Western Railway - Gujarat

45841014 supply of piston o ringpiston o ring,piston o ring, part no. tsl 1 19 for hydraulic torque wrench of tritorc make , torque h ead model tsl 01. [ warranty period: 30 months after the date of delivery ] ] , piston backup seal, part no. tsl 1 18 for hydraulic torque wrench of tritorc make , torqu e head model tsl 01. [ warranty period: 30 months after the date of delivery ] ] , piston support seal, part no. tsl 1 17 for hydraulic torque wrench of tritorc make , torq ue head model tsl 01. [ warranty period: 30 months after the date of delivery ] ] , swivel o ring for nobe, part no. swl l 38 for hydraulic torque wrench of tritorc make , torque head model tsl 01. [ warranty period: 30 months after the date of delivery ] ]...

Western Railway - Gujarat

45824135 supply of battery operated impact wrenchbattery operated impact wrench,battery operated impact wrench 1/2 drive rated for 203 nm max with tool box along with 0 2 numbers of 18v battery and charger to model:gds 18v200 acceptable makes: bosch,dewalt/hitachi/maki ta/ingersollrand/bahco/snap on/chicago/groz/norbar/macmastermake: dewalt. [ warranty period: 30 mo nths after the date of delivery ] ]...

Western Railway - Gujarat

45732505 supply of electronic torque wrench testerelectronic torque wrench tester,supply, installation and commissioning of electronic torque wrench tester of capacity 25 1100 nm, suitable for 3/8 inch, 1 /2 inch & 3/4 inch square drive with digital display unit, mounting arrangement, connecting cable, square drive adopter & calibration certificate issued from nabl/govt. accredited lab only. along with software & data cable for transfering readings to pc for docum ention and all other operation & maintenance manual. specification as per annex a. [ warranty period: 30 months after the date of delivery ] ]...

Western Railway - Gujarat

45653823 auction sale of scrap various type of tools items such as jim crow, bench vice, density machine, drill, die, wrench, chisel, augur, plier, spanner, screw driver, hammer, t squire, rachet, crimping tool, punch, socket handle, tap, adaptor, gauge, crow bar, cutter,anvil and others various size/shape, fully or broken in parts and with or without attachment old used and u.s....

Indian Army - Gujarat

45580812 bids are invited for filter wrench for adfcr , filter wrench 2.5 ton , filter wrench stln , filter wrench for generator filter wrench for generator filter cum pressure regulater, space heater for turbo generator (bhel), carbon brushes for motor and generator, welding goggles for eye protector as per is 5983, oil filter assembly for wheel loader, c band pass filter for polnet terminal (crpf), cartridge filter for lean amine filtration (mrpl), open jaw wrenches (spanners) as per is 2028, accessories for advanced bipolar and ultrasonic energy generator, rotor for 19.5 mw steam turbine generator (bhel) relevant impact wrench total quantity : 8...

Department Of Defence - Gujarat

45467180 bids are invited for consumable naval store items title1 , title2 , title3 , title4 , title5 , title6 , title7 , title8 , title9 , title10 grease gun gl 12500 leaver type spring loaded, open end spanner, spanner wheel 305 mm af, engineers screw driver gemarpts searched 1.6x10x200 mm pr, banana fender, uv protection anti glare sun glasses, portable synthetic banana fender, ptfe strings used in gemarpts grease, flag commissioning pennant (90x60cm), 4d cell torch searched string: grease gun gl 12500 leaver type spring loaded grease gun as per is 7794 searched string: open end spanner non sparking double open ended spanner (v2), multipara monitor low end, non sparking open end slugging spanners (v2), adjustable single ended open jaw wrench as per is 6131, wooden podium, open ended slugging wrenches (spanners) as per is 4508, single double bed wooden with without box, open jaw wrenches (spanners) as per is 2028, adjustable spanner, general purpose ball valves (v2) searched string: spanner wheel 305 mm af ring slugging wrenches (spanners) as per is 4509, wooden lab stools, non sparking ring slugging spanners (v2), medical x ray films, open ended slugging wrenches (spanners) as per is 4508, m.s stopper for traffic control (portable barrier), high strength deformed steel bars and wires for concrete reinforcement conforming to is 1786, 1 11wheeled skid steer loader (v2) as per is iso 7131 total quantity : 20...

Western Railway - Gujarat

45454290 supply of throttle springthrottle spring,clutch housing, part no. c9304761 for pneumatic impact wrench cp 610. [ warranty perio d: 30 months after the date of delivery ] ] , anvil, part no. c1401761 for pneumatic impact wrench cp 610. [ warranty period: 30 mon ths after the date of delivery ] ] , dog, part no. c4602761 for pneumatic impact wrench cp 610. [ warranty period: 30 mont hs after the date of delivery ] ] , spindle, part no. d1913761 for pneumatic impact wrench cp 610. [ warranty period: 30 m onths after the date of delivery ] ] , needle bearing (outer), part no. m5302761 for pneumatic impact wrench cp 610. [ warrant y period: 30 months after the date of delivery ] ] , needle bearing (inner), part no. m5304761 for pneumatic impact wrench cp 610. [ warrant y period: 30 months after the date of delivery ] ] , retaining ring, part no. m4001761 for pneumatic impact wrench cp 610. [ warranty perio d: 30 months after the date of delivery ] ] , lower end plate, part no. c4412761 for pneumatic impact wrench cp 610. [ warranty period: 30 months after the date of delivery ] ] , rotor, part no. d1715761 for pneumatic impact wrench cp 610. [ warranty period: 30 mon ths after the date of delivery ] ] , rotor blade, part no. h5010761 for pneumatic impact wrench cp 610. [ warranty period: 30 months after the date of delivery ] ] , liner, part no. c7108761 for pneumatic impact wrench cp 610. [ warranty period: 30 mon ths after the date of delivery ] ] , reverse valve (inv. cast), part no. d1337761 for pneumatic impact wrench cp 610. [ warra nty period: 30 months after the date of delivery ] ] , upper end plate, part no. c4413761 for pneumatic impact wrench cp 610. [ warranty period: 30 months after the date of delivery ] ] , gasket, part no. h0616761 for pneumatic impact wrench cp 610. [ warranty period: 30 m onths after the date of delivery ] ] , throttle spring, part no. h3524761 for pneumatic impact wrench cp 610. [ warranty perio d: 30 months after the date of delivery...

Western Railway - Gujarat

45454241 supply of 1 square drive electric torque wrench1 square drive electric torque wrench,1 square drive electric torque wrench, torque range: 500 to 1800 nm with sockets. detailed specifications as per attached annexure . [ warranty period: 12 months after the date of delivery ] ] senior section engineer gujarat 1.00 set...

Western Railway - Gujarat

45454156 supply of swivel post retaining clipswivel post retaining clip,swivel post, part no. ttx 01 02 2 for torc usa make, model ttx 1, 3/4 [ warranty period: 30 months after the date of delivery ] ] , swivel block assembly, part no. ttx 01 for torc usa make, model ttx 1, 3/4 sq. drive tor que wrench. [ warranty period: 30 months after the date of delivery ] ] , uniswivel seal kit, part no. ttx 01 02 sk for torc usa make, model ttx 1, 3/4 sq. drive to rque wrench. [ warranty period: 30 months after the date of delivery ] ] , swivel post retaining clip, part no. ttx 01 02 4 of for torc usa make, model ttx 1, 3/4 sq . drive torque wrench. [ warranty period: 30 months after the date of delivery ] ]...

Border Security Force - Gujarat

45443562 bids are invited for tools and equipments 370001 mse hvy duty hydroulic trolly jack five ton , g i tray , torque wrench 100 lbs , classic trolly type hydraulic jack 03 ton , bearing puller tata 407 , bearing puller , piston ring expendar , piston ring compressor big , pipe wrench 2014 tap , socket set sa46 8 32 mm , vice grip plier curb jaw , torque wrench tw 100 tap , torque wrench tw 250 tap , oil can , trolly type hydraulic jack 10 ton , tool box steel , cold chiesel tap 1046 , filler gauge , combination plier , nose plier tap , spark plug mpfi spanner , file half round smooth handle , screw driver tap 931 , screw driver tap 829 , half round file jk , flat file , screw driver 827 tap , triangular file , angle grinder bench , d e spanner 12 pc tap , ring spanner set 12 pc tap , hammer ball pin 800 gm tap , water pump plier tap , circlip plier inner , screw driver 905 tap , screw driver 863 250 tap , circlip plier outer , screw driver 2 in one , screw driver 903 tap , grinding google blck , allen key set 1 5 to 10 mm , square file wood handle , self bush remover brg puller , screw driver 861 200 star , hammer with handle 20 lbs , piston ring compressor small , g i tray , tata 1212 tc filter clamp , oil filter wrench , valve lifting tool mg , soldering iron 65 w , crocodile clip , digital multi meter , psr pol screw remover lucas , oxygen gas regulator esab , da gas regulator , measurement tape , chisel chorsi 03 nos , wooden saw , pincer tap , round file smooth , triangular file jk , file round smooth 1 42 total quantity : 119...

Mehsana District Cooperative Milk Producers Union Limited - Gujarat

45368613 supply of 1. loctite pc 3473 fast steel putty 2. hole tight solution,tin,500ml 3. drill bit set 4. 5 mtr measure tape.5 mtr measure tape. 5. wrench pipe adjustable,14in 6. wrench pipe adjustable,18in 7. d.p. test kitd.p. test kit 8kit 1 ea 30.09.2024 mm01 spm000019 8 3050060 820510 00 9. drill chuck...

Western Railway - Gujarat

45364799 supply of electronic torque wrench testerelectronic torque wrench tester,supply, installation and commissioning of electronic torque wrench tester of capacity 25 1100 nm, s uitable for 3/8 inch, 1/2 inch & 3/4 inch square drive with digital display unit, mounting arrangement, connecting cable, square drive adopter & calibration certificate issued from nabl/govt. accredited lab only. along with sof tware & data cable for transfering readings to pc for documention and all other operation & maintenance man ual. specification as per annex a. [ warranty period: 30 months after the date of delivery ] ]...

Balmer Lawrie And Co Limited - Gujarat

45363333 tender for supply of items 1 pneumatic cp828 h 1/2 inch drive heavy duty air ratchet. cp828 h 1/2 inch chicago/equivalent 2 2 1/2 impact wrench 610 n m (450 ft lb stmt99300 8 stanley/equivalent 1 3 24pcs 1/2 dr. socket & bit set stmt72795 8 stanley/equivalent 1 4 adj. wrench 300mm stmt87434 8 stanley/equivalent 2 5 adj. wrench 200mm stmt87432 8 stanley/equivalent 2 6 23 pcs combination wrench set stmt33650 8 stanley/equivalent 1 7 1/4”x5/16” open ended wrench 87 676 1 stanley/equivalent 2 8 5/16”x3/8” 87 677 1 stanley/equivalent 2 9 3/8”x7/16” 87 678 1 stanley/equivalent 2 10 7/16”x1/2” 87 679 1 stanley/equivalent 2 11 1/2”x9/16” 87 705 1 stanley/equivalent 2 12 9/16”x5/8” 87 680 1 stanley/equivalent 2 13 5/8”x11/16” 87 681 1 stanley/equivalent 1 14 11/16”x3/4” 87 682 1 stanley/equivalent 1 15 13/16”x7/8” 87 683 1 stanley/equivalent 1 16 15/16”x1” 87 706 1 stanley/equivalent 1 17 15/16”x1 1/16” 87 684 1 stanley/equivalent 1 18 1”x1 1/8” 87 685 1 stanley/equivalent 1 19 1 1/8”x1 1/4” 87 686 1 stanley/equivalent 1 20 12” flat file 22 173 / 22 173b stanley/equivalent 2 21 8 three square tapered 22 227 stanley/equivalent 2 22 8 half round file 22 187 / 22 187b stanley/equivalent 2 23 hex key set 12pc l/arm imp 69 257 stanley/equivalent 2 24 hex key set 10pc s/arm imp 69 254 stanley/equivalent 2 25 hex key set 10pc s/arm mm 69 253 stanley/equivalent 2 26 6 pcs precision screwdriver se stht66039 8 stanley/equivalent 1 27 10 way flexible screwdriver stht62508 8 stanley/equivalent 1 28 24 pipe pliers 87 626 s stanley/equivalent 1 29 36 pipe pliers 87 627 s stanley/equivalent 1 30 4 pcs circlips pliers module stmt74180 8 stanley/equivalent 1...

