Arc For Maintenance Of Jobner, Hissar, Bhatinda And Rohtak Base. Fixed Cost 1 Repair, Maintenace, Supervision, Monitoring Of Pipeline Sections Under Jobner, Hissar, Bhatinda And Rohtak Base ( Appx. 577 Kms ) Including All Activities Related To Mechanical / Electrical / Instrumentation / Hse / Civil Works / Other Miscellaneous Work. The Scope Of Work Related To Mainline Maintenance Activities Include Maintaining Equipments As Per Sow And Maintenance Of Pipelines And Also All Rcps, Hovs, Movs Station Etc. Falling Under Jobner Base, Hissar Base And Rohtak Base As Mentioned In Scope Of Work & Its Annexures. Mechanical 1 Installation Of Above Ground Valves ( Ball / Globe / Check ) Of Various Sizes In Piping System Including Handling, Blind Removal Providing Temporary Supports If Necessary, Studs Bolt Loosening / Tightening, Gasket Insertion And Torque Setting With All Tools / Tackles / Manpower Etc. Of Valves Sizes, Hydra And Other Lifting Equipment Inclusive Of Scaffolding Arrangement At Site If Required Including Valve Operation. Gasket Shall Be Provided By Gigl. 2’’Nb 4’’Nb 6’’Nb 8’’Nb 10Nb 12’’Nb 2 Dismantling Of Valves ( Ball / Globe / Check ) From The Line And Putting Blinds / Spool Pieces Etc., For Various Pipe Sizes Etc. Including Stud Bolt Loosening, Gasket Changing, Handling With All Tools / Manpower / Tackles / Hydra And Other Lifting Equipment Inclusive Of Scaffolding Arrangement At Site If Required Etc. Of Valves Sizes. Gasket Shall Be Provided By Gigl. 8’’Nb 10Nb 3 Dismantling Or Installation Of Blind Flanges From A / G Piping For Various Pipe Sizes Including Nut Bolt Removing & Handling With All Tools / Tackles / Manpower / Machinery & Consumables Etc. And Stacking All Within Radius Of 250 Mts As Per Gigl Eic Instructions. From 3 To 6 From 8 To 12 4 Reversal Of Spectacle Blind On Installed A / G Piping For Various Sizes Etc. Including Nut Bolt Loosening, Gasket Changing With All Tools / Tackles / Manpower Etc. Of Valves Sizes:- 10 Nb 12 Nb 16 Nb 18 Nb 30 Nb 5 Dismantling Of Piping Spool Along With Flanges From Line For Various Pipe Sizes And Putting Blind Including Nut Bolt Removing & Handling With All Tools / Tackles / Manpower / Machinery Etc And Stacking All Within Station As Per Owner Eic Instructions. ( No Separate Charges Shall Be Paid Extra For Manpower & Equipments Used ) Up To 4’’ Nb 6’’ Nb 8’’ Nb 10 Nb 12 Nb 6 Installation Of Piping Spool Along With Flanges For Various Pipe Sizes Including Blind Removal, Nut Bolt Removing & Handling With All Tools / Tackles / Manpower / Machinery Etc As Per Owner Eic Instructions. ( No Separate Charges Shall Be Paid Extra For Manpower & Equipments Used ) Up To 4’’ Nb 6’’ Nb 8’’ Nb 10 Nb 12 Nb 7 Replacement By Removing Old Gaskets Including Tightening And Loosing Of Flanges With All Tools / Tackles / Manpower / Machinery Etc As Per Owner Eic Instructions. Gasket Shall Be Provided By Owner At Designated Store. Up To 4’’ Nb 6’’ Nb 8’’ Nb 10 Nb 8 Re-Conditioning Of Coating Of Underground Gas Pipeline After Locating The Pipeline ( In The Scope Of The Contractor ) By Suitable Method ( Pipeline Locator / Trial Pit Method / Pipeline Markers Etc ) As Per The Coating Fault. The Activity Includes ( A ) Excavation To Expose The Line To Suitable Depth To Expose The Pipeline And Provide Working Space Around The Pipeline. ( B ) Removal Of Existing Coating By Using Scrappers Etc. And Cleaning The Surface To Fine Finishes By Power Brush / Suitable Method. ( C ) Rectification Of Coating Of The Defects By Heat Shrinkable / Ray Chem After Surface Preparation By Mechanical Cleaning, Primer Application, Wrapping Of Tape, Edge Preparation, Holiday Test Etc. ( D ) R-95 Epoxy Application, If Required ( E ) Back Filling The Trenches And Restoring The Fields To The Satisfaction Of Owner. Cleaning Rou Of Any Debris Etc. ( F ) The Supply Of All Consumables, Utilities, Equipment, And All Manpower Required, Pipe Cleaning And Surface Preparation, Repairing Of Coating Defects ( Resulting In Holiday In Coating ) And Testing Including All Handling, Transportation, Etc. Included In This Schedule Of Item. ( G ) Any Crop Compensation To The Land Owner / Farmers Shall Be In The Scope Of Owner. ( No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools Used For This Activity ) Raychem Make Tape R-95 Epoxy Heat Shrinkable Sleeve Coating Repair Perp Htlp 80 Coating Repair Filling Material Mastic 9 Supply And Mobilization Of Nitrogen Gas Of Commercial Grade In Loose Cylinder / Banks Of Individual Cylinder Capacity 7M3 At A Pressure Of 150 Kg / Sq Cm With All Connecting Hoses And De-Mobilization After Completion Of Job Including Loading, Unloading, Handling Cylinder Pressure Regulator And Pressure Gauge With Accessories. No Separate Charges Shall Be Paid For Manpower, Tools & Tackles, Lifting Equipments Used During This Activity. Charges Of Nitrogen Qty Shall Be Considered Per Nos Of Cylinders Supplyed By Arc Contractor. 10 Supply, Transportation, Fabrication And Erection Of Ms Structural Steel Section Of Various Sizes Along With Required Fasteners ( Plate, Angle, Tee, Channel, Beam, Pipe Etc ) To Suit The Requirement. Rate Also Includes The Surface Cleaning By A Suitable Method, Supply And Application Of Two Coat Of High Build Chlorinated Rubber / Zinc Phosphate Primer And Two Coats Of Finished Paint Of Epoxy Of Grey Colour / Colour As Specified By Gigl Of Approved Make, The Job Is To Be Executed As Per The Direction Of The Gigl E.I.C. & Gigl Requirement. Job Inclusive Of Labour, Machinery Etc. ( No Separate Charges Shall Be Paid For Transportation Of Fabricated Structure, Manpower, Equipments Used During Execution Of This Activity ) 11 Surface Preparation Of Installed ( Operational ) Piping / Spool / Fittings, Steel Structural Surfaces By Bristle Blaster Machine Or Other Proper Methods ( Paint Rust Remover Equipment ) With Equipments, Accessories, Manpower, Material Etc Upto Required Surface Finish. The Work Also Includes Painting Of Piping Spool Including Supply Of Paint And Application Of 2 Coats Of Red-Oxide Primer Or High Build Chlorinated Rubber / Polyurethane / Zinc Phosphate ( As Per Site Condition ) Of 70 Micron Each And 2 Coats Of High Build Epoxy Finished Paint Of Golden / Cannery Yellow / Any Applicable Colour Instructed By Gigl With 70 Micron Each Of Approved Quality Including Stencilling, Tagging, Direction Arrow And Other Lettering As Per Gigl Eic. This Includes Covering Of Using Masking Tape During Surface Preparation And Painting Works. 12 Surface Preparation Of New Piping / Spool / Fittings, Steel Structural Surfaces Britstle Blaster Machine Or Blasting Methods. Finish Of Surface Quality Sa 2 ½ And Roughness 60 Microns Minimum By Providing Shot / Sand Of Approved Quality, Shot / Sand Blasting Equipments & Its Accessories, Manpower, Material Etc. The Job Also Includes Painting Of Piping Spool Including Supply Of Paint And Application Of 2 Coats Of Red-Oxide Primer Or High Build Chlorinated Rubber / Polyurethane / Zinc Phosphate Of 70 Micron Each And Two Coats Of High Build Epoxy Finished Paint Of Golden / Cannery Yellow / Any Applicable Colour Instructed By Gigl With 70 Micron Each Of Approved Quality Including Stenciling Of Line Numbers, Pipe Tagging, Flow Direction Arrow, Other Lettering As Found Condition Of Pipeline As Per Instruction Of Gigl Eic. This Includes Covering Of Nut-Bolts Using Masking Tape, During Surface Preparation & Painting Works. 13 Complete Job Of Repairing The Leakage Of Existing Buried Pipeline By Using Leak Repair Clamps & Other Accessories Related To Clamp. The Activity Shall Include All Necessary Arrangements, Excavation & Backfilling Work, Material Transportation And Other Works Required For Leak Arrest And Restoration Of Site. Land And Corp Compansation Will Be In Gigls Scope. Clamps Will Free Issued By Gigl 2 4 6’’ 10 12’’ 16” 18’’ 30” 14 Complete Job Of Repairing The Leakage Of Existing Above Ground Piping By Using Leak Repair Clamps. Manpower, Equipments And Material Shifting To Site Shall Be In Scope Of Contractor.Restoration Of Above Ground Piping As Per Original Conditions. Clamps Will Free Issued By Gigl 2 3 4 6’’ 8’’ 10 12’’ 16” 18’’ 30” 15 Emergency Repair Of Leaking Underground Pipe By Replacement By Pipe Spool, Or Fully Encircled Sleeve Welded On Pipe: This Work Shall Include Transportation Of Pipes And Associated Materials From Store Locations, Loading / Unloading Of The Line Pipes To The Site, Hydrotest Of Pipes, Excavating The Trench For Finding Out The Leakage In The Existing Line Burst Portion Of Point ( This Excavation Also Includes The Excavation For Replacement Of Pipe Upto Max. 12 Meter ) , Dewatering And Cleaning Of Pit Or Trench, And To Make It Free From Fire / Accident Etc., Cutting The Line From Both Ends ( Upto One Pipe Length Item, Approx 12 Mtr. Or Part Thereof Shall Be Treated As One Job ) Surface And Bevel Preparation Dp Checking & Welding The Pipe Of The Required Length On The Line, Ndt ( Radiography, Ut, Dp ) Coat And Wrap, Holiday Testing And Back-Filling The Same Etc. Complete The Work As Directed By E.I.C. Contractor To Arrange All Necessary Equipment, Consumables, Manpower Etc To Complete The Job. ( Pipes Shall Be Supplied Free Of Cost By Gigl At Designated Store ) ( Nitrogen Purging For The Section If Required To Be Claimed Seaprately As Per Sor. ) Fully Encircled Sleeve Shall Be Free Issed By Gigl. 4 12’’ 16” 18’’ 30” 16 Repair Of Metal Loss On Pipeline At Third Party Damage Locations / Corrosion / Less Thickness Locations By Composite Sleeve ( Clock Spring ) . The Job Includes Excavation & Restoration , Clearing Of Pit, Dewatering, Removal Of Coating, Preparation The Pipe Surface To Put Sleeve. The Job Also Includes The Supply Of Coating Materials & Repair Of Damaged Coating, Holiday Testing And, Back Filling With Soft Soil And Final Cleanup To Restore The Field To Its Original Conditions. Paut / Ut For Anomaly Assessment At Damaged Location Before Application Of Composite Wrap Shall Be In The Scope Of Contractor. Land And Corp Compansation Will Be In Gigls Scope. It Is Considered That Sleeve Width Will Be 300 Mm Std. ( Scope Of Supply Of Sleeve, Is In The Scope Of Contractor ) 4 12’’ 16” 18’’ 30” 17 Repair Of Flange / Rtd Thermowell / Ij / Valves Body At Leakage Portion Or Less Thickness Locations By Supply And Application Of Nicco - Fermanite Clamp Or Any Other Leak Clamp Which Can Be Installed On Line And Injecting Sealing Material. The Job Includes Cleaning Of Flange / Rtd Thermowell / Ij / Valves, Installation Of Nicco - Fermanite Clamp Or Any Other Leak Clamp Which Can Be Installed On Line And Injecting Sealing Material On Pipes. The Job Includes The Painting Of Pipeline / Flange / Rtd Thermowell / Ij / Valves And Restore The Field To Its Original Conditions. The Job Includes Man-Power, Transportation And Other Resources. This Job Shall Be Carried Out By Certified Oem / Vendor Only. Upto 2’’ 2 To 4’’ 6’’ 8’’ 10’’ 18 Hydrostatic Testing Of Clean Agent Cylinder ( Fm200 / Fk-1-2-3 ) / Co2 Flooding Cylinder As Per Latest Gas Cylinder Rules From Authorized Agency / Vendor. Hydro Testing Of Cylinders To Be Carry Out With High Pressure Hose Pipe, Calibrated Pressure Gauge, Suitable Manifold With Fittings And Any Special Requirement. Dismantling, Loading, Unloading, To And Fro Transportation, Refilling And Re-Installation All Inclusive. No Separate Charges Shall Be Paid For Manpower, Consumables, Lifting Equipments, Tools & Tackles Used During Execution Of This Activity. Co2 Flooding Cylinder - Water Capacity: 68 Ltr Clean Agent ( Fm200 / Fk-1-2-3 ) Gas Cylinder- Water Capacity: 80 Ltr 19 Fabrication And Installation Of Above Ground Piping Of Grade Astm A333 Gr.6 / Api 5L & Equivalent Grade Of Different Schedule Including, Handling, Aligning, Cutting, Beveling / Edge Preparation, Installation Of Associated Fittings / Flanges, Fit-Up, Tie-In, Welding, Radiography , Ut, Dp / Mpt, Transportation Of Fabricated Spool To Location, Temporary Supporting, Erection Of Different Size Of Fabricated Aboveground Piping At All Elevations Including Handling, Etc. The Job Includes Carrying Out Hydrostatic Testing As Per Gigl Approved Procedure Of Completed Piping Loop / Piping System As Approved By Owner / Owner’S Representative To The Specified Pressures, Providing All Testing Equipments / Instruments / Accessories, Blind Etc. Including Pressure Recorder, Temperature Probe, Temperature Recorder. Dewatering, Cardboard Blasting Surface Preparation & Painting Of Spool After Successful Completion Of Hydro Testing And Pneumatic Testing Is Also Including In Scope. ( Pipe / Pipefittings Shall Be Issued By Gigl At Designated Store. ) As Built Drawing Of The Installation Shall Be Included In The Scope Of Bidder. Pipe Wall Thickness Ranging Upto 6.4 Mm Pipe Wall Thickness Ranging From 6.4 Mm– 8.56 Mm Pipe Wall Thickness Ranging From 8.57 Mm– 17.4 Mm Pipe Wall Thickness Ranging From 17.5 Mm– 32 Mm    Pqr Laboratory Charges For 2” Wps Pqr Laboratory Charges For 4” Wps Pqr Laboratory Charges For 8” Wps Pqr Laboratory Charges For 12” Wps Pqr Laboratory Charges For 18” Wps    Eqt For 24 Mm Ms Plate ( Smaw ) Including Laboratory Charges Eqt For 24 Mm Ms Plate ( Gtaw ) Including Laboratory Charges Eqt For 16 Mm Ms Plate ( Smaw ) Including Laboratory Charges Eqt For 16 Mm Ms Plate ( Gtaw ) Including Laboratory Charges Ndt Charges For 2” Wps Ndt Charges For 4” Wps Ndt Charges For 8” Wps Ndt Charges For 12” Wps Ndt Charges For 18” Wps Ndt Charges For Eqt ( 24 Mm Plate ) Ndt Charges For Eqt ( 16 Mm Plate 20 Hydrostatic Testing Of Double Length Line Pipe ( Approx. 24 Meter ) At Max. Pressure Of 150 Brag. Job Includes Arrangement Of Header / Dish End ( End Cap ) For Installation Of Calibrated Pressure Gauge, Water Inlet, Drain, Vent; Welding, Ndt, Cutting, Bevelling And Edge Preparation After Testig Job. Submission Of Report After Completion Of Hydrotest.This Includes Loading / Unloading Of Linepipe, Header / Disc End Preparation, Tools, Tackels, Water, Pump, Corrosion Inhibitor, Equipment, Manpower, Etc. Required For Execution Of Job. 12Nb 16Nb 18Nb 30Nb 21 Gas Cutting, Grinding And Welding Of Edges Of Chequered Plate Installed In Cable Trenches, Valve Pit Etc. Including Handling. The Job Inclusive Of All Consumables, Equipments, Tools, Labour Etc. 22 Supply And Installation Of Chequered Plate Of Required Size For Trenches, Platforms Etc Including Application Of Red Oxide Primer And Two Coats Of Finish Paint Of Approved Quality. ( No Separate Charges Shall Be Paid For Gas Cutting, Grinding & Welding Of Edges Of Chequered Palte & Transportation Of The Same ) The Job Inclusive Of All Consumables, Equipments, Tools, Labour Etc. 4 Mm Thick 6 Mm Thick Civil 23 Earth Work In Excavation Below Ground Level For All Kinds Of Work In Basements, Foundations, Including Trenches Etc. Including Removal Of Vegetation, Shrubs And Debris, Cutting And Dressing Of Sides In Slopes, Levelling, Grading And Ramming Of Bottoms, Dewatering Of Accumulated Water From Any Source And Keeping The Surface Dry For Subsequent Works And Disposal Or Stacking Of Excavated Material Within A Lead Of 1 Km, As Decided Including Providing Temporary Supports To Existing Service Lines Like Water Pipes Sewage Pipes, Electric Overhead And Underground Cables Etc. All Complete, Including Shoring And Strutting. