance meter for measuring dista nces is as bridge height and hard to reach objects. (16)led torch (17)piano wire (30 meter) (18)spirit level with two bubbles (19)chipping hammer. (20)nicely finished storing and transporting metallic box made of mild steel and carrying bag for keeping above items (21)tds meter (22)chloroscope (23)thickness gauge ( 24) wire brush (25)protective gloves & eyewear (26).rebound hammer. [ warranty period: 30 months af ter the date of delivery ] ] senior section gujarat 10.00 set...

Western Railway - Gujarat

46637864 bids are invited for industrial safety helmet with lamp (version 2) as per is 2925 (q3) total quantity : 1550...

Arcelor Mittal Nippon Steel India Limited - Gujarat

46613812 tender for admin 2000159238 providing operators and helpers for company 2000159238 10 10 20 unskilled manpower support 2,190 tag 10 skilled manpower support 1,825 tag email : vruthika.patel@ext.amns.in contact : name : vruthika patel item details : technical contact person. mr. fagna, dharmendra mob +91 7227043169 mr. reddy, ananda mob +91 7990166042 mr. rathod, dharmendrasinh mob +91 9879103363 hiring of skilled operator and helper for the company owned housekeeping equipment operations. (garbage compactor & pressure jet m/c, m60 road sweeping machine) scope of work venodr 1.providing operators and helpers for company own machines. (garbage compactor & pressure jet m/c, m60 road sweeping machine) for plant area. this is various administration works as per our requirements and up to the satisfaction of the concerned amns officials. 2.manpower services should be provided for 10 hours on working days from 8:00 am to 6:00 pm from monday to sunday, 365 days working, manpower should be 100% gents only. 3.all operators must have a heavy duty license and at minimum 10 years of experience. 4.the helper should have experience in sewage cleaning, garbage cleaning and road cleaning. 5.accommodation and transportation cost shall be in vendor scope. 6.providing various services for plant admin as per our requirements and up to the satisfaction of the concerned amns officials. it is the sole responsibility of vendor to deploy correct/right set of skilled resources as per competency matrix for all jobs/works being executed by him at various sites of am/ns hazira complex as indicated in msa document. list of specific personal protective equipment’s (ppes) to be used for the job/work and the area of work. 7.safety helmet – hdpe/ frp spectacle type safety goggles with plain glass disposal type dust/gas mask hand gloves 14 canvas earmuff ear plug chemical resistant pvc suit / apron industrial safety shoes high ankle your person should wear proper pep’s at the time of entering shop floor/plant<(>,<)> 8.the contractor shall ensure the safety of all staff. 9.operators and helpers uniform, safety ppe and raincoat under vendor scope. 10.if any violation found, serious action/penalty shall be imposed. 11.below are the general conditions to be added irrespective of job based or regular manpower: 12.hse requirements you shall comply with the health, safety and environment policy as laid down by amns, hazira details of which are as outlined in the master service agreement (msa). in case of any violation found suitable penalty shall be imposed. format of invoice/ running bills. 13.vendor shall submit the bills in the appropriate format as outlined in the master service agreement (msa). industrial relations/ statutory rules and regulations you shall strictly follow the guidelines of the industrial relations policy as outlined in the master service agreement (msa). noncompliance shall attract suitable penalties as defined in msa. page 2 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000125441 date 09.12.2024 submission date 16.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details service provider hse performance evaluation you shall be evaluated on the parameters as outlined in the master service agreement (msa) 14.coverage: vendor will supply the required manpower for managing the company equipment to cover all general admin activities in operational plant area. supplied manpower may be used and within the parameter of administration buildings and common area of plant. if required may be used outside the parameter as per instruction of in charge administration/head administration. 15.manpower will be used for . (garbage compactor & pressure jet m/c, m60 road sweeping machine) plus day to day job as per admin area in charge instruction or admin area supervisor instruction for cleaning of roads, cleaning of common areas of plant premises, cleaning of drain culvert and cleaning of sewage chambers as per instruction of admin area in charge. this is including common areas, garbage collection & waste disposal management and sewage and drain chamber cleaning of plant 10 mtpa area. 16.no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 17.vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. 18.in case of manpower absenteeism and week off vendor will be provide alternative manpower or reliver. 19.the contractor shall submit invoices on or before the 5th of each calendar month for processing, along with all required checklists, log sheets, and the scrum report of manpower. 20.enough number of relivers to be considered by the contractor as the requirement provided is according to full day working. duty roasters to be made accordingly and vendor has to ensure weekly off is provided to all workers. note that the manpower requirements are provided excluding of relivers and needs to be additionally considered. 21.the contractor shall provide proper uniforms, safety shoes, helmets, safety jackets, and dust masks for all staff. ensure that staff use and wear appropriate safety gear while working within the plant area. scope of work amns 1 day to day work instruction will guide by amns area supervisor/incharge. 2 company shall witness /arrange regular and periodical inspection of the above mentioned jobs. 3 company shall review the service performance periodically, and if the services are not found satisfactory, will dis continue the contract. 4 amns area incharge will select new candidates based on requirement. specific penalty for nonperformance by vendor and must be cardinally measured: yes absence of manpower # 1. in case of short fall in agreed deployment, the invoice will be processed as per proportionate deployment. payment shall be made as per actual deployment and minimum wage basis. in case absenteeism of manpower is more than 5% of total man days. in such condition rs.100/per day per person will be levied on manpower on proportionate billing. 2. manpower without uniform and ppes # if manpower was found without ppes and uniform than rs.100/day/instance will be levied on vendors 1.supply operator for m 60 machine, pressure jet machine and garbage compactor. unit days qty. 1825 2.supply helpers for garbage compactor, pressure jet machine and m 60 road sweeping machine.(the helper should have experience in sewage cleaning, garbage cleaning,road cleaning and pressure jet machine operation work ) page 3 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000125441 date 09.12.2024 submission date 16.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details unit days qty. 2190 item note :...

Arcelor Mittal Nippon Steel India Limited - Gujarat

46612494 tender for 2000161942 hbi mod 3 various mechanical related job 2000161942 10 10 10 rem.,segregatn,refillg catalyst refor. 336 no email : niraj.patel1@amns.in contact : name : niraj patel item details : scope of work for reformor tube catalyst dumping, segregation and re filling of 8 reformer tubes: job quantum: size of the reformer tube opening closing for catalyst dumping: 8 no of tube to dump: 336 nos ton of catalyst to dump, segregate and filling: 120 130 mt job duration: 12 days. • 6 nb: 336 nos. reformer tube top cover (8 bolts of m20 x 90 each)—(skill: technician) • 2 1/2 x 1900 long feed gas hose : 336 nos: (16 studs of m20 x 110 each per hose) (skill: technician) • bottom spool piece removal : 336nos 8 dia x 1.5 mtr( 8 studs of m20 x 100 each) ( skill: technician) • bottom canister: 336 nos (special jacking arrangement to be made to lift the canister) (skill: technician), no damage of canister should happened, if found damaged same to be repaired and no extra cost to be given. • counter weight : 84 nos (chain block required to adjust the counter weight) • dumping of all 336 tubes segregation of dumped catalyst as per instruction of amns engineer and filling in 5kg bag for shifting to pg roof. • catalyst shifting to reformer roof manually for filling up the tube by means of electric operated chain block to be arranged by contractor to shift the catalyst from ground floor to 25 mtr height at reformer roof. (tech.) • dp measurement of the reformer tube after catalyst feeling to be taken for total 336 tubes as selected by amns engineer. if dp observed more than normal than tube required to be dumped again without any extra cost. contractor’s scope: (catalyst dumping and segregation and re filling) 1. the reformer tube top cover flange is to be opened and ceramic roll / ceramic discs to be removed, if anchors are there same to be removed and re weld the new as per instruction of in charge engineer. all fasteners and ceramic roll/disc to be kept in container in separate bucket with diesel, to ensure their re use. (tech). 2. counter weights of the tubes to be removed (tech), all dog clamps to be re used for fixing back the counter weights. 3. all feed gas hoses only top flange to be removed and hose to be hanged with hand railing with flange opening covered with plastic bag any hose not tied with hand railing will attract 25% penalty per hose of per tube rate to the agency, utmost care needs to be taken while handling feed gas hose, scaffolding required to be arranged by contactor (tech). replaced hose flanges to be recovered and deposit at workshop safely. page 2 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000125449 date 09.12.2024 submission date 17.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 4. bottom spool piece to be removed and shifted to safe place as shown by in charge, insulation should not be damaged during handling of bottom spool, and bottom canister to be removed by jacking and support ring to be removed, support ring to be kept safely and same to be re used. teflon hammers to be used if catalyst are not coming out. no damage of canister should happened, if found damaged same to be repaired and no extra cost to be given. required scaffolding to be arranged by contractor.(tech). if split ring (lock ring for free flange on tube) connected with reformer tube flange falls down, then same to be collected and kept safely to use it again while boxing up.(tech) 5. minimum two trolleys in each row with wheels to be made available by contractor. tarpaulin to be kept at bottom to collect the spilled catalyst. tarpaulin to be arranged by contractor. tin sheet/pyjama type chute to be used for guiding the catalyst in trolley/jumbo bag and same to be arranged by contractor and 5kg plastic bags for segregated catalyst to be arranged by contractor.(semi skilled persons), all spilled catalyst to be collected from bottom of the reformer and around, not a single catalyst to be seen around the reformer after completing the job. sufficient qty of jumbo bags and plastic bags (5 kg capacity) to be arranged by contractor. 6. dumped catalyst to be shifted and segregation to be done as per site in charge (unskilled persons) 7. bottom canister complete and bottom spool inside cleaning / flushing to be done by contractor. (unskilled). 8. after the necessary inspection and clearance from amns engineer, the bottom canister to be fixed back with new glass wool ring for bottom canister in reformer tube.(tech) 9. 5 kg capacity bags to be arranged by contractor and different type of catalyst to be filled in 5 kg bags. (unskilled) 10. electric chain block to be arranged by contractor to lifting the catalyst from ground floor to 20 mtr height at reformer roof.(tech) 11. tray for filing the catalyst to be fabricated by contractor for filling the catalyst. (tech). 12. rope similar to pull cord with rubber disc and dog clamp to be arranged by contractor. 15 mtr measure tape to be arranged by co ntractor. catalyst to be filled as per instruction of site in charge. (unskilled). 13. if the rope gets broken or stuck, then tube to be dumped again. (tech) 14. bottom spool gasket area to be cleaned, positioned for the boxed up, care to be taken for the counter wt. flange fixing position. new gasket to be fixed properly and all bolts / studs to be tightened and flange gap should be equal at all 15. the top flange gasket area to be cleaned and to be boxed back after fixing of the insulation by refractory/insulation team and get clearance from amns engineer /site engineer (tech) 16. dp measurement to be taken for all tubes. 17. all the flange joints are to be leak proof and if any leakage is found on starting the plant the same is to be attended immediately as per instruction of amns engineer. hot bolting of the flanges to be carried out on instructions from amns engineer.(tech) the soap solution bottles for leak checking to be arranged by contractor. 18. the counter weight to be fixed and balancing to be done, wire rope page 3 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000125449 date 09.12.2024 submission date 17.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details to be changed if required as per engineer’s instructions. damaged rope guide pulley to be replaced if reqd.(tech) 19. old damaged catalyst pieces and powder to be filled in drums with identification of old not usable catalyst / old usable catalyst and to be shifted at the place shown by amns engineer.(unskilled) item note : 2 2000161942 20 20 30 reformer roof plate replm 12 m2 20 reformer roof support beam fabrication 6 no 10 reformer roof box fabrication and replm 2 no email : niraj.patel1@amns.in contact : name : niraj patel item details : roof repairing: • shifting of the plates from stores / yard to site with the help of hydra to be done. • cut the damaged plates by cutting set, all the cut plates to be removed and shift to scrap yard. • cut the plates as per the requirement this is in situ activity, fix the plates and weld them fully. • plates to be fixed after welding the anchors for ceramic wool as per the instruction of in charge engineer. • the welding electrodes to be used should be amns approved only, (gee, esab, ador, l<(>&<)>t). support beam and main beam repairing / replacement: • give the temporary support to the rg duct and cut the damaged mb 400 beam with support plates. • cut the mb 150 beams after proper support to the duct and its box. fabricate the beam from mb 150 beam and plates with extra support. • fabricate the support from mb 400 beam and plates as per the requirement. job is to be done in situ. • set the support below the duct and full welding on the reformer roof beam. reformer tube insulation box fabrication and replacement at reformer roof: • remove the damaged tube insulation top box, care to be taken than the plates should not fall in the reformer. • fabricate the box two nos. as per the requirement for two bays. • fix the insulation box by bolting and rope provision. fix the steel part below the plate from inside the reformer. • welding to be done after proper fixing the insulation box, anchor to be weld as per the requirement. • top fabric compensator to be fixed as per the requirement. general scope: • all tools, tackles, consumables like cutting gas, welding electrodes including dp test kit is in the scope of the contractor. • scaffolding require in the job is in the scope of contractor. • all the scrap to be shifted to scrap yard and balance unused items to be shifted to workshop as per the in charge instruction. • contractor to arrange competent manpower (only) including supervisor for carrying out the job. • after the trial any rectifications that need to be done for satisfactory performance of the equipment is in the contractor’s scope. o safety ø no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. ø vendor must ensure availability of sufficient buses/vehicles to ply page 4 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000125449 date 09.12.2024 submission date 17.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. ø all ppe’s will be in vendor scope. ø vendor shall comply with the health, safety <(>&<)> environment policy as laid down by amns. ø contractor shall provide following safety gears <(>&<)> ppe’s with specifications approved by am/ns: § safety helmet: color (am/ns with provide) § safety shoes. § hand gloves: cotton, leather, culver etc. § safety jacket (as per am/ns standard). § dust mask. § safety goggles. § ear plug or muff. o statutory ø associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. ø amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. ø wc <(>&<)> group insurance policy. ø manpower should be competent as per competency matrix as per latest msa. ø following company rules and regulation provided by am/ns management time to time related to safety hse and other rules and regulation. o penalty ø specific penalty for non performance by vendor and must be strictly measured. ø penalty will be imposed in case of non compliance / violation of hse norms and supervisor and associates incompetency. ø if job compliances are not within specific timing and as per requirement of amns india, penalty will be imposed as per am/ns india norms. ø if any associate / supervisor misbehave with am/ns employees or other associates’ penalty will be imposed as per am/ns india norms. ø unauthorize mobile phone / sleeping case / theft case / vehicle speed greater than 20 km/hr. will be penalize as per am/ns india norm. ø deduction from bill shall be made for delay for plant start up due to the job compliance. ø specific penalty for noncompliance of housekeeping after finishing the work. • scope of work amns india 1. all required work permits provided by amns steel india ltd. 2. all the consumables like bolts <(>&<)> nuts, packing, rtv sealant, gaskets sheets, special welding electrodes will be the free issue from the amns. 3. air, power, water will be made available at source by amns. 4. for shifting of pipes and erection of pipes hydra / crane will be given by amns for amns hbi plant page 5 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000125449 date 09.12.2024 submission date 17.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details item note : 3 2000161942 30 30 10 reformer fg header bellow replm 6 no email : niraj.patel1@amns.in contact : name : niraj patel item details : scope of work for replacement of feed gas header bellows replacement job elevation: 2 mtr 600 nb bellows to be replaced: 06 nos, length: 800 mm position: horizontal drg no: drg:es mech 01398 03 welding joint: 48 inch dia each bellow approx. cutting: 48 inch dia each bellow approx. contractor’s scope: contractor should be come at site to understand the detail job • get the permit from the control room/site engineer , get the sign of field controller • safety talk / hirac to be carried out for the jobs to all man power 1. new bellow to be shifted from stores to work site. ensure the necessary protection to convolutions all the time as per instruction of amns india engineer. 2. proper support to be provided before cutting any bellow. fix the header perfectly. 3. mark the exact length of the new bellow. cut and remove the pipe piece. 4. remove the existing bellow. 5. edge preparation of the duct and the new bellows to be carried out. 6. do fitting of the new bellows. the fit up of the new bellows to be inspected by amns india engineer. all care is to be taken for not damaging the bellow. no arc striking is to be done on or near the bellow. 7. welding of the bellow to the duct to be carried out by suitable welding electrode approved by amns india. the root run and the surface welds are to be done by manual metal arc welding. 100% dp test is to be done for root as well as surface welds. 8. remove temporary protection covers of the bellow and the supports of the duct. 9. do corrections as per instruction of engineer in charge, if required. all consumables, tools and tackles involved for the work is under the contractor’s scope. amns india’s scope: amns india will provide all permanent materials to the contractor free of cost. for other details refer annexture i . page 6 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000125449 date 09.12.2024 submission date 17.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details annexture i 1) new equipment shifting from workshop / store to site and shifting of old equipment to store / workshop is under contractors scope. 2) any cutting / welding required will be in contractors scope. amns india will supply special welding electrode wherever it is mentioned. 3) housekeeping should be carried out after completion of the job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 4) all safety rules and precaution of amns india should be followed by the contractor and his men. 5) all welding is to be done by qualified welders approved by amns india. 6) d. p. test of the welding will be in contractor’s scope. 7) any scaffolding required will be in the contractor’s scope. 8) any portion of structure / deck cut for the should be perfectly welded back by contractor and it is under contractors scope. 9) most care should be taken during the job to avoid damage to the equipment / structure nearby. 10) amns india will provide only permanent material. 12) free supply of air, water and electricity will be provided at a single point. adequate lighting will also be provided. 11) all tools, tackles like welding machines cutting sets, chain block, slings, spanners, hammers, hydraulic pumps, jacksmelt. will be in contractors scope . 12) all consumables like diesel, gas, welding electrode, gauging rods , cotton waste, emery paper, wire rope / slings , etc. will be in contractors scope . 13) all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged by the contractor. 14) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. 15) all joint should be leak proof. 16) contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. general: all the jobs under the scope of work shall be done as per the instruction of the area engineer in charge and as per quality judged by our area engineer and his decision shall be final abiding. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for amns india item note : 4 2000161942 40 40 10 reform fg inclined header bellow replace 4 no email : niraj.patel1@amns.in contact : name : niraj patel item details : scope of work for replacement of feed gas inclined header bellows replacement job elevation: 2 mtr 600 nb bellows to be replaced: 04 nos, length: 800 mm welding joint: 48 inch dia each bellow approx. cutting: 48 inch dia each bellow approx. contractor’s scope: page 7 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000125449 date 09.12.2024 submission date 17.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details contractor should be come at site to understand the detail job • get the permit from the control room/site engineer , get the sign of field controller • safety talk / hirac to be carried out for the jobs to all man power 1. new bellow to be shifted from stores to work site. ensure the necessary protection to convolutions all the time as per instruction of amns india engineer. 2. proper support to be provided before cutting any bellow. fix the header perfectly. 3. mark the exact length of the new bellow. cut and remove the pipe piece. 4. remove the existing bellow. 5. edge preparation of the duct and the new bellows to be carried out. 6. do fitting of the new bellows. the fit up of the new bellows to be inspected by amns india engineer. all care is to be taken for not damaging the bellow. no arc striking is to be done on or near the bellow. 7. welding of the bellow to the duct to be carried out by suitable welding electrode approved by amns india. the root run and the surface welds are to be done by manual metal arc welding. 100% dp test is to be done for root as well as surface welds. 8. remove temporary protection covers of the bellow and the supports of the duct. 9. do corrections as per instruction of engineer in charge, if required. all consumables, tools and tackles involved for the work is under the contractor’s scope. amns india’s scope: amns india will provide all permanent materials to the contractor free of cost. for other details refer annexture i . annexture i 1) new equipment shifting from workshop / store to site and shifting of old equipment to store / workshop is under contractors scope. 2) any cutting / welding required will be in contractors scope. amns india will supply special welding electrode wherever it is mentioned. 3) housekeeping should be carried out after completion of the job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 4) all safety rules and precaution of amns india should be followed by the contractor and his men. 5) all welding is to be done by qualified welders approved by amns india. 6) d. p. test of the welding will be in contractor’s scope. 7) any scaffolding required will be in the contractor’s scope. 8) any portion of structure / deck cut for the should be perfectly welded back by contractor and it is under contractors scope. 9) most care should be taken during the job to avoid damage to the equipment / structure nearby. page 8 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000125449 date 09.12.2024 submission date 17.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 10) amns india will provide only permanent material. 12) free supply of air, water and electricity will be provided at a single point. adequate lighting will also be provided. 11) all tools, tackles like welding machines cutting sets, chain block, slings, spanners, hammers, hydraulic pumps, jacksmelt. will be in contractors scope . 12) all consumables like diesel, gas, welding electrode, gauging rods , cotton waste, emery paper, wire rope / slings , etc. will be in contractors scope . 13) all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged by the contractor. 14) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. 15) all joint should be leak proof. 16) contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. general: all the jobs under the scope of work shall be done as per the instruction of the area engineer in charge and as per quality judged by our area engineer and his decision shall be final abiding. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for amns india item note : 5 2000161942 50 50 20 c/h cone patch welding 220 mtr 220 m 100 oxide feed pipe sleeve repairing 1 lo 110 c/h efd repairing and wear cone replm 1 no 70 proportionate hopper wear cone replm 1 lo 80 proportionate hopper partition repairing 1 lo 90 octopus legs bottom half patch welding 1 lo 10 c/h cylindrical part patch welding 180 m 30 c/h upper seal pipe with spool removal 1 lo 40 c/h usg replm/repairing by patch welding 1 lo 50 c/h lower seal pipe 20” removal,repairin 1 lo 60 proportionate hopper bellow removal 1 lo email : niraj.patel1@amns.in contact : name : niraj patel item details : scope of work for oxide feeding system strengthening the quantum of this job include following stationery equipment to strengthen: 1 charge hopper cone / cylindrical portion patch welding 220 mtrs 2 upper seal pipe with spool 20 replacing or repairing and hard facing. 3 upper slide gate replacing or repairing by patch welding and hard facing 4 upper seal bottom pipe 20 removal repairing and hard facing 5 proportionate hopper bellow replacing / removal with sleeve, and repairing 6 proportionate hopper wear cone replacement / hard facing. 7 proportionate hopper partition repairing and hard facing 8 octopus legs 16 nos. bottom half patch welding 9 feed pipe 16 nos. repairing/replacement working elevation: 66 mtr to 80 mtr. scope of work for the job • charge hopper lower cone strengthening by patch welding. • charge hopper efd replacement or strengthening, its bottom flange nozzle replacement, wear cone replacement. • upper seal pipe to be removed with marking with other matching flange to avoid any mismatch during re fixing, proper support to be given to usg, the position of the gate should not be changed, and load should not transfer to bellow and bellow also to be locked to avoid and undue contraction / pressure on the bellow. • inspect upper slide gate repair the top portion of the gate and hard facing to be done on inner surface of the pipe as per the instruction of page 9 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000125449 date 09.12.2024 submission date 17.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details in charge engineer • after proper fixing the upper seal pipe with usg and charge hopper lower cone remove lower seal pipe, before removal marking to be done with usg flange and lower flange • repair the worn out portion / replace the lower seal pipe with new pipe, hard facing to be done on the inner surface of the pipe as per the instruction of in charge engineer. • repair the lower portion of the usg and hard facing to be done • remove the bellow sleeve and inspect decide for the repairing, if repair is more than replace the sleeve, hard facing of the inner surface to be done as per the instruction of in charge engineer. • inspect the proportionating hopper wear cone, • clean the bellow and get inspected by amns engineer, after clearance re fix / replacing the sleeve. • re fix the upper seal pipe (bottom of usg pipe) and align with charge hopper lower cone to bellow, max 2 3 mm misalignment is allowed more misalignment to be corrected. • proportionating hopper efd replacing / repairing and hard facing to be done as per the instruction of in charge engineer • proportionating hopper partition repairing and had facing to be done as per the instruction of in charge engineer • all the flange joints should be leak proof, any leakage during pressure testing to be attended immediately • welding electrode to be used e 7018 from the amns certified brand only like l <(>&<)> t, esab, advani, general scope : • issue of material from main stores and shifting to the work site to be done by contractor as per the instruction of engineer in charge. • all tools, tackles, consumables, lifting, shifting and erection equipment’s are in contractor’s scope. • job to be carried out with the expert supervisor, and total safety of the equipment and manpower is contractor’s responsibility • all workers should be with all ppes as per the norms of the amns. • special electrodes and hard facing electrodes will be issued free from amns store • all portable electrical tools, welding machine to be certified by amns engineer, norms to be followed strictly, no joint is allowed in power cable. • balance spares to be shifted to store / workshop. • proper housekeeping to be done at every end of the day without fail amns’s scope : • amns will provide all material to be installed at site at store same to be shifted to site, hydra to be given for the shifting. • air, water and power supply to be given free and power connection will be given by amns. • amns engineer will give toolbox talk regarding the job. • crane facility provided by amns, in case non availability of crane alternate arrangements to be done by contractors, electrical chain block, chain block etc. amns hbi plant movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to page 10 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000125449 date 09.12.2024 submission date 17.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate has to undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass....

Arcelor Mittal Nippon Steel India Limited - Gujarat

46485646 tender for 2000160286 various painting work at amnst 2000160286 10 10 60 p & a french polish as per specification 6,800 ft2 70 p & a two coats of luster paint of asian 9,000 ft2 10 scraping of old paint & surface cleaning 77,000 m2 50 applying of acrylic exterior paint 1,800 m2 20 p & a 2 coats birla putti (jk white) 23,100 m2 30 p & a two coats of synthetic enamel of 8,000 m2 40 p&a two coats of acrylic emulsion paint 59,000 m2 email : gajendra.rathore@amns.in contact : name : gajendra rathore item details : technical contact person mr. gajendra rathore, mob no: 9033419180 we are intend to fix prices and finalise service contracts for two (2) year period from jan 25 to dec 26. hence finalised service provider will have two year time duration to provide service, however there will be no price escalation be allowed during these two year period unless it is agreed mutually. description painting work at amns township description surface preparation by only scrapping & cleaning qty 77000 uom m2 description providing & applying 2 coats birla putti (jk white) qty 23100 uom m2 description providing & applying two coats of synthetic enamel (asian / berger) oil paint qty 8000 uom m2 description providing & applying two coats of super acrylic emulsion plastic paint (asian / berger) qty 59000 uom m2 description providing & applying two coats of acrylic exterior paint (asian / berger) qty 1800 uom m2 description providing and applying french polish qty 6800 uom page 2 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124905 date 30.11.2024 submission date 07.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null shail kumari yadav contact email shailkumari.yadav@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details ft2 description providing and applying s2 coats of luster paint qty 9000 uom ft2 scope of work (please specify complete clarity) (in case of amendment, please specify reasons in scope of work) scope of work vendor: contract location – township. contract department – admin (r<(>&<)>m) 1. exterior and interior painting of amns township offices, residencies, building as per admin area in charge instruction. 2. manpower to be deployed with the materials on call basis as per area in charge instruction. 3. all paint consumable with required spares items is under the scope of the vendor. like primer, exterior paint, oil paint, etc. 4. all the painting materials, painting tools and tackles are in vendor scope including transportation. 5. required scaffolding for height area painting under vendor scope. 6. the contractor should ensure that his staff is using and wearing proper safety gears while working inside the ts area. 7. contractor shall provide safety shoes, helmet, dust mask, safety goggles, to his staff. 8. contractor shall provide mobile phone to his supervisor for easy and quick communication. 9. contractor shall ensure that his manpower working in the area is medically fit in order to ensure timeliness of the job to complete in a safe manner. 10. the contractor shall not compromise at all on safety aspect and safe working practices of the company and comply as demanded by the officer in charge and ensure the same with his manpower. 11. his/her manpower shall undergo all types of safety training as required and laid down policies adopted by the company. 12. contractor shall comply with all statutory rules and regulations and acts applicable to his business or sub. contractor including labor laws. compliances all the statutory compliance like workers minimum wage, bonus, pf, leave, esic, etc shall be in vendor scope. attendance verification based on amns scrum data. accommodation and transportation from to site and medical/insurance shall be borne by contractor for his personnel. required workers uniform (4 pair per person) shall be in vendor scope page 3 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124905 date 30.11.2024 submission date 07.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null shail kumari yadav contact email shailkumari.yadav@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details once in year. during rainy season one time raincoat – 1 no per person shall be provided to all workers shall be in the scope of vendor. similarly, safety gum shoes/rainy shoes also provided once in year shall be in vendor scope. all the gate pass process will have to process as per amns policy. all the required ppe’s like safety shoes, hand gloves, goggles, reflective jackets, safety helmet, ear plug, etc. must provide by vendor to their personnel. vendor must provide the one day weekly off to all workers and against this arrange the extra gate pass as per 365 days as a reliever. operation shall be run for 365 days including providing one day weekly off to all workers. wc policy mandate for all contractor. billing guidelines bill shall be release purely based on measurement based only. billing period and attendance should be from 1st of month to 31st of month. before raising the tax invoice, performa invoice to be approved by user. scope of work amns: 1. to get delivery of services. 2. to check quality of services 3. payment terms: within 30 days post submission of bills/invoices. 4. site supervision, quality of work & cleaning to be check by area in charge. if cleaning & painting quality not up to. mark area in charge can stop service immediately. 5. water and electricity provided by company. specific penalty for nonperformance by vendor and must be cardinally measured: yes low quality work :5 % of billing amount on monthly basis. in case of delay in delivery of job :2 % of billing amount on monthly basis. specific penalty for nonperformance by vendor and must be cardinally measured: ye...