Western Railway - Gujarat

45303121 supply of ratchetratchet,ratchet , part no. tsl 1 08 for hydraulic torque wrench, model tsl 1. [ warranty period: 30 months after the date of delivery ] ] , pawl, part no. tsl 1 09 for hydraulic torque wrench, model tsl 1. [ warranty period: 30 mo nths after the date of delivery ] ] , pawl spring, part no. sp d9 l23 10 for hydraulic torque wrench, model tsl 1. [ warranty pe riod: 30 months after the date of delivery ] ] , swivel spacer, part no. swl l 40 for hydraulic torque wrench, model tsl 1. [ warranty perio d: 30 months after the date of delivery ] ] page 1 of 6 run date/time: 19/09/2024 11:32:35gsd/sabarmati/western rly tender document , swivel spacer seal, part no. swl l 39 for hydraulic torque wrench, model tsl 1. [ warranty p eriod: 30 months after the date of delivery ] ] , swivel o ring for nobe, part no. swl l 38 for hydraulic torque wrench, model tsl 1. [ warr anty period: 30 months after the date of delivery ] ] , piston support seal, part no. tsl 1 17 for hydraulic torque wrench, model tsl 1. [ warranty p eriod: 30 months after the date of delivery ] ] , piston backup seal, part no. tsl 1 18 for hydraulic torque wrench, model tsl 1. [ warranty p eriod: 30 months after the date of delivery ] ] , piston o ring, part no. tsl 1 19 for hydraulic torque wrench, model tsl 1. [ warranty peri od: 30 months after the date of delivery ] ] , piston internal seal, part no. tsl 1 20 for hydraulic torque wrench, model tsl 1. [ warranty p eriod: 30 months after the date of delivery ] ] , piston u cap seal, part no. tsl 1 21 for hydraulic torque wrench, model tsl 1. [ warranty per iod: 30 months after the date of delivery ] ] , piston cap backup seal, part no. tsl 1 23 for hydraulic torque wrench, model tsl 1. [ warran ty period: 30 months after the date of delivery ] ] page 2 of 6 run date/time: 19/09/2024 11:32:35gsd/sabarmati/western rly tender document , end cap o ring, part no. tsl 1 24 for hydraulic torque wrench, model tsl 1. [...

Western Railway - Gujarat

45290506 bids are invited for general purpose pipe wrench as per is 4003, is 15, is 14329 (q3) total quantity : 70...

Western Railway - Gujarat

45273905 supply of set of toolsset of tools,soldering iron 75 watt, input voltage 230 v, bit type: flat, temperature accuracy (deg ce lsius): +/ 5, temperature stability (deg celsius): +/ 10, temperature range (deg celsius): 50 to 450. ea ch kit to be provided along with solder wire, flux paste, tips & stand. make stanley or soldron or ingco [ warranty period: 30 mo nths after the date of delivery ] ] , set of tools of 15 items required for maintenance of coaches as per attached annexur e b [ warranty period: 30 months after the date of delivery ] ] , screw spanner, adjustable jaw, size 10 (250mm), make: taparia or everest or stanley only [ warranty period: 30 months after the date of delivery ] ] , adjustable click type 1/2 sq. drive torque wrench, ratchet type with square coupler, r ange: 25 135 nm, lc 10 nm or better. with 01 year validity calibration certificate. make: grip hold or stanley or torq ue master or rigid or equivalent [ warranty period: 30 months after the date of delivery ] ] , adjustable click type 1/2 sq. drive torque wrench, ratchet type with square coupler, r ange: 70 340 nm, lc 10 nm or better. with 01 year validity calibration certificate. make: grip hold or stanley or torq ue master or rigid or equivalent [ warranty period: 30 months after the date of delivery ] ] , digital wheel diameter gauge fitted with digital dial indicator, specification: range 800 to 1100 mm accuracy through vernier scale0.1 mm, dial indicator accuracy 0.01mm dial indicator ra nge 12 mm. gauge should be suitable to measure wheel dia in open and in fitted condition for all t ype of railway coaches and wagon. fitted with spring loaded dial indicator plunger with locking device, supply in suitable carry box. with 01 year calibration certificate from nabl approved lab. make: aoge / pie /ganapathy. [ warranty period: 30 months after the date of delivery ] ] , water pump plier, size 10 (250mm), make: taparia or groz or tata agrico or equivalent [ warranty period: 30 mo...

Department Of Space - Gujarat

45272360 bids are invited for fixed type torque wrench , vernier calipers , spirit level , m8 coarse pitch tapping tool set mse total quantity : 11...

Western Railway - Gujarat

45257469 supply of battery operated impact wrenchbattery operated impact wrench,battery operated impact wrench 1/2 drive rated for 203 nm max with tool box along with 02 numb ers of 18v battery and charger to model:gds 18v200 acceptable makes: bosch,dewalt/hitachi/makita/ingersoll rand/bahco/snap on/chicago/groz/norbar/macmastermake: dewalt. [ warranty period: 30 months after the d ate of delivery ] ]...

Western Railway - Gujarat

45252133 supply of piston o ringpiston o ring,piston o ring, part no. tsl 1 19 for hydraulic torque wrench of tritorc make , torque he ad model tsl 01. [ warranty period: 30 months after the date of delivery ] ] , piston backup seal, part no. tsl 1 18 for hydraulic torque wrench of tritorc make , torque head model tsl 01. [ warranty period: 30 months after the date of delivery ] ] , piston support seal, part no. tsl 1 17 for hydraulic torque wrench of tritorc make , torque head model tsl 01. [ warranty period: 30 months after the date of delivery ] ] , swivel o ring for nobe, part no. swl l 38 for hydraulic torque wrench of tritorc make , t orque head model tsl 01. [ warranty period: 30 months after the date of delivery ] ] page 1 of 5 run date/time: 16/09/2024 11:50:41gsd/sabarmati/western rly tender document...

Bridge And Roof Company India Limited - Gujarat

45214752 tender for supply and delivery of consumable materials water can 20ltr ag 5 cutting whell measuring tape 15 mtr steel safety shoes tiger mccb 40amp 2pole office almira 5 feet steel boiler suit cotton green safety jacket adjustable wrench pvc tape yellow pvc can 20ltr cap hassion cloth welding road 2.5mm padlock 50mm gi pan 16 spead with handle mccb 63amp x 4 pole 30ma baricating tape welding road 3.15mm labour safety shoes tikam with handle safety helmet labour umbrella cotton hand gloves line tester pvc socket 16amp 3 pin pvc socket 16amp k 3 pin nails 3 green safety helmet...

Department Of Heavy Industry - Gujarat

45192001 supply and delivery of consumable materials; water can 20ltr ag 5 cutting whell measuring tape 15 mtr steel safety shoes tiger mccb 40amp 2pole office almira 5 feet steel boiler suit cotton green safety jacket adjustable wrench pvc tape yellow pvc can 20ltr cap hassion cloth welding road 2.5mm padlock 50mm gi pan 16 spead with handle mccb 63amp x 4 pole 30ma baricating tape welding road 3.15mm labour safety shoes tikam with handle safety helmet labour umbrella supply & delivery of store consumable materials at ioci, gujarat refinery, vadodara site. cotton hand gloves line tester pvc socket 16amp x 3 pin pvc socket 16amp x 3 pin nails 3 green safety helmet...

Western Railway - Gujarat

45158893 bids are invited for 1 supply and installation of heavy duty pallet storage racking system with 04 adjustable shelves, dimension of storage space (lxwxh) 2410 x 950 x 3100 mm & shelf height 850 mm. specification & drawing as per attached drg. no. prj_38078 (item a) with 04 shelves, at annexure a. no. of level: 04, material steel, capacity: 1000 kg each level. frame and beam painting will be powder coated with heavy duty packing provided on each leg . make godrej or equivalent reputed make. 5 nos section engineer (c&w) okha 87245541 2 cordless brushless electric drill as per attached gem specification (gem product id 5116877 32662196132) similar model : bosch or dewalt warranty : 01 year 5 nos sr. section engineer (c&w) hapa 87245632 3 rotary hammer drill as per attached gem specification (gem product id 5116877 20546878843) similar model : bosch or dewalt warranty : 01 year 3 nos sr. section engineer (c&w) hapa 87245633 4 cordless brushless impact wrench 1/2 inch drive with (02 nos battery with charger & with standard box for smooth handling)as per speciation of gem product id 5116877 17289312179 similar model : dfc922 of dewalt or bosch warranty : 01 year 10 nos sr. section engineer (c&w) hapa 87245649 5 hydraulic jack 50 ton capacity as per specification attached. 4 nos sr. section engineer (c&w) hapa 87245650 6 hydraulic hand operated jack 30 ton capacity closed height 285mm, lift 150mm extended height 435 mm ram dia 76mm body dia 144 mm base size 200x200 sqmm base plate 20 mm with handle to carry jack (including jack operating handle). total quantity : 35...

Western Railway - Gujarat

45141416 supply of ratchet type torque wrenchratchet type torque wrench,ratchet type torque wrench, square drive size: 1/2 inch, torque range: 70nm 340 nm, swi ng arc: 10 degree over all length: 780mm approx. torque limiting direction: clockwise, material: st eel, finish: chrome plated, make: stanley bri tool or taparia or gedore or snap on or tristar or e quivalent. [ warranty period: 30 months after the date of delivery ] ] , ratchet type torque wrench, square drive size: 1/2 inch, torque range: 10nm 70 nm, swin g arc: 10 degree over all length: 780mm approx. torque limiting direction: clockwise, material: ste el, finish: chrome plated, make: stanley bri tool/taparia /snap on/ tristar /gedore or equivalent. [ warranty period: 30 months after the date of delivery ] ]...

Western Railway - Gujarat

45073702 supply of ratchetratchet,ratchet , part no. tsl 1 08 for hydraulic torque wrench, model tsl 1. [ warranty period: 30 months after the date of delivery ] ] , pawl, part no. tsl 1 09 for hydraulic torque wrench, model tsl 1. [ warranty period: 30 mo nths after the date of delivery ] ] , pawl spring, part no. sp d9 l23 10 for hydraulic torque wrench, model tsl 1. [ warranty pe riod: 30 months after the date of delivery ] ] , swivel spacer, part no. swl l 40 for hydraulic torque wrench, model tsl 1. [ warranty perio d: 30 months after the date of delivery ] ] page 1 of 6 run date/time: 05/09/2024 12:12:56gsd/sabarmati/western rly tender document , swivel spacer seal, part no. swl l 39 for hydraulic torque wrench, model tsl 1. [ warranty p eriod: 30 months after the date of delivery ] ] , swivel o ring for nobe, part no. swl l 38 for hydraulic torque wrench, model tsl 1. [ warr anty period: 30 months after the date of delivery ] ] , piston support seal, part no. tsl 1 17 for hydraulic torque wrench, model tsl 1. [ warranty p eriod: 30 months after the date of delivery ] ] , piston backup seal, part no. tsl 1 18 for hydraulic torque wrench, model tsl 1. [ warranty p eriod: 30 months after the date of delivery ] ] , piston o ring, part no. tsl 1 19 for hydraulic torque wrench, model tsl 1. [ warranty peri od: 30 months after the date of delivery ] ] , piston internal seal, part no. tsl 1 20 for hydraulic torque wrench, model tsl 1. [ warranty p eriod: 30 months after the date of delivery ] ] , piston u cap seal, part no. tsl 1 21 for hydraulic torque wrench, model tsl 1. [ warranty per iod: 30 months after the date of delivery ] ] , piston cap backup seal, part no. tsl 1 23 for hydraulic torque wrench, model tsl 1. [ warran ty period: 30 months after the date of delivery ] ] page 2 of 6 run date/time: 05/09/2024 12:12:56gsd/sabarmati/western rly tender document , end cap o ring, part no. tsl 1 24 for hydraulic torque wrench, model tsl 1. [...