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. Soft Soil Upto 2.5 Meter Below 2.5 Meter Hard Rock Upto 3 Meter 24 Back-Filling Of Available Excavated Earth ( Excluding Rock ) Or Filling Loose Earth Other Than Black Cotton Soil In Trench, Sides Of Foundation Etc In Layers Not Exceeding 20 Cm In Depth Consolidating Earth Deposited Layer By Ramming And Watering And Filling Up To Required Ground Level. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. 25 ( A ) Supplying And Filling Selected Loose Earth Other Than Black Cotton Soil From Borrowed Pits In The Washout / Depressed Land Or In The Pit Locations Of Pipeline Row Compacting Upto 90% Of Proctor Density And Filling In Layers Not Exceeding 200 Mm Including Cost Of Transportation, Spreading, Compacting, All As Directed By Engineer-In-Charge. The Rates Includes Royalty Or Any Other Levies By Govt. Agencies Towards Taking Of Loose Earth From Borrowed Area As Per The Direction Of Engineer-In-Charge / Site Engineer Inclusive All Labour, Materials, Tools, Tackles, Transportation, Taxes Etc. Completion All Respect. ( Payment Shall Be Made On Basis Of Measurement Of The Pit Profile Of The Earth Washout In The Row Or Uncompacted Loose Soil Supply ) 26 Filling, In Foundation And Plinth ( Under Floors ) , With Good Quality Coarse River Sand, Obtained From Outside, Including Watering, Ramming Well, Consolidating And Dressing Etc. Complete, As Directed. 27 Breaking Of Pcc By Using Mechanical Breaker / Hammer / Manually / Abrasive Cutting Machine And Disposal Of The Demolished Materials Within A Lead Of 1Km. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. 28 Breaking Of Rcc By Using Mechanical Breaker / Hammer / Manually / Abrasive Cutting Machine And Disposal Of The Demolished Materials Within A Lead Of 1Km. Including Stacking Of Steel Bars And Disposal Of Unserviceable Material Within 1Km Lead. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. 29 Demolishing Brick Work In Cement Mortar ( With Plaster On Both Face ) Including Staking Of Serviceable Materials And Disposal Of Unserviceable Material Within 1Km Lead Including Transportation / Labour Etc. 30 Providing And Laying Masonry Work In Foundation / Superstructure Using Class -5 Brick With Cement Mortar 1:6 ( 1 Cement: 6 Coarse Sand ) As Per Specifications In One Or More Brick Thickness And In Any Standard Shape ( Excluding Circular / Curved ) Including Providing Recesses, Opening, Scaffolding, Staging, Curing, Finishing The Joints Flush Below Ground Level And Raking Out Joints In And Above Plinth Level Etc. All Complete. At All Depths Below And Upto 4.0 Mtr. From Ground Level At All Heights Above 4.0 Mtr. From Ground Level 31 12Mm Thick Plaster In 1:4 Cement-Mortar, Providing & Applying Finish Cement Plaster At All Heights, Levels And Places, Including Scaffolding, Chipping, Roughing Up The Concrete , Curing And Finishing . No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Scaffolding, Handling, Tools & Tackles Used During Execution Of This Activity. 32 100 Mm Thick Gravel Filling : Supplying, Stacking And Spreading Of Stone Aggregate Of Size 40 Mm To 63 Mm With Layer Of Sand And 250 Micron Thick Hm Hdpe Grade-I Film ( Conforming To Is:10889 ) At Desired Locations Inside The Process Area Over Well Compacted Earth Complete As Per Owner Construction Drawing And As Directed By Engineer-In-Charge. 33 Supply, Transportation And Installation Of Tp / Warning / Arial / K.M. / Ofc Marker On Pipeline Rou Including Supply Of All Materials For Fabrication, Cleaning, Two Coats Of Red-Oxide And Two Coats Of Zebra Colour ( Black And Golden Yellow Strips ) Of Approved Quality ( I S I Mark ) Paint And Marking The Number, Direction, Chainage And Pipe Size. Excavation Upto Required Size, Grouting In 1:3:6 Pcc Mixture To Correct Line, Level And Direction, Back-Filling & Restoration. The Work Is To Be Executed As Per Drawing And Direction E.I.C. No Separate Charges Shall Be Paid For Manpower, Consumables, Transportation, Lifting Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. For Normal Soil For Rocky Areas 34 Providing, Mixing And Laying Pcc Grade Of 1:3:6 Nominal Mix Using 40 Mm And Downgraded Coarse Aggregate For Any Thickness Below Footings, Plinth Beams, Foundations, Trenches, Pits & Sumps Etc. Using Ordinary Portland Cement, Curing Etc., Complete As Per Drawings, Specifications And As Directed By Eic. Centring & Shuttering Is Also In The Scope. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. 35 Providing Reinforcement ( Hysd Bars ) For Rcc Work Including Bending, Binding And Placing In Position Complete As Per Standard Isi 422 Part 1. Transportation, Loading, Unloading & Handling Of Materials To Site Are Included. No Separate Charges Shall Be Paid For Manpower, Consumables, Lifting Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. 36 Providing Rcc Work M20 1:1.5:3 ( 1Cement, 1.5 Coarse Sand , 3 Graded Stone Aggregate Size 20Mm Nominal Size ) In Support, Foundation, Footing, Pavements, Floors Etc. This Job Includes Providing Centering And Shuttering, Strutting, Propping And Removal Of Form With All Tools / Tackles / Labour / Machinery Etc. Charges Of Hysd Bars Shall Be Paid As Per Relevant Sor. 37 Washout Repair Job On Existing Buried Pipeline, Which Occur Mostly During Monsoon Period: ( A ) Supplying And Filling Selected Loose Earth Other Than Black Cotton Soil From Borrowed Pits In The Washout / Depressed Land Or In The Pit Locations Of Pipeline Row Compacting Upto 90% Of Proctor Density And Filling In Layers Not Exceeding 200 Mm Including Cost Of Transportation, Spreading, Compacting, All As Directed By Engineer-In-Charge. The Rates Includes Royalty Or Any Other Levies By Govt. Agencies Towards Taking Of Loose Earth From Borrowed Area As Per The Direction Of Engineer-In-Charge / Site Engineer Inclusive All Labour, Materials, Tools, Tackles, Transportation, Taxes Etc. Completion All Respect. ( Payment Shall Be Made On Basis Of Measurement Of The Pit Profile Of The Earth Washout In The Row Or Uncompacted Loose Soil Supply ) ( B ) Filling Empty Cement Bags Of 50 Kg Capacity ( The Bags To Be Used In Good Condition Only ) By Using Sand / Cement Mixture In 1:10 Ratio And Stitching By Using Jute Threads And Placing In Position In Row As Directed By Engineer-In-Charge / Site Engineer. 38 Water Body Bank Protection: Construction Of Gabions Structures By Providing & Making Gabion Structure With Mechanically Woven Double Twisted Hexagonal Shaped Wire Mesh Gabion Boxes As Per Is 16014:2012, Morth Clause 2500, Of Required Size, Mesh Type 10X12 ( D=100 Mm With Tolerance Of ± 2% ) Zinic+Pvc Coated, Mesh Wire Diameter2.7 / 3.7Mm, Mechanically Edged / Selvedged With Partitions At Every 1M Interval And Shall Have Minimum 10 Numbers Of Openings Per Meter Of Mesh Perpendicular To Twist, Tying With Lacing Wire Of Diameter 2.2 / 3.2Mm ( Id / Od ) , Supplied @3% By Weight Of Gabion Boxes, Filled With Boulders With Least Dimension Of 200 Mm, As Per Drawing, All Complete As Per Directions Of Engineer-Incharge. 39 Supply And Installation Of 1 Upvc Water Pipeline In Control Room Building / Terminal At Damaged Locations 40 Supply And Installation Of Ofc Pit Of Rcc Along With Cover, No Separate Charges Shall Be Paid For Transportation, Excavation, Backfilling, Manpower & Equipments Including Jcb. 41 Supply And Installation Of Hdpe Conduit For The Fiber Along With Hdpe Couplers. No Separate Charges Shall Be Paid For Manpower, Transportation & Equipments Used During This Activity. Hdpe Couplers Hdpe Conduit Of 50 Mm Dia 42 Restoration Or Installation Of Pipeline Makers ( Either Supplied By Gigl Or Fallen ) , The Job Includes Supply And Transportation Of All Materials Required To Complete The Restoration Or Installation Works Including Excavation, Fixing Of Pipeline Marker On Pipeline Rou In Pcc 1:3:6 To Correct Line & Level, Restoration Etc. Complete Job As Per Specification And Direction Of E.I.C. 43 Painting, Numbering & Lettering Of Existing Pipeline Markers Including Supply Of Paint And Application Of 2 Coats Of Red-Oxide Primer And 2 Coats Of Zebra Strip ( Black And Golden Yellow Stripes ) Of Approved Quality To Give An Even Shade After Proper Scraping Of Existing Paint And Clearing Of Surface Free From Foreign Materials. The Rate Are Including Man / Material And Transportation To The Position / Site. Direction Marker Warning Marker K.M. Marker Aerial Marker Ofc Marker Tlp 44 Providing Stone Pitching Average 230-250Mm Thickness With The Joints Filled Up With Cement Mortar Of 1:6. Including Preparation Of The Bed Slope, Cutting And Filing Earth, Compacting To The 90% Of Proctors Density, Filling The Joints With 1:6 Cement Mortar Pointing The Joints With Same Mortar Complete In All Respects Including The Supply Of Stone Boulders, All Materials, Labour And Consumables Etc. As Directed By Engineer-In-Charge And As Per The Specifications. 45 Removing Of Damaged / Settled Paver Blocks And Relaying Of Shot Blasted Interlocking / Non- Interlocking Colored Paver Blocks Of High Density 80-100 Mm Thick M-30 Grade For Footpath, Parking Areas, Service Lanes And Other Areas As Mentioned In The Drawing. Including Providing And Laying 50 To 80 Mm Thick Average Bedding Layer Of Coarse Sand Below Paver Block As Per Required Grading And Specification. Laid Paver Block Shall Be Mechanically Compacted. The Work Of The Paving Blocks Shall Be Executed In Line And Level By Skilled Mason Of Flooring Work Only. It Should Be Laid In Such A Way That The No Cutting Of The Paver Block To Be Necessary. Cutting Of Paver Block By Machine Cut Only And Laying To Be Done By Skilled Flooring Mason. The Finished Surface Of The Paver Block Shall Have Coarse Sand Texture Finish. Paver Blocks Shall Be Compacted And Shall Be Re-Laid If Necessary. 46 Providing And Laying Shot Blasted Interlocking / Non- Interlocking Colored Paver Blocks Of High Density 80-100 Mm Thick M-30 Grade For Footpath, Parking Areas, Service Lanes And Other Areas As Mentioned In The Drawing. Including Providing And Laying 50 To 80 Mm Thick Average Bedding Layer Of Coarse Sand Below Paver Block As Per Required Grading And Specification. Laid Paver Block Shall Be Mechanically Compacted. The Work Of The Paving Blocks Shall Be Executed In Line And Level By Skilled Mason Of Flooring Work Only. It Should Be Laid In Such A Way That The No Cutting Of The Paver Block To Be Necessary. Cutting Of Paver Block By Machine Cut Only And Laying To Be Done By Skilled Flooring Mason. The Finished Surface Of The Paver Block Shall Have Coarse Sand Texture Finish. Paver Blocks Shall Be Compacted And Shall Be Re-Laid If Necessary. 47 Providing And Fixing Kerb Stones 150 Mm Thick And 450 Mm Wide Chisel Dressed Cut Stones Fixed In Cc 1:3:6 ( Block Size 450X300x150mm ) Including Cost Of Excavation, Backfilling, Pcc Bed ( 1:3:6 ) , Etc. 48 Providing, Laying, Spreading And Compacting Graded Stone Aggregate ( Size Range 53 Mm To 0.075 Mm ) To Wet Mix Macadam ( Wmm ) Specification Including Premixing The Material With Water At Omc In For All Leads & Lifts, Laying In Uniform Layers With Mechanical Paverfinisher In Sub- Base / Base Course On Well Prepared Surface And Compacting With Vibratory Roller Of 8 To 10 Tonne Capacity To Achievethe Desired Density, Complete As Per Specifications And Directions Of Engineer-In-Charge. 49 Supplying & Filling Approved 230 Mm Thk. Rubble Soling With The Use Of Excaveted Materials And As Approved By Consultant / Client. Including Filing Voids By Sand And Stone Chips, Flooding With Water, Etc. Complete Inclusing All Types Of Labours, Tools / Tackles, Consumables ( Sand, Approved Excavated Rubbles And Others Required To Complete The Entire Job ) , Compaction By Mechanical Means / Manual Method To The Satisfaction Of Consultant / Client Etc. Complete. The Rate Is Inclusive Of Carting Of All Materials From Any Distance Of Stacked Yard To The Location Of Placement. For Measurement, Plan Area Of Work Done Only Is To Be Considered As Per Drawing Or Actual, Whatever Is Less. 50 Chained Link Fencing Supplying & Fixing In Position 1.20-Meter-High Galvanised Iron Chain Linked Fencing Of Minimum 8 Gauge Of Mesh Size 75Mm And Galvanised Concertina. The Diameter Of The Steel Wire For Chain Link Fencing Shall Not Be Less Than 12 Gauge And The Chain Link Has To Be Fixed With 65X65x6 Ms Angle Fixed At Every 3M Interval With Pcc 1:3:6, 0. 30 M X 0. 30 M X 0.45 M Depth With Necessary Excavation, Pcc, 2 Coats Of Painting Over One Coat Of Primer All As Per Drawings. 65X65x6 Ms Angle Struts To Be Provided At Corners And At Distance Of 30 Mtr C / C. Electrical 51 Dismantling And Taking Out Of Submersible Pump-Motor From Bore Well, Retaining And Rolling Of Power Cable Pulled Out From Bore Well. And Reinstallation Of Repaired Motor And Associated Assembly Back Into The Bore In Complete Working Condition. The Rate For Repairing Of Damages In The System Shall Be Paid As Per List Below. All The Tools Tackles, Manpower, Tripod, Fasteners Etc. Required For The Job Is Included In The Scope. Up To 5 Hp From 5.1 Hp To 10 Hp Bushing / Bearing Replacement Rectification / Replacement Of Mechanical Damage Of Pump Rewinding Of Motor Flat Strip Cable Supply And Installation Of Pump Pipe Upvc / Gi Class C Of Required Diameter A ) 1 B ) 2 52 Repairing & Installation Of Bore-Well Starter Three-Phase Starter Should Be With In Built Over Load Tripping Feature. Up To 5 Hp 5.1 To 10 Hp 53 Replacement Of Concrete / Ms Plate Covers Of Earth Pits By Hinged Acrylic Covers With Locking / Bolting Facility & With Facility To Change Testing Date. The Related Modifications Of Masonry Works Of Earth Pits Shall Be In The Scope Of The Contractor. 