Arcelor Mittal Nippon Steel India Limited - Gujarat

46449918 tender for various tarpaulin related job in amns hazira o pr no. pr item rfq item services for line item quantity uom technical details other details 1 2000155909 10 10 10 providing of tarpaulin shed rental basis 580,000 ft2 20 providing of tarpaulin shed rental basis 368,000 ft2 30 providing of tarpaulin shed rental basis 1,403,583 ft2 40 providing of tarpaulin shed rental basis 158,000 ft2 50 providing of tarpaulin shed rental basis 97,000 ft2 60 providing of tarpaulin shed rental basis 106,000 ft2 email : dharmraj.desai@amns.in contact : 9879101055 name : desai, dharmraj am/ns india material item details : job title: provide service for raw material tarpaulin covering work at material handling department detailed scope of work of vendor: (a) technical 1. tarpaulin covering of various raw material (bf <(>&<)> corex coke, corex coal, bf pci coal, coal fines, coke fines, sinter). 2. vendor must have technical and operational competence to provide required services. a. vendor must have work experience in heavy industries such as large steel plant, cement, mining, or port area or any other similar jobs of covering in large manufacturing plants. b. vendor must comply with all relevant local, state regulations, including health and safety standards. c. vendor must have capabilities to allocate sufficient resources, including manpower, material, to meet job requirements. 3. vendors must ensure that skilled/educated supervisors are deployed for supervision of job. 4. daily toolbox talks (for understanding hazards and risk involved in job) to be given to manpower in presence of mh engineer and proper records to be maintained. 5. no work to be start at site without taking work permit from concern mh area. 6. tarpaulin (hdpe 250gsm), bamboo (hollow cylindrical 2inch diax6mtr), katha rope 6mm coir rope, empty bags (preferably empty cement bags). 7. bamboo <(>&<)> tarpaulin should be in good condition. amns site engineer will verify the condition of bamboos <(>&<)> tarpaulin and will reject the material if found of substandard quality. 8. minimum per day covering requirement 30000 sq ft. manpower deployment to be done accordingly. 9. 6 manpower should be at site round the clock for opening and covering of stockpile during material extraction/removal from stockpile. 10. after completion of each heap covering quality will be checked by amns engineer and if not found up to mark will lead to deductions from square feet quantity of that heap. 11. vendor to ensure no ingress of rainwater is there in a covered heap. 12. each tarpaulin to be sufficiently overlapped and bamboos to be placed in vertical and horizontal lines equidistantly over the tarpaulin covering. 13. bamboos to be secured with tightly knot ropes, bamboo frames over heap should be symmetrical. 14. sufficient weight to be placed on covered heap, to sustain heavy wind situations in yards during monsoon. empty bags to be filled with same material (material from same heap) and must be placed on the covered heap (at equal distance) without fail. 15. a covered heap may be opened or closed several times as per rain forecast or plant requirement, no additional covering costs will be applicable. 16. if a covered heap is opened (or uncovered) to fill with additional material, then covering that same heap again additional square feet quantity will be considered for billing. page 2 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 17. after completion of covering of a heap surrounding area to be cleared of any covering material. (tarpaulin/bamboo/ropes). 18. any damage to tarpaulin <(>&<)> bamboo due to natural calamities will not be accounted in amns account. 19. gate pass of any manpower leaving amns india mh site, their gate pass should be release/cancelled from system within 15 days. 20. vendor to ensure all his manpower are made to understand the sops of amns india user department. and sops to be strictly implemented by vendor across his work area inside amns india premises. (b) safety. 1. 1. equipment and material standards: a. tarpaulin quality: ensure all tarpaulins used meet the is 15351: 2003 standards for high density polyethylene (hdpe) tarpaulins, ensuring durability and resistance to environmental factors. b. bamboo use considerations: i. bamboo, if used, must be of grade a quality, treated for moisture and termite resistance to ensure durability. ii. regular inspections: bamboo should be inspected regularly for signs of wear, rot, or pest infestation. any damaged or weakened bamboo should be replaced immediately. iii. load bearing capacity: ensure that the bamboo used can handle the expected loads with a significant safety margin. consider consulting a structural engineer to verify load capacity. c. alternative materials: i. consider replacing bamboo with metal scaffolding poles or engineered wood. these materials provide more predictable strength, durability, and safety, particularly in industrial settings where safety is a critical concern. d. load security: all tarpaulins must be securely fastened using uv resistant ropes and weatherproof fasteners to prevent loosening during high winds or heavy rain. 2. worker safety training: a. conduct worker safety training programs every three months, focusing on the specific risks associated with tarpaulin covering, including manual handling of heavy materials and working in adverse weather conditions. b. workers must undergo a competency assessment by am/ns india before being authorized to participate in tarpaulin covering operations. 3. risk assessment and hazard identification: a. a comprehensive risk assessment must be conducted quarterly, focusing on the hazards associated with covering raw material stockpiles, especially during the monsoon season. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. 4. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during tarpaulin covering operations. b. emergency drills should be conducted every quarter to ensure preparedness, particularly for scenarios involving adverse weather c onditions or material spills. 5. material handling and storage: a. ensure proper handling and storage of tarpaulins and support materials (bamboo or alternatives) to prevent damage. dry storage fa cilities should be used to maintain material integrity, especially during the monsoon season. b. regular inspections of tarpaulin and support materials should be conducted, and any damaged materials should be immediately replaced. 6. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 7. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety protocols, focusing on the proper implementation of tarpaulin covering, page 3 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details load security, and material handling. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 8. ppe requirements: a. all personnel involved in tarpaulin covering must wear flame resistant clothing, reflective jackets, safety shoes, gloves, and other necessary ppe as specified by am/ns india. b. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 9. environmental compliance: a. ensure compliance with the environment (protection) act, 1986 and the water (prevention and control of pollution) act, 1974 to prevent contamination from uncovered materials during rains. b. regular monitoring and reporting of stormwater runoff around tarpaulin covered areas should be conducted to prevent environmental contamination. 10. health and medical surveillance: a. regular health and medical surveillance is mandatory for all employees, including annual health checks to ensure fitness for duty. b. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. worker certification and competency: a. workers involved in tarpaulin covering must be certified in material handling and safety protocols, with training records maintained and updated regularly. 12. compliance with indian labor laws: a. adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. 13. load and material security: a. ensure all tarpaulins are securely fastened to prevent displacement during high winds or rain, with regular inspections to check for looseness or wear. b. weighting materials (e.g., filled sandbags) should be used to secure tarpaulins, especially in high wind areas, to prevent material exposure. 14. the contractor must follow all rules and regulations of company including safety <(>&<)> hse norms. 15. all safety ppes to manpower must be provided before entry to plant premises. (safety shoe, hand gloves wherever required, safety helmet, safety goggles, dust mask, safety jackets, rain gears (gum boots/raincoats/umbrella etc.) 16. 3. the contractor should provide the required number of relievers for safe operation. no manpower will be permitted to work beyond 12 hrs and must be given weekly off. continuous duty of more than 9 days is not allowed. 17. 4. penalties will be applicable for violating safety/statutory norms, mobile policy/vehicle driving policy as per amns consequence management policy. 18. 5. the contractor must ensure safe transport of their manpower inside plant premises. 19. movement of manpower / associates at our hazira site. 20. a). no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 21. b). the contractor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. 22. 6. contractor must provide reflective jackets to all manpower working in night shifts (associates, supervisors) working at amns india plant premises. 23. 7. associates must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is to be used for the gate entry inside plant premises. 24. 8. the contractor is also responsible for training and retraining of page 4 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details their manpower regarding general plant safety, behavioural safety, or any future training requirements as per amns hse policy. proper training records to be maintained by the vendor. 25. 9. any lapse found in safety/security inside plant premises will attract termination of work order. (c) statutory. 1. material replacement and quality assurance: a. vendors must guarantee the availability of replacement tarpaulins and support materials (bamboo or alternatives) in case of damage or wear. quality checks should be conducted regularly to ensure materials meet the required standards. 2. regular maintenance schedule: a. a detailed maintenance schedule for equipment and materials used in tarpaulin covering must be provided, with records of all maintenance activities kept up to date to ensure readiness. 3. safety performance bonus: a. introduce a safety performance bonus for vendors who achieve 100% compliance with all safety protocols and maintain an incident free operation during the contract period. 4. insurance coverage: a. comprehensive insurance coverage must be provided by the vendor for all personnel involved in tarpaulin covering operations, including third party liability insurance. 5. no delay clause: • strict adherence to the no delay clause, where vendors must ensure tarpaulin covering is completed within the stipulated timeframe to prevent raw material exposure to environmental elements, with penalties for delays. 6. the vendor shall provide the services as per land of law and company policies (e.g., safety certification <(>&<)> competency training). 7. vendor must be following all applicable central, state, and local govt rules <(>&<)> regulations. 8. vendor must ensure wsa policy and group insurance for their manpower. 9. manpower should be competent as per competency matrix as per latest msa of amns. 10. worker safety: tarpaulin covering is also mandated under worker safety regulations such as the factories act and the mines act to protect workers from dust exposure. 11. vendor to ensure strict adherence to all statutory requirements related to national and state level regulations (d) penalty clause. termination and penalties for non compliance 1. penalty for unsafe acts: o 10,000 for each unsafe act observed during safety audits or inspections, particularly in the handling and covering of raw materials. 2. severe safety violations: o 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in material exposure or environmental contamination. 3. safety violations: o 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to tarpaulin covering. 4. late incident reporting: o 5,000 per hour of delay beyond the 30 minute reporting window for any incident. 5. failure to provide adequate materials/manpower: o 20,000 for each instance where tarpaulin materials or manpower are page 5 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details not provided as per the contract, leading to delays or substandard covering. 6. penalty for environmental non compliance: o 100,000 for any non compliance with environmental regulations, including failure to prevent runoff or improper disposal of damaged materials. 7. penalty for non performance: o penalty as per the monthly bill amount if the vendor fails to meet the required standards for tarpaulin covering, with escalating penalties for repeated non performance. 8. penalty will be imposed as per hse directive for consequence management for safety non compliance / violation(s) <(>&<)> accident(s) for contractor employees at all plants / work sites of amns india ltd. 9. in case of any property damage vendor is liable for penalty as per amns policy for consequent management or vendor have to repair/replace damage property or pay amount of damage as per assessment by competent amns india authority. 10. in case of any traffic or road safety rules violation inside plant premises suitable penalty will be imposed by amns security team as per consequent management policy of amns india. 11. repeated road safety violations will result in blacklisting of the associate or vendor as per amns india consequence management policy. 12. penalty as bill amount of respective month will be imposed if work gets delayed due to manpower shortage. if manpower count goes below 80% of required manpower. (80 to 70 % 2 % penalty of bill amount, 70 to 60 % 5 % penalty of bill amount, below 60 % 10 % penalty of bill amount). 13. 6. if the vendor fails to remedy the non performance within the specified time frame, or if the vendor repeatedly fails to perform its obligations under this scope of work, the amns india shall have the right to suitably deduct penalty amount from any payments due to the vendor under this contract or terminate this work order for non performance. 14. (non performance: failure by the vendor to provide services as specified, failure to adhere to agreed schedules, failure to meet safety and compliance standards, and failure to maintain equipment in proper working condition). compliance with specific indian regulations • the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. • the motor vehicles act, 1988: regulates the movement of materials within and outside plant premises, ensuring compliance with transport safety standards. • the environment (protection) act, 1986: provides for the protection and improvement of the environment, with specific rules for pollution control during material handling. • the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. (e) am/ns india scope. 1. ensure that plant personnel cooperate with the contractor and provide necessary support. 2. designate a point of contact for coordination and communication with the contractor. 3. provide all necessary documentation, including ptw and safety protocols timely to ensure work is safe and on time. page 6 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details sr no work description cy 2025(sq. ft) 1 tarpaulin activity for bf coke 580000 2 tarpaulin covering activity for corex coke 368000 3 tarpaulin covering activity for corex coal 1403583 4 tarpaulin covering activity for pci coal bf 158000 5 tarpaulin covering activity for coal fines 97000 6 tarpaulin covering activity for coke fines/a. coal 106000 item note : 2 2000155909 20 20 10 providing of tarpaulin shed rental basis 568,000 ft2 email : dharmraj.desai@amns.in contact : 9879101055 name : desai, dharmraj am/ns india material item details : job title: provide service for raw material tarpaulin covering work at material handling department detailed scope of work of vendor: (a) technical 1. tarpaulin covering of various raw material (pellet <(>&<)> oxide, flux fines etc.). 2. vendor must have technical and operational competence to provide required services. a. vendor must have work experience in heavy industries such as large steel plant, cement, mining, or port area or any other similar jobs of covering in large manufacturing plants. b. vendor must comply with all relevant local, state regulations, including health and safety standards. c. vendor must have capabilities to allocate sufficient resources, including manpower, material, to meet job requirements. 3. vendors must ensure that skilled/educated supervisors are deployed for supervision of job. 4. daily toolbox talks (for understanding hazards and risk involved in job) to be given to manpower in presence of mh engineer and proper records to be maintained. 5. no work to be start at site without taking work permit from concern mh area. 6. tarpaulin (hdpe 250gsm), bamboo (hollow cylindrical 2inch diax6mtr), katha rope 6mm coir rope, empty bags (preferably empty cement bags). 7. bamboo <(>&<)> tarpaulin should be in good condition. amns site engineer will verify the condition of bamboos <(>&<)> tarpaulin and will reject the material if found of substandard quality. 8. minimum per day covering requirement 30000 sq ft. manpower deployment to be done accordingly. 9. 6 manpower should be at site round the clock for opening and covering of stockpile during material extraction/removal from stockpile. 10. after completion of each heap covering quality will be checked by amns engineer and if not found up to mark will lead to deductions from square feet quantity of that heap. 11. vendor to ensure no ingress of rainwater is there in a covered heap. 12. each tarpaulin to be sufficiently overlapped and bamboos to be placed in vertical and horizontal lines equidistantly over the tarpaulin covering. 13. bamboos to be secured with tightly knot ropes, bamboo frames over heap should be symmetrical. 14. sufficient weight to be placed on covered heap, to sustain heavy wind situations in yards during monsoon. empty bags to be filled with same material (material from same heap) and must be placed on the covered heap (at equal distance) without fail. 15. a covered heap may be opened or closed several times as per rain forecast or plant requirement, no additional covering costs will be applicable. 16. if a covered heap is opened (or uncovered) to fill with additional material, then covering that same heap again additional square feet quantity will be considered for billing. 17. after completion of covering of a heap surrounding area to be page 7 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details cleared of any covering material. (tarpaulin/bamboo/ropes). 18. any damage to tarpaulin <(>&<)> bamboo due to natural calamities will not be accounted in amns account. 19. gate pass of any manpower leaving amns india mh site, their gate pass should be release/cancelled from system within 15 days. 20. vendor to ensure all his manpower are made to understand the sops of amns india user department. and sops to be strictly implemented by vendor across his work area inside amns india premises. (b) safety. 1. 1. equipment and material standards: a. tarpaulin quality: ensure all tarpaulins used meet the is 15351: 2003 standards for high density polyethylene (hdpe) tarpaulins, ensuring durability and resistance to environmental factors. b. bamboo use considerations: i. bamboo, if used, must be of grade a quality, treated for moisture and termite resistance to ensure durability. ii. regular inspections: bamboo should be inspected regularly for signs of wear, rot, or pest infestation. any damaged or weakened bamboo should be replaced immediately. iii. load bearing capacity: ensure that the bamboo used can handle the expected loads with a significant safety margin. consider consulting a structural engineer to verify load capacity. c. alternative materials: i. consider replacing bamboo with metal scaffolding poles or engineered wood. these materials provide more predictable strength, durability, and safety, particularly in industrial settings where safety is a critical concern. d. load security: all tarpaulins must be securely fastened using uv resistant ropes and weatherproof fasteners to prevent loosening during high winds or heavy rain. 2. worker safety training: a. conduct worker safety training programs every three months, focusing on the specific risks associated with tarpaulin covering, including manual handling of heavy materials and working in adverse weather conditions. b. workers must undergo a competency assessment by am/ns india before being authorized to participate in tarpaulin covering operations. 3. risk assessment and hazard identification: a. a comprehensive risk assessment must be conducted quarterly, focusing on the hazards associated with covering raw material stockpiles, especially during the monsoon season. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. 4. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during tarpaulin covering operations. b. emergency drills should be conducted every quarter to ensure preparedness, particularly for scenarios involving adverse weather c onditions or material spills. 5. material handling and storage: a. ensure proper handling and storage of tarpaulins and support materials (bamboo or alternatives) to prevent damage. dry storage fa cilities should be used to maintain material integrity, especially during the monsoon season. b. regular inspections of tarpaulin and support materials should be conducted, and any damaged materials should be immediately replaced. 6. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 7. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety protocols, focusing on the proper implementation of tarpaulin covering, page 8 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details load security, and material handling. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 8. ppe requirements: a. all personnel involved in tarpaulin covering must wear flame resistant clothing, reflective jackets, safety shoes, gloves, and other necessary ppe as specified by am/ns india. b. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 9. environmental compliance: a. ensure compliance with the environment (protection) act, 1986 and the water (prevention and control of pollution) act, 1974 to prevent contamination from uncovered materials during rains. b. regular monitoring and reporting of stormwater runoff around tarpaulin covered areas should be conducted to prevent environmental contamination. 10. health and medical surveillance: a. regular health and medical surveillance is mandatory for all employees, including annual health checks to ensure fitness for duty. b. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. worker certification and competency: a. workers involved in tarpaulin covering must be certified in material handling and safety protocols, with training records maintained and updated regularly. 12. compliance with indian labor laws: a. adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. 13. load and material security: a. ensure all tarpaulins are securely fastened to prevent displacement during high winds or rain, with regular inspections to check for looseness or wear. b. weighting materials (e.g., filled sandbags) should be used to secure tarpaulins, especially in high wind areas, to prevent material exposure. 14. the contractor must follow all rules and regulations of company including safety <(>&<)> hse norms. 15. all safety ppes to manpower must be provided before entry to plant premises. (safety shoe, hand gloves wherever required, safety helmet, safety goggles, dust mask, safety jackets, rain gears (gum boots/raincoats/umbrella etc.) 16. 3. the contractor should provide the required number of relievers for safe operation. no manpower will be permitted to work beyond 12 hrs and must be given weekly off. continuous duty of more than 9 days is not allowed. 17. 4. penalties will be applicable for violating safety/statutory norms, mobile policy/vehicle driving policy as per amns consequence management policy. 18. 5. the contractor must ensure safe transport of their manpower inside plant premises. 19. movement of manpower / associates at our hazira site. 20. a). no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 21. b). the contractor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. 22. 6. contractor must provide reflective jackets to all manpower working in night shifts (associates, supervisors) working at amns india plant premises. 23. 7. associates must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is to be used for the gate entry inside plant premises. 24. 8. the contractor is also responsible for training and retraining of page 9 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details their manpower regarding general plant safety, behavioural safety, or any future training requirements as per amns hse policy. proper training records to be maintained by the vendor. 25. 9. any lapse found in safety/security inside plant premises will attract termination of work order. (c) statutory. 1. material replacement and quality assurance: a. vendors must guarantee the availability of replacement tarpaulins and support materials (bamboo or alternatives) in case of damage or wear. quality checks should be conducted regularly to ensure materials meet the required standards. 2. regular maintenance schedule: a. a detailed maintenance schedule for equipment and materials used in tarpaulin covering must be provided, with records of all maintenance activities kept up to date to ensure readiness. 3. safety performance bonus: a. introduce a safety performance bonus for vendors who achieve 100% compliance with all safety protocols and maintain an incident free operation during the contract period. 4. insurance coverage: a. comprehensive insurance coverage must be provided by the vendor for all personnel involved in tarpaulin covering operations, including third party liability insurance. 5. no delay clause: a. strict adherence to the no delay clause, where vendors must ensure tarpaulin covering is completed within the stipulated timeframe to prevent raw material exposure to environmental elements, with penalties for delays. 6. the vendor shall provide the services as per land of law and company policies (e.g., safety certification <(>&<)> competency training). 7. vendor must be following all applicable central, state, and local govt rules <(>&<)> regulations. 8. vendor must ensure wsa policy and group insurance for their manpower. 9. 5. manpower should be competent as per competency matrix as per latest msa of amns. 10. 6. worker safety: tarpaulin covering is also mandated under worker safety regulations such as the factories act and the mines act to protect workers from dust exposure. 11. 7. vendor to ensure strict adherence to all statutory requirements related to national and state level regulations (d) penalty clause. termination and penalties for non compliance 1. penalty for unsafe acts: a. 10,000 for each unsafe act observed during safety audits or inspections, particularly in the handling and covering of raw materials. 2. severe safety violations: a. 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in material exposure or environmental contamination. 3. safety violations: a. 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to tarpaulin covering. 4. late incident reporting: a. 5,000 per hour of delay beyond the 30 minute reporting window for any incident. page 10 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 5. failure to provide adequate materials/manpower: a. 20,000 for each instance where tarpaulin materials or manpower are not provided as per the contract, leading to delays or substandard covering. 6. penalty for environmental non compliance: a. 100,000 for any non compliance with environmental regulations, including failure to prevent runoff or improper disposal of damaged materials. 7. penalty for non performance: a. penalty as per the monthly bill amount if the vendor fails to meet the required standards for tarpaulin covering, with escalating penalties for repeated non performance. 8. penalty will be imposed as per hse directive for consequence management for safety non compliance / violation(s) <(>&<)> accident(s) for contractor employees at all plants / work sites of amns india ltd. 9. in case of any property damage vendor is liable for penalty as per amns policy for consequent management or vendor have to repair/replace damage property or pay amount of damage as per assessment by competent amns india authority. 10. in case of any traffic or road safety rules violation inside plant premises suitable penalty will be imposed by amns security team as per consequent management policy of amns india. 11. repeated road safety violations will result in blacklisting of the associate or vendor as per amns india consequence management policy. 12. penalty as bill amount of respective month will be imposed if work gets delayed due to manpower shortage. if manpower count goes below 80% of required manpower. (80 to 70 % 2 % penalty of bill amount, 70 to 60 % 5 % penalty of bill amount, below 60 % 10 % penalty of bill amount). 13. 6. if the vendor fails to remedy the non performance within the specified time frame, or if the vendor repeatedly fails to perform its obligations under this scope of work, the amns india shall have the right to suitably deduct penalty amount from any payments due to the vendor under this contract or terminate this work order for non performance. 14. (non performance: failure by the vendor to provide services as specified, failure to adhere to agreed schedules, failure to meet safety and compliance standards, and failure to maintain equipment in proper working condition). compliance with specific indian regulations • the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. • the motor vehicles act, 1988: regulates the movement of materials within and outside plant premises, ensuring compliance with transport safety standards. • the environment (protection) act, 1986: provides for the protection and improvement of the environment, with specific rules for pollution control during material handling. • the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. (e) am/ns india scope. 1. ensure that plant personnel cooperate with the contractor and provide necessary support. 2. designate a point of contact for coordination and communication with the contractor. 3. provide all necessary documentation, including ptw and safety protocols timely to ensure work is safe and on time. job name: tarpaulin covering of pellet/ oxide <(>&<)> flux fines during page 11 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details monsoon category/descriptions qty uom tarpaulin covering during monsoon 568000 sq. ft. total 568000 item note : 3 2000155927 10 30 10 providing and fixing temp.covered shed 9,600 ft2 email : dharmraj.desai@amns.in contact : 9879101055 name : desai, dharmraj am/ns india material item details : job title: provide service for temporary dome erection work at material handling department detailed scope of work of vendor: (a) technical 1. providing temporary dome (erection and maintenance) for iobs, pci, d yard, additive yard in mh area. 2. providing 1st class type of ms wide span shed on contract basis, made of ms pipes, ms trusses, ms purlins all material in vendor’s scope also to and fro transportation charges in vendor’s scope. 3. vendor must ensure that skilled/educated supervisors are deployed for supervision of job. 4. daily toolbox talks (for understanding hazards and risk involved in job) to be given to manpower in presence of mh engineer and proper records to be maintained. 5. no work to be start at site without taking work permit from concern mh area. 6. height pass certification will be mandatory for person working at height. 7. the structure of the shed would be completely of steel. 8. material quality of dome should be in good condition. amns site engineer will verify the condition of dome material 9. before dome erection work dome ground base to be checked properly by amns engineer/vendor. 10. dome quality inspection for every dome will be done by amns site engineer. each dome inspection records to be maintained by vendor. 11. double covering of entire dome with double layer tarpaulin top and bottom and double layering of bamboo top and bottom. (top and sides). hdpe tarpaulin should be of 250 gsm pure virgin quality along with additional layer of heavy duty cross laminated sheets (as per isi specifications). 2 layers of sheets must be sandwiched between 2 layers of bamboos which should be fixed in the form of a matrix. 12. the shed should be waterproof from top and side and most care should be taken to avoid any ingress of water inside the shed. 13. provision for lighting and lighting fixtures inside the dome shall be in the scope of vendor. (fixture will be provided by amns, installation will be in vendor’s scope) 14. certified scaffolding, certified ladder for safe approach to climb for erection, certified roof top lifelines and other tools and tackles for safe erection shall be in the scope of vendor. 15. for safe erection, vendor must provide farana/manlifter for work at height job. 16. vendor to provide 2 nos farana for erection of middle top part (for safe erection). 17. it will be sole responsibility of vendor to deploy correct/right set of skilled resources as per competency matrix for all jobs/works being executed by him at various sites of am/ns india ltd hazira as indicated in msa document. 18. any damage to dome structure due to natural calamities will not be accounted for amns india. 19. gate pass of any manpower leaving amns india mh site, their gate pass should be release/cancelled from system within 15 days. 20. vendor to ensure all his manpower are made to understand the sops of amns india user department. and sops to be strictly implemented by vendor across his work area inside amns india premises. page 12 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details (b) safety. 1. equipment and material standards: a. tarpaulin quality: ensure all tarpaulins used meet the is 15351: 2003 standards for high density polyethylene (hdpe) tarpaulins, ensuring durability and resistance to environmental factors. b. bamboo use considerations: i. bamboo, if used, must be of grade a quality, treated for moisture and termite resistance to ensure durability. ii. regular inspections: bamboo should be inspected regularly for signs of wear, rot, or pest infestation. any damaged or weakened bamboo should be replaced immediately. iii. load bearing capacity: ensure that the bamboo used can handle the expected loads with a significant safety margin. consider consulting a structural engineer to verify load capacity. c. alternative materials: i. consider replacing bamboo with metal scaffolding poles or engineered wood. these materials provide more predictable strength, durability, and safety, particularly in industrial settings where safety is a critical concern. d. load security: all tarpaulins must be securely fastened using uv resistant ropes and weatherproof fasteners to prevent loosening during high winds or heavy rain. 2. worker safety training: a. conduct worker safety training programs every three months, focusing on the specific risks associated with tarpaulin covering, including manual handling of heavy materials and working in adverse weather conditions. b. workers must undergo a competency assessment by am/ns india before being authorized to participate in tarpaulin covering operations. 3. risk assessment and hazard identification: a. a comprehensive risk assessment must be conducted quarterly, focusing on the hazards associated with covering raw material stockpiles, especially during the monsoon season. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. 4. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during tarpaulin covering operations. b. emergency drills should be conducted every quarter to ensure preparedness, particularly for scenarios involving adverse weather c onditions or material spills. 5. material handling and storage: a. ensure proper handling and storage of tarpaulins and support materials (bamboo or alternatives) to prevent damage. dry storage fa cilities should be used to maintain material integrity, especially during the monsoon season. b. regular inspections of tarpaulin and support materials should be conducted, and any damaged materials should be immediately replaced. 6. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 7. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety protocols, focusing on the proper implementation of tarpaulin covering, load security, and material handling. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 8. ppe requirements: a. all personnel involved in tarpaulin covering must wear flame resistant clothing, reflective jackets, safety shoes, gloves, and other necessary ppe as specified by am/ns india. b. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. page 13 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 9. environmental compliance: a. ensure compliance with the environment (protection) act, 1986 and the water (prevention and control of pollution) act, 1974 to prevent contamination from uncovered materials during rains. b. regular monitoring and reporting of stormwater runoff around tarpaulin covered areas should be conducted to prevent environmental contamination. 10. health and medical surveillance: a. regular health and medical surveillance is mandatory for all employees, including annual health checks to ensure fitness for duty. b. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. worker certification and competency: a. workers involved in tarpaulin covering must be certified in material handling and safety protocols, with training records maintained and updated regularly. 12. compliance with indian labor laws: a. adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. 13. load and material security: a. ensure all tarpaulins are securely fastened to prevent displacement during high winds or rain, with regular inspections to check for looseness or wear. b. weighting materials (e.g., filled sandbags) should be used to secure tarpaulins, especially in high wind areas, to prevent material exposure. 14. the contractor must follow all rules and regulations of company including safety <(>&<)> hse norms. 15. all safety ppes to manpower must be provided before entry to plant premises. (safety shoe, hand gloves wherever required, safety helmet, safety goggles, dust mask, safety jackets, rain gears , full body harness with shock absorber and (gum boots/raincoats/umbrella etc.) 16. the contractor should provide the required number of relievers for safe operation. no manpower will be permitted to work beyond 12 hrs and must be given weekly off. continuous duty of more than 9 days is not allowed. 17. penalties will be applicable for violating safety/statutory norms, mobile policy/vehicle driving policy as per amns consequence management policy. 18. the contractor must ensure safe transport of their manpower inside plant premises. movement of manpower / associates at our hazira site. a). no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. b). the contractor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. 19. contractor must provide reflective jackets to all manpower working in night shifts (associates, supervisors) working at amns india plant premises. 20. associates must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is to be used for the gate entry inside plant premises. 21. the contractor is also responsible for training and retraining of their manpower regarding general plant safety, behavioural safety, or any future training requirements as per amns hse policy. proper training records to be maintained by the vendor. 22. any lapse found in safety/security inside plant premises will attract termination of work order. 23. age above 45 years will not allowed to work on height. page 14 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details (c) statutory. 1. material replacement and quality assurance: a. vendors must guarantee the availability of replacement tarpaulins and support materials (bamboo or alternatives) in case of damage or wear. quality checks should be conducted regularly to ensure materials meet the required standards. 2. regular maintenance schedule: a. a detailed maintenance schedule for equipment and materials used in tarpaulin covering must be provided, with records of all maintenance activities kept up to date to ensure readiness. 3. safety performance bonus: a. introduce a safety performance bonus for vendors who achieve 100% compliance with all safety protocols and maintain an incident free operation during the contract period. 4. insurance coverage: a. comprehensive insurance coverage must be provided by the vendor for all personnel involved in tarpaulin covering operations, including third party liability insurance. 5. no delay clause: • strict adherence to the no delay clause, where vendors must ensure shed erection and covering is completed within the stipulated timeframe to prevent raw material exposure to environmental elements, with penalties for delays. 6. the vendor shall provide the services as per land of law and company policies (e.g., safety certification <(>&<)> competency training). 7. vendor must be following all applicable central, state, and local govt rules <(>&<)> regulations. 8. vendor must ensure wsa policy and group insurance for their manpower. 9. manpower should be competent as per competency matrix as per latest msa of amns. 10. worker safety: tarpaulin covering/dome erection is also mandated under worker safety regulations such as the factories act and the mines act to protect workers from dust exposure. 11. vendor to ensure strict adherence to all statutory requirements related to national and state level regulations (d) penalty clause. 1. penalty for unsafe acts: o 10,000 for each unsafe act observed during safety audits or inspections, particularly in the handling and covering of raw materials. 2. severe safety violations: o 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in material exposure or environmental contamination. 3. safety violations: o 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to tarpaulin covering. 4. late incident reporting: o 5,000 per hour of delay beyond the 30 minute reporting window for any incident. 5. failure to provide adequate materials/manpower: o 20,000 for each instance where tarpaulin materials or manpower are not provided as per the contract, leading to delays or substandard covering. 6. penalty for environmental non compliance: o 100,000 for any non compliance with environmental regulations, including failure to prevent runoff or improper disposal of damaged materials. 7. penalty for non performance: o penalty as per the monthly bill amount if the vendor fails to meet the required standards for tarpaulin covering, with escalating penalties for page 15 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details repeated non performance. 8. penalty will be imposed as per hse directive for consequence management for safety non compliance / violation(s) <(>&<)> accident(s) for contractor employees at all plants / work sites of amns india ltd. 9. in case of any property damage vendor is liable for penalty as per amns policy for consequent management or vendor have to repair/replace damage property or pay amount of damage as per assessment by competent amns india authority. 10. in case of any traffic or road safety rules violation inside plant premises suitable penalty will be imposed by amns security team as per consequent management policy of amns india. 11. repeated road safety violations will result in blacklisting of the associate or vendor as per amns india consequence management policy. 12. penalty will be imposed if any dome preparation is delayed due to non availability of material or manpower as per below criteria: a) delay over 12days: 20% penalty on same dome bill amount. b) delay between 8 12days: 10% penalty on same dome bill amount. c) delay over 5 days: 5% penalty on same dome bill amount. 13. if the vendor fails to remedy the non performance within the specified time frame, or if the vendor repeatedly fails to perform its obligations under this scope of work, the amns india shall have the right to suitably deduct penalty amount from any payments due to the vendor under this contract or terminate this work order for non performance. (non performance: failure by the vendor to provide services as specified, failure to adhere to agreed schedules, failure to meet safety and compliance standards, and failure to maintain equipment in proper working condition). (e) am/ns india scope. 1. ensure that plant personnel cooperate with the contractor and provide necessary support. 2. designate a point of contact for coordination and communication with the contractor. 3. provide all necessary documentation, including ptw and safety protocols timely to ensure work is safe and on time. mh temporary dome qty dome dimension 120 l x 80 b in feet center of shed 38 40 feet side height 20 feet distance b/w vertical columns along the length 15 feet qty in sq ft 9600 sq ft item note : 4 2000155927 20 40 10 providing and fixing temp.covered shed 9,600 ft2 email : dharmraj.desai@amns.in contact : 9879101055 name : desai, dharmraj am/ns india material item details : service of temporary dome erection work at material handling department scope of work vendor: 1.execution of job as per agreed detailed sow of temporary dome for material handling department 2.all ppe as per company rules <(>&<)> regulations 3.following all rules and regulation of company including safety <(>&<)> hse norms 4.wsa policy <(>&<)> group insurance 5.all transportation facility 6.manpower should be competent as per competency matrix as per latest msa page 16 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details detailed scope of work: 1. providing temporary dome for iobs, pci, d yard, additive yard in mh area. 2. providing 1st class type of ms wide span shed on contract basis, made of ms pipes, ms trusses, ms purlins all material in vendor’s scope also to and fro transportation charges in vendor’s scope. 3. all safety ppes to manpower must be provided before entry to plant premises. (safety shoe, hand gloves wherever required, safety helmet, safety goggles, dust mask, safety jackets, rain gears (gum boots/raincoats/umbrella etc.)). 4. vendor must ensure that skilled/educated supervisors are deployed for supervision of job. 5. vendor to ensure duty hours not to exceed beyond shift hours as applicable from hse rules of amns india. 6. vendor to ensure that no manpower will be permitted to work beyond 12 hours and should be given weekly off regularly. continuous duty of more than 9 days is not allowed. 7. daily toolbox talks (for understanding hazards and risk involved in job) to be given to manpower in presence of mh engineer and proper records to be maintained. 8. no work to be start at site without taking work permit from concern mh area. 9. height pass certification will be mandatory for person working at height. 10. the structure of the shed would be completely of steel. 11. material quality of dome should be in good condition. amns site engineer will verify the condition of dome material 12. before dome erection work dome ground base to be checked properly by amns engineer/vendor. 13. dome quality inspection for every dome will be done by amns site engineer. each dome inspection records to be maintained by vendor. 14. double covering of entire dome with double layer tarpaulin top and bottom and double layering of bamboo top and bottom. (top and sides). hdpe tarpaulin should be of 250 gsm pure virgin quality along with additional layer of heavy duty cross laminated sheets (as per isi specifications). 2 layers of sheets must be sandwiched between 2 layers of bamboos which should be fixed in the form of a matrix. 15. the shed should be waterproof from top and side and most care should be taken to avoid any ingress of water inside the shed. 16. provision for lighting and lighting fixtures inside the dome shall be in the scope of vendor. (fixture will be provided by amns, installation will be in vendor’s scope) 17. certified scaffolding, certified ladder for safe approach to climb for erection, certified roof top lifelines and other tools and tackles for safe erection shall be in the scope of vendor. 18. vendor to provide 2 nos farana for erection of middle top part (for safe erection). 19. it will be sole responsibility of vendor to deploy correct/right set of skilled resources as per competency matrix for all jobs/works being executed by him at various sites of am/ns india ltd hazira as indicated in msa document. 20. erection of dome should not get delayed due to lack of manpower or material, failing which mh will impose commercial penalties. 21. any damage to dome structure due to natural calamities will not be accounted for amns india. 22. gate pass of any manpower leaving amns india mh site, their gate pass should be release/cancelled from system within 15 days. 23. vendor to ensure all his manpower are made to understand the sops of amns india user department. and sops to be strictly implemented by vendor across his work area inside amns india premises. 24. attendance of manpower to be maintained over 85% every month, failing to which commercial penalties will be imposed by mh. 25. any lapse found in safety/security inside plant premises will attract termination of work order with immediate effect. 26. penalty will be imposed if any dome preparation is delayed due to non availability of material or manpower as per below criteria: a) delay over 12days: 20% penalty on same dome bill amount. page 17 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details b) delay between 8 12days: 10% penalty on same dome bill amount. c) delay over 5 days: 5% penalty on same dome bill amount. # movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. scope of work amns india: 1.over all supervision of work. 2.nonconformity of work penalty <(>&<)> specific penalty for nonperformance by vendor and must be strictly measured. 3.penalty will be imposed in case of non compliance / violation of hse norms <(>&<)> housekeeper incompitancy. mh temporary dome qty dome dimension 120 l x 80 b in feet center of shed 38 40 feet side height 20 feet distance b/w vertical columns along the length 15 feet qty in sq ft 9600 sq ft item note : 5 2000155927 30 50 10 providing and fixing temp.covered shed 19,200 ft2 email : dharmraj.desai@amns.in contact : 9879101055 name : desai, dharmraj am/ns india material item details : service of temporary dome erection work at material handling department scope of work vendor: 1.execution of job as per agreed detailed sow of temporary dome for material handling department 2.all ppe as per company rules <(>&<)> regulations 3.following all rules and regulation of company including safety <(>&<)> hse norms 4.wsa policy <(>&<)> group insurance 5.all transportation facility 6.manpower should be competent as per competency matrix as per latest msa detailed scope of work: 1. providing temporary dome for iobs, pci, d yard, additive yard in mh area. 2. providing 1st class type of ms wide span shed on contract basis, made of ms pipes, ms trusses, ms purlins all material in vendor’s scope also to and fro transportation charges in vendor’s scope. 3. all safety ppes to manpower must be provided before entry to plant premises. (safety shoe, hand gloves wherever required, safety helmet, safety goggles, dust mask, safety jackets, rain gears (gum boots/raincoats/umbrella etc.)). 4. vendor must ensure that skilled/educated supervisors are deployed for supervision of job. 5. vendor to ensure duty hours not to exceed beyond shift hours as applicable from hse rules of amns india. 6. vendor to ensure that no manpower will be permitted to work beyond 12 hours and should be given weekly off regularly. continuous duty of more than 9 days is not allowed. 7. daily toolbox talks (for understanding hazards and risk involved in page 18 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details job) to be given to manpower in presence of mh engineer and proper records to be maintained. 8. no work to be start at site without taking work permit from concern mh area. 9. height pass certification will be mandatory for person working at height. 10. the structure of the shed would be completely of steel. 11. material quality of dome should be in good condition. amns site engineer will verify the condition of dome material 12. before dome erection work dome ground base to be checked properly by amns engineer/vendor. 13. dome quality inspection for every dome will be done by amns site engineer. each dome inspection records to be maintained by vendor. 14. double covering of entire dome with double layer tarpaulin top and bottom and double layering of bamboo top and bottom. (top and sides). hdpe tarpaulin should be of 250 gsm pure virgin quality along with additional layer of heavy duty cross laminated sheets (as per isi specifications). 2 layers of sheets must be sandwiched between 2 layers of bamboos which should be fixed in the form of a matrix. 15. the shed should be waterproof from top and side and most care should be taken to avoid any ingress of water inside the shed. 16. provision for lighting and lighting fixtures inside the dome shall be in the scope of vendor. (fixture will be provided by amns, installation will be in vendor’s scope) 17. certified scaffolding, certified ladder for safe approach to climb for erection, certified roof top lifelines and other tools and tackles for safe erection shall be in the scope of vendor. 18. vendor to provide 2 nos farana for erection of middle top part (for safe erection). 19. it will be sole responsibility of vendor to deploy correct/right set of skilled resources as per competency matrix for all jobs/works being executed by him at various sites of am/ns india ltd hazira as indicated in msa document. 20. erection of dome should not get delayed due to lack of manpower or material, failing which mh will impose commercial penalties. 21. any damage to dome structure due to natural calamities will not be accounted for amns india. 22. gate pass of any manpower leaving amns india mh site, their gate pass should be release/cancelled from system within 15 days. 23. vendor to ensure all his manpower are made to understand the sops of amns india user department. and sops to be strictly implemented by vendor across his work area inside amns india premises. 24. attendance of manpower to be maintained over 85% every month, failing to which commercial penalties will be imposed by mh. 25. any lapse found in safety/security inside plant premises will attract termination of work order with immediate effect. 26. penalty will be imposed if any dome preparation is delayed due to non availability of material or manpower as per below criteria: a) delay over 12days: 20% penalty on same dome bill amount. b) delay between 8 12days: 10% penalty on same dome bill amount. c) delay over 5 days: 5% penalty on same dome bill amount. # movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. page 19 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details scope of work amns india: 1.over all supervision of work. 2.nonconformity of work penalty <(>&<)> specific penalty for nonperformance by vendor and must be strictly measured. 3.penalty will be imposed in case of non compliance / violation of hse norms <(>&<)> housekeeper incompitancy. mh temporary dome qty dome dimension 120 l x 80 b in feet center of shed 38 40 feet side height 20 feet distance b/w vertical columns along the length 15 feet qty in sq ft 19200 sq ft item note : 6 2000155927 40 60 10 providing and fixing temp.covered shed 19,200 ft2 email : dharmraj.desai@amns.in contact : 9879101055 name : desai, dharmraj am/ns india material item details : service of temporary dome erection work at material handling department scope of work vendor: 1.execution of job as per agreed detailed sow of temporary dome for material handling department 2.all ppe as per company rules <(>&<)> regulations 3.following all rules and regulation of company including safety <(>&<)> hse norms 4.wsa policy <(>&<)> group insurance 5.all transportation facility 6.manpower should be competent as per competency matrix as per latest msa detailed scope of work: 1. providing temporary dome for iobs, pci, d yard, additive yard in mh area. 2. providing 1st class type of ms wide span shed on contract basis, made of ms pipes, ms trusses, ms purlins all material in vendor’s scope also to and fro transportation charges in vendor’s scope. 3. all safety ppes to manpower must be provided before entry to plant premises. (safety shoe, hand gloves wherever required, safety helmet, safety goggles, dust mask, safety jackets, rain gears (gum boots/raincoats/umbrella etc.)). 4. vendor must ensure that skilled/educated supervisors are deployed for supervision of job. 5. vendor to ensure duty hours not to exceed beyond shift hours as applicable from hse rules of amns india. 6. vendor to ensure that no manpower will be permitted to work beyond 12 hours and should be given weekly off regularly. continuous duty of more than 9 days is not allowed. 7. daily toolbox talks (for understanding hazards and risk involved in job) to be given to manpower in presence of mh engineer and proper records to be maintained. 8. no work to be start at site without taking work permit from concern mh area. 9. height pass certification will be mandatory for person working at height. 10. the structure of the shed would be completely of steel. 11. material quality of dome should be in good condition. amns site engineer will verify the condition of dome material 12. before dome erection work dome ground base to be checked properly by amns engineer/vendor. 13. dome quality inspection for every dome will be done by amns site engineer. each dome inspection records to be maintained by vendor. 14. double covering of entire dome with double layer tarpaulin top and bottom and double layering of bamboo top and bottom. (top and sides). hdpe tarpaulin should be of 250 gsm pure virgin quality along with additional layer of heavy duty cross laminated sheets (as per isi specifications). 2 layers of sheets must be sandwiched between 2 layers page 20 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details of bamboos which should be fixed in the form of a matrix. 15. the shed should be waterproof from top and side and most care should be taken to avoid any ingress of water inside the shed. 16. provision for lighting and lighting fixtures inside the dome shall be in the scope of vendor. (fixture will be provided by amns, installation will be in vendor’s scope) 17. certified scaffolding, certified ladder for safe approach to climb for erection, certified roof top lifelines and other tools and tackles for safe erection shall be in the scope of vendor. 18. vendor to provide 2 nos farana for erection of middle top part (for safe erection). 19. it will be sole responsibility of vendor to deploy correct/right set of skilled resources as per competency matrix for all jobs/works being executed by him at various sites of am/ns india ltd hazira as indicated in msa document. 20. erection of dome should not get delayed due to lack of manpower or material, failing which mh will impose commercial penalties. 21. any damage to dome structure due to natural calamities will not be accounted for amns india. 22. gate pass of any manpower leaving amns india mh site, their gate pass should be release/cancelled from system within 15 days. 23. vendor to ensure all his manpower are made to understand the sops of amns india user department. and sops to be strictly implemented by vendor across his work area inside amns india premises. 24. attendance of manpower to be maintained over 85% every month, failing to which commercial penalties will be imposed by mh. 25. any lapse found in safety/security inside plant premises will attract termination of work order with immediate effect. 26. penalty will be imposed if any dome preparation is delayed due to non availability of material or manpower as per below criteria: a) delay over 12days: 20% penalty on same dome bill amount. b) delay between 8 12days: 10% penalty on same dome bill amount. c) delay over 5 days: 5% penalty on same dome bill amount. # movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. scope of work amns india: 1.over all supervision of work. 2.nonconformity of work penalty <(>&<)> specific penalty for nonperformance by vendor and must be strictly measured. 3.penalty will be imposed in case of non compliance / violation of hse norms <(>&<)> housekeeper incompitancy. mh temporary dome qty dome dimension 120 l x 80 b in feet center of shed 38 40 feet side height 20 feet distance b/w vertical columns along the length 15 feet qty in sq ft 19200 sq ft item note : page 21 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 7 2000155964 10 70 10 intercarting raw materials 1,296,000 to email : dharmraj.desai@amns.in contact : 9879101055 name : desai, dharmraj am/ns india material item details : job title: provide service for shifting of thermal coal to 270mw power plant at material handling department. detailed scope of work of vendor: (a) technical 1. vendor to provide tippers/dumpers (minimum 16 cubic meter tipper truck body) for shifting of raw material (coal) at mh department of am/ns. all vehicles must be equipped with all safety devices as per hse norms of am/ns india. 2. maximum distance is 14km up and down i.e. two sides <(>&<)> density category bd<(><<)>1. maximum distance may change subjected to project area expansion jobs. work order rates will be renegotiated and revised accordingly as per mutual consent <(>&<)> understanding. 3. material shifting to be done from coal yard/third party yard to power plant hopper/new jaldevi plot as per plant requirement, loa ding/unloading points/ route change will be authorized by am/ns india. 4. minimum one day stock (i.e., 4000mt) must be maintained at new jaldevi plot or power plant bunkers must be always maintained minimum70% level. vendor to provide adequate tippers to maintain shifting rate per day as per plant requirements. 5. minimum 18 dumpers to be provided per shift to meet the daily plant requirement. if tippers/dumper count go below minimum/agreed as per work order and power plant operation is hampered due to non availability of dumpers, vendor will be liable for suitable penalties by am/ns india. 6. final material shifting quantity for generating invoice bill will be based on actual weighment, in case of weighing not done/stock out situations, final quantity will be based on bl to bl basis (draft survey report will shared by am/ns in each month). 7. during the entire contract period, age of the vehicle should not exceed 7 years <(>&<)> vehicle should be capable of climbing ramp of 8 degree gradient and no material spillage from vehicle. 8. ensure all deployed vehicles are fit for work as per am/ns safety norms and monthly fitness checklist of each vehicle should be prepared as per requirement. vehicle tracking system (gps) should be provided in each vehicle as per amns india safety guidelines. 9. daily toolbox talks (for understanding hazards and risk involved in job) to be given to manpower in presence of mh engineer and proper records to be maintained. 10. all operators / drivers to be deployed on shift wise duty basis. vendor to ensure duty hrs not to exceed beyond shift hours as applicable from hse rules of amns india. 11. vendor must ensure that skilled/educated supervisors are deployed for supervision of job (minimum 1 supervisor per 10 dumpers) 12. all type of maintenance including all spares <(>&<)> fuel will be provided by vendor for the equipment/ machine, fuel refilling to be done at site. maintenance record of tipper to be maintained and provide to user on monthly basis. 13. in case of breakdown in any equipment, replacement must of same category or higher side. 14. space for maintenance facility and fuel storage space for equipment’s will be in successful bidders scope. 15. due to amns plant expansion project work is going on, present route is divided in to 5 zones from material gate to corex area. vendor must abide by any road diversions due to safety, projects executions <(>&<)> to manage plant operations. 16. intercarting road may be of rcc or pcc or precast or slag layers also. road will be compatible with speed of 20kmph. 17. daily shifting log sheet to be maintained on daily basis and same to be signed by mh shift i/c. quantity will be certified by am/ns engineer. 18. contractor must visit regularly visit the working site at mh area. page 22 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 19. vendor must ensure to give proper numbering of deployed dumper at mh department (for example: vendor name/mh/sr no.) 20. vendor must ensure proper auto lock + manual lock, both systems are available in dumping gate of each dumper deployed at mh department. 21. all equipment/dumpers must be installed with gps system/or similar equipment to have real time location data with amns. 22. ensure all deployed vehicles are fit for work as per am/ns safety norms and fitness checklist of each vehicle should be prepared as per requirement. 23. vendor to ensure all his manpower are made to understand the sop of amns india user department. and sop to be strictly implemented by vendor across his work area inside amns india premises. 24. each equipment/dumper should be equipped with reflective warning triangles to warn other drivers or pedestrians in case of any breakdown of equipment/dumper. any breakdown dumper to be removed from road to a safe location within 12 hrs. 25. gate pass of any manpower/equipment leaving amns india mh site, their gate pass should be release/cancelled from system within 15 days. 26. the contractor shall not move the equipment from designated work area to another area without prior approval from the site incharge. equipment/manpower (gate pass issued under mh department) working under amns india mh department shall not be diverted to other department in any case, failing to comply with this vendor will be solely responsible for any safety violation in plant. 27. before deputing any new operator prior approval to be taken from site incharge for competency assessment. 28. daily logbook as per format provided by site in charge, must be maintained by operators. daily equipment checklist to be filled out by operator. the monthly summary of the daily check list should be submitted along with the invoice. 29. final vehicle check will be done by amns hse department, equipment fitness <(>&<)> ppes will be checked every month by amns india user department. 30. all equipment needs to be deployed from 07:00 am to 07:00 pm for day shift <(>&<)> 07:00 pm to 07:00 am for night shift. 31. to avoid production loss, equipment must be maintained in healthy condition for readiness for shutdown activities <(>&<)> regular work to complete in stipulated time. 32. the contractor shall deploy alternate equipment same specification or above in case of any breakdown above 48hrs duration. (b) safety. 1. vehicle and equipment safety standards: a. age of vehicles: ensure that all vehicles used are not more than 7 years old, as stipulated. regular inspections should be conducted to ensure compliance, with any exceptions approved by am/ns india only in exceptional cases. b. mandatory safety devices: in addition to the standard safety devices listed, all dumpers/tippers should be equipped with: i. speed governors: to ensure adherence to the 20 kmph speed limit within plant premises. ii. automatic fire suppression systems: especially for vehicles handling coal, to mitigate fire risks. c. overloading prevention: install load sensors on all dumpers to prevent overloading beyond the safe load capacity, which should be clearly marked on each vehicle. 2. driver and operator safety training: a. regular training programs: conduct training every three months, with a focus on defensive driving, hazard recognition, and emergency response specific to the transportation of thermal coal. b. competency assessments: implement regular competency assessments for drivers and operators, with a focus on adherence to am/ns safety norms and effective use of all safety devices. 3. risk assessment and hazard identification: a. a comprehensive risk assessment should be conducted quarterly, page 23 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details focusing on the risks associated with the transportation of coal, particularly over long distances and varying road conditions. b. hazard identification and risk assessment (hira) reports should be submitted to am/ns india for review, ensuring that all identified risks are adequately mitigated. 4. emergency response plan: a. develop a detailed emergency response plan (erp), including procedures for handling vehicle breakdowns, fire incidents, and spillage of coal. emergency drills should be conducted biannually. b. spillage management: include protocols for immediate clean up of any coal spillage, with dedicated spill kits available in all vehicles. 5. material handling and transport: a. load security: ensure that all loads are securely fastened to prevent spillage during transit. this includes the use of tarpaulins or other covering materials where necessary. b. maintenance protocols: implement a rigorous maintenance schedule, with monthly checks on vehicle fitness, including brakes, steering, and load bearing components. 6. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. this includes any road safety violations, equipment br eakdowns, or safety breaches. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 7. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with all safety protocols, focusing on vehicle and driver safety, load security, and adherence to speed limits. b. audit findings should be documented, with corrective actions implemented immediately. 8. ppe requirements: a. all personnel involved in the transport and handling of thermal coal must wear appropriate personal protective equipment (ppe), including flame resistant clothing, reflective jackets, and safety boots. b. regular inspection and replacement of ppe is required, ensuring compliance with the factories act, 1948. 9. environmental compliance: a. ensure compliance with the environment (protection) act, 1986, particularly in relation to emissions from vehicles and the prevention of coal spillage. b. regular monitoring of vehicle emissions should be conducted, with records submitted to the relevant authorities. 10. health and medical surveillance: a. regular health and medical surveillance is mandatory for all drivers and operators, including annual health checks to ensure fitness for duty. b. compliance with health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. 1. the contractor must follow all rules and regulations of company including safety <(>&<)> hse norms. 12. 2. the contractor should provide the required number of relievers for safe operation. no operators/associates will be permitted to work beyond 12 hrs and must be given weekly off. continuous duty of more than 9 days is not allowed. 13. 3. penalties will be applicable for violating safety/statutory norms, mobile policy/vehicle driving policy as per amns consequence management policy. 14. 4. the contractor must ensure safe transport of their operator and maintenance team inside plant premises. 15. movement of manpower / associates at our hazira site. 16. a). no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 17. b). the contractor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. page 24 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 18. 5. contractor must provide reflective jackets to all operators (dumper drivers, supervisors, maintenance crew) working at amns india plant premises. reflective jackets for heavy equipment operators are must. 19. 6. associates must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is to be used for the gate entry inside plant premises. 20. 7. operator and maintenance crew will mandatorily use all necessary ppe s as per site conditions. all ppes shall be in the scope of contractor. 21. 8. the contractor is also responsible for training and retraining of their manpower regarding general plant safety, defensive driving, and behavioural safety or any future training requirements as per amns hse policy. proper training records to be maintained by the vendor. 22. 9. any lapse found in safety/security inside plant premises will attract termination of work order worder. 23. 10. contracted equipment should have all oem standard safety devices and as required by am/ns india, as per table below. contractual equipment shall be equipped with safety devices are in working condition as per oem standard and am/ns india requirements as given below. mandatory safety devices for tipper/dumper 1 gps system from vendor approved by am/ns 2 prestart alarm 3 seat belt for driver 4 head lights 5 side indicators 6 brake light 7 front main horn 8 backup alarm/reverse alarm 9 rear view side mirrors as per oem recommendations 10 parking/hand brake 11 seat belt for co passengers 12 parking light 13 rear view camera 14 reverse proximity sensors with warning system 15 wipers 16 fire extinguisher for heavy equipment categories. 1 gps system from vendor approved by am/ns. 2 prestart alarm 3 seat belt for driver 4 head lights 5 side indicators 6 brake light 7 front main horn 8 backup alarm/reverse alarm 9 rear view side mirrors as per oem recommendations 10 parking/hand brake 11 load test certificate (form 10 third party) 12 forklift blue spot light/safety pedestrian lights 13 red zone warning light for forklift 14 over hoist limit switch 15 safe load indicator (sli) 16 marching alarm 17 boom control system warning 18 platform capacity indiactor other safety devices if any non complinace arises to be rectified with in 3days . 19 seat belt for co passengers page 25 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 20 parking light 21 rear view camera 22 reverse proximity sensor with warning system 23 wipers 24 fire extinguisher for heavy equipment category 9kg,medium equipment 6kg and light vehicle 2kg 25 revolving light/beacons (c) statutory. 1. availability of backup vehicles and equipment: a. vendors must guarantee the availability of backup vehicles within 2 hours in case of breakdowns to avoid delays in coal transportation. b. penalty for non availability: implement a penalty clause for failure to provide backup vehicles, which could disrupt power plant operations. 2. regular maintenance schedule: a. a detailed maintenance schedule must be submitted monthly, including records of all maintenance activities to ensure vehicles and equipment remain in optimal working condition. 3. safety performance bonus: a. introduce a safety performance bonus for vendors who maintain 100% compliance with all safety protocols and achieve an incident free operation during the contract period. 4. insurance coverage: a. comprehensive insurance coverage must be provided by the vendor for all vehicles, equipment, and personnel, including third party liability insurance. 5. the vendor shall provide the equipment and operators as per land of law (e.g., rto laws <(>&<)> fitness) and company policies (e.g., safety certification <(>&<)> competency training). 6. all equipment must be following all applicable rto, central, state, and local govt rules <(>&<)> regulations. 7. vendor must ensure wsa policy and group insurance for their manpower. 8. vendor must have technical and operational competence to provide required services. 9. vendor must have work experience in heavy industries such as large steel plant, cement, mining, or port operations. 10. vendor must comply with all relevant local, state regulations, including health and safety standards. 11. vendor must have sufficient fleet to allocate sufficient resources, including manpower, equipment, to meet plant requirements. 12. manpower should be competent as per competency matrix as per latest msa of amns. 13. prices to be inclusive of all charges including operator / driver charges +reliver + repairs <(>&<)> maintenance crew + insurance + rto + consumables (like fuel oil etc.) +fuel filling facility (like bowser, pick up, etc.) at site + safety ppe. 14. vendors must quote basic prices. gst shall be paid extra as applicable. 15. payment shall be made as per actual availability of equipment on site 16. all equipment prices to be inclusive of mobilization <(>&<)> de mobilization charges (if any). 17. prices shall remain firm for the duration of the contract. 18. all offers to be submitted in quotation format only. page 26 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 19. the contract period can be extended beyond the initial period as per mutual consent <(>&<)> understanding. 20. equipment manufacturing year must not exceed 7 years during entire contract duration, and it should be in good working condition as per amns safety standards. any decision regarding acceptance of equipment of yom earlier than 7 years will be taken by amns only in exceptional cases. 21. payment shall be made as per quantity certification provided by amns india user department. 22. payment shall be made within 30 days of invoice submission. 23. equipment should be ready to deploy / make operational at our site by 1st jan 2025. however, the exact date of mobilization would be communicated 7 days in advance. 24. 17. vendor must ensure no overloading of dumper is done. dumper to be loaded within allowable load. dumper trucks should have a safe load capacity mentioned against each dumper and which should not be exceeded in any case. (refer annexure 1 for maximum allowable load inside plant premises) (d) penalty clause. termination and penalties for non compliance 1. penalty for unsafe acts: a. 10,000 for each unsafe act observed during safety audits or inspections, particularly in the transportation of coal. 2. severe safety violations: a. 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in spillage or environmental contamination. 3. safety violations: a. 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to coal transport. 4. late incident reporting: a. 5,000 per hour of delay beyond the 30 minute reporting window for any incident. 5. failure to provide backup vehicle/equipment: a. 20,000 for each instance where a backup vehicle or equipment is not provided within the stipulated time frame. 6. penalty for environmental non compliance: a. 100,000 for any non compliance with environmental regulations, including failure to prevent coal spillage or improper disposal of materials. 7. penalty for non performance: a. penalty as per the monthly bill amount if the vendor fails to meet the required standards for coal transportation, with escalating penalties for repeated non performance. 8. 9. penalty will be imposed as per hse directive for consequence management for safety non compliance / violation(s) <(>&<)> accident(s) for contractor employees at all plants / work sites of amns india ltd. 10. in case of any property damage vendor is liable for penalty as per amns policy for consequent management or vendor have to repair/replace damage property or pay amount of damage as per assessment by competent amns india authority. 11. in case of any traffic or road safety rules (over speeding, overtaking) violation inside plant premises suitable penalty will be imposed by amns security team as per consequent management policy of amns india. 12. repeated road safety violations will result in blacklisting of the associate or vendor as per amns india consequence management policy. 13. spillage of material will not be allowed on yards or roads, any spillage from dumper will result in suitable penalties (rs 500/ per page 27 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details incident debit note will be levied against vendor) 14. strict penalties will be levied in case of overloading of dumpers. 15. a) vendor must ensure no overloading of dumper is done. dumper to be loaded within allowable load. dumper trucks should have a safe load capacity mentioned against each dumper and which should not be exceeded in any case. (refer annexure 1 for maximum allowable load inside plant premises) 16. b) if load is exceeding maximum allowable load, amns user department will consider only max allowable load in invoice bill generation (example: if max allowable load for any dumper is 30mt, and its weighment is showing 31mt, then only 30mt will be considered for invoice generation) 17. penalty as per bill amount of respective month will be imposed if dumper fleet goes below 80% of required dumpers fleet. (80 to 70 % 5 % penalty of bill amount, 70 to 60 % 10 % penalty of bill amount, below 60 % 20 % penalty of bill amount). 18. if the vendor fails to remedy the non performance within the specified time frame, or if the vendor repeatedly fails to perform its obligations under this scope of work, the amns india shall have the right to terminate this work order for non performance. 19. (non performance: failure by the vendor to provide services as specified, failure to adhere to agreed schedules, failure to meet safety and compliance standards, and failure to maintain equipment in proper working condition). compliance with specific indian regulations • the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. • the motor vehicles act, 1988: regulates the movement of materials within and outside plant premises, ensuring compliance with transport safety standards. • the environment (protection) act, 1986: provides for the protection and improvement of the environment, with specific rules for pollution control during material handling. • the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. am/ns india scope: 1. all required work permits. 2. designate a point of contact for coordination and communication with the contractor. 3. loading of material will be in am/ns india scope. annexure 1 annexure 1 for bulk density less than 1(bd<(><<)> 1) sr no material thermal coal/coal fines density 0.95 tipper cum load as per cum allowable (20% allowance) 1 12 11.4 13.7 2 14 13.3 16.0 3 16 15.2 18.2 4 18 17.1 20.5 5 23 21.9 26.2 6 29 27.55 33.1 annexure 2 (cost calculation) job: intercarting of raw material and plant returns with loading page 28 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details equipments category/descriptions qty uom rate value intercarting raw mat bd less 1t/m3 3011925 1296000 to 63.47 82257120 total 82257120 # power plant consumption of indonesian thermal coal considered. # no handling of coal from 140 yard considered. (18km distance not considered) # existing route considered for shifting from coal yard logistic gate material gate power plant. (14km distance taken) item note : 8 2000156142 10 80 10 providing and fixing temp.covered shed 1 ft2 email : pankaj.yadav@amns.in contact : name : pankaj yadav item details : item note : 9 2000159475 10 90 10 providing of tarpaulin shed rental basis 19,600 ft2 20 providing of tarpaulin shed rental basis 10,000 ft2 email : mohit.kumar1@amns.in contact : 9510814447 name : kumar, mohit am/ns india by product item details : title of spr providing temporary dome shed for various plant of by product management. scope of work (vendor): ø providing temporary dome shed for finished product <(>&<)> raw material storage at mixed pellet unit – 1 (near mod v), mixed pellet unit – 2 (near corex), sap, and other by product plant during rainy seasons. ø shed materials like structure, tarpaulin, tie rope etc. are all will be in vendor scope and shifting equipment’s like hydra, crane, dumper, tractor, forklift are all will be in vendor scope. ø all required materials and installation spares for making temporary dome shed will be in vendor scope. ø shed dome clothes material should be waterproof. ø shed dome should be completed before june’25 and it will be removed after oct’25 month. ø during from may’25 to october’25, if any damages or services required, then vendor should be attended. ø manpower to be deployed as per competency matrix latest revision. ø operators ppes and their corona test, safety, safety equipment <(>&<)> materials, other related welfare all will be in vendor scope. ø vendor and manpowers must follow amns safety policy. ø vendor and manpowers must follow site engineers’/supervisors’ instructions. ø manpowers transportation will be in vendor scope. ø if delay occurred in installation of temporary dome, it will be deducted from bill amount. ø in case of any incident the responsibility and the accountability will be in vendor scope. specific penalty for non performance by vendor and must be cardinally measured penalty will be applicable for violating sop, and any damage to plant property as per amnsi policy. penalty will be imposed in case of noncompliance to hse norms and non conformity of work. specific penalty will be 20% of running monthly bill value. movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate must undergo medical fitness at our care nursing page 29 of 29 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124718 date 28.11.2024 submission date 06.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null yagnika patel contact email yagnika.patel@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. scope of work (amns): ø power supply will be in amns scope. ø work related safety awareness training will be provided by amns engineer/safety captain to associates. item note :...

