Renovation Of Lift Lobby At Ground Floor Of Main Office Building Carefully Breaking, Chiselling The Existing Flooring, Dado Of Vitrified Tiles / Marble Dado Including Bedding / Backing Mortar, Removing Of Existing False Ceiling, Doors, Windows, Aluminium / Glazed Doors, Windows, Partitions Etc. By Means Of Chisel, Hammer, Breaker Machine, Etc. Including Lowering The Dismantled Materials, Scaffolding, Cleaning The Surfaces And Carting Away The Dismantled Material From The Bank`S Premises To An Authorised Dumping Yard Of Civic Authority Etc. Complete All As Directed By The Bank`S Engineer. The Rate May Be Quoted Considering The Salvage Value Of The Dismantled Items. 2 2 Renovation Of Lift Lobby At Ground Floor Of Main Office Building Constructing Half Brick Masonry With Common Burnt Clay F.P.S. ( Non Modular ) Bricks Of Class Designation 7.5 With Locally Available Best Quality Bricks In Cement Mortar 1:4 ( 1 Cement:4 Coarse Sand ) Including Raking The Joints, Curing Etc. As Directed By The Bank`S Engineer. The Rates Quoted Shall Be Inclusive Of All Required Material, Labour, Transportation, Loading-Unloading, Scaffolding, Tools & Plants, Wastage If Any, Making Good Damages To Match With Surroundings Surface, Carrying Out Work In Workman Like Manner At All Lead And Lift, Curing Wherever Required, Carting Away Debris Out Of Premises Etc. Complete Cleaning Of The Site To The Satisfaction Of Banks Engineer. 3 3 Renovation Of Lift Lobby At Ground Floor Of Main Office Building Providing And Applying Average 15 Mm Thick Cement Plaster 1:4 ( 1 Cement: 4 Coarse Sand ) Finished With A Floating Coat Of Neat Cement On The Rough Side Of Single Or Half Brick Wall In Line And Level To Brick Masonry Works Etc. The Rates Quoted Shall Be Inclusive Of All Required Material, Labour, Scaffolding, Transportation, Loading-Unloading, Tools & Plants, Wastage If Any, Making Good Damages To Match With Surroundings Surface, Carrying Out Work In Workman Like Manner At All Lead And Lift, Curing Wherever Required, Carting Away Debris Out Of Premises Etc. Complete Cleaning Of The Site To The Satisfaction Of Banks Engineer. 4 4 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Veneer Panelling Providing & Fixing Wall Panelling Made From 37 Mm X 25 Mm Teak Wood Frame At Approx. 600Mm X 600Mm C / C Distance Clad With 12 Mm Thick Approved Make Bwp Marine Ply Confirming To Is 710, With 4 Mm Thick Veneer Of Approved Make And Shade With Required Coats Of Melamine Polish, Surface Preparation Etc. And With Grooves As Per Drawing No. 03 And As Directed By Banks Engineer And Architect. Basic Rate Of Veneer - Rs.1100 / Sq.Mt The Rates Quoted Shall Be Inclusive Of All Required Material, Labour, Transportation, Loading - Unloading, Tools & Plants, Scaffolding, Wastage If Any, Making Good Damages To Match With Surroundings Surface, Carrying Out Work In Workman Like Manner At All Lead And Lift, Carting Away Debris Out Of Premises Etc. And Complete Cleaning Of The Site To The Satisfaction Of Banks Engineer. 5 5 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Security Desk ( 1200 Mm L X 550 Mm D X 950 Mm Ht. ) Providing & Fixing Table Of Over All Size ( 1200 Mm L X 550 Mm Dx 950 Mm Ht. ) With 550 Mm Depth With One Drawer. Entire Table Should Be Made Of 19 Mm Thick Approved Make Bwp Marine Ply Confirming To Is 710, With 6Mm Thick Corian On Exposed Side And Approved Make Balancing Laminate On Inner Side. Thickness Of All Open Edges Should Be 50Mm. ( Table Top, Vertical Fascia ) . Solid Ghana Teak Wood Member Of 100 Mm X 100 Mm To Be Provide At Two Round Surface And 12 Mm X 12 Mm Ghana Teak Batterns To Be Provided On 6Mm Thick Corian With Pu Adhesive ( Vertical Surface ) . It Should Be Fixed At 150 Mm C / C Distance. All Ghana Teak Frame And Beading To Be Finished With Required Coats Of Melamine Polish, Surface Preparation Etc. For More Details Refer To Bill Of Quantity And The Tender Document. 