54 Supply And Replacement Of Lamps / Fixture ( Bajaj / Philips / Cg / Osram / Ge Make Or Other Makes As Per The Gigl / Gspl Vendor List ) Including Scaffolding, Men, Machinery If Required As Per Eic Led 18W Tube Light 50 W Led Exd Type Battery Room 20 W Led Double Fluorescent Tube Light Fitting Led 36W / 40 W Recessed Type 70 W Led Street Light 100W Led Flood Light Exd 180W Led Flood Light 45W Led 12 / 18 W Led Recessed Type High Mast Light Flood Type 350 / 360W Led Weather Proof 150W Led Flood Light 55 Supply And Replacement Of Ballast / Driver / Choke For Led ( Bajaj / Philips / Cg / Osram / Ge Make Or Other Makes As Per The Gigl / Gspl Vendor List Including Scaffolding, Men, Machinery If Required As Per Eic. ( All Ballasts / Drivers To Be Industrial Grade ) 50 W Led Exd Type Battery Room Led 36W / 40 W Recessed Type 70 W Led Street Light 100W Led Flood Light Exd 180W Led Flood Light High Mast Light Flood Type 120W / 240W / 350W Led High Mast Light Flood Type 120W Led 45W Led Weather Proof 150W Led Light 56 Maintenance Of High Mast Repairing Of Motor Rope Assembly Locking System Repairing Of Motor Electrical Lift Rope Assembly Electrical Lift Locking System Electrical Lift 57 Supply And Installation Side Hinged Smc Frp Based Pole Mounted Junction Box For Street Light / Flood Lighting Pole For Below Mentioned Size Of Approved Make Like Sintex. Size 250 Mm X 200 Mm X 105Mm Size 300 Mm X 200 Mm X 105 Mm 58 Supply And Installation Of 45W Led Post Top Lanterns Of Approved Make As Per The Gigl / Gspl Vendor List For Gate Lighting With Ip 54 Protection, Complete With Lamp And Gear Box And All Accessories. 59 Rewinding Of The Following Motors Pump ( Single Phase / Three Phase ) . Work Includes Removal Of The Equipment, Rewinding & Repairing, Re-Installation Of The Same. ( Including Replacement Of Bearing, Required Cable ) .No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Bearings, Tools & Tackles Used During Execution Of This Activity. Ceiling Fan Pump Of 2.0 Hp Pump Of Upto 1.5 Hp Bushing / Bearing Replacement Exhaust Fan Heavy Duty Up To 140W Exhaust Fan Heavy Duty Explosion Proof Iia & Iib Up To 0.33 Hp 60 Checking And Then Supply And Installation ( Including Supply Of Component ) For Split / Cassette / Vrv Ac As Applicable 3 Way Switch Swing Motor / Blower Motor Exhaust Fan & Its Motor Air Filter Copper Tubing Indoor Pcb Split Ac Indoor Pcb Cassette Ac Indoor Pcb Vrv Ac Outdoor Pcb Split Ac Outdoor Pcb Cassette Ac Outdoor Pcb Vrv Ac Temperature Sensor / Card Cu Flexible Cable ( 3Cx6sqmm ) Insulation Of Ac Duct Supply And Replacing Of Drain Pipe Of Pvc For Ac Charging Of Refrigerant For Ac Control Card Split Ac Control Card Cassette Ac Control Card Vrv Ac 61 Below Items To Be Applicable For All Dg Sizes Supply And Installation Of Banjo Hose For Dg For All Dg Sizes Supply And Installation Of Kwh Meters In Dg For All Dg Sizes Supply And Installation Of Thermostat For Dg For All Dg Sizes Supply And Installation Of Water Temperature Switch For Dg For All Dg Sizes Supply And Installation Of Spin On Lube Oil Filter For Dg For All Dg Sizes Supply And Installation Of Spin On Air Filter For Dg For All Dg Sizes Supply And Installation Of Spin On Diesel Filter For Dg For All Dg Sizes Supply And Installation Of Battery Charger 12 V For Dg For All Dg Sizes Supply And Installation Of Battery Charger 24 V For Dg For All Dg Sizes Supply Of Engine Oil Of Cummins / Kirloskar Make For All Dg Sizes Supply And Installation Of Magnetic Pick-Up Coil For Dg For All Dg Sizes Supply Of Coolant For Coolant Cooled Engines Of Cummins / Kirloskar / Mahindra Make For All Dg Sizes Supply And Installation Of Dg Set Exhaust Pipe Insulation ( Rope ) Coating For All Dg Sizes Supply & Installation Of Floating Mechanical Fuel Gauge On Fuel Tank Of Kirloskar / Cummins / Mahindra Make Repairing Of Display Panel / Amf Panel And Programming Of Kirloskar / Cummins / Mahindra Make Repairing & Supply Of Any Component For Amf Panel And Programming Of Kirloskar / Cummins / Mahindra Make Supply & Installation Of Acoustic Enclosure Door Lock 62 Repairing Of Automatic Voltage Regulator Of Crompton Greaves Avr Of Cummins / Kirloskar / Mahindra Make D.G Set. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 63 Supply & Replacement Of Fuel Filter Pre Type Of Kirloskar / Cummins / Mahindra Make 64 Supply & Replacement Of Fuel Filter Mic Type Of Kirloskar / Cummins / Mahindra Make 65 Supply & Replacement Of Lube Oil Filter Element Of Kirloskar / Cummins / Mahindra Make 66 Supply & Replacement Of Air Filter Of Kirloskar / Cummins / Mahindra Make 67 Supply & Replacement Of Air Cleaner Of Kirloskar / Cummins / Mahindra Make 68 Supply & Replacement Of V-Belt For Blower Of Kirloskar / Cummins / Mahindra Make. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 69 Supply Of & Replacement V-Belt For Dynamo Of Kirloskar / Cummins / Mahindra Make. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 70 Replacement Of Bearing Set Of Kirloskar / Cummins / Mahindra Make. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 71 Replacement Of Oil Seal For Crank Of Kirloskar / Cummins / Mahindra Make. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 72 Supply And Installation Of Automatic Float-Boost Charger Of Nhp Make Provided By M / S Kirloskar / Cummins / Mahindra Of 12V / 24V 6 / 12 Amp Rating. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 73 Supply, Removal Of Old Battery & Installation Of New 12V / 24V Lead-Acid Battery Of Approved Make For Invertor / Dg Set. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles, Used During Execution Of This Activity. Contractor Shall Buyback The Old Battery. 65Ah 75Ah 100Ah 120Ah 150 Ah 74 Supply And Replacement Of Applicable Current Transformer Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 150 / 1A, Cl 5P20, Va 7.5 Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 100 / 1A, Cl 5P20, Va 7.5 Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 100 / 1A, Cl 1, Va 7.5 Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 75 / 1A, Cl 5P20, Va 15 Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 75 / 1A, Cl 1, Va 10 Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 75 / 1A, Cl 5P20, Va 7.5 Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 200 / 1A, Cl 1, Va 10 75 Supply And Replacement Of Potential Transformer Pt Ratio 415 / 110V, 50Va Or As Applicable 76 Supply And Installtion Of Transformer Optional Item Transformer Oil Transformer Oil Filtration And Testing Of Oil As Per Is:1866 Replacement Of Silica Gel 77 Supply, Replacement And Installation Of Solar Light Spares Solar Module ( Vikram Solar, Waree Solar, Goldi Green Technologies Pvt Ltd, Tata Power Solar Systems Pvt.Ltd, Solar Systems Pvt.Ltd, Moser Bear Solar Limited, Xl Energy Limited, Solar Semiconductor, Emmvee Photovoltaic Pvt Ltd , Navitas Green Solutions Pvt Ltd, Satvik, Panchwakr Solar, Surana Solar ) Photovoltaic Battery 12V 150Ah ( Exide, Okaya, Luminous, Relicell, Artheon, Su-Kam, Base, Southern, Hbl, Gem ) Charge Controller ( Photonic, Superier, Gelco ) 78 Led Street Light Fixtures Solar Lighting Poles ( Philips, Crompton, Wipro, Havells, Oreva, Charlson, Syska, Moser Bear, Surya, Bajaj ) Led Luminaire Fixture 18, 36, 40 Watts Approved Make Pcb For Led Luminaire Fixture 18, 36, 40 Watts Supply, Laying & Termination Of 2C X 4 Sq. Mm Armoured Power Cable 79 Supply & Installation ( Including Removal Of Existing One ) Of Ni-Cd Battery ( Vrpp / Vrla / Vrnm / Ultra Low Maintenance Batt. ) 1.2 V For Ups / Dc Charger / Inverter System. ( Contractor Shall Buyback The Old Battery. ) 120Ah 150Ah 107Ah 540Ah 450Ah 651Ah 80 Supply & Installation Of 11 Kv Line Type Lightning Arrestor On Dp Structure Of Reputed Make Like Oblum, National Electric Etc. 81 Liasioning With Cei For Annual Periodical Inspection Of Ht Facility ( 11 Kv ) Or Lt Facility ( 420 V ) Including Distribution Transformer, Vcb, Dg Set & Obtaining Statutory Clearance Certificate Under Electricity Act ( Measures Relating To Safety & Electric Supply ) As Amended From Time To Time. Applicable Statutory Fees Only Shall Be Paid By Owner. 82 Supply And Installation Of Cable Jointing Kit For Following Cable ( 3M / Raychem Make ) Including Ir Test And Re-Commissioning Of Cable. The Work Includes Excavation Upto The Cable, Making Required Trenches For Execution Of Job And Backfilling The Area. No Separate Charges Shall Be Paid For Manpower, Excavation, Backfilling, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. Upto 3.5 C X 50 Sq. Mm. Al. Armoured Cable Upto 4 C X 50 Sq. Mm. Al. Armoured Cable 3.5 C X 95 Sq. Mm. Al. Armoured Cable ( Ht ) 3.5 C X 95 Sq. Mm. Al. Armoured Cable ( Lt ) 3.5 C X 100-300 Sq. Mm. Al. Armoured Cable ( Ht ) 83 Supply, Laying & Termination Of Xlpe Insulated, Frls Outer Sheathed, Pvc Inner Sheathed Cable Voltage Grade 650 / 1100 Volts Of Following Sizes Above-Ground On Cable Trays, Supported On Steel Structures, In Ready Made Trenches. The Rates Shall Include The Supply And Fixing Of Aluminium Number Tags, G.I. Saddles / Clamps, Saddle Bars, Lugs, Ferrules, Double Compression Type Ss Glands, Etc, Including Transportation With All Labor And Materials As Per The Specifications, Drawings And Directions Of Engineer-In-Charge . The Insulation Resistance Of Cable Has To Be Checked & Report To Be Submitted Before Commissioning. No Separate Charges Shall Be Paid For Manpower, Consumables, Tools & Tackles Used During Execution Of This Activity. Upto 4 C X 6 Sq. Mm. Cu. Armoured Cable 4 C X 10 Sq. Mm. Cu. Armoured Cable 4 C X 25 Sq. Mm. Cu. Armoured Cable 84 Supply, Laying & Termination Of Xlpe Insulated, Frls Outer Sheathed, Pvc Inner Sheathed Cable Voltage Grade 650 / 1100 Volts Of Following Sizes Under-Ground And / Or Pull Through Pipes Including Excavation And Backfilling Etc. Work Includes Excavation Of Trench Of Average 0.5 Meter Wide & Up To 1.2 Meter Depth With All Appropriate Tools & Tacles ( Manual Work Inside Terminals ) . Layer Of Sand Shall Be Of 100 Mm Thick & Brick Layer Shall Be Laid On Cable For Protection And Back Filling Of Trench After Completion Of Work. Work Includes Carting Of Surplus Earth / Debris And Handling / Unrolling Of Cable, Supply Of Aluminium Tags, Lugs, Ferrules, Double Compression Type Ss Glands, Etc, Including Transportation With All Labour And Materials As Per The Specifications, Drawings And Directions Of Engineer-In-Charge . The Insulation Resistance Of Cable Has To Be Checked & Reported Before Commissioning.No Separate Charges Shall Be Paid For Excavation, Backfilling, Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity Upto 4 C X 4 Sq. Mm. Cu. Armoured Cable 4 C X 6 Sq. Mm. Cu. Armoured Cable Upto 4 C X 10 Sq. Mm. Cu. Armoured Cable 85 Supply And Installation Of Gi 4.5 Meter Lighting Pole For Process Area 86 Supply And Installation Of 100 Watt Flp Flood Light Along With Jb ( Mcb Etc ) And Armond Cable 87 Supply And Installation Of Vcb Spare Surge Arrestor ( Make: Raychem Rfg, Rating: 10 Kv, 10 Ka, Class-1, Model: Da1-10A-Ind ) Supply And Replacement Of Applicable Current Transformer ( Ct ) 11 Kv , Ct 2 Core Wound : Cr1 - 50 / 5A, Burden 7.5Va, Cl: 1 Isf:5 Cr2 - 50 / 5A, Burden 7.5Va, Cl: 5P10 Bil 12Kv / 28Kv / 75Kv. Freq: 50Hz Supply And Replacement Of Applicable Gun Type Pt With 3.15A Bussman Fuse Pri. Volt : 11Kv / 3, Freq :50Hz Cr1 : Sec Volt : 110 / 3, Burden : 100 Va , Cl :1 / 3P Cr2 : Sec Volt : 110 / 3, Burden : 25 Va , Cl :3P Bil 12Kv / 28Kv / 75Kv. Freq: 50Hz Schneider Make Protection Relay , P127 Dir / Non Dir 3 Ph O / C & E / F Model No : P127 Aa0z112fed Earth Current : I / P – 0.1 – 40A Voltage I / P- 57-130 V Digital I / P Voltage : 24-250 Vdc / Ac 88 Supply & Installation Of Spd ( Surge Protection Device ) 10 Ka / 25Ka ( For Medb ) 89 Supply And Installation Of Ht Termination Kit ( Indoor / Outdoor ) For Following Cable ( 3M / Raychem Make ) Including Ir Test And Re-Commissioning Of Cable ( 3C X Up To 300 Sq. Mm. Al. Armoured Cable ) 90 Supply & Installation Of Copper Earthing Cable 10 / 16 / 25 Sq Mm In Consultation With Eic. The Job Includes The Excavation, Removal Of Existing Copper Strip, Laying Of New Cable, Back-Filling & Restoration. No Separate Charges Shall Be Paid For Manpower, Tools & Tackles, Equipments, Instruments Used During This Activity. 91 Supply, Installation Testing & Commissioning Of Copper Earthing: The Job Includes: A ) Excavation Of A Pit Of Size ( 900 Mm X 900Mm X 3500Mm Deep ) B ) Placement Of Copper Earth Plate ( 600Mm X600mm X3 6Mm ) And Embedding The Gi Pipe Of 20Mm, 3Mtr. Length In The Earth C ) Back Filling The Pit With Alternate Layers Of Approx. 100Kg Charcoal And 50 Kg Salt To Cover The Earth Plate The Pit Shall Further Be Refilled With Earth Upto Ground Level And Compacted. Copper Strip ( Size 25Mm X 3 6Mm ) 2 Nos. Shall Be Provided From Plate Electrode To Ground Level To Facilitate Jointing With Earth Wire. It Shall Be Provided With Test Link For Testing Of The Particular Earth Pit. The Funnel Shall Be Installed Above The Ground For Facilitating Pouring Of Water. The Funnel Of Earthing Pits Shall Be Covered By Brick Masonry Chamber ( Size 900Mm X 900 Mm X 600Mm ) With Cement Plaster On Inside And Outside. The Chamber Shall Be Provided With A Hinged Ms Cover And Frame Fixed On Chamber Alognwith Sticker Tagging Installed On The Backside Of Ms Plate ( 400X100mm ) . The Resistance Of The Pit Must Be Achieved Below 1 Ohm 92 Supply And Filling Of Chemical Solution For Earthing And Restoring The Earth Pit To Its Standard Values 93 Supply, Installation, Testing & Commissioning Of Gi Pipe Earthing. A Pit ( Size : 3500 Mm Deep ) Shall Be Excavated By Auguring Or Otherwise, 65 Dia Gi Pipe 3.5 Mtr. Length Shall Be Put. The Gi Pipe Shall Be Cut Tapered At The Bottom And Provided With Holes Of 12 Mm Dia. Drilled At 75 Mm Interval Upto 2.5 Mtr. Length From Bottom. The Pit Shall Be Back Filled With Alternate Layers Of Appx 100 Kg Of Charcoal And 50 Kg Of Salt. The Pit Shall Further Be Refilled With Earth Upto Ground Level And Compacted. Gi Strip Size 50X12mm Shall Be Welded To This Gi Pipe At Ground Level To Facilitate Jointing With Earth Wire. It Shall Be Provided With Test Link For Testing Of The Particular Earth Pit. The Funnel Shall Be Installed Above The Ground For Facilitating Pouring Of Water. The Funnel Of Earthing Pits Shall Be Covered By Brick Masonry Chamber ( Size 900Mm X 900Mm X 600Mm ) With Cement Plaster On Inside And Outside. The Chamber Shall Be Provided With A Hinged Ms Cover And Frame Fixed On Chamber Along With Tagging On Ms Plate ( 400X100mm ) . The Resistance Of The Pit Must Be Achieved Below 1 Ohm. 94 Supply, Laying & Installation Of Copper Earthing Strip – 25 X 3 Mm ( Above Ground / Under Ground ) With Over Lapping Of Minimum 75 Mm At Joints And Two Consecutive Strip Be Bolted Together With Copper Bolt, Job Includes Cutting The Strip Suitable To Site, Edge Preparation , Excavation Of Required Length / Width / Depth, Strip Laying And Back Filling After Completion, Site Welding And Bending And Termination As Per Eic, Supply Of Copper Connection Bolts Etc. 95 Supply, Laying & Installation Of Gi Earthing Strip – 50 X 6 Mm, ( Above Ground / Under Ground ) With Over Lapping Of Minimum 75 Mm At Joints And Two Consecutive Strips To Be Welded Together And Applying Bitumen On The Joint. Job Includes Cutting The Strip Suitable To Site, Edge Preparation , Excavation Of Required Length / Width / Depth, Strip Laying And Back Filling After Completion, Site Welding And Bending And Termination As Per Eic, Supply Of Ss Connection Bolts Etc. 96 Supply, Laying & Installation Of Gi Earthing Strip – 25 X 6 Mm, ( Above Ground / Under Ground ) With Over Lapping Of Minimum 75 Mm At Joints And Two Consecutive Strips To Be Welded Together And Applying Bitumen On The Joint. Job Includes Cutting The Strip Suitable To Site, Edge Preparation , Excavation Of Required Length / Width / Depth, Strip Laying And Back Filling After Completion, Site Welding And Bending And Termination As Per Eic, Supply Of Ss Connection Bolts Etc. 97 Supply And Installation Of Three Way Flameproof Junction Box With Appropriate Flame Proof Double Compression Cable Gland Of Approved Make 98 Dismantling, Powder Coating ( Alkali Resistant Epoxy Powder Coated , Shade:Ral 7032 ) & Reassembling Of Ni-Cd Battery Rack. Work Includes Surface Cleaning Of Batteries With Dm Water & Potential Measurement Of Each Cell Voltage After Reassembling. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 99 Supply & Installation Of Stabilizer Upto 4 Kva 230 Volt Of V Guard, Gelco, Luminous, Voltek Make. It Should Be Cu Wound With Overload Tripping Feature, Voltmeter ( Digital ) And Mcb. 100 Supply & Installation Of Stabilizer From 5 Kva To 8 Kva 420 Volt ( 3 Phase ) Of V Guard, Gelco, Luminous, Voltek Make. It Should Be Cu Wound With Overload Tripping Feature, Voltmeter ( Digital ) And Mcb. 101 Relocation Of Lighting Pole / Solar Pole / Opgd / Pgd Within The Terminal Which Includes Removal With Or Without Rcc Foundation & Re-Installation With Proper Foundation, Concrete Support Etc. Complete In All Respect. This Also Include Levelling Of Old Foundation Location & Backfilling If Required With All Tools, Tackles, Labour, Machinary, Hydra Etc. Removal Of Fixture, Jb , Earthing Connections, Cable Connection From Pole At Old Location & Reconnection & Testing Of All The System At New Location Is Included In The Scope. 102 Supply & Replacement Of Rectifier Module For Industrial Inverter Up To 2.5 Kva Make: Vertive / Emerson 103 Supply Laying & Termination Of 4 C X 10 Sq.Mm Cu Flexible Cable 104 Supply And Installation Of Ss 316, Double Compression Type Cable Glands For Armoured Twin And Multicore Power Cables Of Voltage Grade 650 / 1100 V And Instrument Cables Alongwith Pvc Shrouds. The Glands Shall Be Flameproof To Gas Group Iia, Iib And / Or Weatherproof To Ip 65, For Cables Having Overall Diameters As Given Below. Applicable Certificate Shall Be Provided By The Contractor. 1 / 2 Npt / Et As Specified By Eic 3 / 4 Npt / Et As Specified By Eic 1 Npt / Et As Specified By Eic 105 Maintenance Of Junction Box Including Cleaning, Supply & Replacement Of Rubber Seal, Nut-Bolt , Entry Plug, Gland & Washer. No Separate Charges Shall Be Paid For Manpower, Rubber Seal, Nut-Bolt, Entry Plug, Gland, Washer, Consumables, Tools & Tackles Used During Execution Of This Activity. 106 Supply & Instalaltion Of Gi Cable Trays With Cover On Ms Steel Support. All Accessories Shall Be In The Scope Of Contractor Like Ms Angle Support , Channel, Fastners, Clamp, Cable Tie Etc. As Per Below Mentiond Size Perforated Cable Tray With Cover 150 Mm Perforated Cable Tray With Cover 100 Mm 107 Supply & Instalation Of Heavy Duty Exhaust Fan, Made Of Cast Aluminium Alloy Lm6, Exproof To Gas Group Iia & Iib. Suitable For Continuos Running. It Should Be Epoxy Powder Coated For Resistance To Corrosion And Acid Alkali Fumes. It Should Be Supplied With Self Opening Louvers For Total Protection Against Birds And Direct Rain. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. Size : 300 Mm, Single Phase Size : 450Mm, Single Phase 108 Supply And Installation Of Ceiling Fan ( Gigl Approved Vendor Make ) , White / Ivory Colour, 230V, 1-Phase, 1200 Mm Sweep. It Shall Have Robust Two Piece Motor Construction, All Aluminum Alloy Construction With Double Ball Bearing And Powder Coated Finish To Protect Metal From Corrosion.The Fan Shall Be Energy Efficient Having 5 Star Rating. Removing Of Existing Fan From The Location. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 109 Painting Of Lighting Pole / Solar Pole / Opd Pole / Stack Including Surface Preperation, Supply Of Paint And Application Of 2 Coat Of High Build Chlorinated Rubber / Zinc Phosphate Primer And Two Coats Of Finished Paint Of Epoxy Paint Of Silver Colour Approved Make To Give An Even Shade After Proper Removal Of Existing Paint By Power Brushing Or Suitable Method And Clearing Of Surface Free From Foreign Materials. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. Upto 5 Meter Height Pole Upto 6 Meter Height Pole 6.1 Meter To 9 Meter Height Pole 9.1 Meter To 11 Meter Height Pole Instrumentation 110 Removal, Refilling & Re-Installation Of Co2 Gas Cylinders Used For Flooding System Of Water Capacity: 68 Liter Including To & Fro Transportation. ( Co2 Refilling Shall Be Carried Out Thru Peso Approved Vendor Only ) . No Separate Charges Shall Be Paid For Manpower, Tools & Tackles, Lifting Equipments Used During This Activity. 111 Removal, Refilling & Re-Installation Of Clean Agent ( Fm200 / Fk-1-2-3 ) Gas Cylinders Used For Flooding System Of Water Capacity: 80 Liter Including To & Fro Transportation. ( Clean Agent Refilling Shall Be Carried Out Thru Peso Approved Vendor Only ) . No Separate Charges Shall Be Paid For Manpower, Tools & Tackles, Lifting Equipments Used During This Activity. 112 Ofc-24 / 48 Fiber Jointing At Pit Location By Preparation Of Fiber, Removal Of The Sheath, Cleaning Of The Fiber, Fixing The Fiber To The Ftc With Proper Clamping / Ties. Numbering Of The Fiber Using Ferrules, Splicing The Fiber To The Pigtail, Proper Routing Of The Fiber In The Cassette. Proper Closure Of The Cassette, Connecting The Pigtail To The Adapter, And Marking The Same, For 1-24 / 48 Fibers Joints. Job Include Fault Finding & Identification Using Otdr. End To End Testing Of Fibres After Jointing And Submission Of Report. Incase Of Unacceptable Db Loss At Repair Joint Same Needs To Be Rectified With-Out Any Cost Implication To Owner. Final End To End Otdr Test Shall Be Carried-Out For All 24 / 48 Fibres & Submit The Report Without Any Cost Implication To Owner. No Separate Charges Shall Be Paid For Manpower, Instruments, Transportation Used During This Activity. Visit For Fault Finding & Final Testing Shall Be Considered As One Visit Only. Complete Link Testing End To End With Power Source, Laser Source, Otdr Meter Working With 1310 Nm And 1550 Nm From Both End Including Pigtails, Patch Cord For Testing. Submission Of All 24 Core Otdr Traces Between Two Terminals Or Across The Joints. Pit Excavation & Back-Filling Included & No Extra Charge Shall Be Paid. Jointing Enclosure For 24 / 48 Core Fiber Cable Shall Be Supplied By Contractor. 113 Removal And Re-Installation Of Ultrasonic Meter Of Size Mentioned Below. No Separate Charges Shall Be Paid For Manpower, Consumables, Lifting Equipments, Valve Operations, Tools & Tackles Used During Execution Of This Activity. Gasket Shall Be Supplied By Owner At Designated Store. 4 8 10 114 Removal And Re-Installation Of Turbine Flow Meter Of Size Mentioned Below. No Separate Charges Shall Be Paid For Manpower, Consumables, Lifting Equipments, Tools & Tackles Used During Execution Of This Activity. Gasket Shall Be Supplied By Owner At Designated Store. 3 4 115 Removal And Re-Installation Of Rotary Positive Displacement ( Rpd ) Meter Of Size Mentioned Below. No Separate Charges Shall Be Paid For Manpower, Consumables, Lifting Equipments, Tools & Tackles Used During Execution Of This Activity. Gasket Shall Be Supplied By Owner At Designated Store. 2 116 Removal And Re-Installation Of Flow Control Valve Of Size Mentioned Below. No Separate Charges Shall Be Paid For Manpower, Consumables, Lifting Equipments, Tools & Tackles Used During Execution Of This Activity. Gasket Shall Be Supplied By Owner At Designated Store. 4 8 10 117 Supply, Laying & Termination Of Pvc Insulated, Frls Outer Sheathed, Pvc Inner Sheathed Instrumentation Cable Voltage Grade 650 / 1100 Volts Of Following Sizes Under-Ground And / Or Pull Through Pipes Including Excavation And Backfilling Etc. Work Includes Excavation Of Trench Of Average 0.5 Meter Wide & Up To 1.2 Meter Depth With All Appropriate Tools & Tackles ( Manual Work Inside Terminals ) . Layer Of Sand Shall Be Of 100 Mm Thick & Brick Layer Shall Be Laid On Cable For Protection And Back Filling Of Trench After Completion Of Work. Work Includes Carting Of Surplus Earth / Debris And Handling / Unrolling Of Cable, Supply Of Aluminium Tags, Lugs, Ferrules, Double Compression Type Ss Glands, Etc, Including Transportation With All Labour And Materials As Per The Specifications, Drawings And Directions Of Engineer-In-Charge . The Insulation Resistance Of Cable Has To Be Checked & Reported Before Commissioning. No Separate Charges Shall Be Paid For Excavation, Backfilling, Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity Instrument Cable Upto 1P X 1.5Sqmm Armoured Cable Instrument Cable Upto 2P X 1.5Sqmm Armoured Cable Instrument Cable Upto 6P X 1.5Sqmm Armoured Cable 118 Supply, Fabrication And Installation Of Aluminium Canopy For Field Instruments, Open Path Gas Detectors, Flow Computers. Dimensions Of The Canopy As Per Field Instrument Actual At Site And Instruction As Per Eic 119 Supply & Installation Of Gigl Approved Makes Cooling / Ventilation Fan Along With Safety Grill And Dust Preventor In Control Panel. Size : 4” Axial Fan 220V Ball Baring With Finger Guard Size : 6” Axial Fan 220V Ball Baring With Finger Guard 120 Supply & Replacement Of Door Hinges / Lock In Instrument Local Control Panel / Rtu Panel / Metering Panel Etc. The Job Shall Be Caarried Out By Qualified Instrument Technician / Electrician. 121 Supply And Installation Of Pre Cast Foundation With Metallic Cable Route Marker ( For Instrumentation And Electrical Cables ) . Excavation And Backfilling Are Inclusive Noe Extra Charges Shall Be Paid General 122 Arrangement And Supply Of Water In Tanker / Truck / Lorry 5000 Litres 123 Collection Of Hazardous Wastes Including Used Engine Oil, Gear Oil, Hydraulic Oil , Transformer Oil , Spent Oil, Filter Elements, Grease Contaminated Cotton Waste Etc. From Gigl Stations And Disposal-Off The Same To An Approved Pollution Control Board Vendor By Complying Hazardous Waste ( Management And Handling ) Rules, 1989. 124 Hiring Of Following Equipments For Doing Any Emergency Work With All Required Valid Test Certificates. The Period Of Hiring Will Start After The Equipment Reaches At Site And Ends When Equipment Leaves The Site. Break Down Period Of Equipment Will Not Be Paid. Normal Working Time Per Day Will Be 8 Hrs. Rate For Idle Time Shall Be 50%. Night Is Not Included In Idle Time Except If Works Will Continue In Night. Hiring Rates Is Inclusive Of Diesel, Operators, Maintenance Cost, Loading / Unloading Of Equipments By Hydra / Manual At Site. Dewatering Pump Of Capacity 20Kl With Required Capacity D.G.Set Hydra Of Lifting Capacity 10Mt To 15 Mt Along With Required Wire Ropes & D-Shackle 15Kva Dg Set 30Kva To 45 Kva Dg Set Jcb 125 Schedule Of Rates For Extra Works For Manpower Supply Along With Required Tools Tackles, Consumables And Equipment Qualified Welder Fitter / Grinder Electrician / Wireman Instrument Technician / Tubing Fitter Rigger Helper / Unskilled Labour Plumber Mason Carpenter 126 Supply & Installation Of Dm Water As Per The Requirement At Designated Store. Transportation, Manpower And Containers Are In Contractors Scope. 127 Greasing, Oiling, Repairing Of M.S.Rolling Shutters ( Manual Operating ) 128 Installation, And Pre-Commissioning Of Fml Skid With All Required Manpower, Consumable, Equipments, Tools & Tackles Etc. Unloading Of Entire Fml Skid And Installation At Designated Foundation With Proper Alignment And Grouting Of Skid Hook Up With Existing Station Piping With Necessary Gaskets Providing Required Structural Support Pneumatic Testing At 95 Barg  ( N2 Supply, Tested High Pressure Hose, Ss Fittings, Calibrated Pressure Gauge Etc Inclusive ) Calibration Of Psv / Creep Relief Valve Calibration Of Filed Instruments ( Within Fml Skid – Press, Temp, Dp Gauges / Transmitters ) Supply & Installation Of Opgd Pole With Proper Foundation ( Pole Height Max. 6 Mtr Of 6” Dia ) Opgd Instruments Shall Be Supplied By Owner ) , Installation Of Opgd On The Pole Shall Be In Contractor Scope Installation Of Pgd On Structure Support With Proper Cable Termination Installation Of Instrument Panel In Control Room Glanding & Termination Of Cable Laid For Panel / Instruments / Jb / Fixtures Supply Of Armoured Communication Cable Rs485 Laying & Termination Of Communication Rs485 ( Above Ground / Under Ground As Per Requirement-Shall Be Laid In Proper Cable Trench-Req. Excavation / Backfilling / Dressing Between Control Room To Skid Shall Be In Contractor Scope ) Supply Of 3 Core X 2.5 Sq. Mm Armoured Cu Cable For Meter & Heater Laying & Termination Of Individual Run Of 3 Core X 2.5 Sq. Mm Armoured Cu  Cable  For Meter & Heater ( Above-Ground / Under-Ground As Per Requirement - Shall Be Laid In Proper Cable Trench-Req. Excavation / Backfilling / Dressing Between Control Room To Skid Shall Be In Contractor’S Scope ) Supply Of 10 Sq. Mm Cu Earthing Cable From Instruments To Cu Earth Pit Laying & Termination Of 10 Sq. Mm Cu Earthing Cable From Instruments To Cu Earth Pit Supply, Installation, Testing & Commissioning Of Copper Earthing Pit ( Earth Pit Details As Per Relevant Sor ) Providing Gi Earthing ( 50 X 6 Mm Gi Strip ) To Skid From Existing Gi Earth Pit Providing And Installation Of Copper Jumper Of Req. Size ( 10 Sq . Mm ) Supply Of Instrument Cable ( Refer Relevant Sor For Cable Details ) For The Following Instrument Cable Upto 1P X 1.5Sqmm Armoured Cable Instrument Cable Upto 2P X 1.5Sqmm Armoured Cable Laying & Termination Of Individual Run Of Instrument Cable ( Above-Ground / Under-Ground As Per Requirement - Shall Be Laid In Proper Cable Trench-Req. Excavation / Backfilling / Dressing Between Control Room To Skid Shall Be In Contractor’S Scope ) With Panel / Instrument / Fixtures 129 Stencilling & Painting Of Numbers / Letters / Logos / Arrow Etc Including Supply Of Fluorescent / Highlighted Paint / Acrylic Emulsion / Oil Paint Of Approved Brand As Per The Gigl / Gspl Vendor List And Quality Wherever Required As Per Directed By Gigl E-I-C: Area Of The Stencilling & Painting Shall Be Calculated On The Basis Of Length & Width Of Words. 130 Supply And Application Of Good Quality Sun Film Of Isi Mark, Black Colour On Plain Float Glass. 