University Of Agriculture - Gujarat

45070823 d form tender for civil materials; 1 white wall hung (size 500mm x 360mm x 350mm)(make hindware cerajaguar) 1 no 2 white wall hung (size 530mm x 350mm x 375mm)(make hindware cerajaguar) 1 no 3 white wall hung (size 525mm x 365mm x 360mm)(make hindware cerajaguar) 1 no 4 white urinal (size 315mm x 265mm x 440mm) (make hindware cerajaguar) 1 no 5 white urinal (size 375mm x 390mm x 590mm) (make hindware cerajaguar) 1 no 6 white urinal (size 340mm x 280mm x 470mm) (make hindware cerajaguar) 1 no 7 white washbasin (size 450mm x 350mm) (make hindware cera jaguar) 1 no 8 white washbasin (size 515mm x 410mm) (make hindware cera jaguar) 1 no 9 white washbasin (size 550mm x 400mm) (make hindware cera jaguar) (table top) 1 no 10 washbasin brackets c.i 1 pair 11 washbasin stud pair 1 pair 12 orrissa pan (size 530mm x 425mm) (make hindware cera jaguar) 1 no 13 orrissa pan (size 510mm x 410mm) (make hindware cera jaguar) 1 no 14 orrissa pan (size 580mm x 440mm) (make hindware cera jaguar) 1 no 15 kitchen sink (size 24x18)(make nirali) 1 no 16 kitchen sink (size 21x18)(make nirali) 1 no 17 kitchen sink (size 19x16)(make nirali) 1 no 18 kitchen sink (size 24x20)(make nirali) 1 no 19 kitchen sink (size 28x18)(make nirali) 1 no 20 kitchen sink (size 27x21)(make nirali) 1 no 21 kitchen sink s.s. coupling (size 4 long) 1 no 22 hand faucet (make hindware cera jaguar) 1 no 23 jet spray (make isi approved) 1 no 24 sintex water tank black colour double layer 1 ltr 25 sintex water tank white colour double layer 1 ltr 26 6”x6” s.s. steel jali (make isi approved) 1 no 27 teflon (tap role) (make isi approved) 1 no 28 15 mm cp brass mixture cock (make hindware cera jaguar) 1 no 29 15 mm cp brass 2 in 1 cock (make hindware cera jaguar) 1 no 30 15 mm ceramic spindal heavy (make i.s.i approved) 1 no 31 15 mm brass spindal heavy (make i.s.i approved) 1 no 32 15 mm cp brass angle cock (make hindware cera jaguar) 1 no 33 15 mm c.p brass bib cock (make hindware cera jaguar) 1 no 34 15 mm c.p brass pillar cock (make hindware cera jaguar) 1 no 35 15 mm c.p brass swan neck pillar cock (make hindware cera jaguar) 1 no 36 15 mm c.p brass stop cock (make hindware cera jaguar) 1 no 37 15 mm c.p brass conceal cock (make hindware cera jaguar) 1 no 38 25 mm c.p brass flush cock (make hindware cera jaguar) 1 no 39 waste coupling brass (make i.s.i approved) 1 no 40 15 mm brass spindle (make plumber ) 1 no 41 25 x 15 g.i. tee (make i.s.i approved) 1 no 42 15 mm g.i elbow (make i.s.i approved) 1 no 43 15 mm g.i coupling (make i.s.i approved) 1 no 44 15 mm g.i union (make i.s.i approved) 1 no 45 15x15 mm g.i tee (make i.s.i approved) 1 no 46 15mm g.i nipple (make i.s.i approved) 1 no 47 25mm g.i nipple (make i.s.i approved) 1 no 48 40mm g.i nipple (make i.s.i approved) 1 no 49 40mm x 25mm g.i reducer (make i.s.i approved) 1 no 50 25mm x 15mm g.i reducer (make i.s.i approved) 1 no 51 g.i wiremesh mosquito proof jali (make i.s.i approved) 1 smt 52 100mm duplex joint (make i.s.i approved) 1 no 53 150mm duplex joint (make i.s.i approved) 1 no 54 200mm duplex joint (make i.s.i approved) 1 no 55 100mm butter valve (make i.s.i approved) 1 no 56 150mm butter valve (make i.s.i approved) 1 no 57 75 mm pvc pipe 4 kg/cm2 (make astral finolex prince) 1 rmt 58 75 mm pvc pipe 6 kg/cm2 (make astral finolex prince) 1 rmt 59 90mm pvc pipe (4 kg/cm2) (make astral finolex prince) 1 rmt 60 90mm pvc pipe (6 kg/cm2) (make astral finolex prince) 1 rmt 61 110 mm pvc pipe 4 kg/cm2 (make astral finolex prince) 1 rmt 62 110 mm pvc pipe 6 kg/cm2 (make astral finolex prince) 1 rmt 63 160mm pvc pipe 4kg/cm2 (make finolex or equivalent) 1 rmt 64 160mm pvc pipe 6kg/cm2 (make finolex or equivalent) 1 rmt 65 75 mm pvc couplar (make astral finolex prince) 1 no 66 90mm pvc couplar (make astral finolex prince) 1 no 67 110 mm pvc couplar (make astral finolex prince) 1 no 68 160mm pvc couplar (make finolex or equivalent) 1 no 69 75 mm pvc elbow (make astral finolex prince) 1 no 70 90mm pvc elbow (make astral finolex prince) 1 no 71 110 mm pvc elbow (make astral finolex prince) 1 no 72 160mm pvc elbow (make finolex or equivalent) 1 no 73 pvc west pipe (washbasin) (make i.s.i approved) 1 no 74 pvc flush tank with complete set (make hindware cera jaguar) 1 no 75 pvc connection pipe 18 (make i.s.i approved) 1 no 76 pvc connection pipe 2 foot (make i.s.i approved) 1 no 77 15 mm abc (pvc) ball cock (make polo sparsh or equivalent) 1 no 78 25 mm abc (pvc) ball cock (make polo sparsh or equivalent) 1 no 79 40 mm abc (pvc) ball cock (make polo sparsh or equivalent) 1 no 80 20mm pvc pipe (make astral finolex prince) 1 rmt 81 32mm pvc pipe (make astral finolex prince) 1 rmt 82 50mm pvc pipe (make astral finolex prince) 1 rmt 83 63mm pvc pipe (make astral finolex prince) 1 rmt 84 20mm pvc elbow (make astral finolex prince) 1 no 85 32mm pvc elbow (make astral finolex prince) 1 no 86 50mm pvc elbow (make astral finolex prince) 1 no 87 63mm pvc elbow (make astral finolex prince) 1 no 88 20mm pvc couplin (make astral finolex prince) 1 no 89 32mm pvc couplin (make astral finolex prince) 1 no 90 50mm pvc couplin (make astral finolex prince) 1 no 91 63mm pvc couplin (make astral finolex prince) 1 no 92 20mm pvc tee (make astral finolex prince) 1 no 93 32mm pvc tee (make astral finolex prince) 1 no 94 50mm pvc tee (make astral finolex prince) 1 no 95 63mm pvc tee (make astral finolex prince) 1 no 96 pvc solution (make astral finolex prince) (100 gram) 1 no 97 20mm pvc cap inner aanta (make astral finolex prince) 1 no 98 20mm pvc cap outer aanta (make astral finolex prince) 1 no 99 32mm pvc cap inner aanta (make astral finolex prince) 1 no 100 32mm pvc cap outer aanta (make astral finolex prince) 1 no 101 50mm pvc cap inner aanta (make astral finolex prince) 1 no 102 50mm pvc cap outer aanta (make astral finolex prince) 1 no 103 100mm pvc rubber ring (make i.s.i approved) 1 no 104 150mm pvc rubber ring (make i.s.i approved) 1 no 105 200mm pvc rubber ring (make i.s.i approved) 1 no 106 300mm pvc rubber ring (make i.s.i approved) 1 no 107 100mm d.i. pipe ring (make i.s.i approved) 1 no 108 150mm d.i. pipe ring (make i.s.i approved) 1 no 109 200mm d.i. pipe ring (make i.s.i approved) 1 no 110 15mm pvc bib cock (make polo sparsh or equivalent) 1 no 111 20mm pvc valve (make astral finolex prince) 1 no 112 32mm pvc valve (make astral finolex prince) 1 no 113 50mm pvc valve (make astral finolex prince) 1 no 114 15mm pvc pillar cock(make polo sparsh or equivalent) 1 no 115 15mm pvc swan neck pillar cock (make polo sparsh or equivalent) 1 no 116 15mm pvc angle stop cock (make polo sparsh or equivalent) 1 no 117 110mm pvc tee (make astral finolex prince) 1 no 118 90mm pvc tee (make astral finolex prince) 1 no 119 75mm pvc tee (make astral finolex prince) 1 no 120 110mm x 90mm pvc reducer bushing (make astral finolex prince) 1 no 121 90mm x 75mm pvc reducer bushing (make astral finolex prince) 1 no 122 15 mm upvc pipe (½’’) (make astral finolex prince) 1 rmt 123 25 mm upvc pipe 1 (make astral finolex prince) 1 rmt 124 40 mm upvc pipe (1. ½) (make astral finolex prince) 1 rmt 125 15 mm upvc elbow (make astral finolex prince) 1 no 126 25 mm upvc elbow (make astral finolex prince) 1 no 127 40 mm upvc elbow (make astral finolex prince) 1 no 128 15 mm upvc tee (make astral finolex prince) 1 no 129 25 mm upvc tee (make astral finolex prince) 1 no 130 40 mm upvc tee (make astral finolex prince) 1 no 131 15 mm upvc coupling (make astral finolex prince) 1 no 132 25 mm upvc coupling (make astral finolex prince) 1 no 133 40 mm upvc coupling (make astral finolex prince) 1 no 134 15 mm upvc m tee (make astral finolex prince) 1 no 135 25 mm upvc m tee (make astral finolex prince) 1 no 136 40 mm upvc m tee (make astral finolex prince) 1 no 137 15 mm upvc f tee (make astral finolex prince) 1 no 138 25 mm upvc f tee (make astral finolex prince) 1 no 139 40 mm upvc f tee (make astral finolex prince) 1 no 140 15 mm upvc union (make astral finolex prince) 1 no 141 25 mm upvc union (make astral finolex prince) 1 no 142 40 mm upvc union (make astral finolex prince) 1 no 143 15 mm upvc brass elbow (make astral finolex prince) 1 no 144 25 mm upvc brass elbow (make astral finolex prince) 1 no 145 40 mm upvc brass elbow (make astral finolex prince) 1 no 146 15 mm upvc brass tee (make astral finolex prince) 1 no 147 25 mm upvc brass tee (make astral finolex prince) 1 no 148 40 mm upvc brass tee (make astral finolex prince) 1 no 149 15mm upvc valve (make astral finolex prince) 1 no 150 25mm upvc valve (make astral finolex prince) 1 no 151 40mm upvc valve (make astral finolex prince) 1 no 152 25mm upvc check nut (make astral finolex prince) (tank connection) 1 no 153 40mm upvc check nut (make astral finolex prince) (tank connection) 1 no 154 50mm upvc check nut (make astral finolex prince) (tank connection) 1 no 155 50mm upvc pipe (40sch) (make astral finolex prince) 1 rmt 156 50mm upvc elbow (make astral finolex prince) 1 no 157 50mm upvc tee (make astral finolex prince) 1 no 158 50mm upvc coupling (make astral finolex prince) 1 no 159 50mm upvc f tee (make astral finolex prince) 1 no 160 50mm upvc m tee (make astral finolex prince) 1 no 161 50mm upvc union (make astral finolex prince) 1 no 162 50mm upvc check nut (make astral finolex prince) 1 no 163 50mm upvc valve (make astral finolex prince) 1 no 164 50mm x 40mm upvc reduser (make astral finolex prince) 1 no 165 40mm x 25mm upvc reduser (make astral finolex prince) 1 no 166 25mm x 15mm upvc reduser (make astral finolex prince) 1 no 167 50mm x 40mm upvc busing (make astral finolex prince) 1 no 168 40mm x 25mm upvc busing (make astral finolex prince) 1 no 169 25mm x 15mm upvc busing (make astral finolex prince) 1 no 170 50mm x 40mm upvc reducer tee (make astral finolex prince) 1 no 171 40mm x 25mm upvc reducer tee (make astral finolex prince) 1 no 172 25mm x 15mm upvc reducer tee (make astral finolex prince) 1 no 173 2x1½ upvc bushing (make astral finolex prince) 1 no 174 2 upvc pipe (make astral finolex prince) 1 rmt 175 2 upvc couplin (make astral finolex prince) 1 no 176 2 upvc union (make astral finolex prince) 1 no 177 2 upvc elbow (make astral finolex prince) 1 no 178 2 upvc tee (make astral finolex prince) 1 no 179 2 upvc m.t (make astral finolex prince) 1 no 180 2 upvc f.t (make astral finolex prince) 1 no 181 upvc solution (make finolex or equivalent) (100 gram) 1 no 182 15 mm cpvc m tee (make astral finolex prince) 1 no 183 25 mm cpvc m tee (make astral finolex prince) 1 no 184 40 mm cpvc m tee (make astral finolex prince) 1 no 185 15 mm cpvc f tee (make astral finolex prince) 1 no 186 25 mm cpvc f tee (make astral finolex prince) 1 no 187 40 mm cpvc f tee (make astral finolex prince) 1 no 188 15 mm cpvc coupling (make astral finolex prince) 1 no 189 25 mm cpvc coupling (make astral finolex prince) 1 no 190 40 mm cpvc coupling (make astral finolex prince) 1 no 191 15 mm cpvc elbow (make astral finolex prince) 1 no 192 25 mm cpvc elbow (make astral finolex prince) 1 no 193 40 mm cpvc elbow (make astral finolex prince) 1 no 194 15 mm cpvc tee (make astral finolex prince) 1 no 195 25 mm cpvc tee (make astral finolex prince) 1 no 196 40 mm cpvc tee (make astral finolex prince) 1 no 197 15 mm cpvc union (make astral finolex prince) 1 no 198 25 mm cpvc union (make astral finolex prince) 1 no 199 40 mm cpvc union (make astral finolex prince) 1 no 200 20mm cpvc valve (make astral finolex prince) 1 no 201 25mm cpvc valve (make astral finolex prince) 1 no 202 40mm cpvc valve (make astral finolex prince) 1 no 203 20mm cpvc pipe (13.5 sdr) (make astral finolex prince) 1 rmt 204 25mm cpvc pipe (13.5 sdr) (make astral finolex prince) 1 rmt 205 40mm cpvc pipe (13.5 sdr) (make astral finolex prince) 1 rmt 206 50mm cpvc pipe (13.5 sdr) (make astral finolex prince) 1 rmt 207 20mm cpvc elbow (make astral finolex prince) 1 no 208 20mm cpvc tee (make astral finolex prince) 1 no 209 20mm cpvc coupling (make astral finolex prince) 1 no 210 20mm cpvc m tee (make astral finolex prince) 1 no 211 20mm cpvc f tee (make astral finolex prince) 1 no 212 20mm cpvc union(make astral finolex prince) 1 no 213 20mm cpvc check nut (make astral finolex prince) 1 no 214 20mm x 15mm cpvc brass elbow (make astral finolex prince) 1 no 215 20mm x 15mm cpvc brass m tee (make astral finolex prince) 1 no 216 20mm x 15mm cpvc brass f tee (make astral finolex prince) 1 no 217 50mm cpvc elbow (make astral finolex prince) 1 no 218 50mm cpvc tee (make astral finolex prince) 1 no 219 50mm cpvc coupling (make astral finolex prince) 1 no 220 50mm cpvc union (make astral finolex prince) 1 no 221 cpvc solution (make astral finolex prince)(100 gram) 1 no 222 opc 53 grade cement (50kg per bag) (make ambuja, ultratech, j.k.lakshmi) 1 bag 223 white cement (1kg bag) (make birla, ultratech, j.k.lakshmi) 1 kg 224 conventional red brick 1 no 225 fine sand 1 tonne 226 kapachi/aggregate 20mm 1 tonne 227 metal 40mm to 63mm 1 tonne 228 murrum 1 tonne 229 30 mm thick flush door (make century, greenply, tata) 1 smt 231 1 mm thick synmica (make century, greenply, tata) 1 smt 232 0.9 mm thick white lamination sheet (formyca) (make century, greenply, tata) 1 smt 233 5 mm thick clear glass (make isi approved) 1 smt 234 dr. fixit ‘new coat’ water proofing chemical 1 ltr 235 6 mm plywood sheet (make century, greenply, tata) (size 8x4) 1 smt 236 8 mm commercial plywood (make century, greenply, tata) (size 8x4) 1 smt 237 12 mm plywood (make century, greenply, tata) (size 8x4) 1 smt 238 18 mm plywood (make century, greenply, tata) (size 8x4) 1 smt 239 door closer (make godrej or equivalent) 1 no 240 screw (make r.k. or equivalent) size 35”x 8” (round edge) 1 kg 241 screw (make r.k. or equivalent) size 25”x 5” (round edge) 1 kg 242 screw (make r.k. or equivalent) size 30”x 7” (round edge) 1 kg 243 screw (make r.k. or equivalent) size 20”x 5” (round edge) 1 kg 244 screw (make r.k. or equivalent) size 45”x 8” (round edge) 1 kg 245 screw (make r.k. or equivalent) size 50x 8 (round edge) 1 kg 246 various size of nail (khili) 1 kg 247 various size of nut bolt 1 kg 248 pavan ankadi s.s 1 no 249 tadi s.s (size 9) 1 no 250 alluminum stopper (size 4 , 6 , 8) 1 no 251 aldrop s.s (size 10 , 12) 1 no 252 handle s.s (size 4 , 6) 1 no 253 pavan datta s.s 1 no 254 dhoba nail (size 1, 3 , 4) 1 kg 255 various size of jasti nail (jasti khilla) 1 kg 256 favicol (make pidilite or equivalent) 1 kg 257 glass cutter (hirakani) (make isi approved) 1 no 258 hexa blade (make isi approved) 1 no 259 marble cutter blade (make isi approved) 1 no 260 iron cutter blade (make isi approved) 1 no 261 white glazed tiles (size 8x12) (make isi approved) 1 box 262 white glazed tiles (size 12x18) (make isi approved) 1 box 263 synthetic anamal oil paint (first quality) light shed (make asian or equivalent) 1 20 ltr 264 synthetic anamal oil paint (first quality) light shed (make asian or equivalent) 1 4 ltr 265 synthetic anamal oil paint (first quality) dark shed (make asian or equivalent) 1 4 ltr 266 synthetic anamal oil paint (first quality) dark shed (make asian or equivalent) 1 20 ltr 267 acrylic washable distemper (light shed) (first quality) (make asian or equivalent) 1 20 ltr 268 acrylic washable distemper (light shed) (first quality) (make asian or equivalent) 1 4 ltr 269 acrylic washable distemper (dark shed) (first quality) (make asian or equivalent) 1 20 ltr 270 acrylic washable distemper (dark shed) (first quality) (make asian or equivalent) 1 4 ltr 271 premium acrylic emulsion plastic paint light shed (make asian or equivalent) 1 20 ltr 272 premium acrylic emulsion plastic paint light shed (make asian or equivalent) 1 4 ltr 273 premium acrylic emulsion plastic paint dark shed (make asian or equivalent) 1 20 ltr 274 premium acrylic emulsion plastic paint dark shed (make asian or equivalent) 1 4 ltr 275 premium exterior emulsion paint dark shed (make asian or equivalent) 1 20 ltr 276 premium exterior emulsion paint dark shed (make asian or equivalent) 1 4 ltr 277 premium exterior emulsion paint light shed (make asian or equivalent) 1 20 ltr 278 premium exterior emulsion paint light shed (make asian or equivalent) 1 4 ltr 279 royal exterior paint (make asian or equivalent) 1 20 ltr 280 royal exterior paint (make asian or equivalent) 1 4 ltr 281 red oxide (make asian or equivalent) 1 20 ltr 282 red oxide (make asian or equivalent) 1 4 ltr 283 damp proof paint (make asian or equivalent) 1 20 ltr 284 damp proof paint (make asian or equivalent) 1 4 ltr 285 colour roller for interior 1 no 286 colour roller for exterior 1 no 287 turpentine (make cat or equivalent) 1 20 ltr 288 turpentine (make cat or equivalent) 1 5 ltr 289 50 mm thick rubber moulded paver block (make isi approved) 1 smt 290 curb stone (make isi approved) (size 1x1x3) 1 rmt 291 waterproofing material of perma ; pidilite ; zycosil or equilent make (a) guard (waterproofing for terrace) 1 kg 292 eazee coat (waterproofing for terrace) 1 kg 293 s.b.r (bonding agent in plaster work) 1 ltr 294 45 gsm glass fiber net (use with eazee coat) 1 smt 295 acrasil/crack fill paste (for terrace) 1 kg 296 rubber packing sheet (make isi approved) 1 kg 297 bond set (make isi approved) (100 gram) 1 no 298 areldite (make isi approved) (100 gram) 1 no 299 fine broom 1 no 300 broom stick 1 kg 301 dry mob 1 no 302 wet mob 1 no 303 door stopper rubber 1 no 304 m seal (90 gram/packet) 1 no 305 wiper 2 feet 1 no 306 acid 1 ltr 307 phynyle plain white 1 ltr 308 damar goli 1 kg 309 lime stone 1 kg 310 ddl 1 kg 311 salt 1 kg 312 hammery paper 1 no 313 geru 1 kg 314 pvc road cleaning brush 2 feet long 1 no 315 nirma powder 1 kg 316 gallon dori (size 4, 6, 8 10,12) 1 no 317 grease 1 kg 318 star couplar 1 no 319 sodium hyphoclorite chemical 1 kg 320 r.c.c drill pana set 1 set 321 wood cutter (size 6) 1 no 322 drill pana for wall (size 18 long) 1 no 323 iron pana set for make hall in iron (size 4, 6) 1 no 324 patra for cleaning colour 1 no 325 tar brush (size 6) 1 no 326 pipe wrench (vandri panu) (size 12) 1 no 327 pipe wrench (vandri panu) (size 14) 1 no 328 pipe wrench (vandri panu) (size 16) 1 no 329 pipe wrench (vandri panu) (size 18) 1 no 330 fixed pana set 1 no 331 steel measure tap (size 3mtr long) (make freemans) 1 no 332 steel measure tap (size 5mtr long) (make freemans) 1 no 333 fiber measure tap (size 30mtr long) (make freemans) 1 no 334 fiber measure tap (size 50mtr long) (make freemans) 1 no 335 fiber measure tap (size 100mtr long) (make freemans) 1 no 336 colour brush (size 2) 1 no 337 colour brush (size 4) 1 no 338 colour brush (size 6) 1 no 339 15mm brass handel valve (make zoloto or equivalent) 1 no 340 25mm brass handel valve (make zoloto or equivalent) 1 no 341 40mm brass handel valve (make zoloto or equivalent) 1 no 342 50mm brass handel valve (make zoloto or equivalent) 1 no 343 1inch cp extention nipple 1 no 344 1.5inch cp extention nipple 1 no 345 2inch cp extention nipple 1 no 346 2.5inch cp extention nipple 1 no 347 3inch cp extention nipple 1 no 348 4inch cp extention nipple 1 no 349 6inch cp extention nipple 1 no 350 ½ inch golden clamp 1 no 351 1 inch golden clamp 1 no 352 2 inch golden clamp 1 no 353 2 ½ inch golden clamp 1 no 354 3 inch golden clamp 1 no 355 4 inch golden clamp 1 no 356 2x1½ upvc bushing (make astral finolex prince) 1 no 357 siphone for conseal tank (make hindwer) 1 no 358 fill valve for conseal tank (make hindwer) 1 no 359 inlet valve for conseal tank (make hindwer) 1 no 360 ewc seat cover 1 no 361 wall hung seat cover 1 no 362 ¾ garden pipe 1 kg 363 1 garden pipe 1 kg 364 flush cock spindel 1 no 365 ewc with seat cover 1 no 366 ppgl sheet(0.50mm) (make jsw asian or equivalent) 1 smt 367 ppgl sheet(0.60mm) (make jsw asian or equivalent) 1 smt 368 ppgi sheet(0.50mm) (make jsw asian or equivalent) 1 smt 369 ppgi sheet(0.60mm) (make jsw asian or equivalent) 1 smt 370 pvc door with frame 1 smt 371 g.i sheet metal door frame of size (100mmx50mm)(14 gauge) 1 kg 372 plastic cat eye set heavy 1 no 373 plastic road delineators (size 4 feet height) 1 no...