6 6 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Gypsum False Ceiling Providing And Fixing Gypsum Or Equivalent Make False Ceiling With 12.5Mm Thick Gypboard At All Height Including Providing And Fixing Of Frame Work Of Gyproc, Made Of Special Sections, Power Pressed From M.S. Sheets And Galvanized With Zinc Coating Of 120 Gms / Sqm ( Both Side Inclusive ) As Per Is : 277 And Consisting Of Angle Cleats Of Size 25 Mm Wide X 1.6 Mm Thick With Flanges Of 27 Mm And 37Mm, At 1200 Mm Centre To Centre, One Flange Fixed To The Ceiling With Dash Fastener 12.5 Mm Dia X 50Mm Long With 6Mm Dia Bolts, Other Flange Of Cleat Fixed To The Angle Hangers Of 25X10x0.50 Mm Of Required Length With Nuts & Bolts Of Required Size And Other End Of Angle Hanger Fixed With Intermediate G.I. Channels 45X15x0.9 Mm Running At The Spacing Of 1200 Mm Centre To Centre, To Which The Ceiling Section 0.5 Mm Thick Bottom Wedge Of 80 Mm With Tapered Flanges Of 26 Mm Each Having Lips Of 10.5 Mm, At 450 Mm Centre To Centre. For More Details Refer To Bill Of Quantity And The Tender Document. 7 7 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Channelled Wood Work Ceiling Providing And Fixing Channelled Wood False Ceiling Of Armstrong Or Equivalent Make Perforated Panels Of Width 192Mm, Thickness Of 15Mm And Length 2400 Mm, Made Of A Moisture Resistant Fibre Board Substrate With A Laminated Facing As Per The Approved Shade ( Portland Maple, Sea Beech, Siam Wood & Mystique Walnut, Interior White, Alumina Pearl ) And A Melamine Balancing Layer On The Reverse Side. The Boards Shall Have A Special Perforation Pattern Where The Reverse Surface Has A ?Helmholtz? Fluted Perforation With Consecutive 3 Mm Wide Groove Followed By 21 Mm Of Visible Pane. The Edges Of The Panel Shall Be ?Tongue-And-Grooved? To Fix Special Clips For Installation And Seamless Visual. The Back Of The Perforated Panel Shall Have Sound Absorbing Non-Woven Soundex Acoustical Fleece Hot Pressed To Achieve Nrc Of 0.5. For More Details Refer To Bill Of Quantity And The Tender Document. 8 8 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Glass Door Providing And Fixing Double Leaf Glass Doors With Patch Fitting As Shown In The Drg. Door Shall Consist Of Approved Make 12Mm Thk. Toughened Clear Float Glass With Necessary Hardwares Of Smooth Swinging Action. Rate Shall Include Necessary Approved Locking Systems, Ghana Teak Handle Pair Finish With Melamine Polished Floor Springs ( Heavy Duty Or Equivalent ) , Gaskets & Miscellaneous Hardware Items. Including All Materials And Labour Etc. Complete As Per Detail Drawing And Instruction Of Banks Engineer And Architect. The Rates Quoted Shall Be Inclusive Of All Required Material, Labour, Transportation, Loading-Unloading, Tools & Plants, Scaffolding, Wastage If Any, Making Good Damages To Match With Surroundings Surface, Carrying Out Work In Workman Like Manner At All Lead And Lift, Carting Away Debris Out Of Premises Etc. And Complete Cleaning Of The Site To The Satisfaction Of Banks Engineer. Complete As Per Drawing No. - 10 9 9 ( A ) Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Italian Marble For Dado Providing And Fixing Machine Cut, Mirror / Edge Hell Polished Italian Marble Stone ( 16-18 Mm ) For Wall Lining Work Including Dado, Sides Of Lifts Etc., In Required Design And Pattern Wherever Required, Stones Of Different Finished Surface Texture, On 12 Mm ( Average ) Thick Cement Mortar 1:3 ( 1 Cement : 3 Coarse Sand ) Laid And Jointed With White Cement Slurry @ 3.3 Kg / Sqm Including Pointing With White Cement Slurry Admixed With Pigment Of Matching Shade, Adhesive, Including Rubbing, Curing, Polishing Etc. All Complete ( 16 Mm To 18 Mm Thick Italian Marble Stone Slab, Crema - Bergamo, Perlato, Rosso Verona, Fire Red Or Dark Emperadore Etc. ) As Per Architectural Drawings, And As Directed By The Banks Engineer And Architect. For More Details Refer To Bill Of Quantity And The Tender Document. 