Western Railway - Gujarat

46395443 supply of iow inspection kitiow inspection kit,iow inspection kit with 26 items inspection equipment list [(1) magnifying glass 100 mm 1 n o. , (2) freemans pocket steel tape with bubble & belt clip 3 meter long. 1 no. (3) freemans glass fiber ta pe 30 meter long 1 no. (4) inspection mirror with handle (5)inside caliper 10 long 1 no.(6) outside calipe r 10 long 1 no.(7) prismatic binocular (olympic/nikon) falcon 10x50 or similar 10x zoom. 1 no.(8) shim f eeler gauge 4 01 nos. (9) chisel 01 nos (10)safety helmet (11)welding gauge (12).heavy duty laser plumb bob with hook string and runner. (13).concrete test hammer (14).digital coating thickness gauge fo r ferrous metals. measuring range: 0 1250 muhm (15) .laser targeting distance meter for measuring dista nces is as bridge height and hard to reach objects. (16)led torch (17)piano wire (30 meter) (18)spirit level with two bubbles (19)chipping hammer. (20)nicely finished storing and transporting metallic box made of mild steel and carrying bag for keeping above items (21)tds meter (22)chloroscope (23)thickness gauge ( 24) wire brush (25)protective gloves & eyewear (26).rebound hammer. [ warranty period: 30 months af ter the date of delivery ] ] senior section gujarat 10.00 set...

Arcelor Mittal Nippon Steel India Limited - Gujarat

46340009 tender for slab handling & yard management at smp1 caster 2000156466 40 10 10 scarfing of slabs 1,200,000 to 20 scarfing of slabs 600,000 to 30 scarfing of slabs 1,440,000 to email : vishal.vadi@amns.in contact : 9879103459 name : vadi, vishal am/ns india smp1 (haz) item details : slab handling <(>&<)> yard management at smp1, amns india ltd. hazira, surat. the scope of work in general has been mentioned as under. we have tried to cover most of the scopes. however, since the job volume is vast and hence some jobs could possibly be missed out <(>&<)> will have to be executed by contractor as <(>&<)> when required as directed by area in charge. submission of quote would automatically mean that below terms are accepted to the contractor. the manpower required are for some specialized jobs. they are to be skilled to perform the below mentioned job. the scope generally shall be as under. service providers / contractors’ scope and specification of work. suppliers scope of work: the scope of work for slab handling <(>&<)> yard management is as under: the scope of work shall include but shall not be limited to the following: job / quantity estimation cy25: slab handling <(>&<)> yard management cy 25 sr no service unit qty / month qty / year 1. slabs up to 1 lac ton 1,00,000 12,00,000 2. slabs 1 lac to 1.5 lac ton 50,000 6,00,000 3. slabs above 1.5 lac ton 1,20,000 14,40,000 note the quantities shown are on annual basis. however, it may increase or decrease depending on the production plan and actual requirements. technical: vendor scope: scarfing of slabs: • marking of slab id as and when required to ensure proper visibility. • inspection of slabs, spot scarfing / complete scarfing as per the requirement. • processing of slabs as per the requirement. (scarfing) • filling of formats / maintaining all the records as per standard format provided by am/ns in charge. • collecting, changing, shifting, and connecting of gas cylinders and scarfing torch hose connection. • safe operation of scarfing torch / gas cutting torch, lancing torch / page 2 of 9 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124429 date 22.11.2024 submission date 03.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details pressure regulators / scarfing nozzles / pug cutting machine / hoses <(>&<)> and their day to day maintenance. • upkeepment / housekeeping of working area <(>&<)> premises in caster slab yard. • to deploy skilled scarfer to ensure that in the scarfing process no new defects are initiated <(>&<)> entire surface of slab must be cleaned properly. ensuring smooth surface with proper shape <(>&<)> defect free slabs. • contractor is responsible for preparation <(>&<)> cleaning of scarfing and slitting bed. • daily targets for scarfing will be given by shift manager that must be achieved otherwise penalty will be imposed as per penalty clause. • quality of scarfed slab must be defect free <(>&<)> if scarfing related defects found in finished product penalty will be imposed to the contractor. • contractor must ensure that all <(>&<)> any burrs generated during casting / scarfing / parting of slabs are completely removed before sending slabs to hsm / pm. • manual cutting of crop end or rejected slabs by gas cutting or lancing. • slitted / parted slabs measurement required before <(>&<)> after slitting / parting. • contractor should maintain the record of slitted / parted slab measurement and submit to shift in charge. • slitting <(>&<)> parting job must be done as per given plan <(>&<)> measurement. if wrong slitting / cutting reported penalty will be imposed to contractor. as <(>&<)> when required: • slitting of slabs for quadruped making as <(>&<)> when required. • lancing work at caster as and when required. • cutting of samples from steel slabs as <(>&<)> when required. • tcm rot emergency cutting of cold / hot slabs by gas cutting or lancing as <(>&<)> when required. • lancing of steel skull / jam build up in area of torch cutting machine including scale, at flume tunnel, rot (run out area), in segments at maintenance area as <(>&<)> when required. • joint slabs cutting, lancing <(>&<)> skull removal at rot as <(>&<)> when required. • preparation of tundish cover from slab as per drawing as per instruction of amns in charge as <(>&<)> when required. • slitting of slabs as <(>&<)> when required. • any other gas cutting jobs as <(>&<)> when required <(>&<)> as per instruction given by the engineers. machine operation <(>&<)> maintenance: • safe operation of scarfing torches, parting machine <(>&<)> pressure regulators <(>&<)> their day to day maintenance is in vendor scope page 3 of 9 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124429 date 22.11.2024 submission date 03.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details including all spares • contractor shall maintain the slitting machines, slitting nozzles, scarfing torches, scarfing nozzles, regulators, required hoses and their spares (minor spares and all other small items required for the job like potentiometer, gears toggle switch, on / off switch, carbon brush, brazing rod etc.) all maintenance of the equipment <(>&<)> its minor / small spares will be in contractor / vendor scope. manpower: • vendor will ensure adequate manning to run 6 scarfing torches and 6 parting / slitting machine round the clock. • the deployed supervisors and scarfers must have adequate knowledge of inspection of slabs surfaces and sub surfaces defects of slabs and methods to remove the same by scarfing. • for minimum 06 torches in operation / shift which required minimum 12 scarfers, 06 semi skilled, <(>&<)> 3 job supervisor / shift. (12 hrs. duty/shift x 2 shift/day) • for minimum 6 parting machine in operation which requires minimum 6 parting machine operator / shift. (12 hrs. duty / shift x 2 shift /day) • minimum 7 riggers to be deployed / shift for slab shifting <(>&<)> rigging job in slab yard (12 hrs. duty /shift x 2 shift /day) • one site supervisor to be deployed in day shift for slab yard general management <(>&<)> coordination with amns team. • one technician to be deployed for machine / torch / hose / regulator repair and maintenance job on daily basis. • one painter / shift for stencil letter marking on slabs (12 hrs. duty /shift x 2 shift / day) • contractor to ensure minimum manpower for below table no 1 <(>&<)> mentioned jobs. table 1 category 12hrs shift total req. w off reliever leave relie total supervisor 3*2 shift 6 2 0 8 scarfer 12*2 shift 24 4 0 28 semi skilled 6*2 shift 12 2 0 14 gas cutter 6*2 shift 12 2 0 14 site technician 1 1 0 0 1 rigger 7*2 shift 14 3 0 17 safety supervisor 1 1 0 0 1 painter 1 shift 2 1 3 total / day 72 with w off <(>&<)> leave reliever 86 note: 1. 1 scarfer cum lancer is required per 12 hrs shift (included in above count as per above mentioned table 1) 2. contractor must maintain manpower in each category as mentioned above to ensure week off / leave management as per legal requirement. page 4 of 9 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124429 date 22.11.2024 submission date 03.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 3. manpower to be deployed on 12 hrs shift with mandatory weekly off. relievers to be deployed to carter the balance days. 25% extra gate passes will be allowed to take care of week off, leave relievers etc. scope of work rigger: technical • shifting of slabs from different locations of slab yard to charging area as per rolling requirements. • loading / unloading of slabs and crops. • turnover of the slabs for inspection and scarfing on the other side of the slab as per the requirement. (inclusive stod operation). • placing of scarfed slabs back in the designated area as per the requirement. • shifting of slabs from the storage yard to parting / scarfing area. • shifting the slabs back to storage yard. • guiding to crane operator for slab lifting from tcm rot area. • to operate slab turnover device. • inter bay slabs shifting through slab transfer car. • slab spreading on scarfing / parting bed. • slabs cut end/scrap loading in dumper. • slabs loading on trailer for dispatch. • scarfing bed bloom removing and placing for bed cleaning. • slabs sample carrying to spectrum lab. • handling of joint / bent slabs on rot. • slab yard area housekeeping. • slabs marking of unmarked slab. • slabs shifting in open yard for spreading / piling. • required slabs movement inside the slab yard. • emergency head preparation at tcm for casting as <(>&<)> when required. • hot slab removing from caster machine in case of emergency. • scarfing burr loading and unloading in dumper area cleaning. • rigger must be competent must be minimum 10th pass able to speak <(>&<)> understand hindi, must have minimum 1 year of rigging exp erience. scope of work painter: stencil letter marking on slabs technical • marking of slabs with stencil plate for slab identification purpose <(>&<)> as per instructions of area in charge. • scope of work includes carrying out stencil plate marking for slabs including required paints and machinery as per requirement <(>&<)> page 5 of 9 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124429 date 22.11.2024 submission date 03.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details instructions / direction of area in charge. • mechanical cleaning of slabs surface by chipping, cleaning by wire brush / cloths, applying background painting. • vendor shall complete the job as per the approved specifications, drgs, and as per the direction <(>&<)> satisfaction of amnsi e ngineer in charge <(>&<)> you shall provide all services on 24 hrs. basis. • letter size: 65 mm (h) x 50 mm (w) x 10 mm (t) • number of letters per slab = 10 (ten) • number of slabs / days to be painted 230 slabs. • 10 x 230 x 365 = 8,39,500 letters / year. (approx) note the quantities shown are on annual basis. however, it may increase or decrease depending on the production plan and actual requirements. hse requirements: • vendor shall comply with the health, safety <(>&<)> environment policy as laid down by amns. • vendor must follow all safety protocol of the amns safety. in future amnsi can add new safety norms as per the requirement. • vendor shall ensure the safety of your personnel <(>&<)> follow all safety measures prescribed. vendor shall provide for all safety requirements as per the demands of the services rendered at your own cost with all necessary ppe (personal protective equipment) • provided vehicle must be healthy <(>&<)> must be as per safety norms as per amns rule. • operator must fill up a comprehensive equipment / machine checklist every day on start up of his shift. • the checklist is to be maintained for a period of 2 years for any audit purpose. • all ppe will be in vendor scope. • weekly off to be maintained as per ir guidelines by the vendor. tools <(>&<)> tackles: • vendor shall ensure that all the tools and tackles are certified by a competent authority for use in factory. such a certificate should be duly valid at all points of time. safety rules and regulations: • contractor shall ensure safety of your personnel <(>&<)> follow all safety measures prescribed as per amns policy. • contractor shall provide for all safety requirements as per the demands of the services rendered at your own cost. • contractor shall comply all safety and environmental rules as per guidelines of fire <(>&<)> safety department and environment department. • contractor shall ensure that all the employees deputed by contractor at amns site are medically fit to carry out the activities in order to ensure that the jobs entrusted are completed safely in time and without any hindrances. for this, it is necessary for contractor to submit medical fitness certificate for all contractor employees deputed at amns page 6 of 9 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124429 date 22.11.2024 submission date 03.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details site to amns fire and safety department. in case at any time, the persons deputed are found medically unfit, they shall be denied entry in amns premises and not allowed to carry out the jobs. • all required ppe’s for the job <(>&<)> manpower transportation with safety will be in vendors scope • contractor shall provide following safety gears with specifications approved by am/ns: 1. safety helmet (colour will be provided by am/ns) 2. safety shoes. 3. safety jacket (as per amns india standards). 4. dust mask. 5. safety goggles 6. hand gloves. 7. ear plugs / earmuff. 8. addition safety equipment if required. housekeeping in slab yard: • contractor will be responsible for housekeeping in slab yard. material should be loaded in the buckets and buckets should be unloaded in the dumper. scarfing bay cleaning with the help of loader <(>&<)> dumper. amnsi scope of work: • amnsi will provide all handling equipment like eot crane, trucks, and loader etc. • all gas, consumables, scarfing torches, slitting machines and its nozzles, ng <(>&<)> oxygen hoses will be provided by amns free of charge on accountable basis. • space, power, gas, and water supply will be given by amns. movement of manpower / associates at our hazira site: • no pedestrian / cycles / two wheelers movement will be allowed inside the plant premises. • vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. • vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. safety: 1. competency needs: a. all workers shall have at least 1 yrs. of hands on working experience. b. all workers shall have min. understanding of local or national language. 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. b. workers must undergo 16 days of associates training program organized by respective plant as a part of induction followed by assessment. c. they all must have a signalling skill. d. communicate learning from incident or accident wrt job work with all working staff. e. all workers shall be medically fit to work in hazardous operation. page 7 of 9 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124429 date 22.11.2024 submission date 03.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details f. ensure daily tbt. 3. risk assessment and hazard identification: a. a comprehensive risk assessment study must be conducted quarterly, focusing on the hazards associated with job / work. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of job. 4. supervision: a. assign job supervisor to manage overall operation, administration and emergency for the job and workers. b. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every quarter to ensure preparedness the probable emergency. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. nitrile shole safety shoes c. hand gloves d. safety jacket (as per amns india standards) e. dust mask f. safety goggles g. hand gloves. h. ear plug / earmuff i. any other special ppes as asked by amnsi. j. contractor shall fulfil all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. vendor shall ensure safety of your personnel <(>&<)> follow all safety measures prescribed as per amnsi policy. 10. all transportation of man <(>&<)> material in vendor scope up to the department gate (bus / vehicle facility). 11. any kind of unauthorized mobile phone are not allowed. page 8 of 9 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124429 date 22.11.2024 submission date 03.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 12. following of all am/ns india sop <(>&<)> hse norms. 1. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medical examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 2. compliance with indian labor laws: adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. (c) statutory: • the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. • the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. • wc policy / group insurance. • wc <(>&<)> group insurance policy in vendor’s scope. • manpower should be competent as per competency matrix as per latest msa. • following company rules and regulation provided by am/ns management time to time related to safety hse and other rules and regulation. • all associates attendance, salary, invoice related data, scrum attendance system tracking and request generation for attendance re gularization in scrum system as and when required. • all kind of required legal certification, license, insurance of vehicle, personal insurance of driver <(>&<)> cleaner, vehicle health checkup <(>&<)> certification will be in vendor scope. other terms: • associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. penalty clause to vendor: contractor is liable for penalty in following cases: if vendor does not achieve monthly scarfing targets penalty as given below will be deducted from total invoice for the month. if minimum scarfing targets not achieved: monthly 23000 sq mt – penalty will be 2.5% of invoice amount. • if the quality of scarfing, slitting <(>&<)> parting will find poor <(>&<)> quality defects found in final product due to poor scarfing, slitting <(>&<)> parting of slabs. • if vendor will be unable to maintain spares of the equipment which are used in scarfing, slitting <(>&<)> parting job. page 9 of 9 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124429 date 22.11.2024 submission date 03.12.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details • if vendor will violate any process sop, guidelines, instructions regarding scarfing, slitting, parting, housekeeping <(>&<)> safety. • in case of overstay of manpower for more than 16 hrs. • penalty amount for above instances, amns will give appraise mail to vendor for every instances. up to 2 apprise mail for same case no penalty. from 3rd mail for the same instance, penalty will be 2000 / apprise mail. • in case of property / machine / equipment damage by vendor. vendor is liable for the same and penalized for the damage. penalty for non compliance: 1. penalty will be on a monthly bill value. 2. penalty for absence minimum presence 100%. manpower, up to 95% availability – 4.0 % of invoice amount 95 – 90% availability – 9.5 % of invoice amount 90 – 85% availability – 14 % of invoice amount 85 80% availability – 18 % of invoice amount <(><<)> 75 80 % availability – 22.5 % of invoice amount penalty for noncompliance of job like poor workmanship, sop violation, poor quality work, etc will be as per sow and as per prorate basis. • penalty of 10% in two consecutive months will make contractor eligible for either termination of contract or penalty more than 25%. • while normal duty hours are 12 per day, more than 16 hours’ continuous duty is not allowed on any day. contractor shall be penalized by an amount of rs. 5000/ per such cases <(>&<)> any such repetition of more than 3 cases in total will increase penalty amount to rs. 6000/ per cases. • manpower is allocated basis 12 hours’ duty. hence, contractor must ensure that shift schedule is maintained as per 12 hours shift. only in extreme crisis condition, contractor shall be allowed for 3 consecutive days of 16 hours shift in a month. after 3 days, penalty of rs. 2500/ per day shall be levied if 16 hours’ duty continues. • w off must be provided. penalty for late coming: associates must relieve on workplace. no workmen should leave workplace without reliever being available at workplace. contractor to ensure availability of his own supervisor during each shift relieving to ensure smooth transition of shifts. failure to ensure relieving at workplace <(>&<)> non availability of associates will also attract penalty at the rate of rs. 200/hou r/associate late coming. end of sow – scarfing <(>&<)> slitting of slabs ...

Vadodara Mahanagar Seva Sadan - Gujarat

46296232 operation and maintenance of mechanical, electrical, civil and instrumentation equipments for 21 mld sewage treatment plant and mps at chhani , vadodara for three years . 1 safety helmet 2 safety shoes 3 electric insulation mat as per is 15652 for ht panel 4 ht yard fencing 5 fire bucket with sand and water 6 torch 7 first aid kit 8 electric tester 9 shock treatment instruction chart 10 fire extinguisher (a,b & c type) 11 safety belt with double polyimide land yard with scaffold hook and shock observe with rope 12 megger 13 clip on meter 14 11 kv high voltage insulated gloves 15 danger and caution notice board 16 chlorine leak detection with alarm 17 chlorine gas kit 18 face shield 19 barricading and caution tap 20 safety jackets for chlorine gas leakage...

Arcelor Mittal Nippon Steel India Limited - Gujarat

46233767 tender for spr 27021253 manpower for pickling commissioning trial 27021253 10 10 10 diployment of rigger 7,290 tag 20 providg services of supervisor 12hr/day 486 10 email : anil.bhujade@amns.in contact : name : anil bhujade item details : scope of work detail sheet attached with approval note regular menpower 30 men * 243 days * 1000 rs/day rigger: 30 no duty hr: 12hr per shift supervisor : 2 men*243*1200 rs/day supervisor : 2 vendor scope: (menpower supply with following) 1) all ppes 2) uniform 3) medical fitness cirtificate 4) insurance 5) require minimum qualification <(>&<)> expirence as per amns msa safety a. personnel protective equipment (ppe): 1. contractor must ensure following listed ppe for their workmen working under this contract as per the amns ppes standard guideline of first party which are mandatory to execute the service: 1. safety helmet (frp) – isi make ansi z89.2 osha 1926.1 2.high ankle safety shoes – safety approved ansi z41.1 – 1967 osha 1926.96 3. safety goggle – isi make good quality. ansi z87.1 1968 osha 1926.102 4. ear plug ansi s3.19 1974 osha 1926.101 5. jeans jacket / fluorescent jacket 6. dust mask – 7. hand gloves as required – cotton for technician / leather for welder and gas cutter. 8. full body safety harness 9. welding helmet – for welder (welding job) 10.face shield – for grinder (grinding job) 11. welding goggle for gas cutter (cutting job) 12. safety belt – for height work note: as per ppes matrix shall issue the ppes to each workman b. high risk safety activities: following mandatory safety permissions should be taken during service execution work to be carried out: 1)permit to work (ptw) 2)work at height certificates 3) confined space entry certificates 4)excavations certificates 5)lock out/tag out (energy isolation) 6)hydra (pick <(>&<)> carry crane) certificates 7) heavy equipment or materials with cranes or hoists certificates amns scope page 2 of 2 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124056 date 16.11.2024 submission date 25.11.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null ragini mishra contact email ragini.mishra@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 1. instruction for work execution 2. required work permit. item note :...

Arcelor Mittal Nippon Steel India Limited - Gujarat

46233765 tender for feasibility study and feed support cgl6 o pr no. pr item rfq item services for line item quantity uom technical details other details 1 2000160764 10 10 10 engineering/technical study 1 lo email : manoj.lalvani@amns.in contact : 9879101878 name : lalvani, manoj am/ns india crm ope item details : vendor scope of work feasibility and fitment study for cgl#6 in rs bay in crm#1 complex with related auxiliary facilities with electrical, water and utility facilities. preparation of plant layout with its associated infrastructure facilities for cgl#6. preparation of rfq for cgl#6 in consultation of gcto. technical bid evaluation and recommendation for the above package. 5 nos or offers have been considered for each package with comparison sheet and ranking matrix. estimation of boqs for civil <(>&<)> structural, utility, water and electrical <(>&<)> automation for balance of plant area. preparation of investment report (technical part) for board approval (go ahead) of the project. on receipt of contract from am/ns, hazira vendor will appoint a project coordinator, who will be responsible as a single window for all communications. all the activities, thereafter, will be carried out by vendor team. fitment study with respect to available space for cgl#6 line fitment including auxiliaries like ecr, hydrogen and nitrogen, fuel, electrical power and water facilities shall be done and decided jointly with amns team technical specification shall be prepared for cgl#6 based on the offers received, necessary clarification/confirmation as needed shall be sought by amdec for technical alignment. necessary meeting with the bidders shall also be conducted for the same. upon alignment, price offers shall be received from the bidders by am/ns for lines needed for estimation of overall project cost. other bop packages (like compressors, hydrogen <(>&<)> nitrogen facility, electrical transformers and so on) cost to be provided by vendor. a global scope matrix shall then be prepared for the project by vendor, identifying the packages to be envisaged during project ex ecution. enablers boq/ cost shall be considered based on mutually agreed solution with amns team. upon completion of the above activities, technical input to cac file shall be prepared scope of work amns essentials like electricity, water etc. work space provide. amns safety rule and regulation as per company policy: • all the persons should be healthy and medically fit and must be certified by the hospital(cnh). • work should be started only after taking authorized work permit. • toolbox talk must be delivery before starting the job on daily basic. • use certified portable hand electric machine. • use certified lifting tools <(>&<)> tackles <(>&<)> it should be check before every use. • ensure that all persons are wearing safety helmet, safety shoe, safety page 2 of 2 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000124059 date 16.11.2024 submission date 25.11.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. krutikkumar patel contact 7043217731 email krutik.patel@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details goggles, face shield and cut resistance hand gloves, full body shock absorber double lanyard safety harness (for jobs above 4 metre height) / for job bellow 4 metre height full body double lanyard safety harness without shock absorber to be used. • work should be carried out in close supervision of competent supervisor. item note : vendor arcelormittal design and engineering centre pvt. limited...

Arcelor Mittal Nippon Steel India Limited - Gujarat

46161359 tender for 2000160611 hiring of manpower for company owned acs o pr no. pr item rfq item services for line item quantity uom technical details other details 1 2000160611 10 10 10 services of skilled personnel 12 no email : gajendra.rathore@amns.in contact : name : gajendra rathore item details : technical contact person mr. gajendra rathore, mob no: 9033419180 job description skilled manpower co owned ac ikj hostel 07 skilled technician + 01 skilled supervisor. (08 nos x 12 month = 96) uom nos qty. 12 scope of work vendor: contract location – township. contract department – admin (r<(>&<)>m) deliverables vendor must provide skilled manpower for acs maintenance job of amns ts for company own acs. all manpower has valid iti certificate of rac (refrigeration and air conditioner course) manpower accommodation, transportation and food services is part of service provider. manpower working hrs should be 08 hrs. (starting 08:30 am to 05:30 pm). vendors must provide 08 skilled manpower on daily basis to attend acs services. vendors must develop one skilled manpower who can manage supervisor job too for smooth operation and who can communicate with area in charge day to day job. all manpower has valid scrum pass as per amns sop. all house job cards should be maintained by vendor with resident signature. all acs services should cover once in a month. permit to work (ptw) system must be followed by the contractors personnel where required within amns premises. the contractor shall ensure all his staff are aware of company safety and fire regulations whilst on company premises. accommodation, transportation to and from work site, and page 2 of 4 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000123746 date 12.11.2024 submission date 19.11.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null shail kumari yadav contact email shailkumari.yadav@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details medical/insurance shall be borne by contractor for his personnel. although each person will be given the safety induction and will be familiar with the amns safety regulations, this will not deduct from the responsibilities of the chosen contractor to ensure that their employees work safely. any non compliance with these regulations will result in the termination of that manpower. the contractor shall make replacement of persons at no additional cost to amns. the performance of the contractor shall be monitored continuously to ensure they meet acceptable standards of service. if amns is not satisfied with the contractors work the contract shall be terminated, at no additional cost to amns. contractor shall be deemed to have full working knowledge and have obtained all necessary information and data of company facilities at which services are to be performed, including, where applicable, prevailing location, physical conditions, hygienic state, access, contingencies, and all other circumstances under which the services shall be performed. services contractor vehicles entering amns site shall be well maintained and should be as per amns safety standards and shall be inspected by company designated representative. the contractor shall ensure that his workforce is covered under the required insurance as per government rules and regulations. the contractors shall prepare the security gate passes for their personnel and furnish all information requested bypass issuing authority. other terms and conditions shall be as per amns rules and regulations. tools and tackles you shall ensure that all the tools and tackles deployed by you are certified by competent authority for use in factory. such certificate should be duly valid at all points of time. hse requirements you shall comply with the health, safety and environment policy as laid down by amns, hazira details of which are as outlined in the master service agreement (msa). in case of any violation found suitable penalty shall be imposed. format of invoice/ running bills you shall submit the bills in the appropriate format as outlined in the master service agreement (msa). industrial relations/ statutory rules and regulations you shall strictly follow the guidelines of the industrial relations policy as outlined in the master service agreement (msa). noncompliance shall attract suitable penalties as defined in msa. service provider hse performance evaluation you shall be evaluated on the parameters as outlined in the master service agreement (msa). ohsas and hse requirements you shall comply with all the environment, safety, health rules, regulations, standards, and measures to be taken to have injury free and healthy workplace including those of ohsas as outlined in the master service agreement (msa). page 3 of 4 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000123746 date 12.11.2024 submission date 19.11.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null shail kumari yadav contact email shailkumari.yadav@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details for all contracts, contractor will appoint at least one qualified safety officer / professional for the workmen strength between 50 200 and for more than 200 they must appoint safety officer / professional on pro rata basis. the contractor appointing a person in name of supervisor who is non technical kept for the administrative work will not be considered as a technical supervisor or safety supervisor. administrative supervisor will not be assigned any technical work. for all job contracts, contractor must ensure suitable and sufficient technical supervision for all jobs being executed by him on exclusive basis for safe execution of work to the satisfaction of amns management. compliances worker’s accommodation, food, transportation from to site and medical/insurance shall be born by contractor. all the statutory compliance like workers minimum wage, bonus, pf, leave, esic, etc shall be in vendor scope. attendance verification based on amns scrum data. all the required ppe’s like safety shoes, hand gloves, goggles, reflective jackets, safety helmet, ear plug, etc must provide by vendor to all workers once in year. required workers uniform (4 pair per person) shall be in vendor scope once in year. during rainy season one time raincoat – 1 no per person shall be provided to all workers shall be in the scope of vendor. similarly, safety gum shoes/rainy shoes also provided once in year shall be in vendor scope. vendor must provide the one day weekly off to all workers and against this arrange the extra gate pass as per 365 days as a reliever. operation shall be run for 365 days including providing one day weekly off to all workers. vendor must follow the gate pass process for all workers as per amns policy. reward and recognition 500 rupees voucher for best performer once in month and birthday celebration once in month. food allowance, transportation allowance, washing allowance and hra should be the part of quotation. wc policy mandate for all contractual workers. contractual workers salary should be done by first week of every month, irrespective of the vendor received the payment or not. attendance regularization in scrum on weekly basis by vendor. billing guidelines bill shall be release purely based scrum report only. if there is any mismatch with scrum data, then deviation approval to be taken on manual entry. billing period and attendance should be from 1st of month to 31st of month. before raising the tax invoice, performa invoice to be approved by user. scope of work amns: all consumables for acs maintenance are provided by amnst. job verification final signature done by hostel admin supervisor/amnsi in charge specific penalty for nonperformance by vendor and must be cardinally measured: yes 1. not wearing uniform 50/day page 4 of 4 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000123746 date 12.11.2024 submission date 19.11.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null shail kumari yadav contact email shailkumari.yadav@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 2. misbehaving/drunk or inappropriate working condition: rs. 250/ per person 3. theft: termination and contractor penalty of rs. 5000/ 4. not using ppe: rs. 100/ per person 5. maintaining of hygienic 100/day/person 6. 24 hrs. reception should remain manned incase not manned 50/hours. 7. manpower absenteeism is up to 2% of total attendance, no penalty is applicable. 8. manpower absenteeism is up to 5% of total attendance, 2% of billing amount will be deducted. 9. manpower absenteeism is up to 7% of total attendance, 5% of billing amount will be deducted 10. manpower absenteeism is up to 10% of total attendance, 7% of billing amount will be deducted 11. manpower absenteeism is more than 10% of total attendance, 15000 rs amount will be deducted. 12. incase absenteeism is due to genuine reason and eic agrees to same with contractor’s justification. he can waive off the penalty. 13. if absenteeism more than 10% of total attendance for continuously for 3 months will lead to termination of contract. ...

Western Railway - Gujarat

46130125 bids are invited for 1. supply of coach indication board of size: 12x10 inch in v shape, with application of retro reflective sheet in yellow colour and black lettering, ultralight and high intensity grade with digital print and uv protect over laminate, content as per annexure: a. make: avery dennison, 3m or similar. base material of indication board galvanized steel of 1.5 mm thickness (+/ 0.1 mm). note: supplier has to collect matter from consignee and get printed sample approval by consignee in advance before bulk supply. 100.nos section engineer (c&w) okha wr 83409 24 00113 2. supply of belly board to size: 48 x 18 inches with the application of cast vinyl graphic film in yellow colour and black lettering, ultra light and high intensity grade digital print and uv protect cover over laminate in different language ex: hindi, english & gujarati as per attached annexure a. make: avery dennison, 3m or similar. base material of belly board galvanized steel of 1.5 mm thickness (+/ 0.1 mm). note: supplier has to collect matter from consignee and get printed sample approval by consignee in advance before bulk supply. 8.nos 3. supply of destination board of size: 48 x 6 inches, with application of retro reflective sheet vinyl stickers in yellow color and black lettering, ultralight, and high intensity grade digital print and uv protect cover over laminate in different language ex: hindi, english & gujarati as per attached annexure a. make: avery dennison, 3m or similar. base material of belly board galvanized steel of 1.5 mm thickness (+/ 0.1 mm). note: supplier has to collect matter from consignee and get printed sample approval by consignee in advance before bulk supply. 150.nos 4. diesel opearted honda dewatering pump 3 5 horsepower , honda model no wv30d 2.nos section engineer (c&w) okha wr 83409 24 00101 5. diesel opearted honda dewatering pump 5 horsepower, honda model no wv30d. firm has to supply accessories mentioned in attached annexure a along the delivery of the pump. 2.nos sr. section engineer (c&w) rajkot wr 83355 24 00135 6. isi marked yellow colour safety helmet with led light & charger as per specification attached. 1550.nos sr section engineer (p.way dp)rjt wr 84130 24 00258 7 digital bore gauge with digital dial gauge measuring to range 160 to 250 mm, least count 0.001 mm, 1.nos section engineer (c&w) okha with calibration certificate from laboratory traceable to nabl and warranty certificate. make: mitutoyojapan (or) tesa swiss (or) precision germany (or) teclock japan only wr 83409 24 00111 8 digital bore gauge with digital dial gauge measuring to range 160 to 250 mm least count 0.001 mm with calibration certificate from laboratory traceable to nabl and warranty certificate. make: mitutoyojapan (or) tesaswiss (or) precision germany (or) teclock japan only 1.nos sr. section engineer (c&w) hapa wr 83343 24 00131 9 digital bore gauge with digital dial gauge measuring to range 160 to 250 mm least count 0.001 mm with calibration certificate from laboratory traceable to nabl and warranty certificate. make: mitutoyojapan (or) tesaswiss (or) precision germany (or) teclock japan only 1.nos sr. section engineer (c&w) rajkot wr 83355 24 00141 10. smart phone with necessary accessories , minimum requirements 6.5 inch display, 5g, volte, dual sim, 12gb ram and 256gb rom. acceptable makeredmi note 13 or motorola g64 or vivo v30 total quantity : 1816...