Western Railway - Gujarat

45061375 auction sale of scrap misc. cutting such as round bar, g.i. ducting with or without foam rubber, m.s. pipe with or without cement, khar etc. guard box with or without wooden, air filter, angle, channel, plate (all type) frame, rod, patra, tmt bar, c and w cutting, nut bolt, rect angle bar, pin, g i rod, g i plate, box, gril, extended metal sheet, coupling, chain hook, battery box, panji, shock absorber, all type of pipe, gi pipe, ms pipe, chain, chain pully, tikam, powrah, structure, platform structure, small rod pieces, strip, foundation, tank, pin, sleeve, bearing plate, tensioning device, window, penel, foot step, sheet, gear, mesh, screw coupling, stand, roller, cylinder, small auto parts, slack adjuster, hanger, link, hook, stay rod, brake shoes, coupler, adopter, cock, pick axe, beater, showel, clamp, stand, rail kaichi, rack ballast, electric pole wire support angle, fire extinguisher, rail dolly, all type of lorries with or w/o. wheels, rubber wheel tyre, chipiya and other pwi tools, jali, angle frame, belly gater, coach washing machine, machine parts, rope wire, gear, various type lc & wl board of, silent block, wire basket, bucket g.i., track lifting jack, beater, steel wire with or without n.f., empty iron box, bucket iron, folder ladder, wire basket, cooling box, hand pump, clamp with/without bolt, lighting box, anchor link, ghamella, station board, rope wire, chain, spacer bar, tyre with stepney, pipe wrench, various type of battery stand, solar lantern, pole angle, pad lock, box type trolly big and small, iron windows, tibar and pieces, anti grip wire, work station frame, with or without wooden and n.f., m.s. door, m.s. jali, meter box,fan rod, cooling box, lpg petromax, m.s. stand, distribution board, junction box, diesel oil pump, iron coat, air filter, type writer, measuring weight, hammer, welding equipment, lifting machine, ranging rod, gauge box with or without wood, bicycle, etc. with or without other ferrous attachment and minor n.f. attachment old used and u.s....

Western Railway - Gujarat

44987028 supply of chamfering bit 28.75mm for battery operated chamfering kit (bosch) [ warranty period: 30 mon ths after the date of delivery ] ] , chamfering bit 35 mm for battery operated chamfering kit (bosch). [ warranty period: 30 month s after the date of delivery ] ] , inspection pwi tool kit with suitcase [ warranty period: 30 months after the date of delivery ] ] , drill bits 28.75 mm (annular cutter 28.75mm) for battery operated rail drilling machine (m/s . lakshmi industrial corporation) [ warranty period: 30 months after the date of delivery ] ] page 1 of 7 run date/time: 30/08/2024 12:15:36brc div/western rly tender document , stepped feeler gauge [ warranty period: 30 months after the date of delivery ] ] , drill bit 26.50mm (annular cutter 26.50mm) for battery operated rail drilling machine (m/s. lakshmi industrial corporation). [ warranty period: 30 months after the date of delivery ] ] , opening size 41mm impact socket, 3/4 inch square drive impact socket 6 point for impact wrench battery operated. [ warranty period: 30 months after the date of delivery ] ]...

Village Panchayat - Gujarat

44975270 tender for various sizes of pipes and fittings for water supply scheme and sewerage scheme. removal of motor from bore with wrench and motor repairing rewinding. garbage collection works. repairing and cleaning of drainage line and water line. xerox and lamination and binding works. fixing and maintenance of loud speaker. providing water tanker, cement, river sand, gravel, stone, cement and brick paver block, iron, jcb loader and tractor, fixing of hoarding board. color works, wall slogan and wall painting works. fabrication and furniture works. videograpghy/photography/mandap table chair stage and banner printing works, light decoration works. cement benches and plant pinjara works. land leveling and filling works, school bag, office bag, education kit and calander printing works. cement pipe for drainage line....

Mehsana District Cooperative Milk Producers Union Limited - Gujarat

44962084 supply of following items 1 3937554 820520 00 150/6 mm adjustable wrench 90 947stanley 2 3937555 820520 00 punch set fmht75077 stanley 3 3937556 820520 00 rubber hammer stht57528 8 stanley 4 3937557 820520 00 din hammer stht0 51907 stanley 5 3937558 820520 00 led twist headlamp hl 2s stanley 6 3937559 tool bag stst70574 stanley...