131 Providing And Fixing Double Action Hydraulic Floor Spring Of Approved Brand ( Dorma Or Equivalent ) And Manufacture ( Conforming To Is: 6315 ) For Aluminium Doors Including Cost Of Cutting Floors As Required, Embedding In Floors And Cover Plates Etc. Complete As Per The Direction Of Eic. 132 Providing And Fixing Mild Steel Bright Polished Nickel Plated Pull Bolt Lock Conforming To Is: 7534 With Necessary Nuts And Screws Etc. Complete 85 Mm X 42 Mm. 133 Providing And Fixing Ss Handles Anodized 125 Mm ( Anodic Coating Not Less Than Grade Ac 10 As Per Is: 1868 ) Transparent Or Dyed To Required Colour Or Shade With Necessary Screws Etc. 134 Providing And Fixing In Position Approved Make Dorma Or Approved Equivalent ) Heavy-Duty Overhead Hydraulic Door Closer With Adjustable Spanners, Screws Etc. Conforming To Is: 3564.Including All Necessary Fixtures Fittings Finishing Etc. All Complete. 135 Repairing Of Floor Spring / Door Closer Of The Rooms Which Includes Replacement Of Internal Parts Etc. 136 Replacement Or Repairing Of Damaged Parts Of Aluminium / Glass Windows / Doors For Smooth Opening And Closing In Control Room Buildings, Guard Room Including Checking Of Alignment, Bearings, Lock, Handle, Sealing, Channel Cleaning, Screws, Tools And Tackles And Labour Charges Etc. All Inclusive. 137 Supply And Installation Of Bakelite Sheet Sheet Upto 10Mm Thick In Doors, Windows As Per Applicable Colour As Per Direction Of Eic. 138 Providing And Fixing Flush Tank Complete With Connection To Sanitary W / C Line. Rate Shall Include All Internal Plumbing Cost Inclusive Of All Necessary Items To Complete The Job As Directed By Engineer – In – Charge 139 Providing & Fixing In Position 15 Mm C.P. Brass Bib Cocks Of Best Quality. Bibcock Valve 140 Providing & Fixing Jet Spray / Hand Faucet – With All Fittings & Fixtures. 141 Removal Of Damaged False Ceiling From The Position And Disposal Of The Same Within A Lead Of 500 Meters And Fixing New False Ceiling Of Mineral Fibre False Ceiling In Place / In Position Of Old Ceiling : By Providing And Fixing Mineral Fibre False Ceiling Of Armstong Or Equivalent With Anodised ( 25 Micron ) Alum Silhouette Grid Framework From Roof Slab At Desired Height In Desired Pattern Including Finishing, Making The Frame Work Perfectly Levelled And Alligned Etc. All Complete. 142 Removal Of Damaged False Ceiling Tiles From The Position And Fixing New False Ceiling Of Mineral Fibre False Ceiling Of 600 X 600 Mm Of Armstong Or Equivalent ( Without Cost Of Suspending Grid Frame Work ) 143 Removal Of Damaged False Ceiling From The Position And Disposal Of The Same Within A Lead Of 500 Meters And Fixing New False Ceiling Of Gypsum In Place / In Position Of Old Ceiling : By Providing , Supplying And Fixing India Gypsum Board Of 12.5Mm Thick ( Plain ) Using All The Farming And Fixing Members / Accesories Of Gypsteel Ultra Supplied By The Manufacturers Igl ( Saint- Gobain Gyproc India ) And Installation Is To Be Done As Per Manufacturers Specification Excluding Painting Rate Shall Be Inclusive For Providing Cut Outs For All Ceiling Light Fixtures Etc As Per Drawing And Approved By Architect / Pmc. ( The Contractor Has To Give Companys ( Igl ) Certification For Performance Of The Product And Installation 144 Water Proofing / Roof Slab Repairing Of Cracks In Old Terraced Roofs. Existing Roof Treatment Will Be Dismantled And App Modified Water Proofing Will Be Provided With Protective Layer Of 35 Mm Thk. P.C.C. ( 1:2:4 ) In Panels Of Maximum Size 1200Mm X 1200Mm Chequered Finish With 24 Swg Chicken Wiremesh Interposed In Between Finished Smooth With Joints Between Panels Sealed With Suitable Polyurethane Sealant; Providing Fillets Of 75 Mm Radius With P.C.C. ( 1:2:4 ) At Junctions Of Horizontal And Vertical Surfaces Finished Smooth; Providing 450Mm X 450Mm Khuras ( Rain Water Collecting Pits ) In 1:2:4 Cement Concrete At All Outlets, Levelled Down By Min. 25Mm, Finishing, Curing Etc. All Complete As Per Approved Manufacturers Standard Specifications And Recommendations. Also, Top Surface Shall Be Covered With China Mosaic Flooring 145 Water Proofing / Roof Slab Repairing Of Cracks In Old Terraced Roofs. Existing Roof Treatment Will Be Dismantled And New Brick Bat Koba Water Proofing Will Be Provided With Laying Cement Concrete Using Broken / Brick Bats 25Mm To 100Mm Size With 50% Of Cement Mortar 1:5 ( 1Cement: 5 Coarse Sand ) Admixed With Proprietary Water Proofing Compound Confirming To Is: 2645 Over 20Mm Thick Layer Of Cement Mortar Of Mix 1:5 ( 1 Cement: 5Coarse Sand ) Admixed With Proprietary Water Proofing Compound Confirming To Is: 2645 To Required Slope And Treating Similarly The Adjoining Walls Upto 300Mm Height Including Rounding Of Junctions Of Walls And Slabs. Finishing The Surface With Broken China ( Glazed ) Laid Joint Less With Cement Mortar Of Mix 1:4 ( 1Cement: 4 Coarse Sand ) Admixed With Proprietary Water Proofing Compound Confirming To Is: 2645 And Finally Finishing The Surface With Trowel. Also, Top Surface Shall Be Covered With China Mosaic Flooring 146 Road Transportation Of Gigl Issued Equipments, Materials, Pipes, Skids Etc. From The Point Of Loading To Destination. This Job Including Loading At Issue Location, Un-Loading & Stacking At Designated Location With Tools & Tackles, Equipments, Hydra / Crane, Manpower, Supervision As Per The Directions Of Eic. This Include Interstate Transportation Of Material And All Applicable Taxes ( Toll Etc. ) Charges For Hydra / Crane Along With Operator And Crew Required For Loading And Unloading Shall Be Inclusive Vehicle Such As Utility / Tata 407 / Tata 409 / Truck With Load Carrying Capacity As Given Below Upto 2.5 Mt 2.6 Mt To 4.5 Mt 4.5 Mt To 6 Mt 6.1 Mt To 9 Mt 147 Trailer With Prime Mover-Flat Bed; Trailer Length: 40 Ft With Load Carrying Capacity As Given Below: For Transportation Of Line Pipes Of Double Random Length Upto 10 Metric Ton In Trailer For Transportation Of Line Pipes Of Double Random Length 10.1-18 Metric Ton In Trailer 148 Dismantling & Removing The Existing Installed Equipment Such As Dg Set, Metering Skid, Filter, Filteration Skid, Prs Skid, Pig Barrel, Pig Trolly, Jib Crane, Piping, Electrical / Instrumentation Panel, Valves, Structural Steel Etc. Carefully Including Handling, Loosing The Nuts, Bolt Cutting Etc ( If Required ) And Stacking The Equipments / Material As Directed By Eic. Manpower, Machinery Required Shall Be In Contractors Scope. Item Weight Upto 50 Kg Item Weight Upto 51-150 Kg Item Weight Upto 151-250 Kg Item Weight Upto 251-500 Kg Item Weight Upto 501-1000 Kg Item Weight Upto 1 Ton - 2 Tonnes Item Weight Upto 2-Tonnes- 3 Tonnes 149 Installation Of Equipment Such As Dg Set, Metering Skid, Filter, Filteration Skid, Prs Skid, Pig Barrel, Pig Trolly, Jib Crane, Piping, Electrical / Instrumentation Panel, Valves, Structural Steel Etc. Carefully Including Handling, Erection And Proper Installtion Of The Equipments / Material As Directed By Eic. Manpower, Machinery Required, Shall Be In Contractors Scope. Item Weight Upto 50 Kg Item Weight Upto 51-150 Kg Item Weight Upto 151-250 Kg Item Weight Upto 251-500 Kg Item Weight Upto 501-1000 Kg Item Weight Upto 1 Ton - 2 Tonnes Item Weight Upto 2-Tonnes- 3 Tonnes 150 Providing Fixing, Testing And Commissioning In Position Uv Stabilised Pvc Swr Pipe Of Supreme, Finolex, Kisan Or Prince Make As Per Is:13592 Class-B, Including Excavation Incase Of Under Ground And Jointing With Tee Shaped Rubber Seal Ring Confirming To Is : 5383 & With Pvc Adhesive Solvent, Including Fitting Like Elbows, Collors, Tees, Unions, Couplers, Reducers, Enlargers, Bends And All Other Required Fittings For Water Facility Inside Terminal 15Mm Dia 20Mm Dia 25 Mm Dia 151 Supply, Installation, Testing And Commissioning Of Gunmetal, Male Or Female Threaded Isolation Valve ( Handle Valve ) , Confirming To Is 778, Pn 1.0, With Necessary Specials, Unions, Nipple Etc., To Complete The Job. ( For External / Internal Work ) 20Mm Dia 25 Mm Dia 50 Mm Dia 152 Cleaning Of Septic Tank / Sever / Mud Pit With Its Associated System Including Removal Of Sock / Mud, Dewatering, Removal Of Chocking If Any, Debris And Disposal Of The Same To The Distance Of 10 Km, Cleaning With Fresh Water Including Tools / Tackels / Transportation / Material / Labour Etc., 153 Construction Of Slab For Soak Pit Including Tools / Tackels / Transportation / Material / Labour Etc., 154 Construction Of Soak Pit Including Tools / Tackels / Transportation / Material / Labour Etc., Hse Refilling Of Co2 155 Refilling Of Co2 2 Kg Cylinders 156 Refilling Of Co2 4.5 Kg Cylinders 157 Refilling Of Co2 Gas Cartridge 180 Gms 158 Refilling Of Co2 Gas Cartridge 1 Kg 159 Refilling Of Co2 Gas Cartridge 2 Kg Other Items 160 Operating Cap - Dcp 161 Operating Cap With Safety Valve -Dcp 162 Pvc Discharge Hose - 9 Kg Dcp 163 Pvc Discharge Hose - 75 Kg Dcp 164 Shutoff Nozzle 75 Kg Dcp 165 Safety Clip With Chain - Dcp 166 Rubber Cap Washer - Dcp 167 Rubber Bush, Screw & Washer - 9 Kg Dcp 168 Inner Container - 10 Kg Dcp 169 Wall Brackate - 10Kg Dcp 170 Rubber Guard For Nozzle - Dcp 171 Pressure Gauge For Abc Fire Extinguishers 172 Trolley Wheel Set - 75 Kg Dcp 173 Sticker ( Dcp 75 Kg, Co2 2 / 4.5 Kg, Dcp 9 Kg, Abc 9 Kg ) 174 Connecting Hose - 75 Kg Dcp 175 Spring Loaded Safety Valve - Dcp 176 Dcp Powder 177 Brass Operating Cap Assembly - Dcp 9 Kg 178 Abs Plastic Siphon Tube Upto 9 Kg Dcp 179 Ss Mad Safety Lock Pin - Dcp 9 Kg 180 Abc Powder With N2 Pressurization In Each Cylinder 181 Discharge Hose With Horn 1 Mtr For Upto 4.5 Kg Co2 182 Discharge Horn - 4.5 Kg 183 Locking Pin 184 Locking Holder 185 Neck Handle Wit Rubber Clip - Co2 186 Wall Brackate - Co2 187 Valve - Co2 188 Rubber Handle ( Hose Between Horn ) Co2 189 Ms Nipple ( Hose Between Horn ) Co2 190 Supply Of Acrylic Sheet For Tagging 191 Painting Of Co2 2 Kg Cylinders 192 Painting Of Co2 4.5 Kg Cylinders 193 Hydro Test & Refilling Of Co2-2 Kg Fire Extinguisher 194 Hydro Test & Refilling Of Co2-4.5 Kg Fire Extinguisher 195 Refilling Of Scba Set Cylinder Pest Control 196 Honeycomb Treatment 197 Diluting And Injecting Chemical Emulsion For Post-Constructional Anti-Termite Treatment ( Excluding The Cost Of Chemical Emulsion ) :Along External Wall Where The Apron Is Not Provided Using Chemical Emulsion at 7.5 Litres / Sqm Of The Vertical Surface Of The Substructure To A Depth Of 300Mm Including Excavation Channel Along The Wall & Rodding Etc. Complete:With Chlorpyriphos / Lindane E.C. 20% With 1% Concentration

Tender Notice

38173479

Indian


Gujarat

July 03, 2023

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Arc For Maintenance Of Jobner, Hissar, Bhatinda And Rohtak Base. Fixed Cost 1 Repair, Maintenace, Supervision, Monitoring Of Pipeline Sections Under Jobner, Hissar, Bhatinda And Rohtak Base ( Appx. 577 Kms ) Including All Activities Related To Mechanical / Electrical / Instrumentation / Hse / Civil Works / Other Miscellaneous Work. The Scope Of Work Related To Mainline Maintenance Activities Include Maintaining Equipments As Per Sow And Maintenance Of Pipelines And Also All Rcps, Hovs, Movs Station Etc. Falling Under Jobner Base, Hissar Base And Rohtak Base As Mentioned In Scope Of Work & Its Annexures. Mechanical 1 Installation Of Above Ground Valves ( Ball / Globe / Check ) Of Various Sizes In Piping System Including Handling, Blind Removal Providing Temporary Supports If Necessary, Studs Bolt Loosening / Tightening, Gasket Insertion And Torque Setting With All Tools / Tackles / Manpower Etc. Of Valves Sizes, Hydra And Other Lifting Equipment Inclusive Of Scaffolding Arrangement At Site If Required Including Valve Operation. Gasket Shall Be Provided By Gigl. 2’’Nb 4’’Nb 6’’Nb 8’’Nb 10Nb 12’’Nb 2 Dismantling Of Valves ( Ball / Globe / Check ) From The Line And Putting Blinds / Spool Pieces Etc., For Various Pipe Sizes Etc. Including Stud Bolt Loosening, Gasket Changing, Handling With All Tools / Manpower / Tackles / Hydra And Other Lifting Equipment Inclusive Of Scaffolding Arrangement At Site If Required Etc. Of Valves Sizes. Gasket Shall Be Provided By Gigl. 8’’Nb 10Nb 3 Dismantling Or Installation Of Blind Flanges From A / G Piping For Various Pipe Sizes Including Nut Bolt Removing & Handling With All Tools / Tackles / Manpower / Machinery & Consumables Etc. And Stacking All Within Radius Of 250 Mts As Per Gigl Eic Instructions. From 3 To 6 From 8 To 12 4 Reversal Of Spectacle Blind On Installed A / G Piping For Various Sizes Etc. Including Nut Bolt Loosening, Gasket Changing With All Tools / Tackles / Manpower Etc. Of Valves Sizes:- 10 Nb 12 Nb 16 Nb 18 Nb 30 Nb 5 Dismantling Of Piping Spool Along With Flanges From Line For Various Pipe Sizes And Putting Blind Including Nut Bolt Removing & Handling With All Tools / Tackles / Manpower / Machinery Etc And Stacking All Within Station As Per Owner Eic Instructions. ( No Separate Charges Shall Be Paid Extra For Manpower & Equipments Used ) Up To 4’’ Nb 6’’ Nb 8’’ Nb 10 Nb 12 Nb 6 Installation Of Piping Spool Along With Flanges For Various Pipe Sizes Including Blind Removal, Nut Bolt Removing & Handling With All Tools / Tackles / Manpower / Machinery Etc As Per Owner Eic Instructions. ( No Separate Charges Shall Be Paid Extra For Manpower & Equipments Used ) Up To 4’’ Nb 6’’ Nb 8’’ Nb 10 Nb 12 Nb 7 Replacement By Removing Old Gaskets Including Tightening And Loosing Of Flanges With All Tools / Tackles / Manpower / Machinery Etc As Per Owner Eic Instructions. Gasket Shall Be Provided By Owner At Designated Store. Up To 4’’ Nb 6’’ Nb 8’’ Nb 10 Nb 8 Re-Conditioning Of Coating Of Underground Gas Pipeline After Locating The Pipeline ( In The Scope Of The Contractor ) By Suitable Method ( Pipeline Locator / Trial Pit Method / Pipeline Markers Etc ) As Per The Coating Fault. The Activity Includes ( A ) Excavation To Expose The Line To Suitable Depth To Expose The Pipeline And Provide Working Space Around The Pipeline. ( B ) Removal Of Existing Coating By Using Scrappers Etc. And Cleaning The Surface To Fine Finishes By Power Brush / Suitable Method. ( C ) Rectification Of Coating Of The Defects By Heat Shrinkable / Ray Chem After Surface Preparation By Mechanical Cleaning, Primer Application, Wrapping Of Tape, Edge Preparation, Holiday Test Etc. ( D ) R-95 Epoxy Application, If Required ( E ) Back Filling The Trenches And Restoring The Fields To The Satisfaction Of Owner. Cleaning Rou Of Any Debris Etc. ( F ) The Supply Of All Consumables, Utilities, Equipment, And All Manpower Required, Pipe Cleaning And Surface Preparation, Repairing Of Coating Defects ( Resulting In Holiday In Coating ) And Testing Including All Handling, Transportation, Etc. Included In This Schedule Of Item. ( G ) Any Crop Compensation To The Land Owner / Farmers Shall Be In The Scope Of Owner. ( No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools Used For This Activity ) Raychem Make Tape R-95 Epoxy Heat Shrinkable Sleeve Coating Repair Perp Htlp 80 Coating Repair Filling Material Mastic 9 Supply And Mobilization Of Nitrogen Gas Of Commercial Grade In Loose Cylinder / Banks Of Individual Cylinder Capacity 7M3 At A Pressure Of 150 Kg / Sq Cm With All Connecting Hoses And De-Mobilization After Completion Of Job Including Loading, Unloading, Handling Cylinder Pressure Regulator And Pressure Gauge With Accessories. No Separate Charges Shall Be Paid For Manpower, Tools & Tackles, Lifting Equipments Used During This Activity. Charges Of Nitrogen Qty Shall Be Considered Per Nos Of Cylinders Supplyed By Arc Contractor. 