10 9 ( B ) Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Italian Marble For Dado Providing And Fixing Machine Cut, Mirror / Eggshell Polished Italian Marble Stone ( 16- 18 Mm ) For Wall Lining Above Lift In Required Design And Pattern Wherever Required, Stones Of Different Finished Surface Texture, On 12 Mm ( Average ) Thick Cement Mortar 1:3 ( 1 Cement : 3 Coarse Sand ) Laid And Jointed With White Cement Slurry @ 3.3 Kg / Sqm Including Pointing With White Cement Slurry Admixed With Pigment Of Matching Shade, Adhesive, Including Rubbing, Curing, Polishing Etc. All Complete ( 16 To 18 Mm Thick Italian Marble Stone Slab, Dyna Or Equivalent. ) Work Shall Be Carried Out As Per Architectural Drawings, And As Directed By The Banks Engineer And Architect. For More Details Refer To Bill Of Quantity And The Tender Document. 11 10 ( A ) Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Plywood Box Providing And Fixing Wooden Box ( T.V Unit ) Of Over All Approx. Size Size 1200 Mm X 2520 Mm Made From 19 Mm Thick Approved Make Bwp Marine Ply Confirming To Is 710, Frame Between Two Plywood Sheets Of Size 19 Mm X 58 Mm With Necessary Hardware And Fittings, . Work Shall Be Carried Out As Per Drawing And As Directed By The Banks Engineer And Architect. All Required Material, Labour, Transportation, Adhesive, Loading-Unloading, Tools & Plants, Wastage If Any, Making Good Damages To Match With Surroundings Surface, Carrying Out Work In Workman Like Manner At All Lead And Lift, Scaffolding, Cutting In Box For Switch, Sockets Of Required Size And Shape, Carting Away Debris Out Of Premises Etc. Complete Cleaning Of The Site To The Satisfaction Of Banks Engineer. Complete As Per Drawing No. - 08 12 10 ( B ) Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Corian On Plywood Box Providing & Fixing Of Straight Independent Panelling Of 6 Mm Thick Corian ( Acylic Solid Surface ) For Walls Straight Fabricated On A Single Face, Finished In Matte / Satin / Glossy Finish, Pasted With Industrial Grade Water Clear Silicon / Polyurethrane Sealant ( 3M Make ) On A Ply Wood Box. The Work Includes The Cost Of Preparing Appropriate Substrate Surface Over The Wooden Box Provided As Above, Along With Material Cost & Installation / Fixing On Straight Walls / Ply Wood Box And Curved Profiles Joint Of Solid Surface Should Be Joined With Low Voc Adhesives. For More Details Refer To Bill Of Quantity And The Tender Document. 13 11 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Granite Flooring Inside Area Providing And Laying Polished Granite Stone Flooring In Required Design And Patterns, In Linear As Well As Curvilinear Portions Of The Building All Complete As Per The Architectural Drawings With 16 To 18 Mm Thick Stone Slab Over 20 Mm ( Average ) Thick Base Of Cement Mortar 1:4 ( 1 Cement : 4 Coarse Sand ) Laid And Jointed With Cement Slurry And Pointing With White Cement Slurry Admixed With Pigment Of Matching Shade Including Rubbing, Curing And Polishing Etc. All Complete As Specified And As Directed By The Banks Engineer And Architect. For More Details Refer To Bill Of Quantity And The Tender Document. 14 12 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Granite Flooring Outside Area Providing And Laying Polished Granite Stone Flooring In Required Design And Patterns, In Linear As Well As Curvilinear Portions Of The Building All Complete As Per The Architectural Drawings With 16 To 18 Mm Thick Stone Slab Over 20 Mm ( Average ) Thick Base Of Cement Mortar 1:4 ( 1 Cement : 4 Coarse Sand ) Laid And Jointed With Cement Slurry And Pointing With White Cement Slurry Admixed With Pigment Of Matching Shade Including Rubbing , Curing And Polishing Etc. All Complete As Specified And As Directed By The Banks Engineer And Architect. For More Details Refer To Bill Of Quantity And The Tender Document. 