Ministry Of Micro Small And Meduim Enterprises - Gujarat

44920769 bids are invited for tool and equipment for plumbing and pipe wrench som , pipe wrench som , drill machine som , hammer ball penn som , hammer cross penn som , hammer with exciter som , screw driver set som , drain cleaning tool som , cold chisel som , tester som , tube cutter som , measuring tape som , level set tool water level som , spanners set som , teflon and thread sealing tape som , pipe and tube benders som , angle grinder machine electric som , hole saw kit som , allen key set som , torch som , plungers som , hacksaw som , plumbing tool bag som , monkey wrench and pipe wrench ngp , pipe wrench ngp , drill machine ngp , hammer ball penn ngp , hammer cross penn ngp , hammer with exciter ngp , screw driver set ngp , drain cleaning tool ngp , cold chisel ngp , tester ngp , tube cutter ngp , measuring tape ngp , level set tool water level ngp , spanners set ngp , teflon and thread sealing tape ngp , pipe and tube benders ngp , angle grinder machine electric ngp , hole saw kit ngp , allen key set ngp , torch ngp , plungers ngp , hacksaw ngp , plumbing tool bag ngp total quantity : 1840...

Ministry Of Micro Small And Meduim Enterprises - Gujarat

44903573 bids are invited for ac reparing and maintance tool drill machine , digital multi meter , clamp meter , tester , hammer , chisel , adjustable wrench , air blower , screw driver set , gas cylinder key , wire stripper , nose plier , lpg brazing blow torch , can valve , combination plier , level set tool , pinch off plier , swaging punch tool , measuring tape , copper brazing flux powder , insulation tape , allen key set , tube cutter , tool bag , coupler , pin valve , brazing rod , gas can butane , manual tube bender in 4 sizes , high and low pressure gauge , flaring tool , t spanner set , tube bender set , refrigerant gas charging pipe , continuity tester , capillary gauge , gas cylinder , thermometer total quantity : 760...

Ministry Of Micro Small And Meduim Enterprises - Gujarat

44903461 bids are invited for equipment drill machine , digital multi meter , clamp meter , tester , hammer , chisel , adjustable wrench , air blower , screw driver set , gas cylinder key , wire stripper , nose plier , lpg brazing blow torch , can valve , combination plier , level set tool , pinch off plier , swaging punch tool , measuring tape , copper brazing flux powder , insulation tape , allen key set , tube cutter , tool bag , coupler , pin valve , brazing rod , gas can butane , manual tube bender in 4 sizes , high and low pressure gauge , flaring tool , t spanner set , tube bender set , refrigerant gas charging pipe , continuity tester , capillary gauge , gas cylinder , thermometer ac reparing and maintenance tools kit and total quantity : 760...

Ministry Of Petroleum And Natural Gas - Gujarat

44878939 bids are invited for procurement of srp accessories 1 sub surface pump api 25 225 thm16 4 4 2 standing valve ball&seat api 25 225 thm 3 traveling valve ball&seat api 25 225 th 4 sub surface pump api 20 175thm16 4 4 5 standing valve ball&seat api 20 175thm1 6 traveling valve ball&seat api 20 175thm 7 sub surface pump api 20 175thm16 4 4 8 valve ball & seat api spec v11 175 tung 9 sub surface pump api 25 225 thm16 4 4 10 valve ball & seat api spec v11 225 tung 11 ss pump api 25 225 thm 16 4 4 12 ss pump api 30 275 thm 16 4 4 13 ball & seat for ss pump api 25 225 thm 16 4 4 14 ball & seat for ss pump api 25 275 thm 16 4 4 15 srp sub surface pump api 25 225 thm 16 4 4 16 srp sub surface pump api 25 175 thm 16 4 4 17 sub surface pump api 25 225 thm16 4 4 18 sub surface pump api25 175 thm20 5 4 19 sub surface pump api25 150 rham20 5 4 w 20 sucker rod hook 50000 lbs 21 sucker rod elevator 7/8 inch x 1 inch 22 sucker rod elevator 3/4 inch x 5/8 inch 23 sucker rod elevator 3/4 inch x7/8 inch 24 sucker rod elevator 3/4 inch x 7/8 inch 25 sucker rod elevator 3/4 inchx7/8 inch 26 sinker bar for srp unit 1 1/4 inch x 25 ft 27 sinker bar for srp unit 1 1/4 inch x 25 ft 28 sinker bars, 1 1/4 inch with coupling 29 1 1/2 inch x 3/16 inch glv 30 1 1/2 inch x 5/16 inch glv 31 2 7/8 inch x 1 1/2 inch mandrel 32 2 1/16 inch weld neck flange 5000 psi 33 2 9/16 inch weld neck flange 5000 psi 34 polish rod 1.1/2 inchx22 ft 35 polish rod 1.1/2 inchx25 ft 36 polished rod 1.50 inch x 22 ft x 7/8 inch 37 polish rod clamp 38 gas anchor 39 gas anchor ql200bpd 40 gas anchor, 300 bpd 41 gas anchor, 300 bpd 42 srp stuffing box 2.7/8 incheue x 5000 psi 43 srp stuffingbox 2.7/8 incheuex 5000 psi 44 stuffing box 2 7/8 inch eue pin 45 2 3/8 inch box x 2 7/8 inch pin cross over 46 2 7/8 inch box x 2 3/8 inch pin cross over 47 shop moulded guides 7/8 inchx 2 ft 48 pumping tee size 27/8 inch 49 pumping tee size 27/8 inch 50 tubing tong 1.1/2 inch to 2.7/8 inch 51 sucker rod wrench 7/8 inch size 52 sucker rod wrench 3/4 inch size 53 s.r. wrench 3/4 inch 7/8 inch 54 s/rod tong wrench 7/8 inchx3/4 inch 55 s/rod tong wrench 3/4 inchx5/8 inch 56 non return valve 2 inch 57 sucker rod 7/8 inchx25 ft 58 sucker rod 3/4 inchx25 ft 59 pony rod 7/8 inch x 8 ft 60 pony rod 7/8 inchx 4ft 61 pony rod 7/8 inchx 2ft 62 pony rod uhs 2 ft x3/4 inch 63 sucker rod plain coupling gread d, 7/8 inch 64 sucker rod plain coupling gread d 3/4 inch 65 change over coupling 3/4 inchx7/8 inch 66 7/8 inch x 2 ft pony rods 67 7/8 inch x 12 ft pony rods 68 sucker rod coupling 7/8 inch 69 sucker rod coupling 3/4 inch 70 pony rod 7/8 inch x 1 ft 71 pony rod 7/8 inchx 2ft 72 pony rod 7/8 inchx 4ft 73 pony rod 7/8 inchx6ft 74 pony rod 7/8 inch x 8 ft 75 pony rod 1 inch x 1 ft 76 pony rod 1 inchx 2ft 77 pony rod 1 inchx 4ft 78 pony rod 1 inchx 6ft 79 pony rod 1 inch x 8 ft 80 change over coupling 7/8 inchx1 inch 81 change over coupling 3/4 inchx7/8 inch 82 sucker rod coupling 3/4 inch 83 sucker rod coupling 7/8 inch 84 sucker rod coupling 1 inch 85 sucker rod 7/8 inchx25 ft 86 sucker rod 3/4 inchx25 ft 87 5/8 inchx25ft sucker rod 88 sucker rod 1 inchx25ft 89 pony rod 7/8 inchx6ft 90 pony rod 7/8 inch x 8 ft 91 pony rod 1 inchx 2ft 92 pony rod 1 inchx 4ft 93 pony rod 1 inchx 6ft 94 sucker rod plain coupling gread d,7/8 inch 95 sucker rod plain coupling gread d 3/4 inch 96 sucker rod plain coupling t,grad d,5/8 inch 97 sucker rod coupling 1 inch slim hole 98 cross over over coupling 3/4 inchx7/8 inch 99 cross over coupling 3/4 inchx5/8 100 cross over coupling 1 inchx7/8 inch 101 cross over couplings 5/8 inch x7/8 102 sucker rod 1 inch (nominal) 25 ft with molded 103 sucker rod moulded guide sucker rod 5/8 104 sucker rod 3/4 inch x 25 ft with 5 nos of mol 105 sucker rod 7/8 inch x 25ft with 5 nos molde ...

Western Railway - Gujarat

44808597 supply of chamfering bit 28.75mm for battery operated chamfering kit (bosch) [ warranty period: 30 mon ths after the date of delivery ] ] , chamfering bit 35 mm for battery operated chamfering kit (bosch). [ warranty period: 30 month s after the date of delivery ] ] , inspection pwi tool kit with suitcase [ warranty period: 30 months after the date of delivery ] ] , drill bits 28.75 mm (annular cutter 28.75mm) for battery operated rail drilling machine (m/s . lakshmi industrial corporation) [ warranty period: 30 months after the date of delivery ] ] page 1 of 7 run date/time: 14/08/2024 22:28:20brc div/western rly tender document , stepped feeler gauge [ warranty period: 30 months after the date of delivery ] ] , drill bit 26.50mm (annular cutter 26.50mm) for battery operated rail drilling machine (m/s. lakshmi industrial corporation). [ warranty period: 30 months after the date of delivery ] ] , opening size 41mm impact socket, 3/4 inch square drive impact socket 6 point for impact wrench battery operated. [ warranty period: 30 months after the date of delivery ] ]...

Western Railway - Gujarat

44670941 supply of supply, installation, testing and commissioning of heavy duty pneumatic air impact wrench square drivesupply, installation, testing and commissioning of heavy duty pneumatic air impact wrench square drive,supply, installation, testing and commissioning of heavy duty pneumatic air impact wrench square drive as per the attach ed specification annexure a. [ warranty period: 30 months after the date of delivery ] ]...

Western Railway - Gujarat

44670895 supply of nm specnm spec,set of spanner set as per annexure attached [ warranty period: 30 months after t he date of delivery ] ] senior section engineer gujarat 9.00 set , drum stacker as per specification attached [ warranty period: 30 months after the dat e of delivery ] ] , battery operated electric torque wrench, single phase 230 volt, 340mm ,340mm 435mm capa city 200nm spec attached [ warranty period: 30 months after the date of delivery ] ] , torque wrench battery operated electric torque wrench, single phase 230 volt, 340mm ,340m m 435mm capacity upto 200nm for smoothing reactor(specification attached) [ warranty perio d: 30 months after the date of delivery ] ] => limited...