Arcelor Mittal Nippon Steel India Limited - Gujarat

46102673 tender for pr 28038554 & 27022165 ac corex o pr no. pr item rfq item services for line item quantity uom technical details other details 1 27022165 10 10 10 installation,testing & commissioning of 1 no 20 supply & fixing of copper piping 27 m 30 supply & fixing of cable 29 m 40 supply & fixing of drain pipe pvc 10 m 50 supply & fixing odu stand package ac 1 no 60 lifting and shifting of material/equipt 1 no 70 removal of old ac equipements 1 no email : gopal.ameta@amns.in contact : name : gopal ameta item details : 1. lifting and shifting to new <(>&<)> old pac units will be in scope of vendor. 2. installation and commissioning of all pac units to be done by vendor as per sop. 3. vendor must submit complete commissioning report with all technical parameters. 4. deployment of skilled, unskilled, semi skilled manpower along with supervisor for work execution. 5. execution of work should be done as per drawings or suite at site condition under the guidance of amns supervisor or oem experts. 6. safe work access and housekeeping activities before and after execution of job at work site will be in contractor scope. 7. vendor must submit ac installation schedule (as per amns requirement) and manpower details as soon as get the po copy/confirmation. 8. all required consumables like cotton, lubrication, oil, paper etc to be provided by the vendor. 9. all required tools and tackles like spanners, screw drives, cutting plyer, box spanners, hole saw cutter are to be arranged by the vendor. 10. all necessary equipment like welding machine, grinding machine, drill machine, gas cutting set to be arranged by the vendor and that is to be available at site when required. all hot work jobs shall be addressed by the vendor. 11. permit to work shall be defined and obtained by amns. the installation work shall be bound to be carried out under supervision of the competent supervisor of the vendor. overall supervision will be ensured by amns engineer. 12. all required piping accessories for commissioning of these pac units are to be provided by the vendor. 13. equipment required to shifting machine from store to site shall be arranged by amns. i.e, hydra, crane, tractor, trailer. 14. provision of main power supply up to source inside ac panel room will be in scope of amns. from ac unit to source cable shall be provided by the vendor. connection of ac to the source shall be done by amns under supervision of the vendor. 15. any type civil (core cutting, base improvement, etc) shall be done by amns. 16. in case an approach is not available to provide service to the system due to height more than 1.8 mtr, amns will provide the approach for installation of idu <(>&<)> odu. 17. all activities carried out by the vendor must comply with sop, safety practices <(>&<)> hirac criteria of amns. 18. permit to work shall be defined and obtained by amns. the installation work shall be bound to be carried out under supervision of the competent supervisor of the vendor. overall supervision will be ensured by amns engineer. certification: 1. medical fitness certificate: all the staff of the contractor must undergo medical checkup at our care nursing home, am/ns township, hazira before starting work at amns. this would be done as per am/ns india standards and its cost shall be borne by the vendor. 2. work at height certificate approved by amns authorities is pre required which is to be fulfilled by the contractor. 3. gate pass for plant entry at amns is to be generated by the page 2 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000123366 date 07.11.2024 submission date 17.11.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. chaitali panchal contact email chaitali.panchal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details contractor for all his staff. here, to be noted that we at amns are h aving our own secures access system called scrum at hazira site which is use for processing the gate pass. ppes: to be provided by contractor. 1. safety helmet – as recommended by amns safety authority. 2. hand gloves cotton 3. safety goggles – as recommended by amns safety authority. 4. safety shoes – as recommended by amns safety authority. 5. dust mask 6. rain gears transportation notes: movement of manpower / associates at amns hazira site. 1. no pedestrian/cycles/two wheelers movement is allowed inside the plant premises. 2. the vendor must ensure availability of sufficient buses/vehicles to ply their associates inside amns facility up to plant premises. vendors ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. item note : 2 27022165 20 20 10 installation,testing & commissioning of 1 no 20 supply & fixing of copper piping 20 m 30 supply & fixing of cable 22 m 40 supply & fixing of drain pipe pvc 10 m 50 supply & fixing odu stand package ac 1 no 60 lifting and shifting of material/equipt 1 no 70 removal of old ac equipements 1 no email : gopal.ameta@amns.in contact : name : gopal ameta item details : 1. lifting and shifting to new <(>&<)> old pac units will be in scope of vendor. 2. installation and commissioning of all pac units to be done by vendor as per sop. 3. vendor must submit complete commissioning report with all technical parameters. 4. deployment of skilled, unskilled, semi skilled manpower along with supervisor for work execution. 5. execution of work should be done as per drawings or suite at site condition under the guidance of amns supervisor or oem experts. 6. safe work access and housekeeping activities before and after execution of job at work site will be in contractor scope. 7. vendor must submit ac installation schedule (as per amns requirement) and manpower details as soon as get the po copy/confirmation. 8. all required consumables like cotton, lubrication, oil, paper etc to be provided by the vendor. 9. all required tools and tackles like spanners, screw drives, cutting plyer, box spanners, hole saw cutter are to be arranged by the vendor. 10. all necessary equipment like welding machine, grinding machine, drill machine, gas cutting set to be arranged by the vendor and that is to be available at site when required. all hot work jobs shall be addressed by the vendor. 11. permit to work shall be defined and obtained by amns. the installation work shall be bound to be carried out under supervision of the competent supervisor of the vendor. overall supervision will be ensured by amns engineer. 12. all required piping accessories for commissioning of these pac units are to be provided by the vendor. 13. equipment required to shifting machine from store to site shall be arranged by amns. i.e, hydra, crane, tractor, trailer. 14. provision of main power supply up to source inside ac panel room will be in scope of amns. from ac unit to source cable shall be provided by the vendor. connection of ac to the source shall be done by amns under supervision of the vendor. 15. any type civil (core cutting, base improvement, etc) shall be done by amns. 16. in case an approach is not available to provide service to the system due to height more than 1.8 mtr, amns will provide the approach for installation of idu <(>&<)> odu. 17. all activities carried out by the vendor must comply with sop, safety practices <(>&<)> hirac criteria of amns. 18. permit to work shall be defined and obtained by amns. the installation work shall be bound to be carried out under supervision of the competent supervisor of the vendor. overall supervision will be ensured by amns engineer. page 3 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000123366 date 07.11.2024 submission date 17.11.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. chaitali panchal contact email chaitali.panchal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details certification: 1. medical fitness certificate: all the staff of the contractor must undergo medical checkup at our care nursing home, am/ns township, hazira before starting work at amns. this would be done as per am/ns india standards and its cost shall be borne by the vendor. 2. work at height certificate approved by amns authorities is pre required which is to be fulfilled by the contractor. 3. gate pass for plant entry at amns is to be generated by the contractor for all his staff. here, to be noted that we at amns are h aving our own secures access system called scrum at hazira site which is use for processing the gate pass. ppes: to be provided by contractor. 1. safety helmet – as recommended by amns safety authority. 2. hand gloves cotton 3. safety goggles – as recommended by amns safety authority. 4. safety shoes – as recommended by amns safety authority. 5. dust mask 6. rain gears transportation notes: movement of manpower / associates at amns hazira site. 1. no pedestrian/cycles/two wheelers movement is allowed inside the plant premises. 2. the vendor must ensure availability of sufficient buses/vehicles to ply their associates inside amns facility up to plant premises. vendors ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. item note : 3 27022165 30 30 10 installation,testing & commissioning of 1 no 20 supply & fixing of copper piping 7 m 30 supply & fixing of cable 9 m 40 supply & fixing of drain pipe pvc 3 m 50 supply & fixing idu stand package ac 1 no 60 supply & fixing odu stand package ac 2 no 70 lifting and shifting of material/equipt 1 no 80 removal of old ac equipements 1 no email : gopal.ameta@amns.in contact : name : gopal ameta item details : 1. lifting and shifting to new <(>&<)> old pac units will be in scope of vendor. 2. installation and commissioning of all pac units to be done by vendor as per sop. 3. vendor must submit complete commissioning report with all technical parameters. 4. deployment of skilled, unskilled, semi skilled manpower along with supervisor for work execution. 5. execution of work should be done as per drawings or suite at site condition under the guidance of amns supervisor or oem experts. 6. safe work access and housekeeping activities before and after execution of job at work site will be in contractor scope. 7. vendor must submit ac installation schedule (as per amns requirement) and manpower details as soon as get the po copy/confirmation. 8. all required consumables like cotton, lubrication, oil, paper etc to be provided by the vendor. 9. all required tools and tackles like spanners, screw drives, cutting plyer, box spanners, hole saw cutter are to be arranged by the vendor. 10. all necessary equipment like welding machine, grinding machine, drill machine, gas cutting set to be arranged by the vendor and that is to be available at site when required. all hot work jobs shall be addressed by the vendor. 11. permit to work shall be defined and obtained by amns. the installation work shall be bound to be carried out under supervision of the competent supervisor of the vendor. overall supervision will be ensured by amns engineer. 12. all required piping accessories for commissioning of these pac units are to be provided by the vendor. 13. equipment required to shifting machine from store to site shall be arranged by amns. i.e, hydra, crane, tractor, trailer. 14. provision of main power supply up to source inside ac panel room will be in scope of amns. from ac unit to source cable shall be provided by the vendor. connection of ac to the source shall be done by amns under supervision of the vendor. 15. any type civil (core cutting, base improvement, etc) shall be done by amns. page 4 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000123366 date 07.11.2024 submission date 17.11.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. chaitali panchal contact email chaitali.panchal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 16. in case an approach is not available to provide service to the system due to height more than 1.8 mtr, amns will provide the approach for installation of idu <(>&<)> odu. 17. all activities carried out by the vendor must comply with sop, safety practices <(>&<)> hirac criteria of amns. 18. permit to work shall be defined and obtained by amns. the installation work shall be bound to be carried out under supervision of the competent supervisor of the vendor. overall supervision will be ensured by amns engineer. certification: 1. medical fitness certificate: all the staff of the contractor must undergo medical checkup at our care nursing home, am/ns township, hazira before starting work at amns. this would be done as per am/ns india standards and its cost shall be borne by the vendor. 2. work at height certificate approved by amns authorities is pre required which is to be fulfilled by the contractor. 3. gate pass for plant entry at amns is to be generated by the contractor for all his staff. here, to be noted that we at amns are h aving our own secures access system called scrum at hazira site which is use for processing the gate pass. ppes: to be provided by contractor. 1. safety helmet – as recommended by amns safety authority. 2. hand gloves cotton 3. safety goggles – as recommended by amns safety authority. 4. safety shoes – as recommended by amns safety authority. 5. dust mask 6. rain gears transportation notes: movement of manpower / associates at amns hazira site. 1. no pedestrian/cycles/two wheelers movement is allowed inside the plant premises. 2. the vendor must ensure availability of sufficient buses/vehicles to ply their associates inside amns facility up to plant premises. vendors ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. item note : 4 27022165 40 40 10 installation,testing & commissioning of 1 no 20 supply & fixing of copper piping 7 m 30 supply & fixing of cable 9 m 40 supply & fixing of drain pipe pvc 3 m 50 supply & fixing idu stand package ac 1 no 60 supply & fixing odu stand package ac 2 no 70 lifting and shifting of material/equipt 1 no 80 removal of old ac equipements 1 no email : gopal.ameta@amns.in contact : name : gopal ameta item details : 1. lifting and shifting to new <(>&<)> old pac units will be in scope of vendor. 2. installation and commissioning of all pac units to be done by vendor as per sop. 3. vendor must submit complete commissioning report with all technical parameters. 4. deployment of skilled, unskilled, semi skilled manpower along with supervisor for work execution. 5. execution of work should be done as per drawings or suite at site condition under the guidance of amns supervisor or oem experts. 6. safe work access and housekeeping activities before and after execution of job at work site will be in contractor scope. 7. vendor must submit ac installation schedule (as per amns requirement) and manpower details as soon as get the po copy/confirmation. 8. all required consumables like cotton, lubrication, oil, paper etc to be provided by the vendor. 9. all required tools and tackles like spanners, screw drives, cutting plyer, box spanners, hole saw cutter are to be arranged by the vendor. 10. all necessary equipment like welding machine, grinding machine, drill machine, gas cutting set to be arranged by the vendor and that is to be available at site when required. all hot work jobs shall be addressed by the vendor. 11. permit to work shall be defined and obtained by amns. the installation work shall be bound to be carried out under supervision of the competent supervisor of the vendor. overall supervision will be ensured by amns engineer. 12. all required piping accessories for commissioning of these pac units page 5 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000123366 date 07.11.2024 submission date 17.11.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. chaitali panchal contact email chaitali.panchal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details are to be provided by the vendor. 13. equipment required to shifting machine from store to site shall be arranged by amns. i.e, hydra, crane, tractor, trailer. 14. provision of main power supply up to source inside ac panel room will be in scope of amns. from ac unit to source cable shall be provided by the vendor. connection of ac to the source shall be done by amns under supervision of the vendor. 15. any type civil (core cutting, base improvement, etc) shall be done by amns. 16. in case an approach is not available to provide service to the system due to height more than 1.8 mtr, amns will provide the approach for installation of idu <(>&<)> odu. 17. all activities carried out by the vendor must comply with sop, safety practices <(>&<)> hirac criteria of amns. 18. permit to work shall be defined and obtained by amns. the installation work shall be bound to be carried out under supervision of the competent supervisor of the vendor. overall supervision will be ensured by amns engineer. certification: 1. medical fitness certificate: all the staff of the contractor must undergo medical checkup at our care nursing home, am/ns township, hazira before starting work at amns. this would be done as per am/ns india standards and its cost shall be borne by the vendor. 2. work at height certificate approved by amns authorities is pre required which is to be fulfilled by the contractor. 3. gate pass for plant entry at amns is to be generated by the contractor for all his staff. here, to be noted that we at amns are h aving our own secures access system called scrum at hazira site which is use for processing the gate pass. ppes: to be provided by contractor. 1. safety helmet – as recommended by amns safety authority. 2. hand gloves cotton 3. safety goggles – as recommended by amns safety authority. 4. safety shoes – as recommended by amns safety authority. 5. dust mask 6. rain gears transportation notes: movement of manpower / associates at amns hazira site. 1. no pedestrian/cycles/two wheelers movement is allowed inside the plant premises. 2. the vendor must ensure availability of sufficient buses/vehicles to ply their associates inside amns facility up to plant premises. vendors ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. item note : 5 27022165 50 50 10 installation,testing & commissioning of 1 no 20 supply & fixing of copper piping 25 m 30 supply & fixing of cable 27 m 40 supply & fixing of drain pipe pvc 10 m 50 supply & fixing odu stand package ac 1 no 60 lifting and shifting of material/equipt 1 no email : gopal.ameta@amns.in contact : name : gopal ameta item details : 1. lifting and shifting to new <(>&<)> old pac units will be in scope of vendor. 2. installation and commissioning of all pac units to be done by vendor as per sop. 3. vendor must submit complete commissioning report with all technical parameters. 4. deployment of skilled, unskilled, semi skilled manpower along with supervisor for work execution. 5. execution of work should be done as per drawings or suite at site condition under the guidance of amns supervisor or oem experts. 6. safe work access and housekeeping activities before and after execution of job at work site will be in contractor scope. 7. vendor must submit ac installation schedule (as per amns requirement) and manpower details as soon as get the po copy/confirmation. 8. all required consumables like cotton, lubrication, oil, paper etc to be provided by the vendor. 9. all required tools and tackles like spanners, screw drives, cutting plyer, box spanners, hole saw cutter are to be arranged by the vendor. page 6 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000123366 date 07.11.2024 submission date 17.11.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. chaitali panchal contact email chaitali.panchal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 10. all necessary equipment like welding machine, grinding machine, drill machine, gas cutting set to be arranged by the vendor and that is to be available at site when required. all hot work jobs shall be addressed by the vendor. 11. permit to work shall be defined and obtained by amns. the installation work shall be bound to be carried out under supervision of the competent supervisor of the vendor. overall supervision will be ensured by amns engineer. 12. all required piping accessories for commissioning of these pac units are to be provided by the vendor. 13. equipment required to shifting machine from store to site shall be arranged by amns. i.e, hydra, crane, tractor, trailer. 14. provision of main power supply up to source inside ac panel room will be in scope of amns. from ac unit to source cable shall be provided by the vendor. connection of ac to the source shall be done by amns under supervision of the vendor. 15. any type civil (core cutting, base improvement, etc) shall be done by amns. 16. in case an approach is not available to provide service to the system due to height more than 1.8 mtr, amns will provide the approach for installation of idu <(>&<)> odu. 17. all activities carried out by the vendor must comply with sop, safety practices <(>&<)> hirac criteria of amns. 18. permit to work shall be defined and obtained by amns. the installation work shall be bound to be carried out under supervision of the competent supervisor of the vendor. overall supervision will be ensured by amns engineer. certification: 1. medical fitness certificate: all the staff of the contractor must undergo medical checkup at our care nursing home, am/ns township, hazira before starting work at amns. this would be done as per am/ns india standards and its cost shall be borne by the vendor. 2. work at height certificate approved by amns authorities is pre required which is to be fulfilled by the contractor. 3. gate pass for plant entry at amns is to be generated by the contractor for all his staff. here, to be noted that we at amns are h aving our own secures access system called scrum at hazira site which is use for processing the gate pass. ppes: to be provided by contractor. 1. safety helmet – as recommended by amns safety authority. 2. hand gloves cotton 3. safety goggles – as recommended by amns safety authority. 4. safety shoes – as recommended by amns safety authority. 5. dust mask 6. rain gears transportation notes: movement of manpower / associates at amns hazira site. 1. no pedestrian/cycles/two wheelers movement is allowed inside the plant premises. 2. the vendor must ensure availability of sufficient buses/vehicles to ply their associates inside amns facility up to plant premises. vendors ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. item note : 6 27022165 60 60 10 installation,testing & commissioning of 1 no 20 supply & fixing of copper piping 15 m 30 supply & fixing of cable 15 m 40 supply & fixing of drain pipe pvc 15 m 50 supply & fixing odu stand package ac 1 no 60 lifting and shifting of material/equipt 1 no email : gopal.ameta@amns.in contact : name : gopal ameta item details : 1. lifting and shifting to new <(>&<)> old pac units will be in scope of vendor. 2. installation and commissioning of all pac units to be done by vendor as per sop. 3. vendor must submit complete commissioning report with all technical parameters. 4. deployment of skilled, unskilled, semi skilled manpower along with supervisor for work execution. 5. execution of work should be done as per drawings or suite at site page 7 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000123366 date 07.11.2024 submission date 17.11.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. chaitali panchal contact email chaitali.panchal@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details condition under the guidance of amns supervisor or oem experts. 6. safe work access and housekeeping activities before and after execution of job at work site will be in contractor scope. 7. vendor must submit ac installation schedule (as per amns requirement) and manpower details as soon as get the po copy/confirmation. 8. all required consumables like cotton, lubrication, oil, paper etc to be provided by the vendor. 9. all required tools and tackles like spanners, screw drives, cutting plyer, box spanners, hole saw cutter are to be arranged by the vendor. 10. all necessary equipment like welding machine, grinding machine, drill machine, gas cutting set to be arranged by the vendor and that is to be available at site when required. all hot work jobs shall be addressed by the vendor. 11. permit to work shall be defined and obtained by amns. the installation work shall be bound to be carried out under supervision of the competent supervisor of the vendor. overall supervision will be ensured by amns engineer. 12. all required piping accessories for commissioning of these pac units are to be provided by the vendor. 13. equipment required to shifting machine from store to site shall be arranged by amns. i.e, hydra, crane, tractor, trailer. 14. provision of main power supply up to source inside ac panel room will be in scope of amns. from ac unit to source cable shall be provided by the vendor. connection of ac to the source shall be done by amns under supervision of the vendor. 15. any type civil (core cutting, base improvement, etc) shall be done by amns. 16. in case an approach is not available to provide service to the system due to height more than 1.8 mtr, amns will provide the approach for installation of idu <(>&<)> odu. 17. all activities carried out by the vendor must comply with sop, safety practices <(>&<)> hirac criteria of amns. 18. permit to work shall be defined and obtained by amns. the installation work shall be bound to be carried out under supervision of the competent supervisor of the vendor. overall supervision will be ensured by amns engineer. certification: 1. medical fitness certificate: all the staff of the contractor must undergo medical checkup at our care nursing home, am/ns township, hazira before starting work at amns. this would be done as per am/ns india standards and its cost shall be borne by the vendor. 2. work at height certificate approved by amns authorities is pre required which is to be fulfilled by the contractor. 3. gate pass for plant entry at amns is to be generated by the contractor for all his staff. here, to be noted that we at amns are h aving our own secures access system called scrum at hazira site which is use for processing the gate pass. ppes: to be provided by contractor. 1. safety helmet – as recommended by amns safety authority. 2. hand gloves cotton 3. safety goggles – as recommended by amns safety authority. 4. safety shoes – as recommended by amns safety authority. 5. dust mask 6. rain gears transportation notes: movement of manpower / associates at amns hazira site. 1. no pedestrian/cycles/two wheelers movement is allowed inside the plant premises. 2. the vendor must ensure availability of sufficient buses/vehicles to ply their associates inside amns facility up to plant premises. vendors ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

46089067 tender for bearing overhauling work at hspm_crm1_cy25 o pr no. pr item rfq item services for line item quantity uom technical details other details 1 2000157929 10 10 10 overhauling of workroll chock 12 no 20 overhauling of bending chocks 12 no email : gaurang.bhojani@edu.amns.in contact : name : bhojani, gaurang am/ns india academy item details : *scope of work vendor •dismantling and cleaning of chock <(>&<)> bearing. •inspection of bearing <(>&<)> chocks. minor repair if required. •inspection <(>&<)> measurement of chock bore <(>&<)> end covers <(>&<)> certification of use. • inspection <(>&<)> replacement of seals • inspection and replacement of sideliners. measurement of dimension across liners. • greasing, stacking <(>&<)> reassembly of bearings in chock. •inspection <(>&<)> replacement of bottom wr chock wheels. •inspection in totality of bearings <(>&<)> chock components. • overhauling schedule will be agreed jointly after seeing the bearing condition during overhauling. •after completion of work housekeeping of overhauling area will be carried out by your team. •responsibility of vendor to deploy correct/right set of skilled resources as per competency matrix for all jobs/works •list of specific personal protective equipment’s (ppes) to be used for the job/work and the area of work safety helmet spectacle type safety goggles with plain glass disposal type dust/gas mask hand gloves 14 canvas earmuff ear plug chemical resistant pvc suit / apron, industrial safety shoes high ankle •your person should wear proper ppes at the time of entering shop floor/plant, if any violation found, serious action/penalty shall be imposed. •below are the general conditions to be added irrespective of job based or regular manpower tools and tackles you shall ensure that all the tools and tackles deployed by you are certified by competent authority for use in factory. such certificate should be duly valid at all points of time. •hse requirements you shall comply with the health, safety and environment policy as laid down by am/ns steel india limited, hazira the contractor appointing a person in name of supervisor who is non technical kept for the administrative work will not be considered as a technical supervisor or safety supervisor. administrative supervisor will not be assigned any technical work. in case of any violation found suitable penalty shall be imposed. •all ppes will be provide by vendor •technically supervision required during executing this job which will be provide by vendor •am/nss scope: •de chocking of rolls and hand over chocks for overhauling as per agreed schedule. •handover of chock at agreed designated place. •provide clear workspace with jib head crane for handling chock and bearings. •provide necessary tools. •provide necessary measuring instruments. •provide all consumables such as waste cloth, oil to clean chocks <(>&<)> bearing components.etc., •provide all spares related to chock assembly like seals, grease, gasket page 2 of 2 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000123277 date 06.11.2024 submission date 15.11.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. venkat sai taneeru contact email venkat.taneeru@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details etc. •provide facility for bearing cleaning with a provision of compressed air line. •provide adequate illumination at overhauling area. *amns safety rule and regulation as per company policy: • work should be started only after taking authorized work permit. • toolbox talk must be delivery before starting the job on daily basic. • use certified portable hand electric machine. • use certified lifting tools <(>&<)> tackles <(>&<)> it should be check before every use. • ensure that all persons are wearing safety helmet, safety shoe, safety goggles, face shield and cut resistance hand gloves. • work should be carried out in close supervision of competent supervisor. • the working area need to be cleaned to avoid the slipping hazards. • ensure highly flammable material should not be store near working area <(>&<)> if any it should be removed immediately before starting the job. • always carry fe near workplace. *sop no / hirac no sop no : amnsil/crm/hspm slt opr/003/sop hirac no : amnsil/crm/hspm slt opr/hirac/52...

Ministry Of Defence - Gujarat

45993540 bids are invited for room freshner , mosquito vapouriser machine with refill , liquid hand wash pump , liquid hand wash refill , safety googles , air wick automatic spray machine , automatic air wick refill , safety helmet , safety boots , vaporizer oil , safety dotted gloves , target papers , door foot mat , mosquito racket , grass cutting wire total quantity : 638...

Western Railway - Gujarat

45953249 bids are invited for industrial safety helmet (v2) as per is 2925 (q3) total quantity : 560...

Arcelor Mittal Nippon Steel India Limited - Gujarat

45880612 tender for 2000159101 services animal husbandry amns townshi 2000159101 10 10 10 service of animal husbandary nn 12 mon email : gajendra.rathore@amns.in contact : name : gajendra rathore item details : technical contact person mr. umesh sharma, mob no: 9265998762 description service charges for animal husbandry. qnty. 12 unit mon sow (scope of work) scope of work vendor: contract location – township. contract department – admin (horticulture) contract sub section – golden harvest cow shelter 1.vendor must finish the job once notified within time. 2.it is the sole responsibility of vendor to deploy correct/right set of skilled resources as per competency matrix for all jobs/works being executed by him at sites. 3.contractor must ensure suitable and sufficient technical supervision for all jobs being executed by him on exclusive basis for safe execution of work to the satisfaction of amns management. 4.grazing of animal and their movement in the field should be at designated place and as per eic instruction. 5.cleaning of animal excreta and dumping should be done on daily basis. 6.regular diagnosis of animal with vetenary doctor and their care and medicines shall be in the scope of vendor. if required to send the animal at surat vetenary hospital for diagnosis shall be in vendor scope. 7.required handy tools (spade, kodali, plastic gummela, tikas, broom, watering pipes etc.) for cleaning purpose shall be in the scope of contractor. 8.total number of animal (female cow – 8 no, female calf (bachdi) – 2 no, male calf – 5 no bullocks – 1 no, paradise pond duck – 10 no, blade wall pond 11 no) 9.mandatory 3 workers must be deputed for taking care of mentioned animal shall be in the scope of vendor. 10.daily cow food preparation and smoke for cow protection from mosquitos and other insects shall be in vendor scope. further, required diesel and other insecticide for smoke and spray shall be perform by vendor. 11.in future, cow population increase and due to this, any financial expenditure increases then financial liability shall not lie with the company. vendor must work with same rate per month. 12.if existing cow decrease due to any reason, then per cow rs.2000/ shall be deducted from monthly bill amount for each ra bill for each month. 13.available company grass chopper machine for chopping the grass for cattle food preparation maintenance shall be in vendor scope. 14.flour mill machine (vendor’s own) for cattle food preparation maintenance shall be in vendor scope. compliances 15.all the statutory compliance like workers minimum wage, bonus, pf, page 2 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000122523 date 22.10.2024 submission date 29.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null shail kumari yadav contact email shailkumari.yadav@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details leave, esic, etc shall be in vendor scope. attendance verification based on amns scrum data. 16.accommodation and transportation from to site and medical/insurance shall be borne by contractor for his personnel. 17.required workers uniform (4 pair per person) shall be in vendor scope once in year. 18.during rainy season one time raincoat – 1 no per person shall be provided to all workers shall be in the scope of vendor. similarly, safety gum shoes/rainy shoes also provided once in year shall be in vendor scope. 19.all the gate pass process will have to process as per amns policy. 20.all the required ppe’s like safety shoes, hand gloves, goggles, reflective jackets, safety helmet, ear plug, etc. must provide by vendor to their personnel. 21.vendor must provide the one day weekly off to all workers and against this arrange the extra gate pass as per 365 days as a reliever. operation shall be run for 365 days including providing one day weekly off to all workers. billing guidelines 1.billing period and attendance should be from 1st of month to 31st of month. 2.before raising the tax invoice, performa invoice to be approved by user. scope of work amns: 23.amns will check the work executed by the vendor. 24.material like animal food of all cows, bullocks and duck shall be free issue to the vendor at free of cost by owners. specific penalty for nonperformance by vendor and must be cardinally measured: yes sr.no. – parameter – measure – penalties – remark 1 delay in service. no’s warning letter on recurring issues based on email communication 2 cleanliness of cow shelter at golden harvest no’s 1. rs.300/ per incident. 2. rs.500/ for repeat incident. based on physical verification by amns & email 3 staff personal hygiene, staff without uniform/proper grooming standards no’s 1. penalty of rs. 100/ per incident based on physical verification by amns & email 4 manpower shortage no’s absenteeism tolerant level is zero as there is only three person resources therefore, penalty of rs. 1000/ in case position is not filled withing one week. based on physical verification by amns & email 5 performing duty under influence of alcohol no’s 1. confirmatory medical check up. 2. immediate removal of person from company site. 3. as per company security & safety guideline rs 50000 penalties to vendor 6 act of integrity while on duty, no’s warning and action as per investigation by in charge/management will be blacklisted immediately from the premises rs 50000 penalties to vendor. 7 deviation in statutory compliances by vendor no’s rs. 10,000/ for 1st incident rs. 25,000/ for repeated incident monthly basis 8 damage/loss of company property – value 1. cost of damaged item. 2. rs 10000/ upon investigation for lack of services as & when loss occurs & discretion of management after joint investigation. 9 posh misconduct by any employee no’s action as per posh committee investigation will be blacklisted immediately from the premises. rs 50000 penalties to vendor. 10 safety violations no’s rs. 5000 per incident based on email communication 11 misbehaviour with customers during serving no’s rs. 5000 per incident based on email communication...

Arcelor Mittal Nippon Steel India Limited - Gujarat

45781182 tender for rollshop management of hsm amns india hazira location 2000158126 10 10 20 various jobs at hsm roll shop 1 lo 10 tech. services for roll shop management 1 mon email : sumeet.padhi@amns.in contact : name : sumeet padhi item details : technical: following is the scope of work to be performed by contractor: a) work roll grinding and assembly: • roll temperature to be taken in the mill once out from stand. • receive the mill out rolls from the roll transfer car. • transfer those mill out rolls from transfer car to bottom platform at rollshop floor. • inspection of mill out rolls prior to grinding <(>&<)> capture the required information / data if any <(>&<)> action to be taken for any abnormalities • for rm work rolls, apron is to be removed before grinding. • implementation of crack detection sop that is inspection of rolls via lismar as per criteria defined by amns. • inspection of mill out chocks prior to grinding <(>&<)> capture the required information / data if any <(>&<)> action to be taken for any abnormalities temperature to be measured with thermo couple of mill out work roll before grinding <(>&<)> backup chock once in a shift <(>&<)> recorded in grinding report. • separator to be removed before grinding <(>&<)> fixed after grinding if required. • profile to be taken on mill out rolls as per requirement. • placement of roll on grinding machine from bottom platform. • grinding of the rolls as per required parameters (material removal amount, diameters, ra value, profile, taper, roundness, error etc. <(>&<)> flaw detection (ust/ ect etc.) as per grinding sop. • thorough inspection of chocks in case of rm wr before assembly. • roll grinding history of all types of rolls (includes roll management system). • shifting of rolls from grinding machine to bottom platform. • roll neck <(>&<)> seal greasing through face of the roll at the bottom platform. • greasing of chock liner to be done at the bottom platform. • for rm work rolls, apron to be fixed after chocking. • for rm work rolls wiper to be fixed after chocking. • for rm work rolls apron clamp to be fixed after chocking. • for fm work rolls before new roll chocking roll neck <(>&<)> wobbler inspection to be done. • place the finished ground <(>&<)> thoroughly inspected roll on roll transfer car <(>&<)> communicate to the mill operation do necessary recording of data. send roll dia. information in proper format to mill. • grinding machine will be operated by contractor and the following activities connected with machine will be carried out: a. coolant changing <(>&<)> top up. b. disposal of sludge to specified location on regular basis. c. grinding wheel change. d. grinding wheel keeping history record. e. machine set up change over as per the requirement of roll to be ground. f. shall coordinate with hsm roll shop planning for maintenance of consumable and spares for grinding machines. page 2 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000122116 date 15.10.2024 submission date 22.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. trupti yagnesh patel contact email trupti.patel@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details g. preventive and breakdown maintenance shall be in amns’s scope. h. turning of edger roll as per required taper shall be done. i. turning of spalled roll will be carried out as per requirement after doing ust. j. work roll /back up roll turning report to be generated. k. loading and unloading of all types of material from shop floor. l. mounting and dismounting of all types of chocks as per requirement. m. up keeping of machines and housekeeping as per 5s. b) back up roll grinding and assembly: • receive the mill out rolls from roll transfer car. • transfer those mill out rolls from transfer car to bottom platform. • for top bur, the separator is to be removed. • dechocking of bur will be done and roll necks are to be cleaned. take the neck dia. of dechocked rr bur. • thorough inspection of mill out rolls prior to grinding <(>&<)> capture the required information / data if any <(>&<)> action to be taken for any abnormalities • thorough inspection of mill out chocks <(>&<)> capture the required information / data if any <(>&<)> action to be taken for any a bnormalities. • placement of roll on grinding machine from saddle. • grinding of the rolls as per required parameters (diameters, ra, hardness, profile etc) <(>&<)> flaw • detection (ust/ ect etc.) as per grinding sop. • ut record to be maintained in soft copy <(>&<)> hard copy. • shifting of rolls from grinding machine to chocking saddle. • thorough inspection of the chock seals <(>&<)> ‘o’ ring and replace if required. also, check bearing sleeve, chock liner, lock nut, pressure <(>&<)> drain line etc.in case of back up roll chocks. liner to liner measurement of all chocks (backup roll chock <(>&<)> work roll chock) to be done as per sop. • liner to liner measurement of all chocks and shim cutting <(>&<)> shim fitting the chock as per requirement • dechocked bur roll neck collar dp test to be checked. • dechocked bur tie bar bracket dp test to be done. • dismounted bur chock bush locking pin o ring to be checked. • dechocked bur chock inspection. (top surface, df seals, oil condition, rocker plates, separator bar bush, etc. • b/up top surface grinding, f2 w/r bush grinding. • b/up chock preliminary inspection after open the hood cover before complete dismounting. • (block <(>&<)> locking condition) • inspections of the rocker plates of bottom chocks in case of back up roll chock. • all side liner greasing at the bottom platform. • chocking of those ready chocks in ground rolls. • fix back the separators in the top chocked rolls in back up roll chocks. • rr top b/up oil collection tray to be fitted before supply to the mill. • place the finished ground <(>&<)> thoroughly inspected roll on roll transfer car <(>&<)> communicate to the mill operation <(>&<)> do necessary data recording. • housekeeping as per 5s objectives defined by amns. • dp test (all t bolt, steady lifting pin) • dust bucket <(>&<)> t bolt load test. • wire rope sling, nylon belt record • store keeping as per 5’s standard. • monthly report updates on safety, overhauling area (amns <(>&<)> page 3 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000122116 date 15.10.2024 submission date 22.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. trupti yagnesh patel contact email trupti.patel@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details contractor) • all test certificate to be maintained of all tools <(>&<)> tackles using in roll shop. • modification of existing equipment as per requirement. c) chock overhauling of fm <(>&<)> rm wr and vertical edger: a. collect the existing overhauling schedule from roll shop in charge. b. review <(>&<)> modify (if required) the existing schedule. c. develop / follow the formats of required data collection. d. take out the scheduled chock set to out of circulation for overhauling. e. opening all the chock components. f. take out the bearings. g. cleaning of the bearings <(>&<)> all chock components. h. through inspection of bearings <(>&<)> chock components <(>&<)> capture necessary data. i. measurement of bearings <(>&<)> chock components <(>&<)> capture necessary data. j. minor repairing of bearings <(>&<)> chock components as per requirement. communicate chock <(>&<)> component condition to roll shop coordinator. k. greasing of the bearing. l. replacing seals as per requirement. m. assembly of chock <(>&<)> bearings. n. thorough checking of chock liners <(>&<)> greasing of the same. o. send back the clock in chocking saddle <(>&<)> assemble with properly ground wr. p. all work roll bearing overhauling data entry in sap. q. housekeeping as per 5s standards set by amns. d) back up rolls chock overhauling: • collect the existing overhauling schedule from roll shop in charge. • review <(>&<)> modify (if required) the existing schedule. • develop / follow the formats of required data collection. • take out the scheduled chock set to out of circulation for overhauling. • opening all the chock components. • take out the sleeve <(>&<)> bush from the chock. <(>&<)> trb from thrust side • cleaning of the sleeve, bush <(>&<)> all chock components <(>&<)> trb for thrust side. • thorough inspection of sleeve, bush <(>&<)> chock components <(>&<)> capture necessary data. • for thrust side thorough inspection of trb <(>&<)> its housing components <(>&<)> capture necessary data. • measurement of sleeve, bush <(>&<)> chock components <(>&<)> capture necessary data. • for thrust side measurement of trb <(>&<)> its housing components <(>&<)> capture necessary data. • minor repairing of sleeve, bush <(>&<)> chock components as per requirement. • for thrust side minor repairing of trb <(>&<)> housing components as per requirement • inspection of chock bore, seals, seal end plate, seal inner ring, rocker plate, tie rod and tie rod pockets etc. • replacing seals as per requirement. • assembly of chock <(>&<)> sleeve <(>&<)> bush. • assembly of housing <(>&<)> trb for thrust side. assembly of thrust bearing unit with bush bearing unit. • thorough checking of chock liners <(>&<)> greasing of the same. • send back the clock in chocking saddle <(>&<)> assemble with properly ground bur. • housekeeping as per 5s standard set up amns. • all safety appliances like helmets, safety shoes, aprons, and hand page 4 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000122116 date 15.10.2024 submission date 22.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. trupti yagnesh patel contact email trupti.patel@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details gloves etc. for its personnel shall be under contractor scope. • contractor shall advice amns for procurement and management of consumables including oil seals, gaskets and grease and high value consumables including chocks, bearings, chock liners. final decision is with amns on procurement whatsoever. • contractor shall be responsible for inventory management of all types of spares and consumables including (roll, chock, bearing, seals, grease, neck shoe oil, gaskets etc) • timely forecasting based on consumption pattern and its information for procurement to hsm representatives • contractor shall interact with nominated amns representative for smooth operation of mill. • contractor shall be maintaining the following are the various types of roll neck bearings that is used in • the plant and would come under the scope of this work: • work roll finishing mill (std. 1 to 6): four rows tapered roller bearings. (grease packed) – 5 sets for each stand. • work roll roughing mill: four rows tapered roller bearings. (grease packed) – 5 sets. • bur morgoil bearings for finishing mill – 2 sets for each stand • bur morgoil bearings for roughing mill – 2 sets • vertical edger roll bearings – 3 sets • contractor shall carry out daily preventive maintenance checks of roll shop equipment’s and inform amns for the required corrective action to be taken amns shall undertake corrective action • measures to rectify the faults/abnormalities in an expeditious manner • housekeeping and safety. • hirac identification of rollshop <(>&<)> hirac preparation <(>&<)> updating accordingly. sop to be preparing of all activity carrying in roll shop <(>&<)> time to time it’s updating. • sop <(>&<)> hirac training to all associates in defined frequency. • contractor shall abide by all the housekeeping and safety norms of amns by providing attention to these activities. e) rollshop delay: • roll shop delay shall not exceed 0.30% of total hsm delay and contractor shall improve to achieve below 0.30% amns shall provide d etailed data related to total hsm delay and roll shop delay to contractor for analysis property damage – • any damage to machine, instrument etc. amns can take any action (fine). • there is a provision of penalty for production delay due to human mistake. continuous improvement: • any activity not defined here in, but required to be carried out for smooth functioning of rolling mill which related to roll shop and smooth functioning of roll shop, shall be done by contractor <(>&<)> amns jointly contractor manpower planning: • contractor must provide minimum manpower as per msa guidelines. it is not fixed it can be revised as per requirement for smooth running of roll shop. •manpower should be competent as per competency matrix as per latest msa. page 5 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000122116 date 15.10.2024 submission date 22.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. trupti yagnesh patel contact email trupti.patel@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details •following company rules and regulation provided by am/ns management time to time related to safety hse and other rules and regulation. •all associates attendance, salary, invoice related data, scrum attendance system tracking and request generation for attendance reg ularization in scrum system will be as and when required. • minimum 06 high skilled (shift in charge level) engineers from main contractor is to be provided. (not from sub agency) • there should be at least one operator who know manual ultrasonic testing in contractor. • manpower as per table attached _ total 72 + 5 (housekeepers) whenever any new eng, grinder, crane operator <(>&<)> crew are deployed, contractor will provide extensive training for 16 days and if amns is satisfied with the performance of the refresher then contractor can put the person on regular job. contractor will be responsible for systematic arrangement of spares on the shop floor as well as in store. safety: • all ppe’s will be in vendor scope. • contractor shall provide following safety gears <(>&<)> ppe’s with specifications approved by am/ns: o safety helmet: colour (am/ns with provide) o safety shoes. o hand gloves: cotton, leather, culver etc. o safety jacket (as per am/ns standard). o dust mask. o safety goggles. o ear plug or muff. • no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors should ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. • vendor shall comply with the health, safety <(>&<)> environment policy as laid down by amns. statutory: • wc <(>&<)> group insurance policy. • manpower should be competent as per competency matrix as per latest msa. • following company rules and regulation provided by am/ns management time to time related to safety hse and other rules and regulation. • all associates attendance, salary, invoice related data, scrum attendance system tracking and request generation for attendance re gularization in scrum system will be as and when required. penalty clause: • specific penalty for non performance by vendor and must be strictly measured. • penalty will be imposed in case of non compliance / violation of hse norms and supervisor and associate’s incompetency. • if any personnel of vendor misbehave with am/ns employees or other associates’ penalty will be imposed as per am/ns india norms. • unauthorize mobile phone / sleeping case / theft case / vehicle speed greater than 20 km/hr. will be penalize as per am/ns india norm. • the penalty amount will be decided by contract cell. page 6 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000122116 date 15.10.2024 submission date 22.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. trupti yagnesh patel contact email trupti.patel@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details am/ns india scope: • amns shall handover to contractor the following minimum sets of chocks assembled with bearing for smooth operation at roll shop and mill • work roll finishing mill (std. 1 to 6): four rows tapered roller (radial) bearings (grease packed) and • two rows tapered roller (thrust) bearing for (std. 2 to 6) – 5 sets for each stand • work roll roughing mill: four row tapered roller bearings. (grease packed) – 4 sets. • bur morgoil bearings for finishing mill – 2 sets for each stand • bur morgoil bearings for roughing mill – 2 sets • vertical edger roll bearings – 2 sets the followings will be supplied by amns: • crane lifting and transporting tackles, wire rope slings • tackles for chock tilters, chocking dechocking machines, bur transfer cars, bearing and chock. • cleaning machine. • tackles / jigs for loading / unloading roll chock assemblies /rolls from the roll change car and the grinding machines. • amns would be responsible for providing all consumables related to grinding rolls and chock/bearing maintenance. • amns shall carry out major maintenance of roll shop equipments like roll grinding machine, edt machine, overhead cranes, tools and tackles and other auxiliary equipment’s (electrical, mechanical and civil). • amns shall provide the infrastructure to contractor consisting of system link facility, telephone / fax facilities (the revenue ex penditure chargeable to you), storage / office space. • amns shall provide all the details as mentioned in the annexure in the beginning of the contract. hsm roll shop contractor manpower status refer: rollshop management_hsm mill_annexture 1 dt 06.09.2024 designation a shift b shift c shift reliver g shift manpower unit leader 0 0 0 0 1 1 general shift in charge (from principal contractor) 0 0 0 0 1 1 shift in charge (from principal contractor) 1 1 1 1 0 4 page 7 of 7 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000122116 date 15.10.2024 submission date 22.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq ms. trupti yagnesh patel contact email trupti.patel@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details goperator (4 machines) 4 4 4 4 0 16 shift technician 5 5 5 4 0 19 coperator (3 cranes) 3 3 3 2 0 11 bearing section 3 3 0 0 0 6 welder 1 1 0 0 0 2 lathe operator (1 machine) 0 0 0 0 1 1 inspection w/r assy 1 1 1 0 0 3 inspection b/r assy 0 0 0 0 1 1 greasing 1 1 0 0 0 2 office asst. 0 0 0 0 1 1 safety officer 0 0 0 0 1 1 site coordinator 0 0 0 0 1 1 mech tech (for rg machine) 1 1 0 0 0 2 total required 72 + housekeeping 0 0 0 0 5 5 note the above manpower requirement is for only scope of work related to rollshop management as stated above. ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