15 13 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Granite Inlay Providing & Fixing Machine Cut, Mirror Polished, 16 To 18 Mm Thick Italian Marble Stone Inlay Flooring Of Approved Make And Shade Of Size 1200 Mm X 1200 Mm Laid In Required Pattern In Linear Portion Of The Building All Complete As Per Architectural Drawings, To Be Laid Over 20 Mm ( Average ) Thick Base Of Cement Mortar 1:4 ( 1 Cement : 4 Coarse Sand ) Laid And Jointed With White Cement Slurry @ 4.4 Kg / Sqm Including Pointing With White Cement Slurry Admixed With Pigment To Match The Marble Shade Including Rubbing, Adhesive, Curing And Polishing Etc. All Complete As Specified And As Directed By The Banks Engineer And Architect.Work Shall Be Carried Out As Per Drawing. For More Details Refer To Bill Of Quantity And The Tender Document. 16 14 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Cnc Cut Duct Jaali Providing & Fixing Aluminium Jali 3 Mm Thick ( Cnc Cutting ) With Colour Powder Coating And Aluminium Frame Work 50 X 25 Mm X 1.5 Mm Thick As Per Pattern, Design, Style As Shown In Architectural Drawing And As Directed By Banks Engineer And Architect. The Rates Quoted Shall Be Inclusive Of All Required Material, Labour, Transportation, Loading-Unloading, Tools & Plants, Wastage If Any, Making Good Damages To Match With Surroundings Surface, Carrying Out Work In Workman Like Manner At All Lead And Lift, Curing Wherever Required, Carting Away Debris Out Of Banks Premises Etc. And Complete Cleaning Of The Site To The Satisfaction Of Banks Engineer. The Openable Area Is Approx. 50 % Of Quantity. The Plate Is Fixed With S. S. Screws. The Door Consist Of 100 X 25 Mm Wide 3 Mm Thick, Hinges 3 Nos. 1 Nos. Allu.Powder Coated D Handles 150 Mm Long And 1 Nos. 100 Mm X 8 Mm Dia Rod Stopper. Complete As Per Drawing No.- 04 17 15 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Security Grills Providing & Fixing S.S Rods Of 304 Grade Consisting Of Vertical S.S Pipes 3 Mm Thick, 25 Mm Dia Spaced At 50 Mm Clear Spacing And Suitable Horizontal Member S. S. Flat Of 40 Mm X 6 Mm Thick As Per Pattern, Design, Style As Shown In Architectural Drawing. Rods To Be Passed Through Ss Horizontal Flats By Making Suitable Dia. Of Holes, Finishing With Wrkman Like Manner, To Be Fixed On Floor, Walls, With Ss Screws, Ss Welding, Anchor Fasteners To Have Proper Fixity Of The Rods / Grill, As Per The Drawing And As Directed By The Banks Engineer And Architect. The Rates Quoted Shall Be Inclusive Of All Required Material, Labour, Transportation, Loading-Unloading, Tools & Plants, Wastage, Scaffolding, Making Good Damages To Match With Surroundings Surface, At All Lead And Lift, Carting Away Debris Out Of Premises Etc. And Complete Cleaning Of The Site To The Satisfaction Of Banks Engineert. Complete As Per Drawing No.- 05 18 16 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Sheraboard Box Ceiling Providing & Installing Suspended False Ceiling Using Fibre Cement Plank Of Shera Make Cassia / Straight Grain / Teak Texture ( External Grade ) Manufactured With Wt Recess Technology Of Thickness 6 Mm Plain Sheet + 8 Mm Thick 150 X 3000 Mm Teak Texture Planks In Bottom And Side And Dimensions 150 Mm X 3000 Mm. Shera Fibre Cement Plank Should Be Of Minimum Density 1300 Kg / M3 And Comply To Is Standards . Shera Plank To Be Fixed Using Shera Screws Of Tensile Strength 34 N And Shear Strength 68 N On Suitable Frame Structure Of M. S. Pipe. Shera Plank To Be Finished With One Coat Of Cement Base Primer On All Sides , With Two Or More Coats Of Water Based Acrylic Paint Of Approved Shade. Including Ms Pipe Support Structure Made Out Of Ms 25 Mm X 25 Mm X 1.8 Mm Thick Pipe And Jointed With 50 Mm X 25 Mm X 2 Mm Thick Pipe And Fixed With Fasteners As Directed Including 1Coat Of Metal Zinc Chromate Primer. For More Details Refer To Bill Of Quantity And The Tender Document. 