Arcelor Mittal Nippon Steel India Limited - Gujarat

44626367 tender for m6 various mech. sd jobs tentative date 20.09.2024 2000145329 10 10 60 erection of pipe 60 inm 10 dismantling of structures 6 to 40 scaffolding with material above 20 mtr 432 m3 30 sand blasting & painting 6 to 20 fabrication of ms structure 6 to 50 fabrication of pipe 90 ind email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod#6 furnace bustle deck area, furnace shell water collection tray replacement job. quantum of job : working height (elevation) – 55m approx. furnace shell diameter – 10m approx. structure dismantling – 6 ton approx. structure fabrication <(>&<)> erection – 6 ton approx. all structural material sand blasting, primer coating and painting – 6 ton approx. scaffolding above 20m – 432 m3 approx. 3 inch (schedule 40) ms drain line fabrication – 90 ind 3 inch (schedule 40) ms drain line erection – 60 inm plate cutting <(>&<)> fabrication details. square collection tray dimension 4.5mx3.5m14mm – 1 set square plate height plate – l 4.5m x h 400mm x thick. 14mm – 2 no square plate height plate – l 3.5m x h 400mm x thick. 14mm – 2 no square collection tray bottom support, ismb 200, 3.5m long – 8 no square collection tray bottom support, ismb150, 700mm long – 12 no furnace shell 10m od surrounding horizontal plate od 10.4m x id 10m x thick. 14mm – 1 no (to be bend manually in reference of furnace shell) furnace shell 10mtr od surrounding vertical plate od 10.4m x h 300mm x thick. 3mm – 1 no (to be bend manually in reference of furnace shell) furnace shell 10mtr od surrounding horizontal plate support 50/50/6 400 length – 30 nos. ss plate cutting – 4.5m x4.5m x 8mm <(>&<)> fit up/erection with furnace shell at 51m elevation. ss fillet welding – 4.5m + ss ss welding – 20m ss 400 mm long plate cutting (5mm thick) – 18m support fabrication <(>&<)> erection for tray supporting – 02 ton. contractor scope: 1. get the permit from the control room / site engineer, get the sign of field controller. 2. job to be started after proper toolbox talk (tbt) given to all contractor associates. additional work at height permit to be taken if required. 3. standard maintenance practice (smp) of structure replacement to be carried out for the jobs to all manpower. smp and hirac number must be mentioned in permit. 4. before starting the job, the fire extinguisher and water hose must be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets to be arranged by contractor. 5. all safety precautions must be followed by the contractor and its technicians. they must wear safety belts while performing jobs at height above 1.8m. use safety belt and lifeline and work area to be barricaded. as per job requirement technician must have rigger pass, work at height pass, crane operator pass, welder pass etc. 6. 12mm ss wire rope to be use in lifeline, rope to be clamping through clamp. 7. safety belt to be hooked up with permanent structure, if required page 2 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details hook to be fabricated and welded. 8. crane/hydra will be provided by am/ns as per availability, otherwise job to be done manually /by chain blocks. crane operation for material shifting must be done by the contract supervisor. (no technicians are allowed to operate the crane). 9. issue of material from main store and shifting from stock yard to work site. 10. for all plates sand blasting, primer coating and painting job to be done and it is in contractor scope. all structures should be replaced with sand blasting and structure coating. 11. all welding joints must be painted by the contractor and scaffolding must be removed after completing this. 12. if any scaffolding to be required to perform the job at height, same to be prepared by contractor. scaffolding will be used after certification only from the am/ns safety engineer. 13. using co meter in job is mandatory and wind direction with co level to be checked in job. working area co level should not be more than 50 ppm. 14. m5 furnace area damaged structure cutting to be done and to be fixed back with new structure. 15. contractors must make proper arrangements for any hot work to control sparks falling on the downward deck to avoid any accident. 16. contractors should deploy competent supervisors and safety officers on a round the clock basis to supervise and complete the jobs in time.do necessary correction as per am/ns engineer if required. 17. all the machines, cutting/welding machines, tools, and consumable items etc., required for the job will be arranged by the contractor. all welding and sharp edge must be grinded. all dismantled material to be shifted back to storage/scrap yard. 18. all safety items like safety shoes, safety helmets, safety belts, lifeline, fall arrestor, hand gloves etc. are to be arranged by the contractor for their manpower. 19. any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. am/ns scope : 1. co ordination for work permit. 2. all permanent material <(>&<)> special electrodes. 3. hydra, trailer, and crane will be provided as per availability. 4. drinking water, power supply, lighting facilities, working platform etc. for workmen at plant site. 5. job certification for executed jobs. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. violation of any hse norms. 3. if delay in completion of job. for arcelormittal nippon steel india ltd. item note : 2 2000155524 20 20 10 reformer top cover blrf op/cln/hot tigtn 576 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod#6 reformer tube top cover blind flange opening, closing and hot tightening job. quantum mof job : working elevation : reformet top, high temperature zone. end cover blind size : 6 inch qty. : 576 no total flange opening : 576 no total flange closing : 576 no after reformer light up and achieving box temperature all 576 reformer tubes hot tightening to be done for 2 times. page 3 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details scaffolding above 20m height : 800 m3 approx. tentative date of shut down : 20th sept. 2024 contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 10. reformer tube top cover opening and closing. 11. total 576 nos reformer tube top cover to be opened for inspection after clearance same to be box up. nos of top cover to be open/closed as per operation team requirement, qty. will be certified as per job done on site. 12. contractor must open requested top cover in minimum time with pneumatic wrench. 13. before opening system pressure to be ensure to zero. 14. top cover to be open. removed fastener to be kept in diesel drum and same to be re use. 15. after inspection from production side same to be box up. all flange joint must be leak proof. to be attended in odd hours also. 16. during box up inside glass wool to be ensure with area engineer. 17. top cover to be box up with new gasket. gasket area to be clean properly. 18. top cover hot tightening to be done 3 times as per production clearance. if any leakage same to be attend for that manpower to be ready in 24 hours. 19. top cover hot tightening can be done whenever clearance received from production side for plant start up so vendor will have ability to provide manpower in day/night or in odd hour also. 20. portable machines is to be shifted before 2 days of shutdown for certification and connection. 21. shifting of all materials required for the job to be shift from workshop or main store to work area. 22. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 23. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 24. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp page 4 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details tested. dp test consumables are in contractor scope. 25. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 26. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 27. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 28. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent materials will be provided 2. power supply, lighting facilities, working platform etc. for workmen at plant site. 3. job certification for executed jobs. 4. electrical certification of tools will be done by am/ns electrical engineer. 5. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 3 2000155524 30 30 10 tgfc,cfc,bsg & sgc water strn cln job 1 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 tgfc, cfc, bsg <(>&<)> sgc water strainer removal for cleaning and box up job. quantum of job: tgfc water strainer, size 16 inch – 1 no cfc water strainer, size 14 inch – 1 no bsg water strainer, size 3 inch – 2 no sgc water strainer, size 4 inch – 4 no stranger inside mest removal, cleaning and box up. if inside mesh is damaged more then same to be made by mesh sheet. if old strainer is damaged more then whole strainer to be replaced. reqiured rectification to be done if face to face distacne need to adjust as per site engineer instruction. tentative date of shutdown: 20th sept. 2024 contractor’s scope: 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. all water strainer end flange to be open. before that ensure valve to be isolated. page 5 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 7. strainer to be removed. 8. strainer to be replaced with one to one. 9. if any welding joints comes same to be done of 3 inch. 10. water line to be flushed by production. for that end blind to be open if required 11. cleaning the gasket area and pasting new gasket. 12. fix the strainer inside spool and box up to be done 13. leak checking and rectification. 14. portable machines is to be shifted before 2 days of shutdown for certification and connection. 15. shifting of all materials required for the job to be shift from workshop or main store to work area. 16. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 17. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 18. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 19. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 20. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 21. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 22. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 23. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope: 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 5. co ordination for work permit specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for arcelormittal nippon steel inda ltd. item note : page 6 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 4 2000155524 40 40 10 pgc,sgc,tgfc,cgc sealdrain op/cln/boxup 9 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 all pgc, sgc, tgfc and cfc to seal leg drain line opening for cleaning <(>&<)> box up job. quantum of job : elevation – 0m, ground floor all drain line opening for all compressor and silencer. flange opening <(>&<)> cloasing, 2 inch – 16 no approx. for one compressor and silencer. silencer 4 inch drain valve open for cleaning – 9 no total compressor – 9 no tentative date of shut down: 20 sept. 2024 contractor scope: 1. get the work permit/hot work permit from area site in charge/the control room, get the sign of field controller 2. safety talk/hirac to be carried out for the jobs to all manpower. 3. all safety precautions must be followed by the contractor and its technicians. must wear safety belt while performing job. use safety belt and lifeline. work area to be barricaded. as per job, technician must have rigger pass, work at height pass, crane operator pass, welder pass. 4. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged by the contractor. 5. before starting the job, the fire extinguisher and water hose must be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 2 drain line opening and after cleaning. cleaning to be ensure with production team after clearance from production side same to be box up with proper gasket. 7. compressor and silencer drain line to be open from seal leg area side after cleaning same to be box up with new gasket 8. silencer 4 drain valve also to be open for cleaning after cleaning same to be box up and end blind to be fixed. 9. drain line 2 damage rubber bellow and valve to be replaced as per instruction from am/ns engineer. 10. if found any leakage in drain line same area welding to be done. 11. line supports and clamp to be provided as per instruction of site in charge 12. trial to be taken with am/ns engineer and if leakages found to be rectified immediately on odd hours also. 12. during seal leg side flange opening if scaffolding required same to be fixed and that area grating to be removed and after job completion grating to be fixed. all joints must be leak proof. any leak must be attended within 1 hour in odd hours. 13. shifting of all materials required for the job to be shift from workshop or main store to work area. 14. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 15. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 16. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. page 7 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 17. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 18. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 19. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 20. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 21. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope: 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 6. co ordination for work permit is in am/ns’s scope. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for arcelormittal nippon steel inda ltd. item note : 5 2000155524 60 50 10 tgf orifice removal & line cleaning 50 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 top gas fuel (tgf) orifice and its line opening for cleaning and box up job. quantum of job : tgf orifice size – 3 inch 3 inch flange opening <(>&<)> closing 3 inch pipe to be removed for cleaning and after cleaning same to be box up. (length approx. 3m) the jammed lines to be cut and to be weld for rodding for cleaning the lines. all open lines to be boxed up and with proper orifice and new gasket. cleaning will be done by production team. total qty. 50 no elevation: 0 to 5m tentative date of shut down : 20th sept. 2024 contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work page 8 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details job is done by contractor. fire blankets in contractor scope. 6. total 50 no. orifice to be open for inspection after clearance same to be box up. 7. before opening system pressure to be ensure. 8. both orifice flange to be open. 9. 3 inch lines is to be cleaned by operation team. 10. if line is jammed then it is to be patch cut and after rodding and cleaning same to be welded back. 11. all open lines to be fixed back with proper gasket <(>&<)> orifice positioning. 12. after inspection from production side same to be box up. 13. during box up new gasket to be use. 14. gasket area to be clean properly. 15. all bolts to be tightened properly. 16. if any leakage same to be attend for that manpower to be ready in 24 hours. 17. orifice flange hot tightening to be done for that manpower to be ready in odd hours also. 18. portable machines is to be shifted before 2 days of shutdown for certification and connection. 19. shifting of all materials required for the job to be shift from work shop or main store to work area. 20. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 21. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 22. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 23. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 24. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 25. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 26. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. 27. billing qty. will be certifiedas per actual job requirement as per operation team. 28. all joints must be leak proof. any leak must be attended within 1 hour in odd hours. am/ns scope : 1. all permanent materials or any special electrode will be provided 2. power supply, lighting facilities, working platform etc. for workmen at plant site. 3. job certification for executed jobs. 4. electrical certification of tools will be done by am/ns electrical engineer. 5. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. page 9 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 6 2000155524 70 60 10 pgc spool,lobe clen&clearance check 6 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 all pgc, tgfc and cgc suction and discharge spool opening, lobe cleaning, clearance checking and box up job . quantum of job : all inlet <(>&<)> outlet line spool opening, cleaning, lobe cleaning, clearance checking <(>&<)> after clearance to be box up. purge gas tapping to be replaced <(>&<)> 9 nos nozzle box to be removed and same to be fixing by nozzle. line size : 900mm spool length : 1500mm (2 nos spools/compressor) total compressor : 6 nos scaffolding up to 10m = total 600m3 at different location. tentative date of shut down : 20th sept. 2024 compressor’s technical details model : gq 22.33, twin lobe type make : aerzen, germany contractor scope : 1. get the work permit/hot work permit entry permit from area site in charge/the control room, get the sign of field controller 2. safety talk/hirac to be carried out for the jobs to all man power. 3. all safety precautions must be followed by the contractor and its technicians. must wear safety belt while performing job. use safety belt and lifeline. work area to be barricaded. as per job, technician must have rigger pass, work at height pass, crane operator pass, welder pass. 4. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 5. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. 6. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged by the contractor. 8. scaffolding in contractor scope for dismantling of tgfc cooler mist eliminator , scaffolding to be fixed then same to be certified by amns engg then green tag to be fixed then scaffolding to be used. all scaffoldings wherever required are to be supplied and erected by contractor with amns work at height pass. work at height pass and ecg report must be required for job as per safety norms. 9. ensure the co ppm before opening the bolt. open the suction spool and discharge spool bolt ensure the compensator bellow gap before opening. 10. before opening suction and discharge spool opening required locking to be done and bottom side support to be fixed and locking stud to be provide. 11. ensure locking of lobe before cleaning. if require fabricate the locking arrangement. 12. clean the both the lobes and casing side wall and casing body by chipping and buffing as per instruction of in charge engineer. 13. flush the lobes and casing by water and rotate the compressor. compressor rotation should be free. for flushing rubber hose is in contractor scope. 14. check all the clearance in compressor and same to be noted down in presence of area incharge. 15. any abnormality noticed during the cleaning and clearance checking page 10 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details to be discussed with in charge engineer. 16. check all the clearance in the compressor along with area engineer and plant rcm team. 17. after clearance from amns representative box up the spool, ensure no any foreign material inside the casing. 18. before spool box up its purge gas tapping to be replaced and some nozzle having box same to be removed and new nozzle to be fixed. 19. box up the spool with new gasket and tightening the bolts. 20. if any leak occurs. rectified immediately on odd hours also. 21. scaffolding to be done at 6 different places approx. 600 m3 22. scaffolding to be done before shutdown of plant. 23. scaffolding approx. 600 m3 is in contractor scope which is to be done before shutdown. 24. after job completion same to be checked with area engineer and then surrounding area housekeeping to be done. 25. shifting of all materials required for the job to be shift from work shop or main store to work area. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 26. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 27. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 28. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 29. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 30. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 31. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 32. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. 33. billing qty. will be certifiedas per actual job requirement as per operation team. am/ns scope : 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 5. co ordination for work permit is in am/ns’s scope. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for arcelormittal nippon steel inda ltd. page 11 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details item note : 7 2000155524 80 70 10 sgc demister pad replacment job 2 no 20 bsg demister pad replacment job 2 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 seal gas compressor <(>&<)> bottom seal gas compressor demister pad replacement job. quantum of job : 1. seal gas compressor demister pad replacement job. hatch opening <(>&<)> closing, size 1000mm – 2 nos old demister pad removal job, size 800mm – 2 nos new demister pad fixing job, size 800mm – 2 nos (demister pad is in 3 parts) 2. bsg compressor demister pad replacement job. hatch opening <(>&<)> closing, size 500mm – 2 nos old demister pad removal job, size 500mm – 2 nos new demister pad fixing job, size 500mm – 2 nos (demister pad is in 2 parts) tentative date of shut down : 20th sept. 2024 contractor scope : 1. get the work permit/hot work permit from area site in charge/the control room, get the sign of field controller 2. safety talk/hirac to be carried out for the jobs to all man power. 3. all safety precautions must be followed by the contractor and its technicians. must wear safety belt while performing job. use safety belt and lifeline. work area to be barricaded. as per job, technician must have rigger pass, work at height pass, crane operator pass, welder pass. 4. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged by the contractor. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. before opening hatch system pressure to be ensure 7. separator hatch to be open 8. after that inside co and o2 level to be checked. if found ok then inside demister pad to be removed. if required its support to be cut. and then again welding to be done. 9. separator inside cleaning to be done by production. 10. new demister pad to be fixed. all bolt to be tightening. 11. after inspection from production and area engineer hatch to be box up with new gasket. 12. leak test to be done if any leak found same to be attend in odd hours also. 13. portable machines is to be shifted before 2 days of shutdown for certification and connection. 14. shifting of all materials required for the job to be shift from work shop or main store to work area. 15. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 16. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 17. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 18. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per page 12 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details the instruction of area engineer in charge. 19. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 20. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 21. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 22. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. drinking water, power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 5. free supply of air, water and electricity will be provided at single point. adequate lighting will also be provided. 6. co ordination for work permit is in am/ns’s scope. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for arcelormittal nippon steel inda ltd. item note : 8 2000155524 90 80 10 reformer tube fsbric bellow relacement 50 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 reformer tube fabric bellow positioning/replacement job. quantum of job : reformer tube detached fabric bellow inspection to be done. if required to positioned or to be replaced by new one as per site engineer instruction. fabric bellow size 9 inch qty. 50 no approx. 9 inch flange opening <(>&<)> closing – 100 no scaffolding up to 10m height – 1800m3 at different location elevation: 4m tentative date of shut down : 20th sept. 2024 contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through page 13 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 10. total 50 nos reformer tube bottom fabric bellow inspection to be done. 11. separate scaffolding for each tube to be done inspection and positioning job. 12. reformer tube bottom fabric bellow is clamped with clamps. 13. clamps to be loosened and fabric bellow to be positioned. 14. once positioning is done then clamps to be tightened. 15. same clamps hot tightening to be done @ 200°c. 16. inspection will be done amns engineer. 17. portable machines is to be shifted before 2 days of shutdown for certification and connection. 18. shifting of all materials required for the job to be shift from work shop or main store to work area. 19. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 20. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 21. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 22. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 23. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 24. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 25. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent materials or any special electrode will be provided 2. power supply, lighting facilities, working platform etc. for workmen at plant site. 3. job certification for executed jobs. 4. electrical certification of tools will be done by am/ns electrical engineer. 5. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any page 14 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 9 2000155524 110 90 10 reformer tube catalyst dump,seg.&refill 108 no 20 scaffolding with material above 20 mtr 6,000 m3 email : yash.vala@amns.in contact : name : yash vala item details : scope of work for reformer tube old catalyst dumping, segregation and new catalyst refilling job. quantum of job : following step to be followed for new catalyst filling : feed gas, bottom spool to be removed and refixing. counter weight to be down/adjustment and refixing. bottom cannister to be removed, cleaning and refixing. old catalyst to be removed. (tube top cover flange to be open if rodding required for catalyst removal) old catalyst segregation and filling in drum. new catalyst filling after bottom canister fixing. all part to be refixed as earlier. total qty. 108 no scaffolding above 25m – 6000m3 approx. reformer tube size : 9 inch, length – 9.45m approx. bottom spool details : dia.3 inch., 860mm long with 1 side special flange with od 340mm and one side 3 inch wnrf 150# bottom cannister : max. dia. 180mm, 643mm long elevation : 4 to 15m contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 1. before opening system pressure to be ensured 2. 