45725961 tender for admin 2000159197 office renovation work at hr payroll 2000159197 10 10 10 conference table 31 ft2 20 supply & fixing of table 1 no 30 providing and fixing aluminium partition 417 ft2 40 providing and fixing aluminium partition 116 ft2 50 door closer 4 no 60 p & f of armstrong make false ceiling 560 ft2 70 supply and installation of 2x2 led panel 6 no 80 prov. & laying of ceramic tiles 132 ft2 90 supply and fixing of vinyl flooring 2mm 2,372 ft2 100 mobile toilets 7 no 110 mobile toilets 1 no 120 mobile toilets 1 no email : tejal.thakkar@ext.amns.in contact : name : tejal thakkar item details : technical contact person. mr. fagna, dharmendra mob +91 9327504621 mr. reddy, ananda mob +91 7990166042 mr. rathod, dharmendrasinh mob +91 9879103363 office renovation work at hr payroll office scope of work vendor: a. area of work will be at hr payroll office and vendor has to extend the support by executing the job as instructed by in charge / head administration. b. all consumable with required spares items will be under the scope of the vendor. c. disposal of scrap after work will be vendor scope at location informed by the amns. d. the contractor must provide a 3 year warranty for all wooden flooring, ceilings, paint, doors, led lights and furniture. e. all materials must be approved by am/ns incharge before use at the site. the contractor is responsible for arranging and covering the costs of any necessary material testing. f. experienced supervisor with relevant expertise must be assigned to oversee the repair work. g. permit to work‟ (ptw) system must be followed by the contractors personnel where required within amns premises. h. contractor shall ensure all his staff are aware of company safety and fire regulations whilst on company premises. i. accommodation, transportation to and from work site, and medical/insurance shall be borne by contractor for his personnel. j. the contractor shall supply their manpower with personal protective equipment, consisting of, but not limited to the following: k. safety boots/shoes l. safety helmet m. safety glasses n. hearing protectors o. hand gloves p. any other special safety equipment shall be supplied by amns. q. although each person will be being given the safety induction and will be familiar with the amns safety regulations, this will not deduct from the responsibilities of the chosen contractor to the termination of that manpower. the contractor shall make replacement of persons at no additional cost to amns. r. performance of the contractor shall be monitored continuously to ensure they meet acceptable standards of service. if amns is not satisfied with the contractors work the contract shall be terminated, at no additional cost to amns. s. contractor shall be deemed to have full working knowledge and have obtained all necessary information and data of company facilities at which services are to be performed, including, where applicable, prevailing location, physical conditions, hygienic state, access, contingencies, and all other circumstances under which the services shall be performed. services t. contractor vehicles entering amns site shall be well maintained and should be as per amns safety standards and shall be inspected by company designated representative. page 2 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121878 date 11.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details u. the contractor shall ensure that his work force is covered under the required insurance as per government rules and regulations. v. the contractors shall prepare the security gate passes for their personnel and furnish all information requested by pass issuing authority. w. other terms and conditions shall be as per amns rules and regulations. x. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. y. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. scope of work amnsi: a. site supervision, quality of work & cleaning to be check by area in charge. if quality of work not up to mark area in charge can stop service immediately specific penalty for nonperformance by vendor and must be cardinally measured: yes. delays will attract penalty of 5000/instance or daily. description conference table (size: 2400w x 1200d x 750h) edge of table is 36mm thick. material: semi marine ply (brand: century/green ply or equivalent) laminates: 1mm thick greenlam/timex or equivalent 2mm thick pvc edge bidding. furnace shaped understructure. unit ft2 qty 31 description pantry table (size: 1200w x 750d x 900h) material: completely made of 20g crca sheets as per is 277 standard. table top: made of (18 to 20mm) thick jet black granite top with edge molding at the front & grove at the bottom to avoid by chemical spillage. pedestal frame: made in crca 1.6 mm thick square tube & 30mm x 30mm x 1.6mm thick ms angle. with height adjustable lever bolt. unit no qty 1 description aluminum partition work providing & fixing anodized aluminum partly glass & partly paneled partition using medium duty section of national make. section 63mm x 38mm (16 guage) unit ft2 qty 417 description aluminum door section 85mm x 50mm (16 guage) unit ft2 qty 116 description door closer (brand: ozone make) unit no qty 4 description false ceiling material : metallic false ceiling brand: armstrong make unit page 3 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121878 date 11.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details ft2 qty 560 description led ceiling square light (2x2) make: panasonic unit no qty 6 description replacement of tiles with vitrified tiles for conference room brand: kjaria make unit ft2 qty 132 description pvc vinyl flooring (2mm thick) unit ft2 qty 2372 description mobile shelving system specification: material: completely made of crca sheets as per is 277 standards. vertical, rear and back panel : 21 swg (powder coated) shelves: 21 swg for 100 kg udl (powder coated) centre sheet : 22 swg (powder coated) base frame : 12 swg ( powder coated) rail track : 2 track system (1) dfmu double faced mobile unit with 6 compartment (3 bay) 2800w x 600d x 2600h unit no qty 7 description (2) sfmu single faced mobile unit with 6 compartment (3 bay) 2800w x 450d x 2600h unit no qty 1 description (3) sffu single faced fixed unit with 6 compartment (3 bay) 2800w x 450d x 2600h unit no qty...

Arcelor Mittal Nippon Steel India Limited - Gujarat

45725857 tender for admin 2000159225 ladies change room interior work hsm cd bay 2000159225 10 10 10 providing & fixing of flooring 168 ft2 20 p & f gypsum false ceiling 168 ft2 30 p & a paint incl lapi & primer 700 ft2 40 p/f alluminium door 510 ft2 50 p&f door with frame laminate finish 64 ft2 60 p& f led ceiling square light 16 no 70 providing & fixing mirror 70 ft2 80 various furniture work as per sow 1 lo 90 locker cupboards 56 ft2 100 providing & fixing table 5 ft2 110 punning on wall for giving smooth finish 50 ft2 120 reparing & maint. furniture & fixtures 1 no 130 supply & fixing of table 1 no 140 providing & fixing of sofa chair 1 no 150 supply & fixing of table 1 no email : tejal.thakkar@ext.amns.in contact : name : tejal thakkar item details : technical contact person. mr. fagna, dharmendra mob +91 7227043169 mr. reddy, ananda mob +91 7990166042 mr. rathod, dharmendrasinh mob +91 9879103363 ladies change room interior work at hsm cd bay area scope of work vendor: a. all job related manpower/materials / resources supply by vendor. b. disposal of debris after work will be vendor scope at location informed by the am/ns c. contractor shall give 3 years of guaranty for any type of wooden flooring, ceiling, paint, door, led lights, furniture, and all mics. item. d. materials should be got approved from am/ns before using at site, contractor will have to make necessary arrangement for testing of materials at his own cost, if required. e. one experienced supervisor who knows the job must be deputed for supervision on the repair works. f. in case of non compliance suitable deductions will be made from the bill. g. vendor will follow all process of safety & security, while making gate pass and during the work execution. h. type of plywood recommended: green ply, century, plywood shall only be used. i. rate will be on job basis subject to quality of work being certified by the committee formed to inspect the work. j. quality of work will be certified by area in charge with sectional in charge by physical verification. k. incase if anything happens during warranty period after completion of work, vendor will arrange the repairs with no additional cost to amns. l. all materials are subject to inspection and approval of am/ns. am/ns shall reserve the right to reject any material when found not in conformity with specifications and terms and conditions of the work order in all respect. m. the contractor shall supply their manpower with personal protective equipment, consisting of, but not limited to the following: i. safety boots/shoes ii. safety helmet iii. safety glasses iv. hearing protectors v. hand gloves n. any other special safety equipment shall be supplied by amns. o. contractor shall be deemed to have full working knowledge and have obtained all necessary information and data of company facilities at which services are to be performed, including, where applicable, prevailing location, physical conditions, hygienic state, access, contingencies, and all other circumstances under which the services shall be performed. services p. contractor vehicles entering amns site shall be well maintained and should be as per amns safety standards and shall be inspected by company designated representative. q. the contractor shall ensure that his work force is covered under the page 2 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121882 date 11.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details required insurance as per government rules and regulations. r. the contractors shall prepare the security gate passes for their personnel and furnish all information requested by pass issuing authority. s. other terms and conditions shall be as per amns rules and regulations. t. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. u. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. scope of work amnsi: a. site supervision, quality of materials, work & cleaning to be check by area in charge. if quality of work not up to mark area in charge can stop service immediately. specific penalty for nonperformance by vendor and must be cardinally measured: yes. delays will attract penalty of 5000/instance or daily description providing and fixing laminated wooden flooring with skirting unit ft2 qty 168 description providing and fixing gypsum / metal false ceiling unit ft2 qty 168 description providing and applying asian paint including 2 coats lapi and 1 coat primer after scrapping and cleaning. (paint: asian plastic paint) unit ft2 qty 700 description providing and fixing solid partition with aluminum framing with mdf including main door with all hardware fittings unit ft2 qty 510 description providing and fixing 1 changing room including door with all hardware fitting (considering partition 2 sides) unit ft2 qty 64 description providing and fixing led lights and switch board with wiring make – poly cab wire. unit no qty 16 description providing and fixing mirror unit page 3 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121882 date 11.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details ft2 qty 70 description loose furniture (providing and fixing sofa chairs and pouf using wooden frame with upholstery and asian coats pu polish in legs)(sofa 1 no’s and poufs 2 no’s)( poufs dimension: 20 dia x 17 height) unit set qty 1 description providing and fixing locker cupboards (cup board dimension: 6ft * 3 ft) unit ft2 qty 56 description providing and fixing dressing top. unit rft qty 5 description providing and fixing of punning on wall for giving smooth finish unit ft2 qty 50 description providing and fixing canvas customized artwork painting with wooden work unit no qty 1 description providing and fixing of center table unit no qty 1 description providing and fixing sofa chairs unit no qty 1 description providing and fixing side table unit no qty...

Arcelor Mittal Nippon Steel India Limited - Gujarat

45725533 tender for spr 2000157036 amc cnc machine no 1&2, csp caster, smp2 2000157036 10 10 10 amc for cnc machine 4 no email : piyushbhai.nogos@amns.in contact : name : piyushbhai nogosh item details : job title: cnc amc no 2 1) scope of work vendor: i) technical: 1.1 health audit visit – at the beginning of the contract, vendor will conduct initial assessment of the machine under contract this will result in a report consisting of conditions of all critical equipment like spindle, all axes, auxiliary systems, lubrication systems, cooling systems and automation systems duration for this inspection will be three (3) days (machine down time required) 1.2 periodic health audit visit – 1.2.1 subsequent to health audit visit as above there will be three (3) major health audit (lasting 3 days) three (3) visits per year to be mutually decided before contract finalization one mechanical engineer + 1 fitter + one electrical/automation engineer will be deputed per visit duration of visit – 3 days max scope for these visits include – inspection of machine replacement of parts where required. spares in amns scope submission of report within 2 weeks of visit with recommended spares that need to be procured and stocked 1.2.2 minor checks on general machine condition (for example lubrication systems, spindle clearances etc) – every quarter(max 4 visits in a year) duration of visit – 1 day(6 to 8 hours) one mechanical fitter 1.3 breakdown visit(s) – as required but limited to 4 visits per year preliminary report to be sent by amnsi for review depending on problem suitable engineer will be deputed to reach site within 48 hours from receipt of intimation spares for break down in amnsi scope. guarantee to be provided for replaced spares if procured from amc vendor. testing and trials *if breakdown visit exceeds 4 nos during the amc period, separate quote will be submitted for additional breakdown visit 1.4 telephonic assistance – one electrical/automation engineer and one mechanical engineer from vendor will be nominated for telephonic assistance for any mechnical or automation related problems if a visit will be required and breakdown visit is exhausted, this additional visit will be on chargeable basis *this will be after first health audit reference scope – provide two year critical spare list to am/ns to support am/ns for maintaining spares special measuring tools / tackles required for preventive & breakdown page 2 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121906 date 11.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details maintenance will be in vendor scope any electrical component / device damaged during fault finding shall be replaced fcc by vendor spare am/ns scope all required lodging boarding and transportation will be in vendor scope of work all safety ppes will be in vendor scope all necessary backups including image backups of all the systems machine alignment & certification to be done once in a year by vendor replacement of spares (electrical ) will be done by vendor spare am/ns scope checklist of vendor – lubrication & maintanance – cleaning of machine from dirt check filters with regards to cleanness check oil levels and refill oil if required check belt tension at the main drive and retention it, if necessary check operating panel and display elements central oil lubrication – check oil is delivered through a discharge system to all points lubrication points of the different axes by means of a pump and distributed by a piston pump and dosing devices check oil levels in lubrication tank hydralics for the tool clamper – it exclusively serves for loosening the tool clamper. the tool clamping is affected by means of belleville washers pneumatics for the tool clamper – the air connection required for the cleaning of the tool clamper machine – check telescopic cover condition check guide rail condition and alignment lm rail inspection – checking of lm rail & lm block of x,y& z axis checking lubrication points spindle belt condition to be check and if any deviation found to be change spare am/ns scope x, y & z axis drive of ball screw , gear box bearing condition to be checked and if any deviation found to be changed spare am/ns scope main spindle run out to be check if any deviation found, bearing to be change spare am/ns scope tool clamping and unclamping condition to be check if any deviation found, respective parts to be change spare am/ns scope electrical – maintenance of all motors (x axis, y axis, z axis and spindle motor) maintenance of all drive units (x axis, y axis, z axis and spindle drive) maintenance of rectifier and nc unit connection and tightness checking maintenance of all hmi, s7 300 plc, and other plc cards maintenance of all field instruments take all necessary backups inclusive image backups of all the system (plc, hmi, nc) and submit to department. it should be with department after maintenance complete trial to be taken along with amns engineer notes – 1) here maintenance means, health checking during amc visit. regular maintenance will be am/ns scope. 2) no electrical or mechanical spare will be in vendor scope. all spares in am/ns scope ii) safety: page 3 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121906 date 11.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 1. competency needs: a scarfer and lancer shall have at least 3 yrs. of hands on working experience in addition to that he/she shall have at least 10th class of education. 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. job specific trade training and assessment is mandatory for all the key roles. b. workers must undergo a competency assessment by am/ns india before being authorized to participate in scarfer and lancer operations. c. conduct worker safety training programs every three months, focusing on the specific risks associated with scarfer and lancer, including manual handling gas safety management. d. communicate learning from incident or accident wrt scarfing and lancing with all working staff. e. all worker shall be medically fit to work in hazardous operation. 3. risk assessment and hazard identification: a. a comprehensive risk assessment must be conducted quarterly, focusing on the hazards associated with scarfing, lancing and material handling. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of scarfing, lancing and material handling. 4. supervision: a. deploy site in charges to manage overall operation, administration and emergency for the job and workers. b. assign job supervisor as per the job scope. c. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every quarter to ensure preparedness, scenarios involving gas leakage and fire, back fire, material falling, etc. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. scarfing and lancing sets shall be inspected before every use and keep record. c. all hand tools shall be inspected and certified as needed. d. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. nitrile shole safety shoes c. thermal heat protective full body suit d. leg sleeves. e. heat protective hand gloves f. safety jacket (as per amns india standards) g. dust mask page 4 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121906 date 11.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details h. safety goggles i. hand gloves. j. ear plug / earmuff k. contractor shall fulfill all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. compliance with indian labor laws: a. adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. iii) statutory: · the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. · the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. iv) penalty: 1. penalty for unsafe acts: o 10,000 for each unsafe act observed during safety audits or inspections. 2. severe safety violations: o 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in material exposure or environmental contamination. 3. safety violations: o 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to the job. 4. late incident reporting: o 5,000 per hour of delay beyond the 30 minute reporting window for any incident. 5. failure to provide adequate materials/manpower: o 20,000 for each instance where materials or manpower are not provided as per the contract, leading to delays process. 6. penalty for non performance: o penalty as per the monthly bill amount if the vendor fails to meet the standard requirement of maintenance activities with escalating penalties for repeated non performance. scope of work amns: amns will provide all material handling equipment amns will make the machine availability amns will provide all required electrical and mechanical spares amns will provide the work permits/gate passes for work carrying amns will provide consumables and cleaning agents amns will take the jobs trials after manienanace amns will take trials by operators after machine maintenance amns will plan and make the schedule for machine availability item note : 2 2000157036 20 20 10 amc for cnc machine 4 no email : piyushbhai.nogos@amns.in contact : name : piyushbhai nogosh item details : job title: cnc amc no 1 1) scope of work vendor: i) technical: 1.1 health audit visit – at the beginning of the contract, we will conduct initial assessment of page 5 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121906 date 11.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details the machine under contract this will result in a report consisting of conditions of all critical equipment like spindle, all axes, auxiliary systems, lubrication systems, cooling systems and automation system duration for this inspection will be three (3) days (machine down time required) 1.2 periodic health audit visit – 1.2.1 subsequent to health audit visit as above there will be three (3) major health audit (lasting 3 days) three (3) visits per year to be mutually decided before contract finalization one mechanical engineer + 1 fitter + one electrical/automation engineer will be deputed per visit duration of visit – 3 days max scope for these visits include – inspection of machine replacement of parts where required. spares in customer’s scope submission of report within 2 weeks of visit with recommended spares that need to be procured and stocked 1.2.2 minor checks on general machine condition (for example lubrication systems, spindle clearances etc) – every quarter(max 4 visits in a year) duration of visit – 1 day(6 to 8 hours) one mechanical fitter 1.3 breakdown visit(s) – as required but limited to 4 visits per year preliminary report to be sent by customer for review depending on problem suitable engineer will be deputed to reach site within 48 hours from receipt of intimation spares for break down in customer scope. no guarantee can be provided for replaced spares unless procured from maxis testing and trials *if breakdown visit exceeds 4 nos during the amc period, separate quote will be submitted for additional breakdown visit 1.4 telephonic assistance – one electrical/automation engineer and one mechanical engineer from maxis will be nominated for telephonic assistance for any mechnical or automation related problems if a visit will be required and breakdown visit is exhausted, this additional visit will be on chargeable basis *this will be after first health audit reference scope – provide two year critical spare list to am/ns to support am/ns for maintaining spares special measuring tools / tackles required for preventive <(>&<)> breakdown maintenance will be in maxis scope any electrical component / device damaged during fault finding shall be replaced fcc by vendor spare am/ns scope all required lodging boarding and transportation will be in maxis scope of work all safety ppes will be in maxis scope all necessary backups including image backups of all the systems machine alignment <(>&<)> certification to be done once in a year by maxis replacement of spares (electrical ) will be done by vendor spare am/ns scope checklist of vendor – lubrication <(>&<)> maintanance – cleaning of machine from dirt check filters with regards to cleanness page 6 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121906 date 11.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details check oil levels and refill oil if required check belt tension at the main drive and retention it, if necessary check operating panel and display elements central oil lubrication – check oil is delivered through a discharge system to all points lubrication points of the different axes by means of a pump and distributed by a piston pump and dosing devices check oil levels in lubrication tank hydralics for the tool clamper – it exclusively serves for loosening the tool clamper. the tool clamping is affected by means of belleville washers pneumatics for the tool clamper – the air connection required for the cleaning of the tool clamper machine – check telescopic cover condition check guide rail condition and alignment lm rail inspection – checking of lm rail <(>&<)> lm block of x,y<(>&<)> z axis checking lubrication points spindle belt condition to be check and if any deviation found to be change spare am/ns scope x, y <(>&<)> z axis drive of ball screw , gear box bearing condition to be checked and if any deviation found to be changed spare am/ns scope main spindle run out to be check if any deviation found, bearing to be change spare am/ns scope tool clamping and unclamping condition to be check if any deviation found, respective parts to be change spare am/ns scope electrical – maintenance of all motors (x axis, y axis, z axis and spindle motor) maintenance of all drive units (x axis, y axis, z axis and spindle drive) maintenance of rectifier and nc unit connection and tightness checking maintenance of all hmi, s7 300 plc, and other plc cards maintenance of all field instruments take all necessary backups inclusive image backups of all the system (plc, hmi, nc) and submit to department. it should be with department after maintenance complete trial to be taken along with amns engineer notes – 1) here maintenance means, health checking during amc visit. regular maintenance will be am/ns scope 2) no electrical or mechanical spare will be in maxis scope. all spares in am/ns scope ii) safety: 1. competency needs: a scarfer and lancer shall have at least 3 yrs. of hands on working experience in addition to that he/she shall have at least 10th class of education. 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. job specific trade training and assessment is mandatory for all the key roles. b. workers must undergo a competency assessment by am/ns india before being authorized to participate in scarfer and lancer operations. c. conduct worker safety training programs every three months, focusing on the specific risks associated with scarfer and lancer, including manual handling gas safety management. d. communicate learning from incident or accident wrt scarfing and lancing with all working staff. e. all worker shall be medically fit to work in hazardous operation. 3. risk assessment and hazard identification: page 7 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121906 date 11.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details a. a comprehensive risk assessment must be conducted quarterly, focusing on the hazards associated with scarfing, lancing and material handling. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of scarfing, lancing and material handling. 4. supervision: a. deploy site in charges to manage overall operation, administration and emergency for the job and workers. b. assign job supervisor as per the job scope. c. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every quarter to ensure preparedness, scenarios involving gas leakage and fire, back fire, material falling, etc. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. scarfing and lancing sets shall be inspected before every use and keep record. c. all hand tools shall be inspected and certified as needed. d. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. nitrile shole safety shoes c. thermal heat protective full body suit d. leg sleeves. e. heat protective hand gloves f. safety jacket (as per amns india standards) g. dust mask h. safety goggles i. hand gloves. j. ear plug / earmuff k. contractor shall fulfill all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. compliance with indian labor laws: a. adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. page 8 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121906 date 11.10.2024 submission date 18.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details iii) statutory: · the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. · the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. iv) penalty: 1. penalty for unsafe acts: o 10,000 for each unsafe act observed during safety audits or inspections. 2. severe safety violations: o 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in material exposure or environmental contamination. 3. safety violations: o 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to the job. 4. late incident reporting: o 5,000 per hour of delay beyond the 30 minute reporting window for any incident. 5. failure to provide adequate materials/manpower: o 20,000 for each instance where materials or manpower are not provided as per the contract, leading to delays process. 6. penalty for non performance: o penalty as per the monthly bill amount if the vendor fails to meet the standard requirement of maintenance activities with escalating penalties for repeated non performance. scope of work amns: amns will provide all material handling equipment amns will make the machine availability amns will provide all required electrical and mechanical spares amns will provide the work permits/gate passes for work carrying amns will provide consumables and cleaning agents amns will take the jobs trials after manienanace amns will take trials by operators after machine maintenance amns will plan and make the schedule for machine availability...

Arcelor Mittal Nippon Steel India Limited - Gujarat

45700122 tender for various opn jobs at gal#1,2_crm1_cy25 000158043 10 10 10 various opn jobs at gal 600,000 to email : gaurang.bhojani@edu.amns.in contact : name : bhojani, gaurang am/ns india academy item details : * sow: providing of manpower for gal lines operations on rs./ton basis. as per operaion requirement, vendor has to supply riggers, skilled, semiskilled manpower for both gal, gal finishing lines and alloy furnace operations. ppes, required tools shall be in vendors scope. minimum tonnage guarantee is 46,000 ton/month. clauses to be followed strictly for this contract: 1. minimum billing is revised to 46,000 ton/month. (earlier it was 40 ,000 ton/ month) 2. billing will be considered basis on production of both gal lines in tonnage basis. 3. minimum 1150 man days per month (for 30 days/month) (~ reciprocate minimum man days for other months having 29 or 31 days) to be ensured from your end. (24 manpower for gal lines, 12 manpower for actl and 5 manpower for alloy) – new clause 4. penalty of inr 500/man day will be levied in absence of minimum number of man days/month as per point 3. – new clause 5. scrum attendance will be considered for man day counting. you need to provide scrum data with bill. (for few cases like short term replacement and starting couple of months will be counted manually) – new clause area of work:crm scope of work includes various jobs for galvanizing at crm, as per the instructions/directions of area in charge. general terms and conditions it is the sole responsibility of vendor to deploy correct/right set of skilled resources as per competency matrix for all jobs/works being executed by him at various sites of essar steel hazira complex as indicated in msa document. list of specific personal protective equipments (ppes) to be used for the job/work and the area of work. tools and tackles you shall ensure that all the tools and tackles deployed by you are certified by competent authority for use in factory. such certificate should be duly valid at all points of time. *amns safety rule and regulation as per company policy: • work should be started only after taking authorized work permit. • toolbox talk must be delivery before starting the job on daily basic. • use certified portable hand electric machine. • use certified lifting tools <(>&<)> tackles <(>&<)> it should be check before every use. • ensure that all persons are wearing safety helmet, safety shoe, safety goggles, face shield and cut resistance hand gloves. • work should be carried out in close supervision of competent supervisor. • the working area need to be cleaned to avoid the slipping hazards. page 2 of 2 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121830 date 10.10.2024 submission date 25.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. venkat sai taneeru contact email venkat.taneeru@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details • ensure highly flammable material should not be store near working area <(>&<)> if any it should be removed immediately before starting the job. • always carry fe near workplace. * sop no / hirac no amnsil/crm/gal opr/16.7/hirac/03, 04,05,07,14,15,17,45,57<(>&<)>77. sop for gal1 amnsil/crm/gal1 opr/19/sop/02,09,15. sop for gal2 amnsil/crm/gal opr/19/sop/gal2/02,03,06,10,14....

Arcelor Mittal Nippon Steel India Limited - Gujarat

45677873 tender for admin_2000156451 washroom refurbish plate mill mat lab 2000156451 10 10 10 breaking of exstg structure/floor tiles 179.5 m3 20 breaking of brick / block masonry & 3 m3 30 p&l fly ash bricks incl cement masonery 4 m3 40 providing & laying pcc m15 incl cement 5 m3 50 p & l sandface plaster incl cement 170 m2 60 fixing of vitrified ceramic tiles 185 m2 70 providing & fix of granite 85 m2 80 p&f e board false ceiling in 2x2 frame 30 m2 90 p & a lapi primer with scrapng & cleang 30 m2 100 p&a two coats of super acrylic emulsion 30 m2 110 p & f ewc including all fixtures 4 no 120 p & f of urinal including all fixtures 6 no 130 providing & fixing of wash basin 7 no 140 providing & fixing of bathroom fittings 4 no 150 providing & fixing bib coke 4 no 160 providing & fixing of flush coke 4 no 170 providing & fixing of angle coke 6 no 180 providing & fixing of stop coke 13 no 190 providing & fixing of pillar coke 7 no 200 providing & fixing of bathroom fittings 4 no 210 p & f nahni trap of approved spec.&qlty. 10 no 220 providing & fixing s.s. jali 6 x 6 10 no 230 providing & fixing upvc pipe dn 15mm 30 m 240 p & f of 1/ dn25 diameter upvc pipeline 20 m 250 providing & fixing 4 dia pvc swr pipe 15 m 260 providing & fixing 6 dia pvc swr pipe 20 m 270 removing of aluminium partition 40 m2 280 providing & fixing alluminium door 16 m2 290 providing & fixing of door closer 5 no 300 p &l rcc m30 incl comp & fin incl cement 6 m3 310 scaffolding with material for upto 10mtr 105 m3 320 reinf. shifting, bending,cutting,placing 0.5 to 330 deployment of labour 15 10 email : tejal.thakkar@ext.amns.in contact : name : tejal thakkar item details : technical contact person: mr. fagna, dharmendra mob +91 9327504621 mr. reddy, ananda mob +91 7990166042 mr. rathod, dharmendrasinh mob +91 9879103363 washroom refurbishment work at plate mill mat lab gents and ladies washroom scope of work vendor: a. 1. area of work will be ini caster general washroom, and vendor must extend the support by executing the job as instructed by in charge / head administration. 2. vendor should mention the job completion duration & all services action plan in estimate and if work is not completed as per action plan, we must penalize 5000/ . per day and it will be deducted from vendor existing bill. b. all consumables with required spares items will be under scope of the vendor including cement. c. all job related manpower and resources provided by vendor. d. disposal of scrap/debris after work will be vendor scope at location informed by the amns. e. permit to work‟ (ptw) system must be followed by the contractors personnel where required within amns premises. f. contractor shall ensure all his staff are aware of company safety and fire regulations whilst on company premises. g. accommodation, transportation to and from work site, and medical/insurance shall be borne by contractor for his personnel. h. the contractor shall supply their manpower with personal protective equipment, consisting of, but not limited to the following: i. safety boots/shoes ii. safety helmet iii. safety glasses iv. hearing protectors v. hand gloves vi. any other special safety equipment shall be supplied by amns. i. although each person will be being given the safety induction and will be familiar with the amns safety regulations, this will not deduct from the responsibilities of the chosen contractor to the termination of that manpower. the contractor shall make replacement of persons at no additional cost to amns. j. performance of the contractor shall be monitored continuously to ensure they meet acceptable standards of service. if amns is not satisfied with the contractors work the contract shall be terminated, at no additional cost to amns. k. contractor shall be deemed to have full working knowledge and have obtained all necessary information and data of company facilities at which services are to be performed, including, where applicable, prevailing location, physical conditions, hygienic state, access, contingencies, and all other circumstances under which the services shall be performed. services l. contractor vehicles entering amns site shall be well maintained and should be as per amns safety standards and shall be inspected by company designated representative. m. the contractor shall ensure that his work force is covered under the page 2 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121781 date 09.10.2024 submission date 16.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details required insurance as per government rules and regulations. n. the contractors shall prepare the security gate passes for their personnel and furnish all information requested bypass issuing authority. o. other terms and conditions shall be as per amns rules and regulations. p. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. q. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. r. contractor shall give 3 years of guaranty for any type of civil and plumbing work. s. materials should be got approved from am/ns before using at site. t. contractor will have to make necessary arrangement for testing of materials at his own cost, if required. u. one experienced supervisor who knows the job must be deputed for supervision on the repair works. in case of non compliance suitable deductions will be made from the bill. v. vendor will follow all process of safety & security, while making gate pass and during the work execution. w. quality of work will be certified by area in charge with sectional in charge by physical verification. x. the contractor shall pay penalty of 1% per week / subject to a maximum of 10% at value of work order in case of delays beyond the accepted completion period for reasons solely attributed to him. y. incase if anything happens during warranty period after completion of work, vendor will arrange the repairs with no additional cost to amns. z. site progress photographs. measurements will be certified within 7 days. consultants will certify r.a. bills within 10 days of submission of correct bills. the contractor will claim extra items vide separate bills only after rate approval of such items. scope of work amnsi: a. site supervision, quality of materials, work & cleaning to be check by area in charge. if quality of work not up to mark area in charge can stop service immediately. b. electrical lights and water supply. specific penalty for nonperformance by vendor and must be cardinally measured: item description breaking of existing tiles/marble/granite floor & shifting of debris unit m2 quantity 179.5 item description breaking of pcc / brick masonry / block masonry & shifting of debris up to 5 km unit m3 quantity 3 item description providing & laying brick masonry (by using fly ash bricks including cement) unit m3 quantity 4 item description providing & laying pcc m15 (including cement) unit m3 quantity page 3 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121781 date 09.10.2024 submission date 16.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 5 item description providing & laying 20mm th sandface plaster (including cement) unit m2 quantity 170 item description providing & fixing vitrified ceramic tiles (kajaria, somani, asian, johnson, bell, nitco or equivalent approved by area in charge including cement) unit m2 quantity 185 item description providing & fixing 15 to 20mm th polished granite stone ( telephone black granite grade ) with edge molding & polishing including cement unit m2 quantity 85 item description providing & fixing e board false ceiling (4mm thick everest or equivalent) unit m2 quantity 30 item description providing & applying two coats lapi & primer including scrapping & cleaning unit m2 quantity 30 item description providing & applying two coats of super acrylic emulsion plastic paint (asian / berger / nerolac or equivalent) unit m2 quantity 30 item description providing & fixing ewc (cera make fittings campbell set) unit no quantity 4 item description providing & fixing urinal (cera make fittings cicily lidless with sensor) unit no quantity 6 item description providing & fixing wash basin (cera make fittings oval) with fittings model changed with all fittings jaguar make model chnaged unit no quantity 7 item description providing & fixing health faucet (jet spray) (jaquar make ald 0577) unit no page 4 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121781 date 09.10.2024 submission date 16.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details quantity 4 item description providing & fixing 2x1 bib cock kup 35041pm jaquar unit no quantity 4 item description providing & fixing of flush coke ( jaquar con 1081a with concealed body ald 081) unit no quantity 4 item description providing & fixing of angle coke ( jaquar con 059kn) unit no quantity 6 item description providing & fixing of stop coke ( jaquar con 087ftk with concealed body ald 089) unit no quantity 13 item description providing & fixing of sensor piller snr chr 51445 jaquar unit no quantity 7 item description providing & fixing paper holder (jaquar make ahs 1553) unit no quantity 4 item description providing & fixing of pvc nahni trap unit no. quantity 10 item description providing & fixing s.s. jali 6 x 6 unit no. quantity 10 item description providing & fixing of ½ dia upvc pipeline (astral or equivalent make) unit m quantity 30 item description providing & fixing of 1 dia upvc pipeline (astral or equivalent make) unit m quantity 20 item description providing & fixing of 4 dia pvc swr pipe (supreme or equivalent) 9.00 mm type a drain pipe astral page 5 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121781 date 09.10.2024 submission date 16.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null pinky raval contact email pinky.craval@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details unit m quantity 15 item description providing & fixing of 6 dia pvc swr pipe (supreme or equivalent) 16mm 0 type a drain pipe astral unit m quantity 20 item description removing aluminium partition / door / false ceiling / false flooring & shifting material unit m2 quantity 40 item description providing & fixing bronze anodized aluminium door including all fixtures (16 gauge) including 5mm th plain glass & 9mm th laminated particle board quantity 16 item description providing & fixing door closer hyper make unit no. quantity 5 item description providing & laying rcc m30 including compaction & finishing (including cement) other than road/flooring work unit m3 quantity 6 item description providing & fixing scaffolding up to 10 m height unit m3 quantity 105 item description reinforcement shifting, bending, binding & placing in position (material steel will be supplied by company at stores, shifting from stores will be in vendors scope) unit mt quantity 0.5 item description supply of unskilled labour 08 hour including necessary tools & tackles unit day quantity 15 ...

Western Railway - Gujarat

45545254 bids are invited for industrial safety helmet (v2) as per is 2925 (q3) total quantity : 400...