19 17 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Plastic Paint Providing And Applying Two Or More Coats Of Plastic Acrylic Emulsion Paint Of Interior Grade Having Voc Content Less Than 50 Grams / Litre Of Approved / Equivalent Brand Over One Or More Coats Of Recommended Alkali Resistant Primer Of Approved Manufacture And Shade To Walls, Ceilings, Etc. As Per Specification In Single Shade / Different Shades For Inlays, Including, Cleaning, Surface Preparation Etc. Complete All As Directed. For More Details Refer To Bill Of Quantity And The Tender Document. 20 18 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Fixed Glazing Providing And Fixing Full Height Glazed Partition Made Of 12 Mm Thick Toughened Glass Bevelled Edges By Using Various Glass Patch Fittings, S.S. Connectors Of Approved Make Without Giving Any Load On The False Ceiling By Using Necessary Hardware To Complete The Job In All Respects. The Agency Has To Obtain Approval For Fixing Details Of The Glass Partition With S.S. Channel On Top And Bottom Etc. As Specified And As Directed By The Banks Engineer And Architect Before Execution Of The Work. Rate Includes Cost Of Glass , Hardware And Any Other Fittings Of Approved Make Necessary For Completing The Job In Totality And Nothing Will Be Paid Extra For Completing The Job. Work Shall Be Carried Out As Per Drawing. For More Details Refer To Bill Of Quantity And The Tender Document. 21 19 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Laminated Flush Door Providing And Fixing Isi Marked 35 Mm Thick Flush Door Shutters Conforming To Is Standard Decorative Type, Core Of Block Board Construction With Frame Of 1St Class Hard Wood And Well Matched Teak 3 Ply Veneering With Vertical Grains Or Cross Bands And Face Veneers On Both Faces Of Shutters 35 Mm Thick Including Isi Marked Stainless Steel 3 Nos. Butt Hinges With Necessary Screws. Door Having A , S.S. Handle 19Cm ( 190Mm ) Door Handle Set With Lock Body Etc. Work Shall Be Carried Out As Per Drawing. The Rates Quoted Shall Be Inclusive Of Gst, All Required Material, Labour, Transportation, Loading-Unloading, Tools & Plants, Wastage If Any, Making Good Damages To Match With Surroundings Surface, Carrying Out Work In Workman Like Manner At All Lead And Lift, Curing Wherever Required, Carting Away Debris Out Of Banks Premises Etc. And Complete Cleaning Of The Site To The Satisfaction Of Banks Engineer. The Work Is To Be Carried Out As Directed By Banks Engineer And Architect. 22 20 Renovation Of Lift Lobby At Ground Floor Of Main Office Building : Corian Panelling Providing & Fixing Wall Panelling Made From 37 Mm X 25 Mm Teak Wood Frame At Approx. 600Mm X 600Mm C / C Distance Clad With 12 Mm Thick Approved Make Bwp Marine Ply Confirming To Is 710 With 6Mm Thick Corian Pasted With Industrial Grade Water Clear Silicon / Polyurethrane Sealant ( 3M Make ) On A Ply Wood. With 6 Mm X 6 Mm Grooves As Per Drg. And As Directed By Banks Engineer And Architect .Work Shall Be Carried Out As Per Drawing. All Required Material, Labour, Transportation, Loading-Unloading, Tools & Plants, Wastage, Making Good Damages To Match With Surroundings Surface, Carrying Out Work In Workman Like Manner At All Lead And Lift, Scaffolding, Carting Away Debris Out Of Banks Premises Etc. And Complete Cleaning Of The Site To The Satisfaction Of Banks Engineer. Complete As Per Drawing No.- 09 23 21 Renovation Of Lift Lobby At Ground Floor Of Main Office Building Providing & Fabricating Folding Steps Made From M. S. 25 X 25 X 5 Mm M. S. Angle And 30 X 6 M. S. Flat Work Shall Be Carried Out As Per Drawing. The Rates Quoted Shall Be Inclusive Of All Required Material, Labour, Transportation, Loading-Unloading, Tools & Plants, Wastage If Any, Making Good Damages To Match With Surroundings Surface, Carrying Out Work In Workman Like Manner At All Lead And Lift, Curing Wherever Required, Carting Away Debris Out Of Premises Without Any Cost To The Bank Etc. And Complete Cleaning Of The Site To The Satisfaction Of Banks Engineer. The Work Is To Be Carried Out As Directed By Banks Engineer And Architect. Complete As Per Drawing No.-11 24 22 Gst @18% Total Gst Amount
Tender Notice
Key Value
Ref. Documents
Ref. Documents
Ref. Documents