108 no of reformer catalyst tubes to be dumped and refilled again after inspection. 3. 108 no of 3 inch feed gas hose to be dismantled. 4. reformer tube top cover to be opening and closing. 5. bottom spool and bottom canister to be removed. 6. 108 nos. of catalyst tubes top cover and bottom canister to be removed for dumping the tubes. 7. all these 108 reformer tubes counterweight is to be dismantled. 8. catalyst to be segregated and filled along with new catalyst in reformer tubes. 9. bottom spool gasket area to be cleaned and new gasket to be provided. page 15 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 10. same arrangements to be boxed up again. 11. after inspection from production side same to be box up. 12. during box up inside glass wool to be ensure with area engineer. 13. top cover to be box up with new gasket. gasket area to be clean properly. 14. top cover hot tightening to be done 3 times as per production clearance. 15. if any leakage same to be attend for that manpower to be ready in 24 hours. 16. top cover hot tightening to be done for that manpower to be ready in odd hours. 17. portable machines is to be shifted before 2 days of shutdown for certification and connection. 18. shifting of all materials required for the job to be shift from work shop or main store to work area. 19. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 20. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 21. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 22. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 23. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 24. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent materials or any special electrode will be provided 2. power supply, lighting facilities, working platform etc. for workmen at plant site. 3. job certification for executed jobs. 4. electrical certification of tools will be done by am/ns electrical engineer. 5. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 10 2000155658 20 100 10 fur53pmp suc./dis. v/v,spol op/cln/boxup 4 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 furnace area 53 pump suction and discharge header, line, valve, nrv <(>&<)> spool opening for cleaning and box up job. quantum of job : page 16 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details suction valve (14 inch) – 4 no suction bellow (10 inch) – 4 no suction spool – 4 no discharge valve (10 inch) – 4 no discharge bellow (8 inch) – 4 no discharge nrv (10 inch) – 4 no discharge spool – 4 no discharge header blind opening <(>&<)> closing, 16 inch – 2 no suction header blind opening <(>&<)> closing, 24 inch – 2 no scaffolding up to 10m for discharge line job – 270 m3. working elevation at m6 deck no. 3 – 18m approx. tentative month of shut down : 20th sept. 2024 contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 10. open the all pump suction and discharge spool, valves, nrv as per instruction of am/ns engineer. any damaged valve, spool <(>&<)> bellow to be shifted to scrap yard. 11. the removed valves, spools, bellow and nrv to be cleaned and offered for inspection to amns engg. after inspection by amns engineer it must be fixed back or replaced. 12. as per the instruction of am/ns engineer new valve/nrv to replaced. if removed one found damage or not reusable. otherwise removed one to be fix back. 13. all suction and discharge pipes must be modified, cut, fit up and welded as per new bellow, valves and nrv. all suction and discharge pipe must be straight, and all flanges must be off centre. bellows stud to be adjusted as per area in charge. replace rubber bellow, cutting and welding to be done as per rubber bellow size. rubber bellow and pipeline must be straight and rubber bellow locking stud to be provided with plate and gape must be set as per area in charge. 14. all valves, nrvs, rubber bellows to be replaced, if any item not available, same to be overhauled in contractor scope. 15. suction and discharge spool 2 vent and drain point provision/valve replacement, spool modification to be done as per amns engg if require. 16. the necessary suction and discharge pipe to be cut and fixed back and weld as per amns engg requirement. all line u clamp and support to be fixed after job and locking and lock cutting to be done as per job as per amns egg. 16. if ready to use gaskets are not available, the contractor has to cut the same as per required size from suitable sheets. 17. the all flange joints to be leak proof. any hot tightening required page 17 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details then same to be carried out as per the instruction of amns engineer. 18. shifting of all materials required for the job to be shift from work shop or main store to work area. 19. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods and hydra for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 20. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 21. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 22. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 23. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 24. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 4.5 25. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 26. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 5. co ordination for work permit is in am/ns’s scope. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 11 2000155658 30 110 10 f/c c/hcone partly repl & hard facing 1 no 20 usg,usl&lsl pipe removal & hard facing 1 no 40 charging distributor hard facing job 1 no 50 octopus leg & feed pipe repairing job 1 no 30 tsealbelow,sleve,wearcon remov&hardfcing 1 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 furnace charge hopper cone, usl/usg job, top seal bellow/sleeve/wear cone job, charging distributor hard facing job and octopus leg/feed pipe repairing job. quantum of job. working height : +60m to +75m 1. charge hopper lower cone partly replacement job code details : top dia. – 3.5m, bottom dia. – 1.12m, length – 3.35m, to be replaced. existing cone strengthening to be done by fixing pad and welding as per site engineer instruction. scaffolding above 20m height – 450 m3 approx. page 18 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 1 inch ms spray water line replacement – 10m approx. fabrication of supporting/locking structure – 1 ton approx. 2. usl pipe, usg gate dismantling for replacement/repairing/hard facing and fixing job. all parts to be dismantle and after inspection by amns engineer, new parts to be fixed as per instruction or existing parts repairing and hard facing to be done. usg gate removal for hard facing job and to refix, weight – 2 ton approx. usl pipe (size : od 508mm, 4500mm long) removal. after inspection hard facing to done or if required to be replaced with new pipe. usl gas inlet and outlet line (size : 6 inch) partially replacement – 6m approx. pad fixing on usl and platform erection for hammering purpose. usg all hatch opening, cleaning, and box up and usg gland replacement. 3. top seal bellow, sleeve and wear cone dismantling for hard facing and fixing back. upper seal leg gas inlet cone replacement, weight 1.3 ton approx. upper seal leg bellow (size : id 770mm od 914mm) replacement, weight 250kg. approx. all parts to be dismantle, after inspection done by amns engineer, new parts to be fixed or existing parts hard facing to be done. bellow to be locked properly. bellow inside sleeve pipe to be replaced. during below replacement job all safety precautions to be followed bellow should not damage. otherwise, penalty to be imposed on contractor as per amns. 4. charging distributor hard facing job. after hatch opening and checking, repairing, and hard facing to be done as per amns engg. same hatches to be box up after clearance. 5. octopus leg – 24 no and feed pipe – 24 no repairing job. pipe side 352mm od and length 1200mm same to be repair after inspection by amns engineer all octopus leg nozzle open and after clearance from prod same box up. if any nozzle jammed as per amns engineer, same to be cut and welded. all feed pipe c lock fixing, patch to be welded as per amns eng. tentative month of shut down : 20th sept. 2024 contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per page 19 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 10. proportionating hopper inside area to be cover properly as furnace inside area work is continue going on. 11. before removal of old cone proper locking to be done from charge hopper side and cone bottom side. also new cone assembly to be shifted from store to site. 12. after locking the cone flange joint to be open. existing cone to be removed as per new cone size. as per amns engineer instruction, pad to be fixed and welded. 13. after cone replacement and fit up inspection by amns engineer final welding to be done and hard facing to be done. as per amns engineer instruction. 14. proportionating hopper new/existing wear cone hard facing to be done near workshop and to be shifted at spot by contractor. 15. during shifting of wear cone at spot, charge hopper crane to use if available, if not available then contractor must shift it by proper lifting tools. 16. the upper slide gate is to be locked from all 04 sides. gate to be removed and hard facing to be done then gate to be fixed.usl(top, middle and bottom) pipe to be dropped. 17. bottom bellow to be locked with all safety precautions. 18. bottom seal pipe of upper slide gate to be removed (size 500 mmx length 1280 mm) 19. bottom bellow to be removed. 20. bellow inner sleeve condition to be checked and repair/ replaced. 21. otherwise new sleeve (500 mm dia.x 1050 mm length) to be prepared and replacement to be done. also hard facing to be done. 01 t chain block to be used for sleeve removal. 22. wear cone to be checked and hard facing/ built up to be done, if possible, otherwise replace it with the shifted spool. 01 t chain block to be used for wear cone removal. 23. usl gas inlet cone to be replaced with new one and gas inlet and outlet line to be fixed as per drawing for that required modification to be done. 24. all feed pipe checking/repairing/locking/pad welding to be done as per amns engg. 25. octopus nozzle to be cut/fixing/pad welding as per amns engg. 26. easy flow device hard facing as per amns engg. 27. after replacement/repairing of wear cone/inner sleeve, bellow, usl pipes and usg bottom spool to be re fixed and gate locking to be removed. usl pipe pad to be fixed and welded. 28. new gasket to be fixed and all bolt to be tight. 29. all hatches to be open and after cleaning same to be box up. 30. leak test to be done if any leak found same to be attend. 31. old removed items to be shifted at ground level and same to be cut in 1 meter piece after that send to scrap yard. 32. if ready to use gaskets are not available, the contractor has to cut the same as per required size from suitable sheets. 33. the all flange joints to be leak proof. any hot tightening required then same to be carried out as per the instruction of amns engineer. 34. shifting of all materials required for the job to be shift from work shop or main store to work area. 35. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods and hydra for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 36. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 37. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done page 20 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 38. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 39. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 40. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 4.5 41. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 42. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 5. co ordination for work permit is in am/ns’s scope. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 12 2000155658 40 120 10 m6 f/c lower cone replacement 1 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 furnace lower cone replacement job. quantum of job. working height : +25m to +30m weight : 5 ton approx. ms cutting : 30m approx. ms welding : 60m, (need help of 5 ton chain block 3 no) assemble furnace lower cone with lbf nozzle, keep assembly ready of shaft with braker disc, plummer block, lubrite bush, pocking nozzle, hydraulic cylinder and hydraulic lines as per amns engg. instruction/drawing. ali gnment/leveling to be done after installing. shift furnace lower cone assembly at lbf deck. cone area required nozzle and manhole to be fixed at site as per engineer instruction. marking, cutting and removal existing lower cone assembly as per amns eng. instruction. before removing lower cone, furnace shell and bottom seal cone to be proper locking with 150 mm beam. edge preparation to be done and proper grinding to be done. position and fit up lower cone. alignment to be done of shaft and lower cone. welding and stiffener to be provide as per amns eng instruction. existing lower cone to be cut and scrap. scaffolding above 20m height 450 m3 approx. supporting and locking structure – 1 ton approx. during lower cone replacement job all safety precautions to be followed. hydraulic cylinder should not damage. page 21 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details before starting job mbf all shaft covered with plant/plate and glass wool as safety purpose. contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 10. furnace lower cone before removal locking to be done at mbf deck and bottom seal cone area with min. 150 mm beam. 11. lbf shaft plummer block and cylinder to be removed after cutting/removing breaker disc and kept at side. extra care to be taken for hydraulic cylinder should not damage during removal. 12. lower cone top portion cut from welding joint and bottom side flange joint to be open. 13. lower cone to be removed by chain block. for that proper anchor point to be prepared/provide and same to be certified by authorized person. 14. after cone removal joint area edge preparation to be done. 15. new cone will be supplied in two parts as per availability by rolling machine. 16. new cone nozzle and manhole will be fixed at site as per exiting and as per amns engineer requirements. 17. new cone assembly kept ready for fixing, after edge preparation of new cone. 18. after cone replacement and fit up inspection by amns engineer final welding to be done. 19. lbf shaft to be fixed with new breaker disk and lubrite bush, plummer block. arm and cylinder. 20. shaft leveling same to be inspect with amns engineer. 21. after ensuring leveling, gland addition, arm, link and cylinder will be fix. 22. lbf trial to be taken with area engineer if any rectification observed same to be correct immediately. 23. all welding joint leak test will be done after job completed. if any leak observed same to be attended immediately for that if manpower required in odd hours same to be kept ready by contractor. 24. after all welding joint temporary lock to be removed which was done during removal. 25. old removed items to be shifted at ground level and same to be cut in 1 meter piece after that send to scrap yard. 26. if ready to use gaskets are not available, the contractor has to cut the same as per required size from suitable sheets. 27. the all flange joints to be leak proof. any hot tightening required then same to be carried out as per the instruction of amns engineer. 28. shifting of all materials required for the job to be shift from work page 22 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details shop or main store to work area. 29. necessary lifting tools, tackles, spanners, hammers, hydraulic pumps, jacks gas cutting set <(>&<)> welding machines, welding rods and hydra for the job is in the scope of contractor. (all welding machines should be certified by electrical team before starting the job) any special jigs or fixture required for execution of the job will be in the scope of the contractor with his own material. for tools <(>&<)> tackles valid tpi certification <(>&<)> form 10 to be submit. 30. all consumable like diesel, gas, welding electrode, gauging rods, chain block, cotton waste, emery paper, wire rope / slings, etc. will be in contractors scope. 31. any cutting / welding required will be in contractors scope. contractor should ensure the quality of welding. all welding to be done by qualified welders approved by am/ns. all welding joints is to be dp tested. dp test consumables are in contractor scope. 32. housekeeping should be carried out after completion job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 33. after shutdown any portion of structure/deck cut for the execution of job will be welded back perfectly as earlier. 34. all scrap to be cut into 1m length and scrap material to be loaded <(>&<)> shifted at specified location as per am/ns engineer. 4.5 35. contractor must deploy continue round the clock skilled manpower for the job. safety supervisor must be available on site, round o’clock. contractor should deploy competent supervisor on round the clock basis to supervise and complete the jobs in time. 36. as per management directive, transport/movement of associates to <(>&<)> from for plant should by mandatorily in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent material <(>&<)> special electrodes to be provide if required. 2. power supply, lighting facilities, working platform, etc. for workmen at plant site 3. job certification for executed jobs. 4. electrical certification will be done by am/ns electrical engineer. 5. co ordination for work permit is in am/ns’s scope. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. m/s arcelormittal nippon steel india ltd. item note : 13 2000155696 10 130 10 cfc suc. strn/spol op/cln/boxup 1 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 centrifugal compressor suction strainer and spool opening, cleaning <(>&<)> box up job. quantum of job: suction spool flange size: 1000mm suction spool length: 2300mm number of flange joints to be open <(>&<)> close: 02 no working elevation: 1.5m approx. scaffolding up to 10m: 250 m3 contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp page 23 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 10. 3. smp of cfc strainer replacement to be carried out for the jobs to all manpower. smp and hirac no must be mentioned in permit. 11. 4. suction line(1000nb), discharge line(1000nb) and n2 line (2) to be blind/de blind, if required. 12. 5. centrifugal compressor suction spool and strainer to be dropped after proper locking of suction bellow. 13. 6. required scaffolding will be prepared by contractor. 14. 7. suction strainer to be removed from spool for cleaning. eot crane available at vpsa area same can be use if required. 15. 8. strainer to be cleaned by wire brush/buffing machine. 16. 9. guide vane operation checked by production, after amns engineer clearance, same to be box up done. 17. 10. cleaning the gasket area and pasting new gasket. 18. 11. fix the strainer inside spool and box up to be done. ensuring cleaning inside spool before boxed up. 19. 12. leak checking and rectification. 20. 13. bellow lock to be normalized after amns engineer clearance. 21. all tools and tackles and required scaffolding material for the job is under the contractor’s scope. 22. contractors should deploy competent supervisors and safety officers on a round the clock basis to supervise and complete the jobs in time. 23. do necessary correction as per amns engineer if required. 24. housekeeping should be carried out after completion of the job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 25. all tools, tackles like welding machines cutting sets, welding electrode, gauging rods, chain block, slings, spanners, hammers, hydraulic pumps, jacks, etc. will be in contractors scope. 26. all safety items like safety shoes, safety helmets, safety belts, lifeline, fall arrestor, hand gloves etc. are to be arranged by the contractor. 27. as per management directive, transport / movement of associates to <(>&<)> from for plant should be mandatory in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent materials or any special electrode will be provided 2. power supply, lighting facilities, working platform etc. for workmen at plant site. 3. job certification for executed jobs. 4. electrical certification of tools will be done by am/ns electrical engineer. 5. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. page 24 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for arcelormittal nippon steel india ltd. item note : 14 2000155696 20 140 10 tgfc2nd clr lech nozl&elbow op/cln/boxup 1 no email : yash.vala@amns.in contact : name : yash vala item details : scope of work for mod 6 tgfc 2nd stage cooler lechlor nozzle and elbow opening, cleaning <(>&<)> fixing job. quantum of job : lechlor nozzle size – 2 ½ inch, 20 no elbow size – 2 ½ inch, 20 no water header dead end flange opening <(>&<)> closing, size – 12 inch, 4 no inside grating opening <(>&<)> box up – 2 no hatch opening <(>&<)> closing – 28 inch, 2 no elevation: 10m contractor scope : 1. get the work permit as per nature of work from site in charge/the control room, to be got sign of field controller and to be sign in as holder by experienced supervisor. 2. safety talk/hirac to be carried out for the jobs to all manpower. smp and hirac no. must be mentioned in work permit. 3. all safety precautions must be followed by the contractor and its manpower. all ppes to be wear as per work nature. use safety belt and lifeline while working at height. work area to be barricaded. 4. as per job nature technician must have rigger pass, work at height pass, eot crane operator pass and welder pass. 5. before starting the job, the fire extinguisher and water hose have to be arranged and fixed. fire blankets to be kept on site when hot work job is done by contractor. fire blankets in contractor scope. 6. 12mm ss wire rope to be used in lifeline, rope to be clamping through clamp. safety belt to be hooked up with permanent structure, if required hook to be fabricated and welded. 7. all safety rules and precaution of am/ns should be followed by the contractor and his team. all safety items like safety shoes, safety helmets, safety belts, hand gloves etc. are to be arranged. 8. scaffolding is in contractor scope with all materials. to be certified by amns engineer. green tag to be fixed and then only scaf folding to be used. work at height pass and ecg report must be required for job as per safety norms. 9. after completion of the job, scaffolding to be removed on priority after site in charge clearance. 4. all necessary hatches/manhole to be open for entering inside the vessel. 5. check the oxygen/co ppm level inside the vessel. do not enter inside vessel without o2 meter. safety officer must be available for round o’clock for job execution. 6. inside grating to be removed as per requirement and after clearance same to be box up. 7. grating supporting damage beam to be replaced as per instruction. 8. all 20 nos. lechlor nozzle to be removed and cleaning and box up. after cleaning same to be inspected by the operation team and protocol to be signed. 9. all 20 nos. elbow, water header end flanges of cooler to be open and after cleaning, same to be boxed up after inspection and clearance from site engineer. 10. required ss grating to be removed for packing removal/filling and after clearance same to be fixed back and locked. 11. all hatches are to be boxed up after clearance. 12. 01 water hoses required for elbow/nozzle and header cleaning, same will be in contractor’s scope. page 25 of 25 arcelormittal nippon steel india limited am/ns hazira plant 27th km, surat hazira road,,hazira,394270,gujarat,india gstin 24aaace1741p1zn pan aaace1741p cin u27100gj1976flc013787 request for quotation number 6000118315 date 06.08.2024 submission date 14.08.2024 coll req no amns deals with oems directly. we are very well equipped in every way to import / buy our goods directly from oems from any part of the world in a professional manner. we also use the vast global networks of our parent companies where necessary. we do not welcome any contact from intermediaries or indian agents of vendors. we assure all oems that you do not need to engage anyone to manage your transactions with us.kindly respond to our rfqs and deal with our officials directly without involving any agents or intermediaries. offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. contact for this rfq mr. sarjan mahida contact email sarjan.mahida@amns.in materials / services please acknowledge receipt of the rfq and provide your best quote for below given rfq details. sr. no pr no. pr item rfq item services for line item quantity uom technical details other details 13. contractors should deploy competent supervisors and safety officers on a round the clock basis to supervise and complete the jobs in time. 14. do necessary correction as per amns engineer if required. 15. housekeeping should be carried out after completion of the job. all used / unused material should be brought back to workshop / scrap yard as per the instruction of area engineer in charge. 16. all tools, tackles like welding machines cutting sets, welding electrode, gauging rods, chain block, slings, spanners, hammers, hydraulic pumps, jacks, etc. will be in contractors scope. 17. all safety items like safety shoes, safety helmets, safety belts, lifeline, fall arrestor, hand gloves etc. are to be arranged by the contractor. 18. as per management directive, transport / movement of associates to <(>&<)> from for plant should be mandatory in 4 wheelers and buses. bicycles and two wheelers are strictly not allowed. am/ns scope : 1. all permanent materials or any special electrode will be provided 2. power supply, lighting facilities, working platform etc. for workmen at plant site. 3. job certification for executed jobs. 4. electrical certification of tools will be done by am/ns electrical engineer. 5. co ordination for work permit. specific penalty for non performance by contractor and must be cardinally measured. 1. non conformity of work. 2. penalty will be imposed in case of noncompliance to hse norms. 3. time is essence of the contract and total job shall have to be finished within time allotted. penalty shall be imposed in case of any delay in completing the job. for arcelormittal nippon steel india ltd....