Arcelor Mittal Nippon Steel India Limited - Gujarat

45536981 tender for welding of >12mm thick fillet in slag pot & pit area 00156874 250 10 10 fillet welding of c.s. pipe, plates, 800 m email : vishal.vadi@amns.in contact : 9879103459 name : vadi, vishal am/ns india smp1 (haz) item details : annexure – 1 scope of work technical ø welding of >12mm thick fillet (locking plate) pit area welding of >12mm thick fillet (locking plate) in pit area sms operationsmp1 cy25 service code service qty/year uom 3003202 welding of >12mm thick fillet (locking plate) pit area 800 m 1. the scope of work includes providing services for welding of >12mm thick fillet (locking plate) pit area slag management as per scope of work on regular and as <(>&<)> when required basis in steel making plant 1 (smp 1), amns india, hazira. 2. the scope of work in general has been mentioned as under. we have tried to cover most of the scopes. however, since the job volume is vast and hence some jobs could possibly be missed out <(>&<)> will have to be executed by contractor as <(>&<)> when required as directed by area in charge. submission of quote would automatically mean that above terms is accepted to the contractor. the service required are for some specialized jobs. vendor to be competent to perform the below mentioned jobs. the scope generally shall be as under: ø vendor scope of work 1. providing services for welding of >12mm thick fillet (locking plate) for cs pipes / plates / structural after grinding as per required length for the job requirement (7018). 2. to provide competent manpower for the job <(>&<)> ensure for uninterrupted services by experienced crew. 3. engaging qualified and experienced engineer / supervisor. 4. supply of skilled and unskilled worker. 5. shifting of all material from the store area to job site. 6. fabrication of structure at job site / off site in the plant area. 7. all tools <(>&<)> tackles, consumable material, da <(>&<)> o2 gas, cutting set, welding machine, welding rod etc. are in vendor scope. ø housekeeping: 1. ensure good housekeeping / cleaning of the area including cleaning / removing the waste and used material. shifting of surplus material to the specific location or shown by the engineer / area in charge. 2. bill certification will be done only after complete housekeeping. ø hse requirement 1. contractor shall comply with the health, safety and environment policy as laid down by amns(i). 2. vendor must ensure all the legal aspects and needs to be maintained in line with both man and machine. 3. all the tools and tackles deployed by you should be certified by a competent authority for use in the factory. such certificate should be page 2 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121260 date 01.10.2024 submission date 09.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details duly valid at all points of time and a copy of same to be submit with amnsi (arcelormittal nippon steel india) engineer in charge. 4. vendor must provide all ppe items for worker. safety shoes, safety jacket, hand gloves, helmet, safety goggles, full body harness and nose mask as per safety standards of amns(i) 5. site engineer must take prior work permit from area in charge to attend the job at site. detailed sop must be available with vendor for all types of job activities. vendor must ensure safe execution of the job <(>&<)> must follow all safety protocols as laid down by amnsi. 6. welder / grinder / gas cutter / associate must be certified with hight pass for working at hight. ø movement of manpower / associates at our hazira site: 1. no pedestrian / cycles / two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. 3. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. ø other terms 1. associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. safety 1. competency needs: a. an associates shall have at least 3 yrs. of hands on working experience in addition to that he/she shall have at least 10th class of education. b. all workers shall have min. understanding of local or national language. 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. b. workers must undergo 16 days of associates training program organized by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india before being authorized to participate in rigging/ ladle handling operations. d. all rigger/ladle handler shall have trained on rigging and ladle handling operation with and training assessment. e. they all must have a signaling skill. f. communicate learning from incident or accident wrt rigging and ladle operation with all working staff. g. all workers shall be medically fit to work in hazardous operation. h. ensure daily tbt. 3. risk assessment and hazard identification: a. a comprehensive risk assessment study must be conducted quarterly, focusing on the hazards associated with ladle handling. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of ladle handling. 4. supervision: a. assign job supervisor to manage overall operation, administration and emergency for the job and workers. b. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: page 3 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121260 date 01.10.2024 submission date 09.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every quarter to ensure preparedness the probable emergency in ladle handling. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. nitrile shole safety shoes c. hand gloves d. safety jacket (as per amns india standards) e. dust mask f. safety goggles g. hand gloves. h. ear plug / earmuff i. any other special ppes as asked by amnsi. j. contractor shall fulfil all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. all transportation of man <(>&<)> material in vendor scope up to the department gate (bus/vehicle facility). 11. any kind of unauthorized mobile phone are not allowed. 12. following of all am/ns india sop <(>&<)> hse norms. 1. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. contractor shall comply with the health, safety and environment policy as laid down by amns(i). vendor must ensure all the legal aspects and needs to be maintained in line with both man and machine. all the tools and tackles deployed by you should be certified by a competent authority for use in the factory. such certificate should be duly valid at all points of time and a copy of same to be submit with amnsi (arcelormittal nippon steel india) engineer in charge. vendor must provide all ppe items for worker. safety shoes, safety jacket, hand gloves, helmet, safety goggles and nose mask as per safety standards of amns(i) site engineer must take prior work permit from area in charge to attend the job at site. detailed sop must be available with vendor for all types of job activities. vendor must ensure safe execution of the job <(>&<)> must follow all safety protocols as laid down by amnsi. page 4 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121260 date 01.10.2024 submission date 09.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details worker / supervisor must be able to read and understand the instructions and sop. all required ppe’s will be in vendor scope. to provide competent manpower / supervisor for the job <(>&<)> ensure for uninterrupted services by experienced crew. engaging qualified and experienced engineer/supervisor. no pedestrian / cycles / two wheelers movement will be allowed inside the plant premises. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. statutory • the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. • the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. • wc policy / group insurance penalty 1. penalties will be applicable for violating safety norms as per amns(i) policy. 2. penalty will be applicable for failing in completing the job as per the agreed timeline with site in charge. 3. vendor must ensure completion of job within specified time limit as defined by amns site in charge. failure to do so will lead to penalty of rs. 1000 per hour of job delay. 4. all other clause as mentioned in terms and conditions of work order shall be applicable to vendor. end of sow welding of >12mm thick fillet (locking plate) pit area item note : 2 2000156874 260 20 10 fillet welding of c.s. pipe, plates, 400 m email : vishal.vadi@amns.in contact : 9879103459 name : vadi, vishal am/ns india smp1 (haz) item details : annexure – 1 scope of work technical welding of >12mm thick fillet in slag pot service code service description qty / year unit 3003202 welding of >12mm thk fillet in slagpot 400.00 m page 5 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121260 date 01.10.2024 submission date 09.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details ø welding of >12mm thick fillet in slag pot: 1. the scope of work includes providing services for welding of >12mm thick fillet in slag pot slag management area as per scope of work on regular and as <(>&<)> when required basis in steel making plant 1 (smp 1), amns india, hazira. 2. the scope of work in general has been mentioned as under. we have tried to cover most of the scopes. however, since the job volume is vast and hence some jobs could possibly be missed out <(>&<)> will have to be executed by contractor as <(>&<)> when required as directed by area in charge. submission of quote would automatically mean that above terms is accepted to the contractor. the service required are for some specialized jobs. vendor to be competent to perform the below mentioned jobs. the scope generally shall be as under: ø vendor scope of work: 1. providing services for welding of >12mm thick fillet in slag pot. welding of cracked pot after grinding as per required length for the job requirement. electrode to be preheated before use (e7018) 2. to provide competent manpower for the job <(>&<)> ensure for uninterrupted services by experienced crew. engaging qualified and e xperienced engineer/supervisor. 3. supply of skilled and unskilled worker. 4. shifting of all material from the store area to job site. 5. all tools <(>&<)> tackles, consumable material, da <(>&<)> o2 gas, cutting set, welding machine, welding rod etc. provided by vendor. ø housekeeping: 1. ensure good housekeeping / cleaning of the area including cleaning / removing the waste and used material. shifting of surplus material to the specific location or shown by the engineer / area in charge. bill certification will be done only after complete housekeeping. ø hse requirement 1. contractor shall comply with the health, safety and environment policy as laid down by amns(i). 2. vendor must ensure all the legal aspects and needs to be maintained in line with both man and machine. 3. all the tools and tackles deployed by you should be certified by a competent authority for use in th 4. factory. such certificate should be duly valid at all points of time and a copy of same to be submit with amnsi (arcelormittal nippon steel india) engineer in charge. 5. vendor must provide all ppe items for worker. safety shoes, safety jacket, hand gloves, helmet, safety goggles, full body harness and nose mask as per safety standards of amns(i) 6. site engineer must take prior work permit from area in charge to attend the job at site. detailed sop must be available with vendor for all types of job activities. vendor must ensure safe execution of the job <(>&<)> must follow all safety protocols as laid down by amnsi. 7. welder/grinder/gas cutter associate must be certified with hight pass for work at hight. ø movement of manpower / associates at our hazira site. 1. no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. 2. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. 3. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is page 6 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121260 date 01.10.2024 submission date 09.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details prohibited. ø other terms 1. associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. safety 1. competency needs: a. an associates shall have at least 3 yrs. of hands on working experience in addition to that he/she shall have at least 10th class of education. b. all workers shall have min. understanding of local or national language. 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. b. workers must undergo 16 days of associates training program organized by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india before being authorized to participate in rigging/ ladle handling operations. d. all rigger/ladle handler shall have trained on rigging and ladle handling operation with and training assessment. e. they all must have a signaling skill. f. communicate learning from incident or accident wrt rigging and ladle operation with all working staff. g. all workers shall be medically fit to work in hazardous operation. h. ensure daily tbt. 3. risk assessment and hazard identification: a. a comprehensive risk assessment study must be conducted quarterly, focusing on the hazards associated with ladle handling. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of ladle handling. 4. supervision: a. assign job supervisor to manage overall operation, administration and emergency for the job and workers. b. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every quarter to ensure preparedness the probable emergency in ladle handling. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective page 7 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121260 date 01.10.2024 submission date 09.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. nitrile shole safety shoes c. hand gloves d. safety jacket (as per amns india standards) e. dust mask f. safety goggles g. hand gloves. h. ear plug / earmuff i. any other special ppes as asked by amnsi. j. contractor shall fulfil all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. all transportation of man <(>&<)> material in vendor scope up to the department gate (bus/vehicle facility). 11. any kind of unauthorized mobile phone are not allowed. 12. following of all am/ns india sop <(>&<)> hse norms. 1. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. contractor shall comply with the health, safety and environment policy as laid down by amns(i). vendor must ensure all the legal aspects and needs to be maintained in line with both man and machine. all the tools and tackles deployed by you should be certified by a competent authority for use in the factory. such certificate should be duly valid at all points of time and a copy of same to be submit with amnsi (arcelormittal nippon steel india) engineer in charge. vendor must provide all ppe items for worker. safety shoes, safety jacket, hand gloves, helmet, safety goggles and nose mask as per safety standards of amns(i) site engineer must take prior work permit from area in charge to attend the job at site. detailed sop must be available with vendor for all types of job activities. vendor must ensure safe execution of the job <(>&<)> must follow all safety protocols as laid down by amnsi. worker / supervisor must be able to read and understand the instructions and sop. all required ppe’s will be in vendor scope. to provide competent manpower / supervisor for the job <(>&<)> ensure for uninterrupted services by experienced crew. engaging qualified and experienced engineer/supervisor. no pedestrian / cycles / two wheelers movement will be allowed inside the plant premises. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. associate must undergo medical fitness at our care nursing home, am/ns page 8 of 8 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121260 date 01.10.2024 submission date 09.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. statutory • the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. • the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. • wc policy / group insurance penalty • penalties will be applicable for violating safety norms as per amns(i) policy. • penalties will be applicable for failing to complete the job as per the agreed timeline with site in charge. • vendors must ensure completion of job within specified time limit as defined by amns site in charge. failure to do so will lead to a penalty of rs. 1000 per hour of job delay. • all other clauses as mentioned in terms and conditions of work order shall be applicable to vendor. end of sow welding of >12mm thick fillet in slag pot ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

45536491 tender for general structure fabrication job at smp 1 2000156874 370 10 10 services for general fabrication 100 to email : vishal.vadi@amns.in contact : 9879103459 name : vadi, vishal am/ns india smp1 (haz) item details : scope of work vendor for various fabrication <(>&<)> erection. (like store room / rack / stand etc. based on plant requirement) • clearing site and preparation for fabrication. • shifting the material from stores, loading, and unloading of the material, cutting to size, bending of tubes /plate, edge preparation. • complete erection as per requirement. in case of any mismatch, correction, during erection the correction/matching will be in the scope of the contractor, site painting by brush (after welding and grinding of the erected assembly will be done by contractor. • visual preparation, by finishing, grinding extra material, dimensional inspection, and report preparation. • welding machine, cutting set, all tools tackles, jigs and fixtures, pressure testing equipment, measurement equipment will be in the scope of contractor. all tools and tackles should be certified and copy of certificate must be kept with supervisor working in that area • all consumables like, welding rod, gas for cutting grinding wheel will be in the scope of contractor. • vendor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by amns) required for the job. • use e 7018 welding electrodes for all welding jobs. annexure – 1 (scope of work) sow for vendor technical service code service description qty / year unit 3012023 services for general fabrication 100.00 ton § re welding of welding joints to be done if required after inspection. § job quantity will be decided by the department/site in charge. § contractor shall complete the job as per the approved specifications, drawings, and as per the direction <(>&<)> satisfaction of amns engineer in charge. § vendors shall ensure housekeeping/cleaning of the area including cleaning /removing the debris/scrap/waste and used material and shifting the same/surplus materials to the location specified or shown by the engineer, area in charge. bill certification will only be done after complete housekeeping. § contractor shall ensure safety of his personnel <(>&<)> follow all safety measures prescribed and shall provide for all safety requirements as per the demands of the services rendered at your own cost with all required ppe’s (personal protective equipment) § vendor shall ensure that all the tools and tackles deployed are page 2 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121280 date 01.10.2024 submission date 09.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details certified by competent authority for use in factory. certificate should be duly valid at all points of time. § hse requirement contractor shall comply with the health, safety and environment policy as laid down by amns steel limited. § penalties will be applicable for violating safety norms as per amns policy. § penalty will be applicable for not completing the job as per the agreed timeline with site in charge. • specific penalty for nonperformance by vendor and must be cardinally measured. § non conformity of work. § penalties will be imposed in case of noncompliance to hse norms. § movement of manpower / associates at our hazira site. § no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. § vendors must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors ensure safe t ransportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. § other terms: associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is used for processing the gate pass. safety 1. competency needs: a. an associates shall have at least 3 yrs. of hands on working experience in addition to that he/she shall have at least 10th class of education. b. all workers shall have min. understanding of local or national language. 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. b. workers must undergo 16 days of associates training program organized by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india before being authorized to participate in rigging/ ladle handling operations. d. all rigger/ladle handler shall have trained on rigging and ladle handling operation with and training assessment. e. they all must have a signaling skill. f. communicate learning from incident or accident wrt rigging and ladle operation with all working staff. g. all workers shall be medically fit to work in hazardous operation. h. ensure daily tbt. 3. risk assessment and hazard identification: a. a comprehensive risk assessment study must be conducted quarterly, focusing on the hazards associated with ladle handling. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of ladle handling. page 3 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121280 date 01.10.2024 submission date 09.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 4. supervision: a. assign job supervisor to manage overall operation, administration and emergency for the job and workers. b. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every quarter to ensure preparedness the probable emergency in ladle handling. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. nitrile shole safety shoes c. hand gloves d. safety jacket (as per amns india standards) e. dust mask f. safety goggles g. hand gloves. h. ear plug / earmuff i. any other special ppes as asked by amnsi. j. contractor shall fulfil all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. all transportation of man <(>&<)> material in vendor scope up to the department gate (bus/vehicle facility). 11. any kind of unauthorized mobile phone are not allowed. 12. following of all am/ns india sop <(>&<)> hse norms. 1. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. contractor shall comply with the health, safety and environment policy as laid down by amns(i). vendor must ensure all the legal aspects and needs to be maintained in line with both man and machine. all the tools and tackles deployed by you should be certified by a competent authority for use in the factory. such certificate should be duly valid at all points of time and a copy of same to be submit with amnsi (arcelormittal nippon steel india) engineer in charge. vendor must provide all ppe items for worker. safety shoes, safety jacket, hand gloves, helmet, safety goggles and nose mask as per safety page 4 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121280 date 01.10.2024 submission date 09.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details standards of amns(i) site engineer must take prior work permit from area in charge to attend the job at site. detailed sop must be available with vendor for all types of job activities. vendor must ensure safe execution of the job <(>&<)> must follow all safety protocols as laid down by amnsi. worker / supervisor must be able to read and understand the instructions and sop. all required ppe’s will be in vendor scope. to provide competent manpower / supervisor for the job <(>&<)> ensure for uninterrupted services by experienced crew. engaging qualified and experienced engineer/supervisor. no pedestrian / cycles / two wheelers movement will be allowed inside the plant premises. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. statutory • the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. • the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. • wc policy / group insurance penalty for non compliance § penalty will be recovered from the monthly payment if vendor is not able to achieve required service levels as mentioned below: § if vendor will delay in job execution / equipment refurbishment as per plant requirement. job to be carried out anytime (24x7, 365days). § if vendor does not deploy the required specified quantity <(>&<)> quality of manpower as per rfq or a person deployed is not reporting to the duty. § while normal duty hours are 8 per day, more than 16 hours continuous duty is not allowed on any day. § if safety violation during job execution. § a minimum 3% penalty will be applicable on a monthly bill value. § penalties in two consecutive months will make contractor eligible for either termination of contract or penalty more than 10% on monthly bill value. scope of work am/ns india: • amns will provide material required to be fabricate / erection.(i.e plates, i beam, channel, angel. etc.) • amns will provide hydra, crane, power, and place for erection...

Bridge And Roof Company India Limited - Gujarat

45461469 tender for supply & delivery of consumable materials at our iocl, gujarat refinery, vadodara, gujarat. ms binding wire tarpoline sheet 18x24 extention board water can 15 ltr white plastic sheet g.i box 4feet x3feet pvc office chair tube light 20watt office wall fan cotton hand gloves nylon braded curfing hose pipe 3/4 pvc funnel 8 vibrator needle gomm diesel drum 20 ltr. ms nail 3 taiping road safety shoes hassian cloth break oil 500ml caution tape oil pent 200ml industrial plug 32amp xs pin industrial socket 32amp x 5 pin industrial socket 16amp x 3 pin industrial plug 16amp x 3 pin steelgrip tape bearing 6203 safety helmet green g.i earthing pipe pvc gamela leather hand gloves gci sheet 10...

Arcelor Mittal Nippon Steel India Limited - Gujarat

45459738 tender for various fabrication & hand railing jobs at crm1 for cy2025 o pr no. pr item rfq item services for line item quantity uom technical details other details 1 2000158160 10 10 10 dismantling of structure 50 to 20 services for general fabrication 100 to 30 fabrication & erection of structural 50 to email : manoj.lalvani@amns.in contact : 9879101878 name : lalvani, manoj am/ns india crm ope item details : * scope of work for vendor: service for general fabrication at various locations. fabrication and erection structures at height work. dismantling existing structures as per requirement. tools, tackles, grinding m/c etc. supply of manpower with proper ppes welding m/c, cutting set, cylinders. fabrication consumables like welding electrodes, grinding wheels. supervisor in contractor scope job to be done as per instructions by line in charge only. scope of work amns required material provide for fabrication (pipe, angle, chennel and sheet) essentials like electricity, water etc. crane and hydra will be provided if required. scaffolding or man lifter will be provided if required. vehicle will be provided for scrap loading and disposal work. specific penalty for safety violation and non performance by vendor. specific penalty for nonperformance by vendor and must be cardinally measured. amns safety rule and regulation as per company policy: • all the persons working at height for exhaust pipe dismantling job should be healthy and medically fit and must be certified by the hospital(cnh). • all the workers have authorized work at height valid pass. • work should be started only after taking authorized work permit. • toolbox talk must be delivery before starting the job on daily basic. • use certified portable hand electric machine. • use certified lifting tools <(>&<)> tackles <(>&<)> it should be check before every use. • the person who is working at height should wear certified double lanyard full body harness (safety belt) <(>&<)> locked safety belt (both clamp) with lifeline. anchoring point must be check before every use. • use only certified two lanyards connected in a y configuration, which allows one lanyard to be attached to an anchor point while the second lanyard is being moved to a new anchor point, thus providing protection from falls at all times. • ensure that all persons are wearing safety helmet, safety shoe, safety goggles, face shield and cut resistance hand gloves, full body shock absorber double lanyard safety harness (for jobs above 4 metre height) / for job bellow 4 metre height full body double lanyard safety harness without shock absorber to be used. • work should be carried out in close supervision of competent supervisor. • the working at height job should be allowed in daytime only • while handling or shifting job of dismantle exhaust pipes with crane ensure that certified lifting belt are used <(>&<)> check the belt condition before every use. ensure exhaust pipes are lift in horizontal balance load condition <(>&<)> ensure guide rope are properly tied with page 2 of 11 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000120994 date 26.09.2024 submission date 13.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. venkat sai taneeru contact email venkat.taneeru@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details bundles. • while fabrication activity ensure crane movement. crane movement must be restricted at working area when ever needed <(>&<)> for that working area must be barricade with danger tape <(>&<)> also manual stopper to be provided on both side of crane rail track minimum 8 meter away from working area. • while fabrication activity near dsl side, ensure dsl power supply must be cut off <(>&<)> for that lototo must be taken for isolation of dsl power supply. • while fabrication activity ensure that ground area should be barricade with danger tape to avoid unauthorized entry in work area • while scaffolding needed for work ensure that it must be certified <(>&<)> also ensure crane movement <(>&<)> if required crane movement must be restricted at scaffolding area. • the working area need to be cleaned to avoid the slipping hazards. • ensure gas cutting spark should not be fall on any electrical wires, trench cover <(>&<)> on any flammable material for that all wires /trench cover must be cover with fire blanket <(>&<)> all flammable materials should be removed from work area before starting the job. • ensure highly flammable material should not be store near working area <(>&<)> if any it should be removed immediately before starting the job. • always carry fe near workplace. • never transport cylinders with regulators and hose attached unless a proper trolley or carrier is used with locking chains. • ensure loose cylinder should not be kept at shop floor. • no oxygen or acetylene gas shall be used for pressure testing purpose. • no oxygen or acetylene gas shall be used for cleaning purposes. • always use red hose for acetylene and blue / black for oxygen, be careful to see they are never interchange. *sop no / hirac no amnsil/crm/pkl opr/16.7/hirac/28 item note : 2 2000158160 20 20 10 dismantling of structure 50 to 20 services for general fabrication 100 to 30 fabrication & erection of structural 50 to email : manoj.lalvani@amns.in contact : 9879101878 name : lalvani, manoj am/ns india crm ope item details : * scope of work for vendor: service for general fabrication at various locations. fabrication and erection structures at height work. dismantling existing structures as per requirement. tools, tackles, grinding m/c etc. supply of manpower with proper ppes welding m/c, cutting set, cylinders. fabrication consumables like welding electrodes, grinding wheels. supervisor in contractor scope job to be done as per instructions by line in charge only. scope of work amns required material provide for fabrication (pipe, angle, chennel and sheet) essentials like electricity, water etc. crane and hydra will be provided if required. scaffolding or man lifter will be provided if required. vehicle will be provided for scrap loading and disposal work. specific penalty for safety violation and non performance by vendor. specific penalty for nonperformance by vendor and must be cardinally measured. amns safety rule and regulation as per company policy: • all the persons working at height for exhaust pipe dismantling job should be healthy and medically fit and must be certified by the hospital(cnh). page 3 of 11 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000120994 date 26.09.2024 submission date 13.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. venkat sai taneeru contact email venkat.taneeru@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details • all the workers have authorized work at height valid pass. • work should be started only after taking authorized work permit. • toolbox talk must be delivery before starting the job on daily basic. • use certified portable hand electric machine. • use certified lifting tools <(>&<)> tackles <(>&<)> it should be check before every use. • the person who is working at height should wear certified double lanyard full body harness (safety belt) <(>&<)> locked safety belt (both clamp) with lifeline. anchoring point must be check before every use. • use only certified two lanyards connected in a y configuration, which allows one lanyard to be attached to an anchor point while the second lanyard is being moved to a new anchor point, thus providing protection from falls at all times. • ensure that all persons are wearing safety helmet, safety shoe, safety goggles, face shield and cut resistance hand gloves, full body shock absorber double lanyard safety harness (for jobs above 4 metre height) / for job bellow 4 metre height full body double lanyard safety harness without shock absorber to be used. • work should be carried out in close supervision of competent supervisor. • the working at height job should be allowed in daytime only • while handling or shifting job of dismantle exhaust pipes with crane ensure that certified lifting belt are used <(>&<)> check the belt condition before every use. ensure exhaust pipes are lift in horizontal balance load condition <(>&<)> ensure guide rope are properly tied with bundles. • while fabrication activity ensure crane movement. crane movement must be restricted at working area when ever needed <(>&<)> for that working area must be barricade with danger tape <(>&<)> also manual stopper to be provided on both side of crane rail track minimum 8 meter away from working area. • while fabrication activity near dsl side, ensure dsl power supply must be cut off <(>&<)> for that lototo must be taken for isolation of dsl power supply. • while fabrication activity ensure that ground area should be barricade with danger tape to avoid unauthorized entry in work area • while scaffolding needed for work ensure that it must be certified <(>&<)> also ensure crane movement <(>&<)> if required crane movement must be restricted at scaffolding area. • the working area need to be cleaned to avoid the slipping hazards. • ensure gas cutting spark should not be fall on any electrical wires, trench cover <(>&<)> on any flammable material for that all wires /trench cover must be cover with fire blanket <(>&<)> all flammable materials should be removed from work area before starting the job. • ensure highly flammable material should not be store near working area <(>&<)> if any it should be removed immediately before starting the job. • always carry fe near workplace. • never transport cylinders with regulators and hose attached unless a proper trolley or carrier is used with locking chains. • ensure loose cylinder should not be kept at shop floor. • no oxygen or acetylene gas shall be used for pressure testing purpose. • no oxygen or acetylene gas shall be used for cleaning purposes. • always use red hose for acetylene and blue / black for oxygen, be careful to see they are never interchange. sop amnsil/crm/hspm_slt opr/022/sop hirac amnsil/crm/hspm_slt opr/hirac/67 item note : 3 2000158160 30 30 10 dismantling of structure 50 to 20 services for general fabrication 100 to 30 fabrication & erection of structural 50 to email : manoj.lalvani@amns.in contact : 9879101878 name : lalvani, manoj am/ns india crm ope item details : * scope of work for vendor: service for general fabrication at various locations. fabrication and erection structures at height work. dismantling existing structures as per requirement. tools, tackles, grinding m/c etc. page 4 of 11 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000120994 date 26.09.2024 submission date 13.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. venkat sai taneeru contact email venkat.taneeru@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details supply of manpower with proper ppes welding m/c, cutting set, cylinders. fabrication consumables like welding electrodes, grinding wheels. supervisor in contractor scope job to be done as per instructions by line in charge only. scope of work amns required material provide for fabrication (pipe, angle, chennel and sheet) essentials like electricity, water etc. crane and hydra will be provided if required. scaffolding or man lifter will be provided if required. vehicle will be provided for scrap loading and disposal work. specific penalty for safety violation and non performance by vendor. specific penalty for nonperformance by vendor and must be cardinally measured. amns safety rule and regulation as per company policy: • all the persons working at height for exhaust pipe dismantling job should be healthy and medically fit and must be certified by the hospital(cnh). • all the workers have authorized work at height valid pass. • work should be started only after taking authorized work permit. • toolbox talk must be delivery before starting the job on daily basic. • use certified portable hand electric machine. • use certified lifting tools <(>&<)> tackles <(>&<)> it should be check before every use. • the person who is working at height should wear certified double lanyard full body harness (safety belt) <(>&<)> locked safety belt (both clamp) with lifeline. anchoring point must be check before every use. • use only certified two lanyards connected in a y configuration, which allows one lanyard to be attached to an anchor point while the second lanyard is being moved to a new anchor point, thus providing protection from falls at all times. • ensure that all persons are wearing safety helmet, safety shoe, safety goggles, face shield and cut resistance hand gloves, full body shock absorber double lanyard safety harness (for jobs above 4 metre height) / for job bellow 4 metre height full body double lanyard safety harness without shock absorber to be used. • work should be carried out in close supervision of competent supervisor. • the working at height job should be allowed in daytime only • while handling or shifting job of dismantle exhaust pipes with crane ensure that certified lifting belt are used <(>&<)> check the belt condition before every use. ensure exhaust pipes are lift in horizontal balance load condition <(>&<)> ensure guide rope are properly tied with bundles. • while fabrication activity ensure crane movement. crane movement must be restricted at working area when ever needed <(>&<)> for that working area must be barricade with danger tape <(>&<)> also manual stopper to be provided on both side of crane rail track minimum 8 meter away from working area. • while fabrication activity near dsl side, ensure dsl power supply must be cut off <(>&<)> for that lototo must be taken for isolation of dsl power supply. • while fabrication activity ensure that ground area should be barricade with danger tape to avoid unauthorized entry in work area • while scaffolding needed for work ensure that it must be certified <(>&<)> also ensure crane movement <(>&<)> if required crane movement must be restricted at scaffolding area. • the working area need to be cleaned to avoid the slipping hazards. • ensure gas cutting spark should not be fall on any electrical wires, trench cover <(>&<)> on any flammable material for that all wires /trench cover must be cover with fire blanket <(>&<)> all flammable materials should be removed from work area before starting the job. page 5 of 11 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000120994 date 26.09.2024 submission date 13.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. venkat sai taneeru contact email venkat.taneeru@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details • ensure highly flammable material should not be store near working area <(>&<)> if any it should be removed immediately before starting the job. • always carry fe near workplace. • never transport cylinders with regulators and hose attached unless a proper trolley or carrier is used with locking chains. • ensure loose cylinder should not be kept at shop floor. • no oxygen or acetylene gas shall be used for pressure testing purpose. • no oxygen or acetylene gas shall be used for cleaning purposes. • always use red hose for acetylene and blue / black for oxygen, be careful to see they are never interchange. hirac_amnsil/crm/ctcm opr/16.7/hirac/36 sop_amnsil/crm/ctcm opr/19/sop/18 item note : 4 2000158160 40 40 10 dismantling of structure 50 to 20 services for general fabrication 100 to 30 fabrication & erection of structural 50 to email : manoj.lalvani@amns.in contact : 9879101878 name : lalvani, manoj am/ns india crm ope item details : * scope of work for vendor: service for general fabrication at various locations. fabrication and erection structures at height work. dismantling existing structures as per requirement. tools, tackles, grinding m/c etc. supply of manpower with proper ppes welding m/c, cutting set, cylinders. fabrication consumables like welding electrodes, grinding wheels. supervisor in contractor scope job to be done as per instructions by line in charge only. scope of work amns required material provide for fabrication (pipe, angle, chennel and sheet) essentials like electricity, water etc. crane and hydra will be provided if required. scaffolding or man lifter will be provided if required. vehicle will be provided for scrap loading and disposal work. specific penalty for safety violation and non performance by vendor. specific penalty for nonperformance by vendor and must be cardinally measured. amns safety rule and regulation as per company policy: • all the persons working at height for exhaust pipe dismantling job should be healthy and medically fit and must be certified by the hospital(cnh). • all the workers have authorized work at height valid pass. • work should be started only after taking authorized work permit. • toolbox talk must be delivery before starting the job on daily basic. • use certified portable hand electric machine. • use certified lifting tools <(>&<)> tackles <(>&<)> it should be check before every use. • the person who is working at height should wear certified double lanyard full body harness (safety belt) <(>&<)> locked safety belt (both clamp) with lifeline. anchoring point must be check before every use. • use only certified two lanyards connected in a y configuration, which allows one lanyard to be attached to an anchor point while the second lanyard is being moved to a new anchor point, thus providing protection from falls at all times. • ensure that all persons are wearing safety helmet, safety shoe, safety goggles, face shield and cut resistance hand gloves, full body shock absorber double lanyard safety harness (for jobs above 4 metre height) / for job bellow 4 metre height full body double lanyard safety harness without shock absorber to be used. • work should be carried out in close supervision of competent supervisor. • the working at height job should be allowed in daytime only page 6 of 11 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000120994 date 26.09.2024 submission date 13.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. venkat sai taneeru contact email venkat.taneeru@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details • while handling or shifting job of dismantle exhaust pipes with crane ensure that certified lifting belt are used <(>&<)> check the belt condition before every use. ensure exhaust pipes are lift in horizontal balance load condition <(>&<)> ensure guide rope are properly tied with bundles. • while fabrication activity ensure crane movement. crane movement must be restricted at working area when ever needed <(>&<)> for that working area must be barricade with danger tape <(>&<)> also manual stopper to be provided on both side of crane rail track minimum 8 meter away from working area. • while fabrication activity near dsl side, ensure dsl power supply must be cut off <(>&<)> for that lototo must be taken for isolation of dsl power supply. • while fabrication activity ensure that ground area should be barricade with danger tape to avoid unauthorized entry in work area • while scaffolding needed for work ensure that it must be certified <(>&<)> also ensure crane movement <(>&<)> if required crane movement must be restricted at scaffolding area. • the working area need to be cleaned to avoid the slipping hazards. • ensure gas cutting spark should not be fall on any electrical wires, trench cover <(>&<)> on any flammable material for that all wires /trench cover must be cover with fire blanket <(>&<)> all flammable materials should be removed from work area before starting the job. • ensure highly flammable material should not be store near working area <(>&<)> if any it should be removed immediately before starting the job. • always carry fe near workplace. • never transport cylinders with regulators and hose attached unless a proper trolley or carrier is used with locking chains. • ensure loose cylinder should not be kept at shop floor. • no oxygen or acetylene gas shall be used for pressure testing purpose. • no oxygen or acetylene gas shall be used for cleaning purposes. • always use red hose for acetylene and blue / black for oxygen, be careful to see they are never interchange. hirac_ sop_ item note : 5 2000158160 50 50 10 dismantling of structure 50 to 20 services for general fabrication 100 to 30 fabrication & erection of structural 50 to email : manoj.lalvani@amns.in contact : 9879101878 name : lalvani, manoj am/ns india crm ope item details : * scope of work for vendor: service for general fabrication at various locations. fabrication and erection structures at height work. dismantling existing structures as per requirement. tools, tackles, grinding m/c etc. supply of manpower with proper ppes welding m/c, cutting set, cylinders. fabrication consumables like welding electrodes, grinding wheels. supervisor in contractor scope job to be done as per instructions by line in charge only. scope of work amns required material provide for fabrication (pipe, angle, chennel and sheet) essentials like electricity, water etc. crane and hydra will be provided if required. scaffolding or man lifter will be provided if required. vehicle will be provided for scrap loading and disposal work. specific penalty for safety violation and non performance by vendor. specific penalty for nonperformance by vendor and must be cardinally measured. amns safety rule and regulation as per company policy: • all the persons working at height for exhaust pipe dismantling job should be healthy and medically fit and must be certified by the page 7 of 11 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000120994 date 26.09.2024 submission date 13.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. venkat sai taneeru contact email venkat.taneeru@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details hospital(cnh). • all the workers have authorized work at height valid pass. • work should be started only after taking authorized work permit. • toolbox talk must be delivery before starting the job on daily basic. • use certified portable hand electric machine. • use certified lifting tools <(>&<)> tackles <(>&<)> it should be check before every use. • the person who is working at height should wear certified double lanyard full body harness (safety belt) <(>&<)> locked safety belt (both clamp) with lifeline. anchoring point must be check before every use. • use only certified two lanyards connected in a y configuration, which allows one lanyard to be attached to an anchor point while the second lanyard is being moved to a new anchor point, thus providing protection from falls at all times. • ensure that all persons are wearing safety helmet, safety shoe, safety goggles, face shield and cut resistance hand gloves, full body shock absorber double lanyard safety harness (for jobs above 4 metre height) / for job bellow 4 metre height full body double lanyard safety harness without shock absorber to be used. • work should be carried out in close supervision of competent supervisor. • the working at height job should be allowed in daytime only • while handling or shifting job of dismantle exhaust pipes with crane ensure that certified lifting belt are used <(>&<)> check the belt condition before every use. ensure exhaust pipes are lift in horizontal balance load condition <(>&<)> ensure guide rope are properly tied with bundles. • while fabrication activity ensure crane movement. crane movement must be restricted at working area when ever needed <(>&<)> for that working area must be barricade with danger tape <(>&<)> also manual stopper to be provided on both side of crane rail track minimum 8 meter away from working area. • while fabrication activity near dsl side, ensure dsl power supply must be cut off <(>&<)> for that lototo must be taken for isolation of dsl power supply. • while fabrication activity ensure that ground area should be barricade with danger tape to avoid unauthorized entry in work area • while scaffolding needed for work ensure that it must be certified <(>&<)> also ensure crane movement <(>&<)> if required crane movement must be restricted at scaffolding area. • the working area need to be cleaned to avoid the slipping hazards. • ensure gas cutting spark should not be fall on any electrical wires, trench cover <(>&<)> on any flammable material for that all wires /trench cover must be cover with fire blanket <(>&<)> all flammable materials should be removed from work area before starting the job. • ensure highly flammable material should not be store near working area <(>&<)> if any it should be removed immediately before starting the job. • always carry fe near workplace. • never transport cylinders with regulators and hose attached unless a proper trolley or carrier is used with locking chains. • ensure loose cylinder should not be kept at shop floor. • no oxygen or acetylene gas shall be used for pressure testing purpose. • no oxygen or acetylene gas shall be used for cleaning purposes. • always use red hose for acetylene and blue / black for oxygen, be careful to see they are never interchange. hirac_ sop_ item note : 6 2000158160 60 60 10 dismantling of structure 50 to 20 services for general fabrication 100 to 30 fabrication & erection of structural 50 to email : manoj.lalvani@amns.in contact : 9879101878 name : lalvani, manoj am/ns india crm ope item details : * scope of work for vendor: service for general fabrication at various locations. fabrication and erection structures at height work. dismantling existing structures as per requirement. tools, tackles, grinding m/c etc. page 8 of 11 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000120994 date 26.09.2024 submission date 13.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. venkat sai taneeru contact email venkat.taneeru@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details supply of manpower with proper ppes welding m/c, cutting set, cylinders. fabrication consumables like welding electrodes, grinding wheels. supervisor in contractor scope job to be done as per instructions by line in charge only. scope of work amns required material provide for fabrication (pipe, angle, chennel and sheet) essentials like electricity, water etc. crane and hydra will be provided if required. scaffolding or man lifter will be provided if required. vehicle will be provided for scrap loading and disposal work. specific penalty for safety violation and non performance by vendor. specific penalty for nonperformance by vendor and must be cardinally measured. amns safety rule and regulation as per company policy: • all the persons working at height for exhaust pipe dismantling job should be healthy and medically fit and must be certified by the hospital(cnh). • all the workers have authorized work at height valid pass. • work should be started only after taking authorized work permit. • toolbox talk must be delivery before starting the job on daily basic. • use certified portable hand electric machine. • use certified lifting tools <(>&<)> tackles <(>&<)> it should be check before every use. • the person who is working at height should wear certified double lanyard full body harness (safety belt) <(>&<)> locked safety belt (both clamp) with lifeline. anchoring point must be check before every use. • use only certified two lanyards connected in a y configuration, which allows one lanyard to be attached to an anchor point while the second lanyard is being moved to a new anchor point, thus providing protection from falls at all times. • ensure that all persons are wearing safety helmet, safety shoe, safety goggles, face shield and cut resistance hand gloves, full body shock absorber double lanyard safety harness (for jobs above 4 metre height) / for job bellow 4 metre height full body double lanyard safety harness without shock absorber to be used. • work should be carried out in close supervision of competent supervisor. • the working at height job should be allowed in daytime only • while handling or shifting job of dismantle exhaust pipes with crane ensure that certified lifting belt are used <(>&<)> check the belt condition before every use. ensure exhaust pipes are lift in horizontal balance load condition <(>&<)> ensure guide rope are properly tied with bundles. • while fabrication activity ensure crane movement. crane movement must be restricted at working area when ever needed <(>&<)> for that working area must be barricade with danger tape <(>&<)> also manual stopper to be provided on both side of crane rail track minimum 8 meter away from working area. • while fabrication activity near dsl side, ensure dsl power supply must be cut off <(>&<)> for that lototo must be taken for isolation of dsl power supply. • while fabrication activity ensure that ground area should be barricade with danger tape to avoid unauthorized entry in work area • while scaffolding needed for work ensure that it must be certified <(>&<)> also ensure crane movement <(>&<)> if required crane movement must be restricted at scaffolding area. • the working area need to be cleaned to avoid the slipping hazards. • ensure gas cutting spark should not be fall on any electrical wires, trench cover <(>&<)> on any flammable material for that all wires /trench cover must be cover with fire blanket <(>&<)> all flammable materials should be removed from work area before starting the job. page 9 of 11 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000120994 date 26.09.2024 submission date 13.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. venkat sai taneeru contact email venkat.taneeru@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details • ensure highly flammable material should not be store near working area <(>&<)> if any it should be removed immediately before starting the job. • always carry fe near workplace. • never transport cylinders with regulators and hose attached unless a proper trolley or carrier is used with locking chains. • ensure loose cylinder should not be kept at shop floor. • no oxygen or acetylene gas shall be used for pressure testing purpose. • no oxygen or acetylene gas shall be used for cleaning purposes. • always use red hose for acetylene and blue / black for oxygen, be careful to see they are never interchange. hirac_amnsil/crm/pkl opr/16.7/hirac/28 item note : 7 2000158163 10 70 10 dismantling of handrailing 5,000 m 20 fabrication & erection of hand railing 5,000 m email : manoj.lalvani@amns.in contact : 9879101878 name : lalvani, manoj am/ns india crm ope item details : * scope of work for vendor: fabrication and erection handrailing at various location(various size). dismantling existing handrailing as per requirement(various size). tools, tackles, grinding m/c etc. supply of manpower with proper ppes welding m/c, cutting set, cylinders. fabrication consumables like welding electrodes, grinding wheels. supervisor in contractor scope job to be done as per instructions by line in charge only. vendor shall provide all required ppes as per ppes matrix according to nature of the jobs. safety shoes, frp helmet, plane goggle, nitrile dipped cut resistance hand gloves, cotton / canvas gloves, leg guard, arm guard. good quality of ppes shall be provided by vendor as per amns standard. scope of work amns required material provide for fabrication (pipe, angle, chennel and sheet) essentials like electricity, water etc. crane and hydra will be provided if required. scaffolding or man lifter will be provided if required. vehicle will be provided for scrap loading and disposal work. specific penalty for safety violation and non performance by vendor. specific penalty for nonperformance by vendor and must be cardinally measured. amns safety rule and regulation as per company policy: • all the persons working at height for exhaust pipe dismantling job should be healthy and medically fit and must be certified by the hospital(cnh). • all the workers have authorized work at height valid pass. • work should be started only after taking authorized work permit. • toolbox talk must be delivery before starting the job on daily basic. • use certified portable hand electric machine. • use certified lifting tools <(>&<)> tackles <(>&<)> it should be check before every use. • the person who is working at height should wear certified double lanyard full body harness (safety belt) <(>&<)> locked safety belt (both clamp) with lifeline. anchoring point must be check before every use. • use only certified two lanyards connected in a y configuration, which allows one lanyard to be attached to an anchor point while the second lanyard is being moved to a new anchor point, thus providing protection from falls at all times. • ensure that all persons are wearing safety helmet, safety shoe, safety goggles, face shield and cut resistance hand gloves, full body shock absorber double lanyard safety harness (for jobs above 4 metre height) / for job bellow 4 metre height full body double lanyard safety harness page 10 of 11 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000120994 date 26.09.2024 submission date 13.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. venkat sai taneeru contact email venkat.taneeru@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details without shock absorber to be used. • work should be carried out in close supervision of competent supervisor. • the working at height job should be allowed in daytime only • while handling or shifting job of dismantle exhaust pipes with crane ensure that certified lifting belt are used <(>&<)> check the belt condition before every use. ensure exhaust pipes are lift in horizontal balance load condition <(>&<)> ensure guide rope are properly tied with bundles. • while fabrication activity ensure crane movement. crane movement must be restricted at working area when ever needed <(>&<)> for that working area must be barricade with danger tape <(>&<)> also manual stopper to be provided on both side of crane rail track minimum 8 meter away from working area. • while fabrication activity near dsl side, ensure dsl power supply must be cut off <(>&<)> for that lototo must be taken for isolation of dsl power supply. • while fabrication activity ensure that ground area should be barricade with danger tape to avoid unauthorized entry in work area • while scaffolding needed for work ensure that it must be certified <(>&<)> also ensure crane movement <(>&<)> if required crane movement must be restricted at scaffolding area. • the working area need to be cleaned to avoid the slipping hazards. • ensure gas cutting spark should not be fall on any electrical wires, trench cover <(>&<)> on any flammable material for that all wires /trench cover must be cover with fire blanket <(>&<)> all flammable materials should be removed from work area before starting the job. • ensure highly flammable material should not be store near working area <(>&<)> if any it should be removed immediately before starting the job. • always carry fe near workplace. • never transport cylinders with regulators and hose attached unless a proper trolley or carrier is used with locking chains. • ensure loose cylinder should not be kept at shop floor. • no oxygen or acetylene gas shall be used for pressure testing purpose. • no oxygen or acetylene gas shall be used for cleaning purposes. • always use red hose for acetylene and blue / black for oxygen, be careful to see they are never interchange. sop amnsil/crm/hspm_slt opr/022/sop hirac amnsil/crm/hspm_slt opr/hirac/67 * am/ns scope: 1. required material provide for fabrication (pipe, angle, chennel and sheet) 2. essentials like electricity, water etc. * amns safety rule and regulation as per company policy: all necessary safety ppe’s i.e. safety shoes, leather gloves, goggles, masks, face shield etc. in contractor scope all work to be carried out as per safety norms which shall be guided to am/ns team during work <(>&<)> no tolerance in safety will be accepted and penalty to be imposed if any violation. contractor shall not proceed with next activity until previous activity will be checked and approved by representative. all required tools <(>&<)> tackles will provide by contractor contractor shall deploy and provide one full time engineer to supervise the project and has experienced of carrying out such type of work. contractor will provide all required consumable items for the job contractor shall be responsible for procuring, supplying, transporting, and providing all labour, materials, tools and equipment page 11 of 11 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000120994 date 26.09.2024 submission date 13.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. venkat sai taneeru contact email venkat.taneeru@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details etc., required for completion of the work. all materials shall be stored in a proper manner protected from natural elements so as to avoid contamination and deterioration. workers working on the site shall be skilled in their job and have related job experience. the contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation will provide the capacities and characteristics specified. * hirac amnsil/crm/ctcm opr/16.7/hirac/36 amnsil/crm/pkl opr/16.7/hirac/28 amnsil/crm/pwh/16.7/hirac/33 amnsil/crm/pwh/16.7/hirac/39 * sop amnsi/crm/6 hi rev/opr/19/sop/18 amnsil/crm/ctcm opr/19/sop/18 amnsil/crm/pwh/19/sop/34 ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

45459665 tender for debagging of ferro alloy fas area at smp 1 2000156874 220 10 10 debagging f. a & h.k upto 1500 mt 18,000 to 20 debag f.a & h.k > 1500 m.t&upto 5000 m.t 42,000 to 30 debagging f.a &h.k > 5000 m.t in a month 22,560 to email : vishal.vadi@amns.in contact : 9879103459 name : vadi, vishal am/ns india smp1 (haz) item details : annexure – 1 scope of work technical sr no job description qty unit 1 up to 1500 tons 18,000.00 ton 2 1501 to 5000 tons 42,000.00 ton 3 above 5000 tons 22,560.00 ton scope of work for debagging of ferro alloys in fas – smp1 the scope of work in general has been mentioned as under. we have tried to cover most of the scopes. however, since the job volume is vast and hence some jobs could possibly be missed out <(>&<)> will have to be executed by contractor as <(>&<)> when required as directed by area in charge. submission of quote would automatically mean that above terms is accepted to the contractor. the manpower required are for specialized jobs. they are to be skilled to perform the below mentioned job. the scope generally shall be as under: detailed scope of work debagging of ferro alloys <(>&<)> feeding to eaf/lf/rh through conveyors. loading of ferro alloys for shifting to other plant and unloading of ferro alloys coming from other plant. bagging and shifting of micro alloys, flux and carburizer, etc. (if need be). shifting of all production consumables like graphite electrodes, temperature probes, lancing pipes, slag conditioners, ebt filling mass <(>&<)> etc. monitoring of feeding of flux, carburizers etc. on belt to segregate bigger / foreign material. evacuated materials returned from shops and any other consumable material as suggested by fas engineer to be refilled in jumbo bags. housekeeping of shed, conveyors, all feeding hoppers platforms <(>&<)> nearby areas. all tools <(>&<)> tackles required for housekeeping (like brush, shovel, trolley, etc.) to be provided by contractor. supervision of all activities to be carried out in area by contract men. loading of secondary sales items. making bundles of empty jumbo bags for sending to secondary yard operation of size analysis machines. page 2 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121029 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details taking back damaged al <(>&<)> cored wire coils from the shop <(>&<)> to be dismantled for disposal. any other activities related to material handling <(>&<)> hk in the area, not limited to above scope, as suggested by ferro alloy engineer to be carried out by vendor personnel. helpers must be able to communicate in hindi. manpower distribution day 09 helpers + 1 supervisor 2 persons for material shifting. 2 persons for cutting ferro alloy jumbo bags for hopper feeding. 4 persons for micro alloy bagging 1 persons for housekeeping of designated areas night 5 helpers (no supervisor. day supervisor has to arrange night personals before leaving.) 2 persons for material shifting. 3 persons for cutting ferro alloy jumbo bags for hopper feeding, housekeeping of designated areas + micro alloy bagging (on need basis) duty hours – 12 hours per day. movement of manpower / associates at our hazira site. no pedestrian / cycles / two wheelers movement will be allowed inside the plant premises. vendor must ensure availability of sufficient buses / vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms: associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. safety 1. competency needs: a. an associates shall have at least 3 yrs. of hands on working experience in addition to that he/she shall have at least 10th class of education. b. all workers shall have min. understanding of local or national language. 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. b. workers must undergo 16 days of associates training program organized by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india before being authorized to participate in rigging/ ladle handling operations. page 3 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121029 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details d. all rigger/ladle handler shall have trained on rigging and ladle handling operation with and training assessment. e. they all must have a signaling skill. f. communicate learning from incident or accident wrt rigging and ladle operation with all working staff. g. all workers shall be medically fit to work in hazardous operation. h. ensure daily tbt. 3. risk assessment and hazard identification: a. a comprehensive risk assessment study must be conducted quarterly, focusing on the hazards associated with ladle handling. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of ladle handling. 4. supervision: a. assign job supervisor to manage overall operation, administration and emergency for the job and workers. b. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every quarter to ensure preparedness the probable emergency in ladle handling. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. nitrile shole safety shoes c. hand gloves d. safety jacket (as per amns india standards) e. dust mask f. safety goggles g. hand gloves. h. ear plug / earmuff i. any other special ppes as asked by amnsi. j. contractor shall fulfil all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. all transportation of man <(>&<)> material in vendor scope up to the department gate (bus/vehicle facility). 11. any kind of unauthorized mobile phone are not allowed. 12. following of all am/ns india sop <(>&<)> hse norms. 1. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working page 4 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121029 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details conditions code, 2020 is required. contractor shall comply with the health, safety and environment policy as laid down by amns(i). vendor must ensure all the legal aspects and needs to be maintained in line with both man and machine. all the tools and tackles deployed by you should be certified by a competent authority for use in the factory. such certificate should be duly valid at all points of time and a copy of same to be submit with amnsi (arcelormittal nippon steel india) engineer in charge. vendor must provide all ppe items for worker. safety shoes, safety jacket, hand gloves, helmet, safety goggles and nose mask as per safety standards of amns(i) site engineer must take prior work permit from area in charge to attend the job at site. detailed sop must be available with vendor for all types of job activities. vendor must ensure safe execution of the job <(>&<)> must follow all safety protocols as laid down by amnsi. worker / supervisor must be able to read and understand the instructions and sop. all required ppe’s will be in vendor scope. to provide competent manpower / supervisor for the job <(>&<)> ensure for uninterrupted services by experienced crew. engaging qualified and experienced engineer/supervisor. no pedestrian / cycles / two wheelers movement will be allowed inside the plant premises. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. statutory • the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. • the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. • wc policy / group insurance penalty for non compliance: penalty will be on a monthly bill value. minimum presence 90%. manpower, up to 90% availability – 0 penalty 90 – 85% availability – 2.5% of invoice amount 85 – 80% availability – 5% of invoice amount 80 75% availability – 7.5% of invoice amount page 5 of 5 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121029 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 75– 70 % availability – 10% of invoice amount penalty of 10% in two consecutive months will make contractor eligible for either termination of contract or penalty more than 10%. while normal duty hours are 12 per day, more than 16 hours continuous duty is not allowed on any day. contractor shall be penalized by an amount of rs. 5000/ per such cases <(>&<)> any such repetition of more than 3 cases in total will make contractor eligible for termination of contract. manpower is allocated basis 12 hours duty. hence, contractor must ensure that shift schedule is maintained as per 12 hours shift. only in extreme crisis condition, contractor shall be allowed for 7 consecutive days of 16 hours duty. after 7 days, penalty of rs. 1000/ per day shall be levied if 16 hours duty continues. penalty for late coming: associates must relieve on workplace in individual control rooms. no workmen should leave workplace without reliever being available at workplace. contractor to ensure availability of his own supervisor during each shift relieving to ensure smooth transition of shifts. failure to ensure relieving at workplace <(>&<)> nonavailability of associates will also attract penalty at the rate of rs. 200/hour /associate late coming. end of smp1 debagging <(>&<)> bagging of material at fas— ...

Arcelor Mittal Nippon Steel India Limited - Gujarat

45459628 tender for skull and scrap processing at smp 1 2000156874 280 10 10 various jobs for skull processing 102,807 to email : vishal.vadi@amns.in contact : 9879103459 name : vadi, vishal am/ns india smp1 (haz) item details : annexure – 1 scope of work technical • skull and scrap processing – scrap yard: the scope of work includes providing services for skull and scrap processing as per scope of work on regular and as <(>&<)> when required basis in steel making plant 1 (smp 1), amns india, hazira. the scope of work in general has been mentioned as under. we have tried to cover most of the scopes. however, since the job volume is vast and hence some jobs could possibly be missed out <(>&<)> will have to be executed by contractor as <(>&<)> when required as directed by area in charge. submission of quote would automatically mean that above terms is accepted to the contractor. the service required are for some specialized jobs. vendor to be competent to perform the below mentioned jobs. the scope generally shall be as under: • vendor scope of work: • engagement of multi skilled lancers for cutting <(>&<)> processing of scrap / skull in scrap yard, <(>&<)> various lancing activities at eaf / lf / tapping pit / ladle bay / vd / rh / lrs • processed skull size to be 400 mm max from all corners and cut scrap piece in to 0.75 mts max. • loading / unloading of unprocessed / processed skull and scrap in processing yard. • lancer to be deployed to various locations at plant premises as <(>&<)> when required for emergency job requirement as guided by amns. • weighing <(>&<)> maintaining record of processed skull / scrap for accounting. • all consumables’ materials, tools <(>&<)> tackles are in vendor scope except oxygen gas, ms lancing pipes. • all nrv, valves and hose to be used as per amns safety standard. • hdri vessel cleaning as and when required. • third party inspection report of lifting tools and tackles to be submitted as per amns safety standard. • manpower: • to provide competent manpower for the job <(>&<)> ensure for uninterrupted services by experienced crew. engaging qualified and ex perienced engineer/supervisor. • supply of skilled lancers. • total 18 nos (lancers) page 2 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121030 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details • scrap yard 12 (day) + 4 (night) • lrs 1 (day) + 1 (night) • one supervisor in each shift for supervision of job is must. it should be covered under vendors scope (day + night) • duty hour 12 hrs/shift, day <(>&<)> night shift • housekeeping: • ensure good housekeeping / cleaning of the area including cleaning / removing the waste and used material. shifting of surplus material to the specific location or shown by the engineer / area in charge. bill certification will be done only after complete housekeeping. safety 1. competency needs: a. an associates shall have at least 3 yrs. of hands on working experience in addition to that he/she shall have at least 10th class of education. b. all workers shall have min. understanding of local or national language. 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. b. workers must undergo 16 days of associates training program organized by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india before being authorized to participate in rigging/ ladle handling operations. d. all rigger/ladle handler shall have trained on rigging and ladle handling operation with and training assessment. e. they all must have a signaling skill. f. communicate learning from incident or accident wrt rigging and ladle operation with all working staff. g. all workers shall be medically fit to work in hazardous operation. h. ensure daily tbt. 3. risk assessment and hazard identification: a. a comprehensive risk assessment study must be conducted quarterly, focusing on the hazards associated with ladle handling. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of ladle handling. 4. supervision: a. assign job supervisor to manage overall operation, administration and emergency for the job and workers. b. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every quarter to ensure preparedness the probable emergency in ladle handling. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in page 3 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121030 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details form 10. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. nitrile shole safety shoes c. hand gloves d. safety jacket (as per amns india standards) e. dust mask f. safety goggles g. hand gloves. h. ear plug / earmuff i. any other special ppes as asked by amnsi. j. contractor shall fulfil all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. all transportation of man <(>&<)> material in vendor scope up to the department gate (bus/vehicle facility). 11. any kind of unauthorized mobile phone are not allowed. 12. following of all am/ns india sop <(>&<)> hse norms. 1. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. contractor shall comply with the health, safety and environment policy as laid down by amns(i). vendor must ensure all the legal aspects and needs to be maintained in line with both man and machine. all the tools and tackles deployed by you should be certified by a competent authority for use in the factory. such certificate should be duly valid at all points of time and a copy of same to be submit with amnsi (arcelormittal nippon steel india) engineer in charge. vendor must provide all ppe items for worker. safety shoes, safety jacket, hand gloves, helmet, safety goggles and nose mask as per safety standards of amns(i) site engineer must take prior work permit from area in charge to attend the job at site. detailed sop must be available with vendor for all types of job activities. vendor must ensure safe execution of the job <(>&<)> must follow all safety protocols as laid down by amnsi. worker / supervisor must be able to read and understand the instructions and sop. all required ppe’s will be in vendor scope. to provide competent manpower / supervisor for the job <(>&<)> ensure for uninterrupted services by experienced crew. engaging qualified and experienced engineer/supervisor. no pedestrian / cycles / two wheelers movement will be allowed inside page 4 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121030 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details the plant premises. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. • hse requirement: • contractor shall comply with the health, safety and environment policy as laid down by amns(i). • vendor must ensure all the legal aspects and needs to be maintained in line with both man and machine. • all the tools and tackles deployed by you should be certified by a competent authority for use in the factory. such certificate should be duly valid at all points of time and a copy of same to be submit with amnsi (arcelormittal nippon steel india) engineer in charge. • vendor must provide all ppe items for worker. safety shoes, fr safety jacket, hand gloves, fr helmet, safety goggles and nose mask as per safety standards of amns(i) • detailed sop must be available with vendor for all types of lancing activities. vendor must ensure safe execution of the job <(>&<)> must follow all safety protocols as laid down by amnsi. • movement of manpower / associates at our hazira site: • no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. • vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. • vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. • other terms: • associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. statutory • the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. • the occupational safety, health, and working conditions code, 2020: page 5 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121030 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details integrates and amends laws related to safety, health, and working conditions. • wc policy / group insurance penalty • minimum 90% attendance of lancers to be ensured at site or else penalty shall be imposed as tabulated below. • penalty rate for non compliance to manpower deployment for the job: • minimum presence 90%. manpower, • up to 90% availability – 0 penalty • 90 – 85% availability – 2.5% of invoice amount • 85 – 80% availability – 5% of invoice amount • 80 75% availability – 7.5% of invoice amount • <(><<)>75% availability – 10% of invoice amount • penalty of 10% in two consecutive months will make contractor eligible for either termination of contract or penalty more than 10%. • while normal duty hours are 12 per day (8 hrs. for data operator), more than 16 hours’ continuous duty is not allowed on any day. contractor shall be penalized by an amount of rs. 5000/ per such cases <(>&<)> any such repetition of more than 3 cases in total will increase penalty amount to rs. 6000/ per case. • manpower is allocated basis 12 hours’ duty. hence, contractors must ensure that shift schedule is maintained as per 12 hours shift. only in extreme crisis conditions, contractor shall be allowed for 3 consecutive days of 16 hours shift in a month. after 3 days, the penalty of rs. 2500/ per day shall be levied if 12 hours’ duty continues. • w off must be provided. • amount for quality deviation and appraise mail penalty. • penalty for late coming: • associates must relieve on workplace. no workmen should leave workplace without reliever being available at workplace. contractor to ensure availability of his own supervisor during each shift relieving to ensure smooth transition of shifts. • failure to ensure relieving at workplace <(>&<)> non availability of associates will also attract penalty at the rate of rs. 200/h our/associate late coming. • penalties will be applicable for violating safety norms as per amns(i) policy. • penalty will be applicable for failing in completing the job as per the agreed timeline with site in charge. • all other clause as mentioned in terms and conditions of work order shall be applicable to vendor. • scope of amnsi • amnsi will provide ng <(>&<)> o2 gas, ms lancing pipe. • space <(>&<)> power will provide. • equipment for lifting <(>&<)> shifting of material inside the plant premises. page 6 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121030 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details end of sow skull and scrap processing item note : 2 2000156874 350 20 10 providing services multi skilled lancer 17,520 std email : vishal.vadi@amns.in contact : 9879103459 name : vadi, vishal am/ns india smp1 (haz) item details : annexure – 1 scope of work technical sr no service description qty / year unit 1 skilled lancers 4 nos x 12 hrs. / day 17,520.00 hr skull and scrap processing – scrap yard: (manpower lancers) the scope of work includes providing services for skull and scrap processing as per scope of work on regular and as <(>&<)> when required basis in steel making plant 1 (smp 1), amns india, hazira. the scope of work in general has been mentioned as under. we have tried to cover most of the scopes. however, since the job volume is vast and hence some jobs could possibly be missed out <(>&<)> will have to be executed by contractor as <(>&<)> when required as directed by area in charge. submission of quote would automatically mean that above terms is accepted to the contractor. the service required are for some specialized jobs. vendor to be competent to perform the below mentioned jobs. the scope generally shall be as under: vendor scope of work engagement of multi skilled lancers for cutting <(>&<)> processing of scrap / skull in scrap yard, <(>&<)> various lancing activities at eaf / lf / tapping pit / ladle bay / vd / rh / lrs for various lancing job at eaf / lf / tapping pit / ladle bay / vd / rh / lrs lancer to be deployed to various locations at plant premises as <(>&<)> when required for emergency job requirement as guided by amns. all consumables’ materials, tools <(>&<)> tackles are in vendor scope except oxygen gas, ms lancing pipe. manpower to provide competent manpower for the job <(>&<)> ensure for uninterrupted services by experienced crew. engaging qualified and ex perienced engineer/supervisor. supply of skilled lancers. total 04 nos (lancers) sms (eaf+vd) 2 (day) + 2 (night) duty hours: 12 hrs / shift, day <(>&<)> night shift. one supervisor in each shift for supervision of job is must. it should be covered under vendors scope (day + night) housekeeping ensure good housekeeping / cleaning of the area including cleaning / removing the waste and used material. shifting of surplus material to the specific location or shown by the engineer / area in charge. bill certification will be done only after complete housekeeping. page 7 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121030 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details hse requirement contractor shall comply with the health, safety and environment policy as laid down by amns(i). vendor must ensure all the legal aspects and needs to be maintained in line with both man and machine. all the tools and tackles deployed by you should be certified by a competent authority for use in the factory. such certificate should be duly valid at all points of time and a copy of same to be submit with amnsi (arcelormittal nippon steel india) engineer in charge. vendor must provide all ppe items for worker. safety shoes, fr safety jacket, hand gloves, fr helmet, safety goggles and nose mask as per safety standards of amns(i) detailed sop must be available with vendor for all types of lancing activities. vendor must ensure safe execution of the job <(>&<)> must follow all safety protocols as laid down by amnsi. movement of manpower / associates at our hazira site no pedestrian/cycles/two wheelers movement will be allowed inside the plant premises. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. other terms associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. safety 1. competency needs: a. an associates shall have at least 3 yrs. of hands on working experience in addition to that he/she shall have at least 10th class of education. b. all workers shall have min. understanding of local or national language. 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. b. workers must undergo 16 days of associates training program organized by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india before being authorized to participate in rigging/ ladle handling operations. d. all rigger/ladle handler shall have trained on rigging and ladle handling operation with and training assessment. e. they all must have a signaling skill. f. communicate learning from incident or accident wrt rigging and ladle operation with all working staff. g. all workers shall be medically fit to work in hazardous operation. h. ensure daily tbt. 3. risk assessment and hazard identification: a. a comprehensive risk assessment study must be conducted quarterly, page 8 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121030 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details focusing on the hazards associated with ladle handling. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of ladle handling. 4. supervision: a. assign job supervisor to manage overall operation, administration and emergency for the job and workers. b. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every quarter to ensure preparedness the probable emergency in ladle handling. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. nitrile shole safety shoes c. hand gloves d. safety jacket (as per amns india standards) e. dust mask f. safety goggles g. hand gloves. h. ear plug / earmuff i. any other special ppes as asked by amnsi. j. contractor shall fulfil all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. all transportation of man <(>&<)> material in vendor scope up to the department gate (bus/vehicle facility). 11. any kind of unauthorized mobile phone are not allowed. 12. following of all am/ns india sop <(>&<)> hse norms. 1. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. contractor shall comply with the health, safety and environment policy as laid down by amns(i). vendor must ensure all the legal aspects and needs to be maintained in line with both man and machine. all the tools and tackles deployed by you should be certified by a competent authority for use in the factory. such certificate should be page 9 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121030 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details duly valid at all points of time and a copy of same to be submit with amnsi (arcelormittal nippon steel india) engineer in charge. vendor must provide all ppe items for worker. safety shoes, safety jacket, hand gloves, helmet, safety goggles and nose mask as per safety standards of amns(i) site engineer must take prior work permit from area in charge to attend the job at site. detailed sop must be available with vendor for all types of job activities. vendor must ensure safe execution of the job <(>&<)> must follow all safety protocols as laid down by amnsi. worker / supervisor must be able to read and understand the instructions and sop. all required ppe’s will be in vendor scope. to provide competent manpower / supervisor for the job <(>&<)> ensure for uninterrupted services by experienced crew. engaging qualified and experienced engineer/supervisor. no pedestrian / cycles / two wheelers movement will be allowed inside the plant premises. vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. the movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. associate must undergo medical fitness at our care nursing home, am/ns township, hazira. this would be done as per am/ns india standards and the cost shall be borne by the vendor. amns has its own secures access system called scrum at hazira site which is use for processing the gate pass. statutory • the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. • the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. • wc policy / group insurance penalty minimum 90% attendance of lancers to be ensured at site or else penalty shall be imposed as tabulated below. penalty rate for non compliance to manpower deployment for the job: minimum presence 90%. manpower, up to 90% availability – 0 penalty 90 – 85% availability – 2.5% of invoice amount 85 – 80% availability – 5% of invoice amount 80 75% availability – 7.5% of invoice amount <(><<)>75% availability – 10% of invoice amount penalty of 10% in two consecutive months will make contractor eligible for either termination of contract or penalty more than 10%. • while normal duty hours are 12 per day more than 16 hours’ continuous duty is not allowed on any day. contractor shall be penalized by an amount of rs. 5000/ per such cases <(>&<)> any such repetition of more than 3 cases in total will increase penalty amount to rs. 6000/ per page 10 of 10 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000121030 date 26.09.2024 submission date 07.10.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. dandaveni shashi kumar contact email dandaveni.shashikumar@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details case. • manpower is allocated basis 12 hours’ duty. hence, contractors must ensure that shift schedule is maintained as per 12 hours shift. only in extreme crisis conditions, contractor shall be allowed for 3 consecutive days of 16 hours shift in a month. after 3 days, the penalty of rs. 2500/ per day shall be levied if 16 hours’ duty continues. • w off must be provided. • penalty for late coming • associates must relieve on workplace. no workmen should leave workplace without reliever being available at workplace. contractor to ensure availability of his own supervisor during each shift relieving to ensure smooth transition of shifts. • failure to ensure relieving at workplace <(>&<)> non availability of associates will also attract penalty at the rate of rs. 200 / hour / associate late coming. • penalties will be applicable for violating safety norms as per amns(i) policy. • penalty will be applicable for failing in completing the job as per the agreed timeline with site in charge. • all other clause as mentioned in terms and conditions of work order shall be applicable to vendor. • scope of amnsi • amnsi will provide o2 gas, ms lancing pipe. • space <(>&<)> power will provide. • equipment for lifting <(>&<)> shifting of material inside the plant premises. end of sow skull and scrap processing (manpower) ...

Dedicated Freight Corridor Corporation Of India Limited - Gujarat

45384256 bids are invited for related items 1 44 punji , banner flag , key man bag , hs flag red , straight edge 1m , clip applicator , hs flag green , fish bolt spanner , rail disc cutter , keying hammer , track jack , track jack mechanical , rail dolly , rail tong , feeler gauge , jaggled fish plate , track gauge cum level , c clamp , plate screw tubular spanner , spl fish plate , versine measuring kit , rail thermometer , crow bar , pwi kit , adjustale spanner , welding gauge , p way inspection motor or moped trolley , digital toe load measuring divice , dip lorrey , measuring tape 30mm , number plate , safety belt , wire brush , pick axe beater , measuring tape 5mm , safety jacket , industrial safety gloves , torch , binoculars , umbrella , safety shoes , safety helmet , calliper inside and outside , retro reflective tape , dragon torch , steel whistle , rain suit , magnify glass 100 cm , wire basket , tricolor torch gemarpts searched p way material strings used in gemarpts two way valve, steel bookcases as per is 7761, three way gemarpts searched stopcocks, books, karabiner p(defence), machine tool way oils, wooden podium, p toluene sulphonyl chloride, bar result generated in gemarpts code reader equipment, molykote p 37 (defence) foldable umbrellas as per is 10675 relevant industrial safety helmet (v2) as per is 2925 categories selected for notification inverter battery trolley p way kits fish plates safety items and other misc track total quantity : 6579...

Western Railway - Gujarat

45341296 bids are invited for industrial safety helmet (v2) as per is 2925 (q3) total quantity : 560...

Bridge And Roof Company India Limited - Gujarat

45214752 tender for supply and delivery of consumable materials water can 20ltr ag 5 cutting whell measuring tape 15 mtr steel safety shoes tiger mccb 40amp 2pole office almira 5 feet steel boiler suit cotton green safety jacket adjustable wrench pvc tape yellow pvc can 20ltr cap hassion cloth welding road 2.5mm padlock 50mm gi pan 16 spead with handle mccb 63amp x 4 pole 30ma baricating tape welding road 3.15mm labour safety shoes tikam with handle safety helmet labour umbrella cotton hand gloves line tester pvc socket 16amp 3 pin pvc socket 16amp k 3 pin nails 3 green safety helmet...

Department Of Heavy Industry - Gujarat

45192001 supply and delivery of consumable materials; water can 20ltr ag 5 cutting whell measuring tape 15 mtr steel safety shoes tiger mccb 40amp 2pole office almira 5 feet steel boiler suit cotton green safety jacket adjustable wrench pvc tape yellow pvc can 20ltr cap hassion cloth welding road 2.5mm padlock 50mm gi pan 16 spead with handle mccb 63amp x 4 pole 30ma baricating tape welding road 3.15mm labour safety shoes tikam with handle safety helmet labour umbrella supply & delivery of store consumable materials at ioci, gujarat refinery, vadodara site. cotton hand gloves line tester pvc socket 16amp x 3 pin pvc socket 16amp x 3 pin nails 3 green safety helmet...