Western Railway - Gujarat

44614326 supply of set of strap wrench & accessoriesset of strap wrench & accessories,set of strap wrench & accessories , one set consists of two items as per annexure att ached. [ warranty period: 12 months after the date of delivery ] ]...

Western Railway - Gujarat

44604758 supply of battery operated impact wrenchbattery operated impact wrench,battery operated impact wrench 1/2 drive rated for 203 nm max with tool box along with 02 numb ers of 18v battery and charger to model:gds 18v200 acceptable makes: bosch,dewalt/hitachi/makita/ingersoll rand/bahco/snap on/chicago/groz/norbar/macmastermake: dewalt. [ warranty period: 30 months after the d ate of delivery ] ]...

Vadodara Muncipal Corporation - Gujarat

44593267 supply of miscellaneous items for zoo items. १ pariah २ garden tool pickaxe wire wrench tool rough 3 scissors ४ a medium sized axe ૫ wire clamp (taperia mac) tarpaulin 6 grass cutting sword ८ parrot pakkad (taperia mac) ८ bandari pana medium size (tapariya make) १० dhariya with wooden handle (length 3 feet) ११ acid 5 liter can १२ surti maks snake catching stick ...

Western Railway - Gujarat

44564576 supply of battery operated impact wrenchbattery operated impact wrench,battery operated impact wrench 1/2 drive rated for 203 nm max with tool box along with 02 numb ers of 18v battery and charger to model:gds 18v200 acceptable makes: bosch,dewalt/hitachi/makita/ingersoll rand/bahco/snap on/chicago/groz/norbar/macmastermake: dewalt. [ warranty period: 30 months after the d ate of delivery ] ]...

Western Railway - Gujarat

44499534 supply of 1. ratchet type torque wrench range 135 675 nm 2. 1/2 square drive ratchet type torque wrench cap 50 220 nm 3. steel ratchet type torque wrench, range 10 70 nm1. ratchet type torque wrench range 135 675 nm 2. 1/2 square drive ratchet type torque wrench cap 50 220 nm 3. steel ratchet type torque wrench, range 10 70 nm,ratchet type torque wrench range 135 675 nm (as per specification attached on annexure a) [ warranty period: 30 months after the date of delivery ] ] , 1/2 square drive ratchet type torque wrench cap 50 220 nm ( detailed description/specification as per attached annexure a) [ warranty period: 30 months after the date of delivery ] ] , steel ratchet type torque wrench, range 10 70 nm brand: mac master or similar (detailed description/specific ation as per attached annexure a). [ warranty period: 30 months after the date of delivery ] ]...

Western Railway - Gujarat

44468456 supply of chamfering bit 28.75mm for batterychamfering bit 28.75mm for battery,chamfering bit 28.75mm for battery operated chamfering kit (bosch) [ warranty period: 30 mon ths after the date of delivery ] ] , chamfering bit 35 mm for battery operated chamfering kit (bosch). [ warranty period: 30 month s after the date of delivery ] ] , inspection pwi tool kit with suitcase [ warranty period: 30 months after the date of delivery ] ] , drill bits 28.75 mm (annular cutter 28.75mm) for battery operated rail drilling machine (m/s . lakshmi industrial corporation) [ warranty period: 30 months after the date of delivery ] ] page 1 of 7 run date/time: 29/07/2024 13:33:18brc div/western rly tender document , stepped feeler gauge [ warranty period: 30 months after the date of delivery ] ] , drill bit 26.50mm (annular cutter 26.50mm) for battery operated rail drilling machine (m/s. lakshmi industrial corporation). [ warranty period: 30 months after the date of delivery ] ] , opening size 41mm impact socket, 3/4 inch square drive impact socket 6 point for impact wrench battery operated. [ warranty period: 30 months after the date of delivery ] ]...