Arcelor Mittal Nippon Steel India Limited - Gujarat

45139143 tender for spr 2000156515 csp refurbishment job segment & mould 2000156515 10 10 10 preparation of csp mould part revision 330 no 20 preparation of csp mould full revision 330 no 30 new copper plate dismantaling &assembly 26 no 40 narrow one side drive assly overhauling 48 no email : kumar.sathish@amns.in contact : name : sathish kumar item details : job title: csp caster mold refurbishment (total manpower required: 48 nos always per day basis) 1) scope of work vendor: i) technical: 1.1) prepration of csp mould part revision 1 mould shifting at repair area. 2 mould cleaning. 3 broad side jacket dismantled for buffing (fixed side only) 4 fixed & loose side buffing. 5 narrow side cleaning. 6 ram test before broad fixed side copper assembly. 7 broad side fs assembly. 8 complete mould hydro test @ 16 bar<(>,<)> including narrow spray nozzle testing if necessory need to be change nozzle or spray header. 9 fixed side alignment. 10 loose side alignment. 11 gap checking in between broad side & narrow side (adherence= 0.4mm no go) 12 hydraulic leakage checking @ 210 bar 13 tapper setting 14 bops checking 15 protocol prepration 1.2) prepration of csp mould full revision (machining) 1 mould shifting at repair area. 2 mould cleaning. 3 broad fixed & loose side jacket dismanteling for machining 4 narrow side plate dismanteling for machining 5 loading & unloading both side broad & narrow plate in cnc machine. 6 cleaning of machined plates, both narrow & broad side. 7 machined cu plate buffing (fs / ls /ns both) 8 narrow side assembly & water test 9 ram test before broad fixed & loose side copper assembly. 10 broad side fixed & loose side assembly 11 complete mould hydro test @ 16 bar<(>,<)> including narrow spray nozzle testing if necessory need to be change nozzle or spray header. 12 fixed side alignment 13 loose side alignment 14 gap checking in between broad side & narrow side (adherence= 0.4mm no go) 15 hydraulic leakage checking @ 210 bar 16 tapper setting 17 bops checking 18 protocol prepration page 2 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 1.3) csp mould broadside new copper plate dismentaling & assembly. 1 mould jacket cleaning. 2 removing of all thermocouples. 3 removing all fixing bolts (90 nos) 4 detache discarded copper plate from jacket 5 removing & cleaning all filler pieces. 6 jacket surface cleaning & o ring cord fixing 7 new copper plate water channel cleaning & filler piece fixing. 8 all fixing bolts cleaning & o ring fixing (90 nos) 9 jacket assemble with new copper plate 10 assembly & torquing of all fixing bolts. 11 hydrotest of new assembled copper plate 12 removed thermocouple fixing. 1.4) csp mould narrow side drive assembly overhaulling 1 mould shifting at repair area. 2 mould cleaning. 3 broad fixed & loose side jacket dismanteling. 4 both narrow side jacket dismanteling ( removing 4 pins) 5 removal of protection cover (4 nos) 6 removal of electric servo motor ( 4 nos) 7 removal of gear box assembly(4 nos) 8 dismantling of operator & drive side top & bottom spindel assembly. 9 cleaning & overhaulling of operator & drive side top & bottom spindel assembly. 10 assembly of operator & drive side top & bottom spindel assembly. ( fixing 4 pins) 11 greasing as per requirment. 12 fixing of gear box (4 nos) 13 fixing of electric servo motor ( 4 nos) 14 fixing of protection cover (4 nos) 15 both side narrow side jacket fixing. 16 travel checking for narrow side drive assembly. safety 1. competency needs: a. all workers shall have min understanding of local or national language, all technicians shall have iti eduction & min 3 yrs iof wokring exp. or min 10 yrs of similar working experience. b. deployed experienced and qualified fitted and foreman 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. job specific trade training and assessment is mandatory for all the key roles. b. workers must undergo 16 days of associates training program organised by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india before being authorized to participate in specific jobs at refurbishment. d. conduct worker safety training programs every three months, focusing on the specific risks associated with segment refurbishment jobs and manual and mechanical material handing. e. communicate learning from incidents or accidents wrt the client and other similar industries to all working staff. f. all worker shall be medically fit to work in hazardous operation. g. comply the need of hse and fire index as per amnsi g. do comply the requirements of lsgr training 3. risk assessment and hazard identification: a. a comprehensive risk assessment must be conducted quarterly, focusing on the hazards associated with refurbishment activities. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of page 3 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details refurbishment activity and material handling. 4. supervision: a. deploy site in charges to manage overall operation, administration and emergency for the job and workers. b. assign job supervisor as per the job scope. c. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every as per the amnsi process to ensure preparedness. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. d. all all protection and other safety personal protective gadgets shall be inspescted at defined frequency and before every use. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. safety shoes c. thermal heat protective full body suit ( as needed) d. dust mask e. safety goggles f. hand gloves. g. ear plug / earmuff h. all other special ppes as per the requirements of the job i. contractor shall fulfill all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. compliance with indian labor laws: a. adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. 12. other needs: a. comply with all the needs of ims, fps ptw, other safety management systems, general processes, plant sops, smps and etc. b. maintained all the protective controls and do not defeate without proper assessment statutory : · the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. page 4 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details · the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. penalty clause to vendor: 1. penalty for unsafe acts: o 10,000 for each unsafe act observed during safety audits or inspections. 2. severe safety violations: o 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in material exposure or environmental contamination. 3. safety violations: o 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to the job. 4. late incident reporting: o 5,000 per hour of delay beyond the 30 minute reporting window for any incident. 5. failure to provide adequate materials/manpower: o 20,000 for each instance where materials or manpower are not provided as per the contract, leading to delays process. 6. penalty for non performance: o penalty as per the monthly bill amount if the vendor fails to meet the standard requirement of refurbishment activities with escalating penalties for repeated non performance. 2) scope of work amns: § amns will provide the planning of equipment priority for readiness. § amns will provide the necessary spares for the equipments readiness. § amns will ensure the necessary utility services (water/electricity/hydraulics). § amns will monitor and see the status for the job execution. § amns will ensure and provide the necessary permit, if required. item note : 2 2000156515 20 20 10 preparation of segment 1 part revision 243 no 20 preparation of segment 1 break out 15 no 30 preparation of segment 1 full revision 18 no 40 new grid assembly segment 1 (fs&ls) 34 no 50 old roller disma & machined roller assly 1,062 no email : kumar.sathish@amns.in contact : name : sathish kumar item details : job title: csp seg#1 refurbishment 1) scope of work vendor: i) technical: csp segment 1 2.1)preparation of segment 1 part revision 2.2) preparation of segment 1 break out 2.3)preparation of segment 1 full revision 2.4) new grid assembly segment 1 (fs<(>&<)>ls) 2.5)old roller dismantaling <(>&<)> machined roller assembly segment 1 (dia 130,140 <(>&<)> 150 mm )=16 nos/ seg 2.1) prepration of segment 1 part revision 1 segment shifting at repair area. 2 cleaning of segment. 3 removing of all protection cover (side) 4 removing all zone hoses by loosing all bolts. 5 removing of zone 3 spray pipe. 6 removing of all zone1,2<(>&<)>3 spray header. 7 remove all grease hose connection. 8 turn segment on turning stand meanse loose side on top. 9 detach loose side from fixed side by removing of all pins ( 4 nos). 10 remove loose <(>&<)> fixed side internal grease line protection covers 11 remove loose <(>&<)> fixed side side grid 12 loding <(>&<)> unloading of loose <(>&<)> fixed side side grid in cnc page 5 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details machine 13 turn loose side on segment loose sede tilting stand, meanse roller on top side 14 cleaning of fixed side <(>&<)> loose side. 15 fixed side <(>&<)> loose side shifting on alignment stand. 16 check roller condition if any roller found jam then need to be overhaulling or replace by new roller assembly. 17 fixed side <(>&<)> loose side roller alignment. 18 grasing of fixed side <(>&<)> loose side roller 19 fixing of loose <(>&<)> fixed side internag grease line protection covers 20 machined grid fixed <(>&<)> loose side grid grinding <(>&<)> chamfering. 21 fixed side grid alignment <(>&<)> grid gap 22 loose side boxup with fixed side frame <(>&<)> fixing all pins. 23 turn segment on turning stand 24 fixing of all protection covers. 25 cleaning <(>&<)> testing of all zone header 26 cleaning <(>&<)> testing of zone 3 spray pipe. 27 fixinf of all zone1,2 <(>&<)>3 headers 28 all zone hoses connection to be done by fixing of bolts 29 fixing of zone 3 spray pipes. 30 nozzle alignment 31 hydro test to be complete 32 protection cover fixinf ( side) 33 calibration at 70 bar 34 grease <(>&<)> hydraulic testing at 210 bar 2.2) prepration of segment 1 break out 1 segment shifting at repair area. 2 cleaning of segment. 3 removing of all protection cover (side) 4 metal cutting to be done 5 removing all zone hoses by loosing all bolts. 6 removing of zone 3 spray pipe. 7 removing of all zone1,2<(>&<)>3 spray header. 8 remove all greas hose connection. 9 turn segment on turning stand meanse loose side on top. 10 detach loose side from fixed side by removing of all pins ( 4 nos). 11 remove loose <(>&<)> fixed side internag grease line protection covers 12 remove loose <(>&<)> fixed side side grid 13 loding <(>&<)> unloading of loose <(>&<)> fixed side side grid in cnc machine 14 turn liise side on segment loose sede tilting stand, meanse roller on top side 15 cleaning of fixed side <(>&<)> loose side. 16 fixed side <(>&<)> loose side shifting on alignment stand. 17 check roller condition if any roller found jam then need to be overhaulling or replace by new roller assembly. 18 fixed side <(>&<)> loose side roller alignment. 19 grase line damage due to breakout needs to be fabraication 20 all grease line connecation 21 grasing of fixed side <(>&<)> loose side roller 22 fixing of loose <(>&<)> fixed side internag grease line protection covers 23 machined grid fixed <(>&<)> loose side grid grinding <(>&<)> chamfering. 24 fixed side grid alignment <(>&<)> grid gap 25 loose side boxup with fixed side frame <(>&<)> fixing all pins. 26 turn segment on turning stand 27 fixing of all protection covers. 28 all zone header need to be repair damage due to break out then cleaning <(>&<)> testing ( including fixing nozzle) 29 zone 3 spray pipe need to be repair damage due to break out then cleaning <(>&<)> testing ( including fixing nozzle) page 6 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 30 fixinf of all zone1,2 <(>&<)>3 headers 31 all zone hoses connection to be done by fixing of bolts 32 fixing of zone 3 spray pipes. 33 nozzle alignment 34 hydro test to be complete 35 protection cover fixinf ( side) 36 calibration at 70 bar 37 grease <(>&<)> hydraulic testing at 210 bar 2.3) prepration of segment 1 full revision 1 segment shifting at repair area. 2 cleaning of segment. 3 removing of all protection cover (side) 4 removing all zone hoses by loosing all bolts. 5 removing of zone 3 spray pipe. 6 removing of all zone1,2<(>&<)>3 spray header. 7 remove all greas hose connection. 8 turn segment on turning stand meanse loose side on top. 9 detach loose side from fixed side by removing of all pins ( 4 nos). 10 remove loose <(>&<)> fixed side internag grease line protection covers 11 remove loose <(>&<)> fixed side side grid 12 loding <(>&<)> unloading of loose <(>&<)> fixed side side grid in cnc machine 13 turn liise side on segment loose sede tilting stand, meanse roller on top side 14 cleaning of fixed side <(>&<)> loose side. 15 detach all roller grease connection. 16 remove all fixed <(>&<)> loose side roller bolts 17 remove all roller from fixed <(>&<)> loose side roller table (16 nos) 18 place all machined roller assembly on fixed <(>&<)> loose side roller table.(16 nos) 19 all fixing bolts tightning 20 fixed side <(>&<)> loose side roller alignment. 21 grasing of fixed side <(>&<)> loose side roller 22 fixing of loose <(>&<)> fixed side internag grease line protection covers 23 machined grid fixed <(>&<)> loose side grid grinding <(>&<)> chamfering. 24 fixed side grid alignment <(>&<)> grid gap 25 loose side boxup with fixed side frame <(>&<)> fixing all pins. 26 turn segment on turning stand 27 fixing of all protection covers. 28 cleaning <(>&<)> testing of all zone header 29 cleaning <(>&<)> testing of zone 3 spray pipe. 30 fixinf of all zone1,2 <(>&<)>3 headers 31 all zone hoses connection to be done by fixing of bolts 32 fixing of zone 3 spray pipes. 33 nozzle alignment 34 hydro test to be complete 35 protection cover fixinf ( side) 36 calibration at 70 bar 37 grease <(>&<)> hydraulic testing at 210 bar 2.4) new grid assembly segment 1 1 remove all fixing bolts of wearing grid plates. 2 remove all discarded wearing grid plates. 3 shim adjustment <(>&<)> fixing of new wearing grid plates. 4 tightning of all fixing bolts. 5 loading <(>&<)> unloading on cnc milling machine for machining. 2.5) old roller dismentaling <(>&<)> machined roller assembly segment 1 (dia 130,140 <(>&<)> 150 mm)=16 nos dismentaling: page 7 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details removing of both side pedistal blocks removing of medium <(>&<)> long roller barrel removing of inter mediate pedistal blocks removing of short roller barrel remove all bearing from short, medium <(>&<)> long roller barrel bearing cleaning <(>&<)> well placed cleaning of short, medium <(>&<)> long roller barrel <(>&<)> cleak dia <(>&<)> send fot machining. remove all inner bearing race from axle. cleaning of axle assembly: cleaning of axle checking straightness of axle ckecking of machined roller dia fixing of bearing in medium <(>&<)> long roller barrel <(>&<)> freeness to be check fix intermidiate bearing pedistal fix both short roller bearing pedistal bearing inner race. assembly of short roller barlle. fixing if another intermaiate beating pedistal. assembly of mediul <(>&<)> long roller barlle. fixing of both side pedistal blocks both side grease connectot fixing. safety 1. competency needs: a. all workers shall have min understanding of local or national language, all technicians shall have iti eduction <(>&<)> min 3 yrs iof wokring exp. or min 10 yrs of similar working experience. b. deployed experienced and qualified fitted and foreman 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. job specific trade training and assessment is mandatory for all the key roles. b. workers must undergo 16 days of associates training program organised by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india before being authorized to participate in specific jobs at refu rbishment. d. conduct worker safety training programs every three months, focusing on the specific risks associated with segment refurbishment jobs and manual and mechanical material handing. e. communicate learning from incidents or accidents wrt the client and other similar industries to all working staff. f. all worker shall be medically fit to work in hazardous operation. g. comply the need of hse and fire index as per amnsi g. do comply the requirements of lsgr training 3. risk assessment and hazard identification: a. a comprehensive risk assessment must be conducted quarterly, focusing on the hazards associated with refurbishment activities. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of refurbishment activity and material handling. 4. supervision: a. deploy site in charges to manage overall operation, administration and emergency for the job and workers. b. assign job supervisor as per the job scope. c. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: page 8 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every as per the amnsi process to ensure preparedness. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. d. all all protection and other safety personal protective gadgets shall be inspescted at defined frequency and before every use. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. safety shoes c. thermal heat protective full body suit ( as needed) d. dust mask e. safety goggles f. hand gloves. g. ear plug / earmuff h. all other special ppes as per the requirements of the job i. contractor shall fulfill all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. compliance with indian labor laws: a. adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. 12. other needs: a. comply with all the needs of ims, fps ptw, other safety management systems, general processes, plant sops, smps and etc. b. maintained all the protective controls and do not defeate without proper assessment statutory : · the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. · the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. penalty clause to vendor: 1. penalty for unsafe acts: page 9 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details o 10,000 for each unsafe act observed during safety audits or inspections. 2. severe safety violations: o 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in material exposure or environmental contamination. 3. safety violations: o 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to the job. 4. late incident reporting: o 5,000 per hour of delay beyond the 30 minute reporting window for any incident. 5. failure to provide adequate materials/manpower: o 20,000 for each instance where materials or manpower are not provided as per the contract, leading to delays process. 6. penalty for non performance: o penalty as per the monthly bill amount if the vendor fails to meet the standard requirement of refurbishment activities with escalating penalties for repeated non performance. 2) scope of work amns: § amns will provide the planning of equipment priority for readiness. § amns will provide the necessary spares for the equipments readiness. § amns will ensure the necessary utility services (water/electricity/hydraulics). § amns will monitor and see the status for the job execution. § amns will ensure and provide the necessary permit, if required. item note : 3 2000156515 30 30 10 preparation of segment 2 part revision 88 no 20 preparation of segment 2 break out 8 no 30 preparation of segment 2 full revision 12 no 40 old roller disma & machined roller assly 648 no email : kumar.sathish@amns.in contact : name : sathish kumar item details : job title: csp seg#2 refurbishment 1) scope of work vendor: i) technical: csp segment 2 3.1)preparation of segment 2 part revision 3.2) preparation of segment 2 break out 3.3)preparation of segment 2 full revision 3.4)old roller dismantaling <(>&<)> machined roller assembly segment 2 (dia 150 mm )=22 nos/ seg prepration of segment 2 part revision 1 segment shifting at repair area. 2 cleaning of segment. 3 removing of all protection cover (side) 4 removing all zone hoses by loosing all bolts. 5 removing of zone 4 spray pipe. 6 removing of zone 4 spray header. 7 remove all greas hose connection. 8 turn segment on turning stand meanse loose side on top. 9 detach loose side from fixed side by removing of all pins ( 4 nos). 10 remove loose <(>&<)> fixed side internal grease line protection covers 11 turn liise side on segment loose sede tilting stand, meanse roller on top side 12 cleaning of fixed side <(>&<)> loose side. 13 fixed side <(>&<)> loose side shifting on alignment stand. 14 check roller condition if any roller found jam then need to be overhaulling or replace by new roller assembly. 15 fixed side <(>&<)> loose side roller alignment. 16 grasing of fixed side <(>&<)> loose side roller 17 fixing of loose <(>&<)> fixed side internag grease line protection covers page 10 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 18 machined grid fixed <(>&<)> loose side grid grinding <(>&<)> chamfering. 19 fixed side grid alignment <(>&<)> grid gap 20 loose side boxup with fixed side frame <(>&<)> fixing all pins. 21 turn segment on turning stand 22 fixing of all protection covers. 23 cleaning <(>&<)> testing of zone 4 header <(>&<)> filters. 24 cleaning <(>&<)> testing of zone 4 spray pipe. 25 fixinf all zone 4 headers 26 all zone hoses connection to be done by fixing of bolts 27 fixing of zone 4 spray pipes. 28 nozzle alignment 29 hydro test to be complete 30 protection cover fixinf ( side) 31 calibration at 70 bar 32 grease <(>&<)> hydraulic testing at 210 bar prepration of segment 2 break out 1 segment shifting at repair area. 2 cleaning of segment. 3 removing of all protection cover (side) 4 metal cutting to be done 5 removing all zone hoses by loosing all bolts. 6 removing of zone 4 spray pipe. 7 removing of zone 4 spray header. 8 remove all greas hose connection. 9 turn segment on turning stand meanse loose side on top. 10 detach loose side from fixed side by removing of all pins ( 4 nos). 11 remove loose <(>&<)> fixed side internag grease line protection covers 12 turn liise side on segment loose sede tilting stand, meanse roller on top side 13 cleaning of fixed side <(>&<)> loose side. 14 fixed side <(>&<)> loose side shifting on alignment stand. 15 check roller condition if any roller found jam then need to be overhaulling or replace by new roller assembly. 16 fixed side <(>&<)> loose side roller alignment. 17 grase line damage due to breakout neet to be fabraication 18 all grease line connecation 19 grasing of fixed side <(>&<)> loose side roller 20 fixing of loose <(>&<)> fixed side internag grease line protection covers 21 machined grid fixed <(>&<)> loose side grid grinding <(>&<)> chamfering. 22 fixed side grid alignment <(>&<)> grid gap 23 loose side boxup with fixed side frame <(>&<)> fixing all pins. 24 turn segment on turning stand 25 fixing of all protection covers. 26 zone 4 header need to be repair damage due to break out then cleaning <(>&<)> testing ( including fixing nozzle) 27 zone 4 spray pipe need to be repair damage due to break out then cleaning <(>&<)> testing ( including fixing nozzle) 28 fixinf of zone 4 headers 29 all zone hoses connection to be done by fixing of bolts 30 fixing of zone 3 spray pipes. 31 nozzle alignment 32 hydro test to be complete 33 protection cover fixinf ( side) 34 calibration at 70 bar 35 grease <(>&<)> hydraulic testing at 210 bar prepration of segment 2 full revision 1 segment shifting at repair area. 2 cleaning of segment. 3 removing of all protection cover (side) 4 removing all zone hoses by loosing all bolts. page 11 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 5 removing of zone 4 spray pipe. 6 removing of zone 4 spray header. 7 remove all greas hose connection. 8 turn segment on turning stand meanse loose side on top. 9 detach loose side from fixed side by removing of all pins ( 4 nos). 10 remove loose <(>&<)> fixed side internag grease line protection covers 11 turn liise side on segment loose sede tilting stand, meanse roller on top side 12 cleaning of fixed side <(>&<)> loose side. 13 detach all roller grease connection. 14 remove all fixed <(>&<)> loose side roller bolts 15 remove all roller from fixed <(>&<)> loose side roller table (16 nos) 16 place all machined roller assembly on fixed <(>&<)> loose side roller table.(16 nos) 17 all fixing bolts tightning 18 fixed side <(>&<)> loose side roller alignment. 19 grasing of fixed side <(>&<)> loose side roller 20 fixing of loose <(>&<)> fixed side internag grease line protection covers 21 machined grid fixed <(>&<)> loose side grid grinding <(>&<)> chamfering. 22 fixed side grid alignment <(>&<)> grid gap 23 loose side boxup with fixed side frame <(>&<)> fixing all pins. 24 turn segment on turning stand 25 fixing of all protection covers. 26 cleaning <(>&<)> testing of all zone header 27 cleaning <(>&<)> testing of zone 4 spray pipe. 28 fixinf of zone 4 headers 29 all zone hoses connection to be done by fixing of bolts 30 fixing of zone 4 spray pipes. 31 nozzle alignment 32 hydro test to be complete 33 protection cover fixinf ( side) 34 calibration at 70 bar 35 grease <(>&<)> hydraulic testing at 210 bar old roller dismentaling <(>&<)> machined roller assembly segment 2 (dia 150 mm)=22 nos dismentaling removing of both side pedistal blocks removing of medium <(>&<)> long roller barrel removing of inter mediate pedistal blocks removing of short roller barrel remove all bearing from short, medium <(>&<)> long roller barrel bearing cleaning <(>&<)> well placed cleaning of short, medium <(>&<)> long roller barrel <(>&<)> cleak dia <(>&<)> send fot machining. remove all inner bearing race from axle. cleaning of axle assembly cleaning of axle checking straightness of axle ckecking of machined roller dia fixing of bearing in medium <(>&<)> long roller barrel <(>&<)> freeness to be check fix intermidiate bearing pedistal fix both short roller bearing pedistal bearing inner race. assembly of short roller barlle. fixing if another intermaiate beating pedistal. assembly of mediul <(>&<)> long roller barlle. fixing of both side pedistal blocks both side grease connectot fixing. page 12 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details safety 1. competency needs: a. all workers shall have min understanding of local or national language, all technicians shall have iti eduction <(>&<)> min 3 yrs iof wokring exp. or min 10 yrs of similar working experience. b. deployed experienced and qualified fitted and foreman 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. job specific trade training and assessment is mandatory for all the key roles. b. workers must undergo 16 days of associates training program organised by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india before being authorized to participate in specific jobs at refu rbishment. d. conduct worker safety training programs every three months, focusing on the specific risks associated with segment refurbishment jobs and manual and mechanical material handing. e. communicate learning from incidents or accidents wrt the client and other similar industries to all working staff. f. all worker shall be medically fit to work in hazardous operation. g. comply the need of hse and fire index as per amnsi g. do comply the requirements of lsgr training 3. risk assessment and hazard identification: a. a comprehensive risk assessment must be conducted quarterly, focusing on the hazards associated with refurbishment activities. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of refurbishment activity and material handling. 4. supervision: a. deploy site in charges to manage overall operation, administration and emergency for the job and workers. b. assign job supervisor as per the job scope. c. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every as per the amnsi process to ensure preparedness. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. d. all all protection and other safety personal protective gadgets shall be inspescted at defined frequency and before every use. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. page 13 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. safety shoes c. thermal heat protective full body suit ( as needed) d. dust mask e. safety goggles f. hand gloves. g. ear plug / earmuff h. all other special ppes as per the requirements of the job i. contractor shall fulfill all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. compliance with indian labor laws: a. adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. 12. other needs: a. comply with all the needs of ims, fps ptw, other safety management systems, general processes, plant sops, smps and etc. b. maintained all the protective controls and do not defeate without proper assessment statutory : · the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. · the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. penalty clause to vendor: 1. penalty for unsafe acts: o 10,000 for each unsafe act observed during safety audits or inspections. 2. severe safety violations: o 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in material exposure or environmental contamination. 3. safety violations: o 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to the job. 4. late incident reporting: o 5,000 per hour of delay beyond the 30 minute reporting window for any incident. 5. failure to provide adequate materials/manpower: o 20,000 for each instance where materials or manpower are not provided as per the contract, leading to delays process. 6. penalty for non performance: o penalty as per the monthly bill amount if the vendor fails to meet the standard requirement of refurbishment activities with escalating penalties for repeated non performance. 2) scope of work amns: § amns will provide the planning of equipment priority for readiness. § amns will provide the necessary spares for the equipments readiness. § amns will ensure the necessary utility services (water/electricity/hydraulics). page 14 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details § amns will monitor and see the status for the job execution. § amns will ensure and provide the necessary permit, if required. item note : 4 2000156515 40 40 10 prep of segment 3&4 part revision 124 no 20 preparation of segment 3&4 full revision 43 no 30 old roller disma & machined roller assly 1,060 no email : kumar.sathish@amns.in contact : name : sathish kumar item details : job title: csp seg#3 <(>&<)> 4 refurbishment 1) scope of work vendor: i) technical: csp segment 3<(>&<)>4 4.1)preparation of segment 3<(>&<)>4 part revision 4.2)preparation of segment 3<(>&<)>4 full revision 4.3)old roller dismantaling <(>&<)> machined roller assembly segment 3 <(>&<)>4 (dia 170 mm )=16 nos/ seg prepration of segment 3<(>&<)>4 part revision 1 segment shifting at repair area. 2 cleaning of segment. 3 removing of all protection cover (side) 4 removing all zone hoses by loosing all bolts. 5 removing of zone 5 or 6 spray pipe. 6 removing of zone 5 or 6 spray header. 7 remove all greas hose connection. 8 turn segment on turning stand meanse loose side on top. 9 detach loose side from fixed side by removing of all pins ( 4 nos). 10 remove loose <(>&<)> fixed side internal grease line protection covers 11 turn liise side on segment loose sede tilting stand, meanse roller on top side 12 cleaning of fixed side <(>&<)> loose side. 13 fixed side <(>&<)> loose side shifting on alignment stand. 14 check roller condition if any roller found jam then need to be overhaulling or replace by new roller assembly. 15 fixed side <(>&<)> loose side roller alignment. 16 grasing of fixed side <(>&<)> loose side roller 17 fixing of loose <(>&<)> fixed side internag grease line protection covers 18 machined grid fixed <(>&<)> loose side grid grinding <(>&<)> chamfering. 19 fixed side grid alignment <(>&<)> grid gap 20 loose side boxup with fixed side frame <(>&<)> fixing all pins. 21 turn segment on turning stand 22 fixing of all protection covers. 23 cleaning <(>&<)> testing of zone 5 or 6 header <(>&<)> filters. 24 cleaning <(>&<)> testing of zone 5 or 6 spray pipe. 25 fixinf all zone 5 or 6 headers 26 all zone hoses connection to be done by fixing of bolts 27 fixing of zone 5 or 6 spray pipes. 28 nozzle alignment 29 hydro test to be complete 30 protection cover fixinf ( side) 31 calibration at 70 bar 32 grease <(>&<)> hydraulic testing at 210 bar prepration of segment 3<(>&<)>4 full revision 1 segment shifting at repair area. 2 cleaning of segment. 3 removing of all protection cover (side) 4 removing all zone hoses by loosing all bolts. 5 removing of zone 5 or 6 spray pipe. 6 removing of zone 5 or 6 spray header. 7 remove all greas hose connection. page 15 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 8 turn segment on turning stand meanse loose side on top. 9 detach loose side from fixed side by removing of all pins ( 4 nos). 10 remove loose <(>&<)> fixed side internag grease line protection covers 11 turn liise side on segment loose sede tilting stand, meanse roller on top side 12 cleaning of fixed side <(>&<)> loose side. 13 detach all roller grease connection. 14 remove all fixed <(>&<)> loose side roller bolts 15 remove all roller from fixed <(>&<)> loose side roller table (16 nos) 16 place all machined roller assembly on fixed <(>&<)> loose side roller table.(16 nos) 17 all fixing bolts tightning 18 fixed side <(>&<)> loose side roller alignment. 19 grasing of fixed side <(>&<)> loose side roller 20 fixing of loose <(>&<)> fixed side internag grease line protection covers 21 machined grid fixed <(>&<)> loose side grid grinding <(>&<)> chamfering. 22 fixed side grid alignment <(>&<)> grid gap 23 loose side boxup with fixed side frame <(>&<)> fixing all pins. 24 turn segment on turning stand 25 fixing of all protection covers. 26 cleaning <(>&<)> testing of all zone header 27 cleaning <(>&<)> testing of zone 5 or 6 spray pipe. 28 fixinf of zone 5 or 6 headers 29 all zone hoses connection to be done by fixing of bolts 30 fixing of zone 5 or 6 spray pipes. 31 nozzle alignment 32 hydro test to be complete 33 protection cover fixinf ( side) 34 calibration at 70 bar 35 grease <(>&<)> hydraulic testing at 210 bar old roller dismentaling <(>&<)> machined roller assembly segment 3 <(>&<)>4 (dia 170 mm)=16 nos dismentaling removing of both side pedistal blocks removing of medium <(>&<)> long roller barrel removing of inter mediate pedistal blocks removing of short roller barrel remove all bearing from short, medium <(>&<)> long roller barrel bearing cleaning <(>&<)> well placed cleaning of short, medium <(>&<)> long roller barrel <(>&<)> cleak dia <(>&<)> send fot machining. remove all inner bearing race from axle. cleaning of axle assembly cleaning of axle checking straightness of axle ckecking of machined roller dia fixing of bearing in medium <(>&<)> long roller barrel <(>&<)> freeness to be check fix intermidiate bearing pedistal fix both short roller bearing pedistal bearing inner race. assembly of short roller barlle. fixing if another intermaiate beating pedistal. assembly of mediul <(>&<)> long roller barlle. fixing of both side pedistal blocks both side grease connectot fixing. safety page 16 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 1. competency needs: a. all workers shall have min understanding of local or national language, all technicians shall have iti eduction <(>&<)> min 3 yrs iof wokring exp. or min 10 yrs of similar working experience. b. deployed experienced and qualified fitted and foreman 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. job specific trade training and assessment is mandatory for all the key roles. b. workers must undergo 16 days of associates training program organised by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india before being authorized to participate in specific jobs at refu rbishment. d. conduct worker safety training programs every three months, focusing on the specific risks associated with segment refurbishment jobs and manual and mechanical material handing. e. communicate learning from incidents or accidents wrt the client and other similar industries to all working staff. f. all worker shall be medically fit to work in hazardous operation. g. comply the need of hse and fire index as per amnsi g. do comply the requirements of lsgr training 3. risk assessment and hazard identification: a. a comprehensive risk assessment must be conducted quarterly, focusing on the hazards associated with refurbishment activities. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of refurbishment activity and material handling. 4. supervision: a. deploy site in charges to manage overall operation, administration and emergency for the job and workers. b. assign job supervisor as per the job scope. c. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every as per the amnsi process to ensure preparedness. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. d. all all protection and other safety personal protective gadgets shall be inspescted at defined frequency and before every use. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; page 17 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details a. frp safety helmet: (as per am/ns india guidelines) b. safety shoes c. thermal heat protective full body suit ( as needed) d. dust mask e. safety goggles f. hand gloves. g. ear plug / earmuff h. all other special ppes as per the requirements of the job i. contractor shall fulfill all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. compliance with indian labor laws: a. adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. 12. other needs: a. comply with all the needs of ims, fps ptw, other safety management systems, general processes, plant sops, smps and etc. b. maintained all the protective controls and do not defeate without proper assessment statutory : · the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. · the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. penalty clause to vendor: 1. penalty for unsafe acts: o 10,000 for each unsafe act observed during safety audits or inspections. 2. severe safety violations: o 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in material exposure or environmental contamination. 3. safety violations: o 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to the job. 4. late incident reporting: o 5,000 per hour of delay beyond the 30 minute reporting window for any incident. 5. failure to provide adequate materials/manpower: o 20,000 for each instance where materials or manpower are not provided as per the contract, leading to delays process. 6. penalty for non performance: o penalty as per the monthly bill amount if the vendor fails to meet the standard requirement of refurbishment activities with escalating penalties for repeated non performance. 2) scope of work amns: § amns will provide the planning of equipment priority for readiness. § amns will provide the necessary spares for the equipments readiness. § amns will ensure the necessary utility services (water/electricity/hydraulics). § amns will monitor and see the status for the job execution. page 18 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details § amns will ensure and provide the necessary permit, if required. item note : 5 2000156515 50 50 10 mould change scope of work 661 no 20 segment#1 change scope of work 276 no 30 segment#2 change scope of work 108 no 40 segment#3&4 change scope of work 80 no email : kumar.sathish@amns.in contact : name : sathish kumar item details : job title: csp machine change 1) scope of work vendor: i) technical: machine change 5.1) mould change scope of work 5.2) segment#1 change scope of work 5.3) segment#2 change scope of work 5.4) segment#3<(>&<)>4 change scope of work mould change scope of work 1 mould handling rig fixing in crane by operation 2 mould cover removing by operation 3 hyd. sys <(>&<)> water system isolated by operation. hyd. hoses <(>&<)> air hose removed by mechanical regular techician 4 mould to be unclamped by operation 5 remove all 4 no wedges 6 handling rig to be fixed in mould hook and mould remove from m/c 7 removed mould to be placed in mould stand 8 water flushing done by operation 9 new mould placed in m/c 10 all 4 no of wedges to be fix 11 clamping mould hydraulically by operatioin 12 handling rig remove from m/c and placed in stand 13 all hyd. hoses and air hose to be fix by mechanical regular techician 14 place the mould cover by operation segment#1 change scope of work 1 seg handling rig fixing in crane by operation 2 mould cover removing by operation 3 hyd. sys <(>&<)> water system isolated by operation. hyd./grease <(>&<)> air hose removed by mechanical regular techician 4 mould <(>&<)> seg#1 to be unclamped by operation 5 remove all wedges from seg#1 <(>&<)> mould 6 handling rig to be fixed in seg#1 hook and mould with seg#1 togetherly remove from m/c 7 removed seg#1 <(>&<)> mould to be placed in segment stand 8 mould <(>&<)> seg#1 water flushing done by operation 9 place the new seg#1 first and fix all wedges 10 then place the new mould and fix all wedges 11 clamping the seg#1 <(>&<)> mould 12 handling rig remove from m/c and placed in stand 13 all hyd. /grease <(>&<)> air hose to be fix by mechanical regular techician 17 place the mould cover by operation segment#2 change scope of work 1 mould/seg#1 handling rig fixing in crane by operation 2 mould cover removing by operation 3 hyd, grease <(>&<)> water system isolated by operation. hyd, grease, air <(>&<)> water hose removed by mechanical regular techician 4 mould <(>&<)> seg#1 to be unclamped by operation 5 remove all wedges from seg#1 <(>&<)> mould 6 handling rig to be fixed in seg#1 hook and mould with seg#1 togetherly remove from m/c 7 removed seg#1 <(>&<)> mould to be placed in seg#1 stand. then separate the mould and place in mould stand page 19 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 8 remove the connecting pin of seg#2 and seg#3. 9 handling rig to be fix in seg#2 lifting lug and remove from m/c. same to be placed in seg#2 stand or transfer car. 10 mould, seg#1 <(>&<)> 2 water flushing done by operation 11 place the new seg#2 in m/c. and connect the pin with se#2 <(>&<)> seg#3 12 place the seg#1 and fix all wedges 13 then place the mould and fix all wedges 14 clamping the seg#1 <(>&<)> mould 15 handling rig remove from m/c and placed in stand 16 all hyd, grease , air <(>&<)> water hoses to be fix by mechanical regular techician 17 place the mould cover by operation segment#3/4 change scope of work 1 mould/seg#1 handling rig fixing in crane by operation 2 mould cover removing by operation 3 hyd, grease <(>&<)> water system isolated by operation. hyd, grease, air <(>&<)> water hose removed by mechanical regular techician 4 mould <(>&<)> seg#1 to be unclamped by operation 5 remove all wedges from seg#1 <(>&<)> mould 6 handling rig to be fixed in seg#1 hook and mould with seg#1 togetherly remove from m/c 7 removed seg#1 <(>&<)> mould to be placed in seg#1 stand. then separate the mould and place in mould stand 8 remove the connecting pin of seg#2 and seg#3. 9 handling rig to be fix in seg#2 lifting lug and remove from m/c. same to be placed in seg#2 stand or transfer car. 10 handling rig to be fix in seg#3 lifting lug and remove from m/c. same to be placed in seg#3/4 stand or transfer car. 11 mould, seg#1,2, 3 <(>&<)> 4 water flushing done by operation 12 place the new seg# 3<(>&<)>4 in m/c. 13 place the seg#2 in m/c. and connect the pin with se#2 <(>&<)> seg#3 14 place the seg#1 and fix all wedges 15 then place the mould and fix all wedges 16 clamping the seg#1 <(>&<)> mould by operation 17 handling rig remove from m/c and placed in stand 18 all hyd, grease , air <(>&<)> water hoses to be fix by mechanical regular techician 19 place the mould cover by operation safety 1. competency needs: a. all workers shall have min understanding of local or national language, all technicians shall have iti eduction <(>&<)> min 3 yrs iof wokring exp. or min 10 yrs of similar working experience. b. deployed experienced and qualified fitted and foreman 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. job specific trade training and assessment is mandatory for all the key roles. b. workers must undergo 16 days of associates training program organised by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india before being authorized to participate in specific jobs at refu rbishment. d. conduct worker safety training programs every three months, focusing on the specific risks associated with segment refurbishment jobs and manual and mechanical material handing. e. communicate learning from incidents or accidents wrt the client and other similar industries to all working staff. f. all worker shall be medically fit to work in hazardous operation. page 20 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details g. comply the need of hse and fire index as per amnsi g. do comply the requirements of lsgr training 3. risk assessment and hazard identification: a. a comprehensive risk assessment must be conducted quarterly, focusing on the hazards associated with refurbishment activities. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of refurbishment activity and material handling. 4. supervision: a. deploy site in charges to manage overall operation, administration and emergency for the job and workers. b. assign job supervisor as per the job scope. c. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every as per the amnsi process to ensure preparedness. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. d. all all protection and other safety personal protective gadgets shall be inspescted at defined frequency and before every use. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. safety shoes c. thermal heat protective full body suit ( as needed) d. dust mask e. safety goggles f. hand gloves. g. ear plug / earmuff h. all other special ppes as per the requirements of the job i. contractor shall fulfill all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. compliance with indian labor laws: a. adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. 12. other needs: a. comply with all the needs of ims, fps ptw, other safety management page 21 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details systems, general processes, plant sops, smps and etc. b. maintained all the protective controls and do not defeate without proper assessment statutory : · the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. · the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. penalty clause to vendor: 1. penalty for unsafe acts: o 10,000 for each unsafe act observed during safety audits or inspections. 2. severe safety violations: o 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in material exposure or environmental contamination. 3. safety violations: o 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to the job. 4. late incident reporting: o 5,000 per hour of delay beyond the 30 minute reporting window for any incident. 5. failure to provide adequate materials/manpower: o 20,000 for each instance where materials or manpower are not provided as per the contract, leading to delays process. 6. penalty for non performance: o penalty as per the monthly bill amount if the vendor fails to meet the standard requirement of refurbishment activities with escalating penalties for repeated non performance. 2) scope of work amns: § amns will provide the planning of equipment priority for readiness. § amns will provide the necessary spares for the equipments readiness. § amns will ensure the necessary utility services (water/electricity/hydraulics). § amns will monitor and see the status for the job execution. § amns will ensure and provide the necessary permit, if required. item note : 6 2000156515 60 60 10 roller welding 307 no email : kumar.sathish@amns.in contact : name : sathish kumar item details : job title: csp roller welding 1) scope of work vendor: i) technical: 1) roller inside to be weld safety 1. competency needs: a. all workers shall have min understanding of local or national language, all technicians shall have iti eduction <(>&<)> min 3 yrs iof wokring exp. or min 10 yrs of similar working experience. b. deployed experienced and qualified fitted and foreman 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. job specific trade training and assessment is mandatory for all the key roles. b. workers must undergo 16 days of associates training program organised by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india page 22 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details before being authorized to participate in specific jobs at refu rbishment. d. conduct worker safety training programs every three months, focusing on the specific risks associated with segment refurbishment jobs and manual and mechanical material handing. e. communicate learning from incidents or accidents wrt the client and other similar industries to all working staff. f. all worker shall be medically fit to work in hazardous operation. g. comply the need of hse and fire index as per amnsi g. do comply the requirements of lsgr training 3. risk assessment and hazard identification: a. a comprehensive risk assessment must be conducted quarterly, focusing on the hazards associated with refurbishment activities. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of refurbishment activity and material handling. 4. supervision: a. deploy site in charges to manage overall operation, administration and emergency for the job and workers. b. assign job supervisor as per the job scope. c. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every as per the amnsi process to ensure preparedness. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. d. all all protection and other safety personal protective gadgets shall be inspescted at defined frequency and before every use. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. safety shoes c. thermal heat protective full body suit ( as needed) d. dust mask e. safety goggles f. hand gloves. g. ear plug / earmuff h. all other special ppes as per the requirements of the job i. contractor shall fulfill all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. health and medical surveillance: a. comply the need of pre employment medical examination and page 23 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. compliance with indian labor laws: a. adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. 12. other needs: a. comply with all the needs of ims, fps ptw, other safety management systems, general processes, plant sops, smps and etc. b. maintained all the protective controls and do not defeate without proper assessment statutory : · the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. · the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. penalty clause to vendor: 1. penalty for unsafe acts: o 10,000 for each unsafe act observed during safety audits or inspections. 2. severe safety violations: o 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in material exposure or environmental contamination. 3. safety violations: o 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to the job. 4. late incident reporting: o 5,000 per hour of delay beyond the 30 minute reporting window for any incident. 5. failure to provide adequate materials/manpower: o 20,000 for each instance where materials or manpower are not provided as per the contract, leading to delays process. 6. penalty for non performance: o penalty as per the monthly bill amount if the vendor fails to meet the standard requirement of refurbishment activities with escalating penalties for repeated non performance. 2) scope of work amns: § amns will provide the planning of equipment priority for readiness. § amns will provide the necessary spares for the equipments readiness. § amns will ensure the necessary utility services (water/electricity/hydraulics). § amns will monitor and see the status for the job execution. § amns will ensure and provide the necessary permit, if required. item note : 7 2000156515 90 70 10 csp rolls rotation checking in machine 1,000 no email : kumar.sathish@amns.in contact : name : sathish kumar item details : job title: csp rolls rotation checking in machine 1) scope of work vendor: i) technical: 1) in every sequnce break in machine segments roll rotation to be checked to find out premature bearing failure if any. 2) rolls rotation to be checked using discarded temprature tips. 3) rolls rotation to be checked in presence of mechanical <(>&<)> operation engineer. 4) if rollers found jammed premature segments to be changed in the basis page 24 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details of observation. safety 1. competency needs: a. all workers shall have min understanding of local or national language, all technicians shall have iti eduction <(>&<)> min 3 yrs iof wokring exp. or min 10 yrs of similar working experience. b. deployed experienced and qualified fitted and foreman 2. worker safety training: a. safety induction is mandatory for all the associates before deploying them for the job. job specific trade training and assessment is mandatory for all the key roles. b. workers must undergo 16 days of associates training program organised by respective plant as a part of induction followed by assessment. c. workers must undergo a competency assessment by am/ns india before being authorized to participate in specific jobs at refu rbishment. d. conduct worker safety training programs every three months, focusing on the specific risks associated with segment refurbishment jobs and manual and mechanical material handing. e. communicate learning from incidents or accidents wrt the client and other similar industries to all working staff. f. all worker shall be medically fit to work in hazardous operation. g. comply the need of hse and fire index as per amnsi g. do comply the requirements of lsgr training 3. risk assessment and hazard identification: a. a comprehensive risk assessment must be conducted quarterly, focusing on the hazards associated with refurbishment activities. b. hazard identification and risk assessment (hira) reports should be updated regularly and submitted to am/ns india for review. c. develop a job method statement for key sub processes of refurbishment activity and material handling. 4. supervision: a. deploy site in charges to manage overall operation, administration and emergency for the job and workers. b. assign job supervisor as per the job scope. c. deploy safety supervisor: 1 for 30+ workers and 1 more for every 50 workers. 5. emergency response plan: a. develop and implement a detailed emergency response plan (erp) that includes procedures for handling accidents, fires, and exposure to hazardous materials during the work. b. emergency drills should be conducted every as per the amnsi process to ensure preparedness. 6. machines and tools: a. all electrically operated machines shall be inspected and certified by amnsi electrical engineer. b. all hand tools shall be inspected and certified as needed. c. all lifting tools and tackles shall be inspected at define frequency and certified by third party competent person and keep record in form 10. d. all all protection and other safety personal protective gadgets shall be inspescted at defined frequency and before every use. 7. incident reporting: a. immediate incident reporting within 30 minutes of occurrence is mandatory. b. a root cause analysis (rca) must be completed within 48 hours of any incident, with findings and corrective actions reported to am/ns india. 8. mandatory safety audits: a. conduct quarterly safety audits to ensure compliance with safety requirements, focusing on the proper implementation of job method statement requirements. b. audit reports should be submitted to am/ns india, with corrective actions implemented promptly. page 25 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 9. ppe requirements: a. all personnel involved in tarpaulin covering must wear; a. frp safety helmet: (as per am/ns india guidelines) b. safety shoes c. thermal heat protective full body suit ( as needed) d. dust mask e. safety goggles f. hand gloves. g. ear plug / earmuff h. all other special ppes as per the requirements of the job i. contractor shall fulfill all safety and environment rules as per guidelines of safety department. regular inspection and replacement of ppe is required, with compliance to standards set by the factories act, 1948. 10. health and medical surveillance: a. comply the need of pre employment medical examination and periodic medial examination. compliance with the health standards under the factories act, 1948 and the occupational safety, health, and working conditions code, 2020 is required. 11. compliance with indian labor laws: a. adherence to indian labor laws is essential, including compliance with the minimum wages act, 1948, payment of wages act, 1936, and the industrial disputes act, 1947. 12. other needs: a. comply with all the needs of ims, fps ptw, other safety management systems, general processes, plant sops, smps and etc. b. maintained all the protective controls and do not defeate without proper assessment statutory : · the factories act, 1948: ensures the safety, health, and welfare of workers in factories, including provisions for hazardous processes. · the occupational safety, health, and working conditions code, 2020: integrates and amends laws related to safety, health, and working conditions. penalty clause to vendor: 1. penalty for unsafe acts: o 10,000 for each unsafe act observed during safety audits or inspections. 2. severe safety violations: o 50,000 for severe violations, such as failure to wear ppe, non compliance with statutory requirements, or incidents resulting in material exposure or environmental contamination. 3. safety violations: o 25,000 for minor safety violations, including incomplete checklists or minor breaches of safety protocols related to the job. 4. late incident reporting: o 5,000 per hour of delay beyond the 30 minute reporting window for any incident. 5. failure to provide adequate materials/manpower: o 20,000 for each instance where materials or manpower are not provided as per the contract, leading to delays process. 6. penalty for non performance: o penalty as per the monthly bill amount if the vendor fails to meet the standard requirement of refurbishment activities with escalating penalties for repeated non performance. 2) scope of work amns: § amns will provide the planning of equipment priority for readiness. § amns will provide the necessary spares for the equipments readiness. § amns will ensure the necessary utility services (water/electricity/hydraulics). § amns will monitor and see the status for the job execution. page 26 of 26 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000119946 date 06.09.2024 submission date 17.09.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq null latha arunkumar contact email latha.arunkumar@ext.amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details § amns will ensure and provide the necessary permit, if required. item note :...

Arcelor Mittal Nippon Steel India Limited - Gujarat

44957811 tender for crm 2 qa qc building furniture work 27020632 10 10 10 var. furniture works as per requirement 1 lo 20 p & f exhaust fan 1 no email : gopal.thummar@amns.in contact : name : gopal thummar item details : amns scope1. drawing/ qap / job procedure / wps/ pqr/ approved document. 2. work instructions /sop’s for preparation of aluminum partition works <(>&<)> other finishing items shall be done as per instructions of engineer in charge. 3. providing essentials like power, water at work site. 4. approved materials list shall be provided by amns. 5. minor civil work i.e., punching in wall, foundation etc. vendor scope: scope of supply1. all mandatory ppe’s required for execution of work will be in vendor’s scope. 2. deployment of skilled, unskilled, semi skilled manpower along with supervisor for work execution. 3. all quality tests shall be in contractor scope and as per relevant is code. 4. deployment of job specific equipment’s for execution of job. 5. all tools <(>&<)> tackles for work execution. 6. all consumable in contractor scope. 7. all works to be performed as per approved technical specification and drawings approved by am/ns. 8. execution of work should be done as per drawings under the guidance of amns engineer in charge. 9. loading, shifting and unloading of material at work site will in vendor’s scope. 10. safe work access and housekeeping activities before and after execution of job at work site will be in vendor’s scope. 11. labor license, compliance of statutory requirements as per govt. norms <(>&<)> amns policies, pf/esic/insurance requirements. 12. processing of gate pass <(>&<)> other formalities. 13. worker accommodation and transportation of workers to worksite will be in contractor scope. 14. deployment of safety officer / supervisor at site. 15. safety kit / first aid box <(>&<)> safety apparatus if any like flashback arrester, dial gauge, conduit pipes flexible wires, db with proper rating elcb/rccb will be in vendor’s scope. 16. providing lifeline, ladders, scaffolding, safety harness, safety/ florescent jacket, safety helmet, safety goggles, fall arrester etc. will be in vendor’s scope. 17. vendor shall use approved materials/equipment for execution of work. 18. furniture shall be manufactured as per actual site measurement to avoid rejection due to over size or under size dimension. 19. the scope includes supply of lab furniture with storages, worktop, leg space/knee space, electrical switches and sockets, sinks and faucets, gas/water valves, anti vibration tables, fume hoods, ducting and blowers, and accessories only and if depicted in the enclosed drawings. 20. furniture supply and installation both will be in vendor’s scope. 21. fume hood blower stand, and necessary accessories will be in vendors scope. 22. any changes in drawings or scope of supply will b...

Arcelor Mittal Nippon Steel India Limited - Gujarat

44810624 tender for housekeeping job 000156048 10 10 10 various housekeeping jobs 1 lo email : gaurang.bhojani@edu.amns.in contact : name : bhojani, gaurang am/ns india academy item details : *scope of work by vendor •provide special trained manpower that has knowledge of trench <(>&<)> floor cleaning, also having valid height pass for cleaning activity on hight above 2mtr. •all unwanted materials need to be removed and segregated. •muddy water/mud/debris to be removed. •all scum/unwanted material to be filled in big garbage bag/metallic barrels <(>&<)> lift from oil cellar garbage to be thrown in 3rd party vehicle. •surrounding walls, tiles to be cleaned through karcher machine. •equipment’s to be cleaned through karchar machine. •pipelines to be cleaned through a special cleaning agent. •blockage trench to be cleaned and solid sludge to be filled in barrel. •one quality and well trained supervisor is also depute for proper guiding the activity till the job is completed. •job to be done as per line in charge instructions. •for carry out the job, all require tools, tackles, materials, ppe’s, gumboot, cleaning chemicals and other items to be arranged by vendor only. •provide hot water high pressure jet machine. •jumbo bag, water high pressure jet machine, machine of floor scrubbing to be arranged by vendor. sow by vendor for sump pit: •provide special trained manpower that has knowledge of trench <(>&<)> floor cleaning, also having valid height pass for cleaning activity on hight above 2mtr. •all unwanted materials need to be removed and segregated. •muddy water/mud/debris to be removed. •all scum/unwanted material to be filled in big garbage bag/metallic barrels <(>&<)> lift from oil cellar garbage to be thrown in 3rd party vehicle. •surrounding walls, railing, tiles to be cleaned through karchar machine. •equipment’s to be cleaned through karchar machine. •pipelines are to be cleaned through a special cleaning agent. •all tanks outside area to be cleaned through special cleaning agent. •all trenches to be cleaned and solid sludge to be filled in barrel. •roll coolant tank top area and floor to be cleaned. •one quality and well trained supervisor is also depute for proper guiding the activity till the job is completed. •job to be done as per line in charge instructions. •for carry out the job, all require tools, tackles, materials, ppe’s, gumboot, cleaning chemicals and other items to be arranged by vendor only. •provide hot water high pressure jet machine. •jumbo bag, water high pressure jet machine, machine of floor scrubbing to be arranged by vendor. * sow by vendor for mill housing cleaning : •provide special trained manpower that has knowledge of trench <(>&<)> page 2 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118831 date 16.08.2024 submission date 26.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. krutikkumar patel contact 7043217731 email krutik.patel@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details floor cleaning, also having valid height pass for cleaning activity on hight above 2mtr. •all unwanted materials need to be removed and segregated. •muddy water/mud/debris to be removed. •all scum/unwanted material to be filled in big garbage bag/metallic barrels <(>&<)> lift from oil cellar garbage to be thrown in 3rd party vehicle. •surrounding walls, railing, tiles to be cleaned through karchar machine. •equipment’s to be cleaned through karchar machine. •pipelines are to be cleaned through a special cleaning agent. •catchment tray to be cleaned and solid sludge to be filled in barrel. •one quality and well trained supervisor is also depute for proper guiding the activity till the job is completed. •job to be done as per line in charge instructions. •for carry out the job, all require tools, tackles, materials, ppe’s, gumboot, cleaning chemicals and other items to be arranged by vendor only. •provide hot water high pressure jet machine. •jumbo bag, water high pressure jet machine, machine of floor scrubbing to be arranged by vendor. * standard safety requirements as per hirac safety: •all the persons working should be healthy and medically fit and should be certified by the medical officer. competent manpower to be provided by vendor. •toolbox talk to be conducted before start of housekeeping on daily basis. •ensure require ppes to be used before start of job. ensure that all persons are wearing safety helmet, safety shoes, goggles, nose mask, ear plug and cut resistance hand gloves during work. •area awareness training to be given. <(>&<)> housekeeping activity to be supervised by vendor. *sop no / hirac no amnsil/crm/6 hi opr/16.7/hirac/13 amnsil/crm/6 hi opr/16.7/hirac/28 amnsil/crm/6 hi opr/19/sop/19 amnsil/crm/6 hi opr/19/sop/09 *scope of work for amns: •work permit <(>&<)> tool box talk. •require saw dust powder to be provided by company. •provide of safe working environment and drinking water. •required electricity <(>&<)> led light will be provided by company. •empty barrels to be arranged by company. •crane/trolley for material <(>&<)> barrel shifting. item note : 2 2000156048 20 20 10 various housekeeping jobs 1 lo email : gaurang.bhojani@edu.amns.in contact : name : bhojani, gaurang am/ns india academy item details : * scope of work for vendor: fume exhaust duct <(>&<)> mill stands cleaning •fume suction inlet in between stands to be cleaned. •after inlet area fume exhaust duct to be open at interval to have proper excess of cleaning. •manpower movement inside duct is not possible so required long handling tools to clean scum deposit inside duct <(>&<)> duct surface. •behind mill stands duct is going to chimney from underground passage – to be open at one place in underground and cleaning to be done. •all solid sludge/scum to be filled in open empty barrels. •mill stands 1 to 5 to be cleaned through karcher machine. •all scum <(>&<)> sludge to be removed from inside mill stands and to be page 3 of 3 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118831 date 16.08.2024 submission date 26.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. krutikkumar patel contact 7043217731 email krutik.patel@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details filled in empty barrels. •provide hot water high pressure jet machine. •jumbo bag provide by vendor. •dot excess water to be removed each tank. •unwanted materials to be removed from each tank by manually. •slurry water <(>&<)> solid sludge to be removed from dot by manually. •cleaning of cross metal filter plate. •suction area <(>&<)> level indicator area cleaning from inside. •all workers should be having valid height pass as cleaning work on height of 5 7 meter <(>&<)> all mixed garbage to be segregated and to be loaded in 3rd party vehicle. •provide special trained young manpower that has knowledge of fume exhaust cleaning/ confine space cleaning (considering confining area) •all ppe’s i.e., gumboots, hand gloves, nose mask, cut resistance hand gloves, goggles, cleaning chemicals <(>&<)> others required material to be provided by vendor. • muddy water/mud/debris removal. • all type of cleaning tools and tackles to be provided by vendor. • removed mud transfer to the jumbo bag which taken on mill floor. • one quality and well trained supervisor is also depute for proper guiding the activity till the job is completed. •job to be done as per line in charge instructions. ssd final date will be intimate to vendor before 2 weeks. •job to be completed within timeline <(>&<)> shutdown period. bill will be signed based on completion of work and quality of work. * standard safety requirements as per hirac safety: •all the persons working should be healthy and medically fit and should be certified by the medical officer. competent manpower to be provided by vendor. •toolbox talk to be conducted before start of housekeeping on daily basis. •ensure require ppes to be used before start of job. ensure that all persons are wearing safety helmet, safety shoes, goggles, nose mask, ear plug and cut resistance hand gloves during work. •area awareness training to be given. <(>&<)> housekeeping activity to be supervised by vendor. *sop no / hirac no amnsil/crm/6 hi opr/16.7/hirac/44 amnsil/crm/6 hi opr/16.7/hirac/41 amnsil/crm/6 hi opr/19/sop/11 *scope of work for amns: • work permit <(>&<)> tool box talk. • confined space permit. • require saw dust powder to be provided by company. • provide of safe working environment and drinking water. • required electricity <(>&<)> led light will be provided by company. • empty barrels to be arranged by company. • crane/trolley for material <(>&<)> barrel shifting. ...