10 Supply, Transportation, Fabrication And Erection Of Ms Structural Steel Section Of Various Sizes Along With Required Fasteners ( Plate, Angle, Tee, Channel, Beam, Pipe Etc ) To Suit The Requirement. Rate Also Includes The Surface Cleaning By A Suitable Method, Supply And Application Of Two Coat Of High Build Chlorinated Rubber / Zinc Phosphate Primer And Two Coats Of Finished Paint Of Epoxy Of Grey Colour / Colour As Specified By Gigl Of Approved Make, The Job Is To Be Executed As Per The Direction Of The Gigl E.I.C. & Gigl Requirement. Job Inclusive Of Labour, Machinery Etc. ( No Separate Charges Shall Be Paid For Transportation Of Fabricated Structure, Manpower, Equipments Used During Execution Of This Activity ) 11 Surface Preparation Of Installed ( Operational ) Piping / Spool / Fittings, Steel Structural Surfaces By Bristle Blaster Machine Or Other Proper Methods ( Paint Rust Remover Equipment ) With Equipments, Accessories, Manpower, Material Etc Upto Required Surface Finish. The Work Also Includes Painting Of Piping Spool Including Supply Of Paint And Application Of 2 Coats Of Red-Oxide Primer Or High Build Chlorinated Rubber / Polyurethane / Zinc Phosphate ( As Per Site Condition ) Of 70 Micron Each And 2 Coats Of High Build Epoxy Finished Paint Of Golden / Cannery Yellow / Any Applicable Colour Instructed By Gigl With 70 Micron Each Of Approved Quality Including Stencilling, Tagging, Direction Arrow And Other Lettering As Per Gigl Eic. This Includes Covering Of Using Masking Tape During Surface Preparation And Painting Works. 12 Surface Preparation Of New Piping / Spool / Fittings, Steel Structural Surfaces Britstle Blaster Machine Or Blasting Methods. Finish Of Surface Quality Sa 2 ½ And Roughness 60 Microns Minimum By Providing Shot / Sand Of Approved Quality, Shot / Sand Blasting Equipments & Its Accessories, Manpower, Material Etc. The Job Also Includes Painting Of Piping Spool Including Supply Of Paint And Application Of 2 Coats Of Red-Oxide Primer Or High Build Chlorinated Rubber / Polyurethane / Zinc Phosphate Of 70 Micron Each And Two Coats Of High Build Epoxy Finished Paint Of Golden / Cannery Yellow / Any Applicable Colour Instructed By Gigl With 70 Micron Each Of Approved Quality Including Stenciling Of Line Numbers, Pipe Tagging, Flow Direction Arrow, Other Lettering As Found Condition Of Pipeline As Per Instruction Of Gigl Eic. This Includes Covering Of Nut-Bolts Using Masking Tape, During Surface Preparation & Painting Works. 13 Complete Job Of Repairing The Leakage Of Existing Buried Pipeline By Using Leak Repair Clamps & Other Accessories Related To Clamp. The Activity Shall Include All Necessary Arrangements, Excavation & Backfilling Work, Material Transportation And Other Works Required For Leak Arrest And Restoration Of Site. Land And Corp Compansation Will Be In Gigls Scope. Clamps Will Free Issued By Gigl 2 4 6’’ 10 12’’ 16” 18’’ 30” 14 Complete Job Of Repairing The Leakage Of Existing Above Ground Piping By Using Leak Repair Clamps. Manpower, Equipments And Material Shifting To Site Shall Be In Scope Of Contractor.Restoration Of Above Ground Piping As Per Original Conditions. Clamps Will Free Issued By Gigl 2 3 4 6’’ 8’’ 10 12’’ 16” 18’’ 30” 15 Emergency Repair Of Leaking Underground Pipe By Replacement By Pipe Spool, Or Fully Encircled Sleeve Welded On Pipe: This Work Shall Include Transportation Of Pipes And Associated Materials From Store Locations, Loading / Unloading Of The Line Pipes To The Site, Hydrotest Of Pipes, Excavating The Trench For Finding Out The Leakage In The Existing Line Burst Portion Of Point ( This Excavation Also Includes The Excavation For Replacement Of Pipe Upto Max. 12 Meter ) , Dewatering And Cleaning Of Pit Or Trench, And To Make It Free From Fire / Accident Etc., Cutting The Line From Both Ends ( Upto One Pipe Length Item, Approx 12 Mtr. Or Part Thereof Shall Be Treated As One Job ) Surface And Bevel Preparation Dp Checking & Welding The Pipe Of The Required Length On The Line, Ndt ( Radiography, Ut, Dp ) Coat And Wrap, Holiday Testing And Back-Filling The Same Etc. Complete The Work As Directed By E.I.C. Contractor To Arrange All Necessary Equipment, Consumables, Manpower Etc To Complete The Job. ( Pipes Shall Be Supplied Free Of Cost By Gigl At Designated Store ) ( Nitrogen Purging For The Section If Required To Be Claimed Seaprately As Per Sor. ) Fully Encircled Sleeve Shall Be Free Issed By Gigl. 4 12’’ 16” 18’’ 30” 16 Repair Of Metal Loss On Pipeline At Third Party Damage Locations / Corrosion / Less Thickness Locations By Composite Sleeve ( Clock Spring ) . The Job Includes Excavation & Restoration , Clearing Of Pit, Dewatering, Removal Of Coating, Preparation The Pipe Surface To Put Sleeve. The Job Also Includes The Supply Of Coating Materials & Repair Of Damaged Coating, Holiday Testing And, Back Filling With Soft Soil And Final Cleanup To Restore The Field To Its Original Conditions. Paut / Ut For Anomaly Assessment At Damaged Location Before Application Of Composite Wrap Shall Be In The Scope Of Contractor. Land And Corp Compansation Will Be In Gigls Scope. It Is Considered That Sleeve Width Will Be 300 Mm Std. ( Scope Of Supply Of Sleeve, Is In The Scope Of Contractor ) 4 12’’ 16” 18’’ 30” 17 Repair Of Flange / Rtd Thermowell / Ij / Valves Body At Leakage Portion Or Less Thickness Locations By Supply And Application Of Nicco - Fermanite Clamp Or Any Other Leak Clamp Which Can Be Installed On Line And Injecting Sealing Material. The Job Includes Cleaning Of Flange / Rtd Thermowell / Ij / Valves, Installation Of Nicco - Fermanite Clamp Or Any Other Leak Clamp Which Can Be Installed On Line And Injecting Sealing Material On Pipes. The Job Includes The Painting Of Pipeline / Flange / Rtd Thermowell / Ij / Valves And Restore The Field To Its Original Conditions. The Job Includes Man-Power, Transportation And Other Resources. This Job Shall Be Carried Out By Certified Oem / Vendor Only. Upto 2’’ 2 To 4’’ 6’’ 8’’ 10’’ 18 Hydrostatic Testing Of Clean Agent Cylinder ( Fm200 / Fk-1-2-3 ) / Co2 Flooding Cylinder As Per Latest Gas Cylinder Rules From Authorized Agency / Vendor. Hydro Testing Of Cylinders To Be Carry Out With High Pressure Hose Pipe, Calibrated Pressure Gauge, Suitable Manifold With Fittings And Any Special Requirement. Dismantling, Loading, Unloading, To And Fro Transportation, Refilling And Re-Installation All Inclusive. No Separate Charges Shall Be Paid For Manpower, Consumables, Lifting Equipments, Tools & Tackles Used During Execution Of This Activity. Co2 Flooding Cylinder - Water Capacity: 68 Ltr Clean Agent ( Fm200 / Fk-1-2-3 ) Gas Cylinder- Water Capacity: 80 Ltr 19 Fabrication And Installation Of Above Ground Piping Of Grade Astm A333 Gr.6 / Api 5L & Equivalent Grade Of Different Schedule Including, Handling, Aligning, Cutting, Beveling / Edge Preparation, Installation Of Associated Fittings / Flanges, Fit-Up, Tie-In, Welding, Radiography , Ut, Dp / Mpt, Transportation Of Fabricated Spool To Location, Temporary Supporting, Erection Of Different Size Of Fabricated Aboveground Piping At All Elevations Including Handling, Etc. The Job Includes Carrying Out Hydrostatic Testing As Per Gigl Approved Procedure Of Completed Piping Loop / Piping System As Approved By Owner / Owner’S Representative To The Specified Pressures, Providing All Testing Equipments / Instruments / Accessories, Blind Etc. Including Pressure Recorder, Temperature Probe, Temperature Recorder. Dewatering, Cardboard Blasting Surface Preparation & Painting Of Spool After Successful Completion Of Hydro Testing And Pneumatic Testing Is Also Including In Scope. ( Pipe / Pipefittings Shall Be Issued By Gigl At Designated Store. ) As Built Drawing Of The Installation Shall Be Included In The Scope Of Bidder. Pipe Wall Thickness Ranging Upto 6.4 Mm Pipe Wall Thickness Ranging From 6.4 Mm– 8.56 Mm Pipe Wall Thickness Ranging From 8.57 Mm– 17.4 Mm Pipe Wall Thickness Ranging From 17.5 Mm– 32 Mm    Pqr Laboratory Charges For 2” Wps Pqr Laboratory Charges For 4” Wps Pqr Laboratory Charges For 8” Wps Pqr Laboratory Charges For 12” Wps Pqr Laboratory Charges For 18” Wps    Eqt For 24 Mm Ms Plate ( Smaw ) Including Laboratory Charges Eqt For 24 Mm Ms Plate ( Gtaw ) Including Laboratory Charges Eqt For 16 Mm Ms Plate ( Smaw ) Including Laboratory Charges Eqt For 16 Mm Ms Plate ( Gtaw ) Including Laboratory Charges Ndt Charges For 2” Wps Ndt Charges For 4” Wps Ndt Charges For 8” Wps Ndt Charges For 12” Wps Ndt Charges For 18” Wps Ndt Charges For Eqt ( 24 Mm Plate ) Ndt Charges For Eqt ( 16 Mm Plate 20 Hydrostatic Testing Of Double Length Line Pipe ( Approx. 24 Meter ) At Max. Pressure Of 150 Brag. Job Includes Arrangement Of Header / Dish End ( End Cap ) For Installation Of Calibrated Pressure Gauge, Water Inlet, Drain, Vent; Welding, Ndt, Cutting, Bevelling And Edge Preparation After Testig Job. Submission Of Report After Completion Of Hydrotest.This Includes Loading / Unloading Of Linepipe, Header / Disc End Preparation, Tools, Tackels, Water, Pump, Corrosion Inhibitor, Equipment, Manpower, Etc. Required For Execution Of Job. 12Nb 16Nb 18Nb 30Nb 21 Gas Cutting, Grinding And Welding Of Edges Of Chequered Plate Installed In Cable Trenches, Valve Pit Etc. Including Handling. The Job Inclusive Of All Consumables, Equipments, Tools, Labour Etc. 22 Supply And Installation Of Chequered Plate Of Required Size For Trenches, Platforms Etc Including Application Of Red Oxide Primer And Two Coats Of Finish Paint Of Approved Quality. ( No Separate Charges Shall Be Paid For Gas Cutting, Grinding & Welding Of Edges Of Chequered Palte & Transportation Of The Same ) The Job Inclusive Of All Consumables, Equipments, Tools, Labour Etc. 4 Mm Thick 6 Mm Thick Civil 23 Earth Work In Excavation Below Ground Level For All Kinds Of Work In Basements, Foundations, Including Trenches Etc. Including Removal Of Vegetation, Shrubs And Debris, Cutting And Dressing Of Sides In Slopes, Levelling, Grading And Ramming Of Bottoms, Dewatering Of Accumulated Water From Any Source And Keeping The Surface Dry For Subsequent Works And Disposal Or Stacking Of Excavated Material Within A Lead Of 1 Km, As Decided Including Providing Temporary Supports To Existing Service Lines Like Water Pipes Sewage Pipes, Electric Overhead And Underground Cables Etc. All Complete, Including Shoring And Strutting. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. Soft Soil Upto 2.5 Meter Below 2.5 Meter Hard Rock Upto 3 Meter 24 Back-Filling Of Available Excavated Earth ( Excluding Rock ) Or Filling Loose Earth Other Than Black Cotton Soil In Trench, Sides Of Foundation Etc In Layers Not Exceeding 20 Cm In Depth Consolidating Earth Deposited Layer By Ramming And Watering And Filling Up To Required Ground Level. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. 25 ( A ) Supplying And Filling Selected Loose Earth Other Than Black Cotton Soil From Borrowed Pits In The Washout / Depressed Land Or In The Pit Locations Of Pipeline Row Compacting Upto 90% Of Proctor Density And Filling In Layers Not Exceeding 200 Mm Including Cost Of Transportation, Spreading, Compacting, All As Directed By Engineer-In-Charge. The Rates Includes Royalty Or Any Other Levies By Govt. Agencies Towards Taking Of Loose Earth From Borrowed Area As Per The Direction Of Engineer-In-Charge / Site Engineer Inclusive All Labour, Materials, Tools, Tackles, Transportation, Taxes Etc. Completion All Respect. ( Payment Shall Be Made On Basis Of Measurement Of The Pit Profile Of The Earth Washout In The Row Or Uncompacted Loose Soil Supply ) 26 Filling, In Foundation And Plinth ( Under Floors ) , With Good Quality Coarse River Sand, Obtained From Outside, Including Watering, Ramming Well, Consolidating And Dressing Etc. Complete, As Directed. 27 Breaking Of Pcc By Using Mechanical Breaker / Hammer / Manually / Abrasive Cutting Machine And Disposal Of The Demolished Materials Within A Lead Of 1Km. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. 28 Breaking Of Rcc By Using Mechanical Breaker / Hammer / Manually / Abrasive Cutting Machine And Disposal Of The Demolished Materials Within A Lead Of 1Km. Including Stacking Of Steel Bars And Disposal Of Unserviceable Material Within 1Km Lead. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. 29 Demolishing Brick Work In Cement Mortar ( With Plaster On Both Face ) Including Staking Of Serviceable Materials And Disposal Of Unserviceable Material Within 1Km Lead Including Transportation / Labour Etc. 30 Providing And Laying Masonry Work In Foundation / Superstructure Using Class -5 Brick With Cement Mortar 1:6 ( 1 Cement: 6 Coarse Sand ) As Per Specifications In One Or More Brick Thickness And In Any Standard Shape ( Excluding Circular / Curved ) Including Providing Recesses, Opening, Scaffolding, Staging, Curing, Finishing The Joints Flush Below Ground Level And Raking Out Joints In And Above Plinth Level Etc. All Complete. At All Depths Below And Upto 4.0 Mtr. From Ground Level At All Heights Above 4.0 Mtr. From Ground Level 31 12Mm Thick Plaster In 1:4 Cement-Mortar, Providing & Applying Finish Cement Plaster At All Heights, Levels And Places, Including Scaffolding, Chipping, Roughing Up The Concrete , Curing And Finishing . No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Scaffolding, Handling, Tools & Tackles Used During Execution Of This Activity. 32 100 Mm Thick Gravel Filling : Supplying, Stacking And Spreading Of Stone Aggregate Of Size 40 Mm To 63 Mm With Layer Of Sand And 250 Micron Thick Hm Hdpe Grade-I Film ( Conforming To Is:10889 ) At Desired Locations Inside The Process Area Over Well Compacted Earth Complete As Per Owner Construction Drawing And As Directed By Engineer-In-Charge. 33 Supply, Transportation And Installation Of Tp / Warning / Arial / K.M. / Ofc Marker On Pipeline Rou Including Supply Of All Materials For Fabrication, Cleaning, Two Coats Of Red-Oxide And Two Coats Of Zebra Colour ( Black And Golden Yellow Strips ) Of Approved Quality ( I S I Mark ) Paint And Marking The Number, Direction, Chainage And Pipe Size. Excavation Upto Required Size, Grouting In 1:3:6 Pcc Mixture To Correct Line, Level And Direction, Back-Filling & Restoration. The Work Is To Be Executed As Per Drawing And Direction E.I.C. No Separate Charges Shall Be Paid For Manpower, Consumables, Transportation, Lifting Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. For Normal Soil For Rocky Areas 34 Providing, Mixing And Laying Pcc Grade Of 1:3:6 Nominal Mix Using 40 Mm And Downgraded Coarse Aggregate For Any Thickness Below Footings, Plinth Beams, Foundations, Trenches, Pits & Sumps Etc. Using Ordinary Portland Cement, Curing Etc., Complete As Per Drawings, Specifications And As Directed By Eic. Centring & Shuttering Is Also In The Scope. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. 35 Providing Reinforcement ( Hysd Bars ) For Rcc Work Including Bending, Binding And Placing In Position Complete As Per Standard Isi 422 Part 1. Transportation, Loading, Unloading & Handling Of Materials To Site Are Included. No Separate Charges Shall Be Paid For Manpower, Consumables, Lifting Equipments, Handling, Tools & Tackles Used During Execution Of This Activity. 36 Providing Rcc Work M20 1:1.5:3 ( 1Cement, 1.5 Coarse Sand , 3 Graded Stone Aggregate Size 20Mm Nominal Size ) In Support, Foundation, Footing, Pavements, Floors Etc. This Job Includes Providing Centering And Shuttering, Strutting, Propping And Removal Of Form With All Tools / Tackles / Labour / Machinery Etc. Charges Of Hysd Bars Shall Be Paid As Per Relevant Sor. 37 Washout Repair Job On Existing Buried Pipeline, Which Occur Mostly During Monsoon Period: ( A ) Supplying And Filling Selected Loose Earth Other Than Black Cotton Soil From Borrowed Pits In The Washout / Depressed Land Or In The Pit Locations Of Pipeline Row Compacting Upto 90% Of Proctor Density And Filling In Layers Not Exceeding 200 Mm Including Cost Of Transportation, Spreading, Compacting, All As Directed By Engineer-In-Charge. The Rates Includes Royalty Or Any Other Levies By Govt. Agencies Towards Taking Of Loose Earth From Borrowed Area As Per The Direction Of Engineer-In-Charge / Site Engineer Inclusive All Labour, Materials, Tools, Tackles, Transportation, Taxes Etc. Completion All Respect. ( Payment Shall Be Made On Basis Of Measurement Of The Pit Profile Of The Earth Washout In The Row Or Uncompacted Loose Soil Supply ) ( B ) Filling Empty Cement Bags Of 50 Kg Capacity ( The Bags To Be Used In Good Condition Only ) By Using Sand / Cement Mixture In 1:10 Ratio And Stitching By Using Jute Threads And Placing In Position In Row As Directed By Engineer-In-Charge / Site Engineer. 38 Water Body Bank Protection: Construction Of Gabions Structures By Providing & Making Gabion Structure With Mechanically Woven Double Twisted Hexagonal Shaped Wire Mesh Gabion Boxes As Per Is 16014:2012, Morth Clause 2500, Of Required Size, Mesh Type 10X12 ( D=100 Mm With Tolerance Of ± 2% ) Zinic+Pvc Coated, Mesh Wire Diameter2.7 / 3.7Mm, Mechanically Edged / Selvedged With Partitions At Every 1M Interval And Shall Have Minimum 10 Numbers Of Openings Per Meter Of Mesh Perpendicular To Twist, Tying With Lacing Wire Of Diameter 2.2 / 3.2Mm ( Id / Od ) , Supplied @3% By Weight Of Gabion Boxes, Filled With Boulders With Least Dimension Of 200 Mm, As Per Drawing, All Complete As Per Directions Of Engineer-Incharge. 39 Supply And Installation Of 1 Upvc Water Pipeline In Control Room Building / Terminal At Damaged Locations 40 Supply And Installation Of Ofc Pit Of Rcc Along With Cover, No Separate Charges Shall Be Paid For Transportation, Excavation, Backfilling, Manpower & Equipments Including Jcb. 41 Supply And Installation Of Hdpe Conduit For The Fiber Along With Hdpe Couplers. No Separate Charges Shall Be Paid For Manpower, Transportation & Equipments Used During This Activity. Hdpe Couplers Hdpe Conduit Of 50 Mm Dia 42 Restoration Or Installation Of Pipeline Makers ( Either Supplied By Gigl Or Fallen ) , The Job Includes Supply And Transportation Of All Materials Required To Complete The Restoration Or Installation Works Including Excavation, Fixing Of Pipeline Marker On Pipeline Rou In Pcc 1:3:6 To Correct Line & Level, Restoration Etc. Complete Job As Per Specification And Direction Of E.I.C. 43 Painting, Numbering & Lettering Of Existing Pipeline Markers Including Supply Of Paint And Application Of 2 Coats Of Red-Oxide Primer And 2 Coats Of Zebra Strip ( Black And Golden Yellow Stripes ) Of Approved Quality To Give An Even Shade After Proper Scraping Of Existing Paint And Clearing Of Surface Free From Foreign Materials. The Rate Are Including Man / Material And Transportation To The Position / Site. Direction Marker Warning Marker K.M. Marker Aerial Marker Ofc Marker Tlp 44 Providing Stone Pitching Average 230-250Mm Thickness With The Joints Filled Up With Cement Mortar Of 1:6. Including Preparation Of The Bed Slope, Cutting And Filing Earth, Compacting To The 90% Of Proctors Density, Filling The Joints With 1:6 Cement Mortar Pointing The Joints With Same Mortar Complete In All Respects Including The Supply Of Stone Boulders, All Materials, Labour And Consumables Etc. As Directed By Engineer-In-Charge And As Per The Specifications. 45 Removing Of Damaged / Settled Paver Blocks And Relaying Of Shot Blasted Interlocking / Non- Interlocking Colored Paver Blocks Of High Density 80-100 Mm Thick M-30 Grade For Footpath, Parking Areas, Service Lanes And Other Areas As Mentioned In The Drawing. Including Providing And Laying 50 To 80 Mm Thick Average Bedding Layer Of Coarse Sand Below Paver Block As Per Required Grading And Specification. Laid Paver Block Shall Be Mechanically Compacted. The Work Of The Paving Blocks Shall Be Executed In Line And Level By Skilled Mason Of Flooring Work Only. It Should Be Laid In Such A Way That The No Cutting Of The Paver Block To Be Necessary. Cutting Of Paver Block By Machine Cut Only And Laying To Be Done By Skilled Flooring Mason. The Finished Surface Of The Paver Block Shall Have Coarse Sand Texture Finish. Paver Blocks Shall Be Compacted And Shall Be Re-Laid If Necessary. 46 Providing And Laying Shot Blasted Interlocking / Non- Interlocking Colored Paver Blocks Of High Density 80-100 Mm Thick M-30 Grade For Footpath, Parking Areas, Service Lanes And Other Areas As Mentioned In The Drawing. Including Providing And Laying 50 To 80 Mm Thick Average Bedding Layer Of Coarse Sand Below Paver Block As Per Required Grading And Specification. Laid Paver Block Shall Be Mechanically Compacted. The Work Of The Paving Blocks Shall Be Executed In Line And Level By Skilled Mason Of Flooring Work Only. It Should Be Laid In Such A Way That The No Cutting Of The Paver Block To Be Necessary. Cutting Of Paver Block By Machine Cut Only And Laying To Be Done By Skilled Flooring Mason. The Finished Surface Of The Paver Block Shall Have Coarse Sand Texture Finish. Paver Blocks Shall Be Compacted And Shall Be Re-Laid If Necessary. 47 Providing And Fixing Kerb Stones 150 Mm Thick And 450 Mm Wide Chisel Dressed Cut Stones Fixed In Cc 1:3:6 ( Block Size 450X300x150mm ) Including Cost Of Excavation, Backfilling, Pcc Bed ( 1:3:6 ) , Etc. 48 Providing, Laying, Spreading And Compacting Graded Stone Aggregate ( Size Range 53 Mm To 0.075 Mm ) To Wet Mix Macadam ( Wmm ) Specification Including Premixing The Material With Water At Omc In For All Leads & Lifts, Laying In Uniform Layers With Mechanical Paverfinisher In Sub- Base / Base Course On Well Prepared Surface And Compacting With Vibratory Roller Of 8 To 10 Tonne Capacity To Achievethe Desired Density, Complete As Per Specifications And Directions Of Engineer-In-Charge. 49 Supplying & Filling Approved 230 Mm Thk. Rubble Soling With The Use Of Excaveted Materials And As Approved By Consultant / Client. Including Filing Voids By Sand And Stone Chips, Flooding With Water, Etc. Complete Inclusing All Types Of Labours, Tools / Tackles, Consumables ( Sand, Approved Excavated Rubbles And Others Required To Complete The Entire Job ) , Compaction By Mechanical Means / Manual Method To The Satisfaction Of Consultant / Client Etc. Complete. The Rate Is Inclusive Of Carting Of All Materials From Any Distance Of Stacked Yard To The Location Of Placement. For Measurement, Plan Area Of Work Done Only Is To Be Considered As Per Drawing Or Actual, Whatever Is Less. 50 Chained Link Fencing Supplying & Fixing In Position 1.20-Meter-High Galvanised Iron Chain Linked Fencing Of Minimum 8 Gauge Of Mesh Size 75Mm And Galvanised Concertina. The Diameter Of The Steel Wire For Chain Link Fencing Shall Not Be Less Than 12 Gauge And The Chain Link Has To Be Fixed With 65X65x6 Ms Angle Fixed At Every 3M Interval With Pcc 1:3:6, 0. 30 M X 0. 30 M X 0.45 M Depth With Necessary Excavation, Pcc, 2 Coats Of Painting Over One Coat Of Primer All As Per Drawings. 65X65x6 Ms Angle Struts To Be Provided At Corners And At Distance Of 30 Mtr C / C. Electrical 51 Dismantling And Taking Out Of Submersible Pump-Motor From Bore Well, Retaining And Rolling Of Power Cable Pulled Out From Bore Well. And Reinstallation Of Repaired Motor And Associated Assembly Back Into The Bore In Complete Working Condition. The Rate For Repairing Of Damages In The System Shall Be Paid As Per List Below. All The Tools Tackles, Manpower, Tripod, Fasteners Etc. Required For The Job Is Included In The Scope. Up To 5 Hp From 5.1 Hp To 10 Hp Bushing / Bearing Replacement Rectification / Replacement Of Mechanical Damage Of Pump Rewinding Of Motor Flat Strip Cable Supply And Installation Of Pump Pipe Upvc / Gi Class C Of Required Diameter A ) 1 B ) 2 52 Repairing & Installation Of Bore-Well Starter Three-Phase Starter Should Be With In Built Over Load Tripping Feature. Up To 5 Hp 5.1 To 10 Hp 53 Replacement Of Concrete / Ms Plate Covers Of Earth Pits By Hinged Acrylic Covers With Locking / Bolting Facility & With Facility To Change Testing Date. The Related Modifications Of Masonry Works Of Earth Pits Shall Be In The Scope Of The Contractor. 54 Supply And Replacement Of Lamps / Fixture ( Bajaj / Philips / Cg / Osram / Ge Make Or Other Makes As Per The Gigl / Gspl Vendor List ) Including Scaffolding, Men, Machinery If Required As Per Eic Led 18W Tube Light 50 W Led Exd Type Battery Room 20 W Led Double Fluorescent Tube Light Fitting Led 36W / 40 W Recessed Type 70 W Led Street Light 100W Led Flood Light Exd 180W Led Flood Light 45W Led 12 / 18 W Led Recessed Type High Mast Light Flood Type 350 / 360W Led Weather Proof 150W Led Flood Light 55 Supply And Replacement Of Ballast / Driver / Choke For Led ( Bajaj / Philips / Cg / Osram / Ge Make Or Other Makes As Per The Gigl / Gspl Vendor List Including Scaffolding, Men, Machinery If Required As Per Eic. ( All Ballasts / Drivers To Be Industrial Grade ) 50 W Led Exd Type Battery Room Led 36W / 40 W Recessed Type 70 W Led Street Light 100W Led Flood Light Exd 180W Led Flood Light High Mast Light Flood Type 120W / 240W / 350W Led High Mast Light Flood Type 120W Led 45W Led Weather Proof 150W Led Light 56 Maintenance Of High Mast Repairing Of Motor Rope Assembly Locking System Repairing Of Motor Electrical Lift Rope Assembly Electrical Lift Locking System Electrical Lift 57 Supply And Installation Side Hinged Smc Frp Based Pole Mounted Junction Box For Street Light / Flood Lighting Pole For Below Mentioned Size Of Approved Make Like Sintex. Size 250 Mm X 200 Mm X 105Mm Size 300 Mm X 200 Mm X 105 Mm 58 Supply And Installation Of 45W Led Post Top Lanterns Of Approved Make As Per The Gigl / Gspl Vendor List For Gate Lighting With Ip 54 Protection, Complete With Lamp And Gear Box And All Accessories. 59 Rewinding Of The Following Motors Pump ( Single Phase / Three Phase ) . Work Includes Removal Of The Equipment, Rewinding & Repairing, Re-Installation Of The Same. ( Including Replacement Of Bearing, Required Cable ) .No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Bearings, Tools & Tackles Used During Execution Of This Activity. Ceiling Fan Pump Of 2.0 Hp Pump Of Upto 1.5 Hp Bushing / Bearing Replacement Exhaust Fan Heavy Duty Up To 140W Exhaust Fan Heavy Duty Explosion Proof Iia & Iib Up To 0.33 Hp 60 Checking And Then Supply And Installation ( Including Supply Of Component ) For Split / Cassette / Vrv Ac As Applicable 3 Way Switch Swing Motor / Blower Motor Exhaust Fan & Its Motor Air Filter Copper Tubing Indoor Pcb Split Ac Indoor Pcb Cassette Ac Indoor Pcb Vrv Ac Outdoor Pcb Split Ac Outdoor Pcb Cassette Ac Outdoor Pcb Vrv Ac Temperature Sensor / Card Cu Flexible Cable ( 3Cx6sqmm ) Insulation Of Ac Duct Supply And Replacing Of Drain Pipe Of Pvc For Ac Charging Of Refrigerant For Ac Control Card Split Ac Control Card Cassette Ac Control Card Vrv Ac 61 Below Items To Be Applicable For All Dg Sizes Supply And Installation Of Banjo Hose For Dg For All Dg Sizes Supply And Installation Of Kwh Meters In Dg For All Dg Sizes Supply And Installation Of Thermostat For Dg For All Dg Sizes Supply And Installation Of Water Temperature Switch For Dg For All Dg Sizes Supply And Installation Of Spin On Lube Oil Filter For Dg For All Dg Sizes Supply And Installation Of Spin On Air Filter For Dg For All Dg Sizes Supply And Installation Of Spin On Diesel Filter For Dg For All Dg Sizes Supply And Installation Of Battery Charger 12 V For Dg For All Dg Sizes Supply And Installation Of Battery Charger 24 V For Dg For All Dg Sizes Supply Of Engine Oil Of Cummins / Kirloskar Make For All Dg Sizes Supply And Installation Of Magnetic Pick-Up Coil For Dg For All Dg Sizes Supply Of Coolant For Coolant Cooled Engines Of Cummins / Kirloskar / Mahindra Make For All Dg Sizes Supply And Installation Of Dg Set Exhaust Pipe Insulation ( Rope ) Coating For All Dg Sizes Supply & Installation Of Floating Mechanical Fuel Gauge On Fuel Tank Of Kirloskar / Cummins / Mahindra Make Repairing Of Display Panel / Amf Panel And Programming Of Kirloskar / Cummins / Mahindra Make Repairing & Supply Of Any Component For Amf Panel And Programming Of Kirloskar / Cummins / Mahindra Make Supply & Installation Of Acoustic Enclosure Door Lock 62 Repairing Of Automatic Voltage Regulator Of Crompton Greaves Avr Of Cummins / Kirloskar / Mahindra Make D.G Set. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 63 Supply & Replacement Of Fuel Filter Pre Type Of Kirloskar / Cummins / Mahindra Make 64 Supply & Replacement Of Fuel Filter Mic Type Of Kirloskar / Cummins / Mahindra Make 65 Supply & Replacement Of Lube Oil Filter Element Of Kirloskar / Cummins / Mahindra Make 66 Supply & Replacement Of Air Filter Of Kirloskar / Cummins / Mahindra Make 67 Supply & Replacement Of Air Cleaner Of Kirloskar / Cummins / Mahindra Make 68 Supply & Replacement Of V-Belt For Blower Of Kirloskar / Cummins / Mahindra Make. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 69 Supply Of & Replacement V-Belt For Dynamo Of Kirloskar / Cummins / Mahindra Make. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 70 Replacement Of Bearing Set Of Kirloskar / Cummins / Mahindra Make. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 71 Replacement Of Oil Seal For Crank Of Kirloskar / Cummins / Mahindra Make. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 72 Supply And Installation Of Automatic Float-Boost Charger Of Nhp Make Provided By M / S Kirloskar / Cummins / Mahindra Of 12V / 24V 6 / 12 Amp Rating. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 73 Supply, Removal Of Old Battery & Installation Of New 12V / 24V Lead-Acid Battery Of Approved Make For Invertor / Dg Set. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles, Used During Execution Of This Activity. Contractor Shall Buyback The Old Battery. 65Ah 75Ah 100Ah 120Ah 150 Ah 74 Supply And Replacement Of Applicable Current Transformer Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 150 / 1A, Cl 5P20, Va 7.5 Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 100 / 1A, Cl 5P20, Va 7.5 Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 100 / 1A, Cl 1, Va 7.5 Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 75 / 1A, Cl 5P20, Va 15 Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 75 / 1A, Cl 1, Va 10 Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 75 / 1A, Cl 5P20, Va 7.5 Supply And Replacement Of Applicable Current Transformer Ct Rasin Cast : Ct Ratio 200 / 1A, Cl 1, Va 10 75 Supply And Replacement Of Potential Transformer Pt Ratio 415 / 110V, 50Va Or As Applicable 76 Supply And Installtion Of Transformer Optional Item Transformer Oil Transformer Oil Filtration And Testing Of Oil As Per Is:1866 Replacement Of Silica Gel 77 Supply, Replacement And Installation Of Solar Light Spares Solar Module ( Vikram Solar, Waree Solar, Goldi Green Technologies Pvt Ltd, Tata Power Solar Systems Pvt.Ltd, Solar Systems Pvt.Ltd, Moser Bear Solar Limited, Xl Energy Limited, Solar Semiconductor, Emmvee Photovoltaic Pvt Ltd , Navitas Green Solutions Pvt Ltd, Satvik, Panchwakr Solar, Surana Solar ) Photovoltaic Battery 12V 150Ah ( Exide, Okaya, Luminous, Relicell, Artheon, Su-Kam, Base, Southern, Hbl, Gem ) Charge Controller ( Photonic, Superier, Gelco ) 78 Led Street Light Fixtures Solar Lighting Poles ( Philips, Crompton, Wipro, Havells, Oreva, Charlson, Syska, Moser Bear, Surya, Bajaj ) Led Luminaire Fixture 18, 36, 40 Watts Approved Make Pcb For Led Luminaire Fixture 18, 36, 40 Watts Supply, Laying & Termination Of 2C X 4 Sq. Mm Armoured Power Cable 79 Supply & Installation ( Including Removal Of Existing One ) Of Ni-Cd Battery ( Vrpp / Vrla / Vrnm / Ultra Low Maintenance Batt. ) 1.2 V For Ups / Dc Charger / Inverter System. ( Contractor Shall Buyback The Old Battery. ) 120Ah 150Ah 107Ah 540Ah 450Ah 651Ah 80 Supply & Installation Of 11 Kv Line Type Lightning Arrestor On Dp Structure Of Reputed Make Like Oblum, National Electric Etc. 81 Liasioning With Cei For Annual Periodical Inspection Of Ht Facility ( 11 Kv ) Or Lt Facility ( 420 V ) Including Distribution Transformer, Vcb, Dg Set & Obtaining Statutory Clearance Certificate Under Electricity Act ( Measures Relating To Safety & Electric Supply ) As Amended From Time To Time. Applicable Statutory Fees Only Shall Be Paid By Owner. 82 Supply And Installation Of Cable Jointing Kit For Following Cable ( 3M / Raychem Make ) Including Ir Test And Re-Commissioning Of Cable. The Work Includes Excavation Upto The Cable, Making Required Trenches For Execution Of Job And Backfilling The Area. No Separate Charges Shall Be Paid For Manpower, Excavation, Backfilling, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. Upto 3.5 C X 50 Sq. Mm. Al. Armoured Cable Upto 4 C X 50 Sq. Mm. Al. Armoured Cable 3.5 C X 95 Sq. Mm. Al. Armoured Cable ( Ht ) 3.5 C X 95 Sq. Mm. Al. Armoured Cable ( Lt ) 3.5 C X 100-300 Sq. Mm. Al. Armoured Cable ( Ht ) 83 Supply, Laying & Termination Of Xlpe Insulated, Frls Outer Sheathed, Pvc Inner Sheathed Cable Voltage Grade 650 / 1100 Volts Of Following Sizes Above-Ground On Cable Trays, Supported On Steel Structures, In Ready Made Trenches. The Rates Shall Include The Supply And Fixing Of Aluminium Number Tags, G.I. Saddles / Clamps, Saddle Bars, Lugs, Ferrules, Double Compression Type Ss Glands, Etc, Including Transportation With All Labor And Materials As Per The Specifications, Drawings And Directions Of Engineer-In-Charge . The Insulation Resistance Of Cable Has To Be Checked & Report To Be Submitted Before Commissioning. No Separate Charges Shall Be Paid For Manpower, Consumables, Tools & Tackles Used During Execution Of This Activity. Upto 4 C X 6 Sq. Mm. Cu. Armoured Cable 4 C X 10 Sq. Mm. Cu. Armoured Cable 4 C X 25 Sq. Mm. Cu. Armoured Cable 84 Supply, Laying & Termination Of Xlpe Insulated, Frls Outer Sheathed, Pvc Inner Sheathed Cable Voltage Grade 650 / 1100 Volts Of Following Sizes Under-Ground And / Or Pull Through Pipes Including Excavation And Backfilling Etc. Work Includes Excavation Of Trench Of Average 0.5 Meter Wide & Up To 1.2 Meter Depth With All Appropriate Tools & Tacles ( Manual Work Inside Terminals ) . Layer Of Sand Shall Be Of 100 Mm Thick & Brick Layer Shall Be Laid On Cable For Protection And Back Filling Of Trench After Completion Of Work. Work Includes Carting Of Surplus Earth / Debris And Handling / Unrolling Of Cable, Supply Of Aluminium Tags, Lugs, Ferrules, Double Compression Type Ss Glands, Etc, Including Transportation With All Labour And Materials As Per The Specifications, Drawings And Directions Of Engineer-In-Charge . The Insulation Resistance Of Cable Has To Be Checked & Reported Before Commissioning.No Separate Charges Shall Be Paid For Excavation, Backfilling, Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity Upto 4 C X 4 Sq. Mm. Cu. Armoured Cable 4 C X 6 Sq. Mm. Cu. Armoured Cable Upto 4 C X 10 Sq. Mm. Cu. Armoured Cable 85 Supply And Installation Of Gi 4.5 Meter Lighting Pole For Process Area 86 Supply And Installation Of 100 Watt Flp Flood Light Along With Jb ( Mcb Etc ) And Armond Cable 87 Supply And Installation Of Vcb Spare Surge Arrestor ( Make: Raychem Rfg, Rating: 10 Kv, 10 Ka, Class-1, Model: Da1-10A-Ind ) Supply And Replacement Of Applicable Current Transformer ( Ct ) 11 Kv , Ct 2 Core Wound : Cr1 - 50 / 5A, Burden 7.5Va, Cl: 1 Isf:5 Cr2 - 50 / 5A, Burden 7.5Va, Cl: 5P10 Bil 12Kv / 28Kv / 75Kv. Freq: 50Hz Supply And Replacement Of Applicable Gun Type Pt With 3.15A Bussman Fuse Pri. Volt : 11Kv / 3, Freq :50Hz Cr1 : Sec Volt : 110 / 3, Burden : 100 Va , Cl :1 / 3P Cr2 : Sec Volt : 110 / 3, Burden : 25 Va , Cl :3P Bil 12Kv / 28Kv / 75Kv. Freq: 50Hz Schneider Make Protection Relay , P127 Dir / Non Dir 3 Ph O / C & E / F Model No : P127 Aa0z112fed Earth Current : I / P – 0.1 – 40A Voltage I / P- 57-130 V Digital I / P Voltage : 24-250 Vdc / Ac 88 Supply & Installation Of Spd ( Surge Protection Device ) 10 Ka / 25Ka ( For Medb ) 89 Supply And Installation Of Ht Termination Kit ( Indoor / Outdoor ) For Following Cable ( 3M / Raychem Make ) Including Ir Test And Re-Commissioning Of Cable ( 3C X Up To 300 Sq. Mm. Al. Armoured Cable ) 90 Supply & Installation Of Copper Earthing Cable 10 / 16 / 25 Sq Mm In Consultation With Eic. The Job Includes The Excavation, Removal Of Existing Copper Strip, Laying Of New Cable, Back-Filling & Restoration. No Separate Charges Shall Be Paid For Manpower, Tools & Tackles, Equipments, Instruments Used During This Activity. 91 Supply, Installation Testing & Commissioning Of Copper Earthing: The Job Includes: A ) Excavation Of A Pit Of Size ( 900 Mm X 900Mm X 3500Mm Deep ) B ) Placement Of Copper Earth Plate ( 600Mm X600mm X3 6Mm ) And Embedding The Gi Pipe Of 20Mm, 3Mtr. Length In The Earth C ) Back Filling The Pit With Alternate Layers Of Approx. 100Kg Charcoal And 50 Kg Salt To Cover The Earth Plate The Pit Shall Further Be Refilled With Earth Upto Ground Level And Compacted. Copper Strip ( Size 25Mm X 3 6Mm ) 2 Nos. Shall Be Provided From Plate Electrode To Ground Level To Facilitate Jointing With Earth Wire. It Shall Be Provided With Test Link For Testing Of The Particular Earth Pit. The Funnel Shall Be Installed Above The Ground For Facilitating Pouring Of Water. The Funnel Of Earthing Pits Shall Be Covered By Brick Masonry Chamber ( Size 900Mm X 900 Mm X 600Mm ) With Cement Plaster On Inside And Outside. The Chamber Shall Be Provided With A Hinged Ms Cover And Frame Fixed On Chamber Alognwith Sticker Tagging Installed On The Backside Of Ms Plate ( 400X100mm ) . The Resistance Of The Pit Must Be Achieved Below 1 Ohm 92 Supply And Filling Of Chemical Solution For Earthing And Restoring The Earth Pit To Its Standard Values 93 Supply, Installation, Testing & Commissioning Of Gi Pipe Earthing. A Pit ( Size : 3500 Mm Deep ) Shall Be Excavated By Auguring Or Otherwise, 65 Dia Gi Pipe 3.5 Mtr. Length Shall Be Put. The Gi Pipe Shall Be Cut Tapered At The Bottom And Provided With Holes Of 12 Mm Dia. Drilled At 75 Mm Interval Upto 2.5 Mtr. Length From Bottom. The Pit Shall Be Back Filled With Alternate Layers Of Appx 100 Kg Of Charcoal And 50 Kg Of Salt. The Pit Shall Further Be Refilled With Earth Upto Ground Level And Compacted. Gi Strip Size 50X12mm Shall Be Welded To This Gi Pipe At Ground Level To Facilitate Jointing With Earth Wire. It Shall Be Provided With Test Link For Testing Of The Particular Earth Pit. The Funnel Shall Be Installed Above The Ground For Facilitating Pouring Of Water. The Funnel Of Earthing Pits Shall Be Covered By Brick Masonry Chamber ( Size 900Mm X 900Mm X 600Mm ) With Cement Plaster On Inside And Outside. The Chamber Shall Be Provided With A Hinged Ms Cover And Frame Fixed On Chamber Along With Tagging On Ms Plate ( 400X100mm ) . The Resistance Of The Pit Must Be Achieved Below 1 Ohm. 94 Supply, Laying & Installation Of Copper Earthing Strip – 25 X 3 Mm ( Above Ground / Under Ground ) With Over Lapping Of Minimum 75 Mm At Joints And Two Consecutive Strip Be Bolted Together With Copper Bolt, Job Includes Cutting The Strip Suitable To Site, Edge Preparation , Excavation Of Required Length / Width / Depth, Strip Laying And Back Filling After Completion, Site Welding And Bending And Termination As Per Eic, Supply Of Copper Connection Bolts Etc. 95 Supply, Laying & Installation Of Gi Earthing Strip – 50 X 6 Mm, ( Above Ground / Under Ground ) With Over Lapping Of Minimum 75 Mm At Joints And Two Consecutive Strips To Be Welded Together And Applying Bitumen On The Joint. Job Includes Cutting The Strip Suitable To Site, Edge Preparation , Excavation Of Required Length / Width / Depth, Strip Laying And Back Filling After Completion, Site Welding And Bending And Termination As Per Eic, Supply Of Ss Connection Bolts Etc. 96 Supply, Laying & Installation Of Gi Earthing Strip – 25 X 6 Mm, ( Above Ground / Under Ground ) With Over Lapping Of Minimum 75 Mm At Joints And Two Consecutive Strips To Be Welded Together And Applying Bitumen On The Joint. Job Includes Cutting The Strip Suitable To Site, Edge Preparation , Excavation Of Required Length / Width / Depth, Strip Laying And Back Filling After Completion, Site Welding And Bending And Termination As Per Eic, Supply Of Ss Connection Bolts Etc. 97 Supply And Installation Of Three Way Flameproof Junction Box With Appropriate Flame Proof Double Compression Cable Gland Of Approved Make 98 Dismantling, Powder Coating ( Alkali Resistant Epoxy Powder Coated , Shade:Ral 7032 ) & Reassembling Of Ni-Cd Battery Rack. Work Includes Surface Cleaning Of Batteries With Dm Water & Potential Measurement Of Each Cell Voltage After Reassembling. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 99 Supply & Installation Of Stabilizer Upto 4 Kva 230 Volt Of V Guard, Gelco, Luminous, Voltek Make. It Should Be Cu Wound With Overload Tripping Feature, Voltmeter ( Digital ) And Mcb. 100 Supply & Installation Of Stabilizer From 5 Kva To 8 Kva 420 Volt ( 3 Phase ) Of V Guard, Gelco, Luminous, Voltek Make. It Should Be Cu Wound With Overload Tripping Feature, Voltmeter ( Digital ) And Mcb. 101 Relocation Of Lighting Pole / Solar Pole / Opgd / Pgd Within The Terminal Which Includes Removal With Or Without Rcc Foundation & Re-Installation With Proper Foundation, Concrete Support Etc. Complete In All Respect. This Also Include Levelling Of Old Foundation Location & Backfilling If Required With All Tools, Tackles, Labour, Machinary, Hydra Etc. Removal Of Fixture, Jb , Earthing Connections, Cable Connection From Pole At Old Location & Reconnection & Testing Of All The System At New Location Is Included In The Scope. 102 Supply & Replacement Of Rectifier Module For Industrial Inverter Up To 2.5 Kva Make: Vertive / Emerson 103 Supply Laying & Termination Of 4 C X 10 Sq.Mm Cu Flexible Cable 104 Supply And Installation Of Ss 316, Double Compression Type Cable Glands For Armoured Twin And Multicore Power Cables Of Voltage Grade 650 / 1100 V And Instrument Cables Alongwith Pvc Shrouds. The Glands Shall Be Flameproof To Gas Group Iia, Iib And / Or Weatherproof To Ip 65, For Cables Having Overall Diameters As Given Below. Applicable Certificate Shall Be Provided By The Contractor. 1 / 2 Npt / Et As Specified By Eic 3 / 4 Npt / Et As Specified By Eic 1 Npt / Et As Specified By Eic 105 Maintenance Of Junction Box Including Cleaning, Supply & Replacement Of Rubber Seal, Nut-Bolt , Entry Plug, Gland & Washer. No Separate Charges Shall Be Paid For Manpower, Rubber Seal, Nut-Bolt, Entry Plug, Gland, Washer, Consumables, Tools & Tackles Used During Execution Of This Activity. 106 Supply & Instalaltion Of Gi Cable Trays With Cover On Ms Steel Support. All Accessories Shall Be In The Scope Of Contractor Like Ms Angle Support , Channel, Fastners, Clamp, Cable Tie Etc. As Per Below Mentiond Size Perforated Cable Tray With Cover 150 Mm Perforated Cable Tray With Cover 100 Mm 107 Supply & Instalation Of Heavy Duty Exhaust Fan, Made Of Cast Aluminium Alloy Lm6, Exproof To Gas Group Iia & Iib. Suitable For Continuos Running. It Should Be Epoxy Powder Coated For Resistance To Corrosion And Acid Alkali Fumes. It Should Be Supplied With Self Opening Louvers For Total Protection Against Birds And Direct Rain. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. Size : 300 Mm, Single Phase Size : 450Mm, Single Phase 108 Supply And Installation Of Ceiling Fan ( Gigl Approved Vendor Make ) , White / Ivory Colour, 230V, 1-Phase, 1200 Mm Sweep. It Shall Have Robust Two Piece Motor Construction, All Aluminum Alloy Construction With Double Ball Bearing And Powder Coated Finish To Protect Metal From Corrosion.The Fan Shall Be Energy Efficient Having 5 Star Rating. Removing Of Existing Fan From The Location. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. 109 Painting Of Lighting Pole / Solar Pole / Opd Pole / Stack Including Surface Preperation, Supply Of Paint And Application Of 2 Coat Of High Build Chlorinated Rubber / Zinc Phosphate Primer And Two Coats Of Finished Paint Of Epoxy Paint Of Silver Colour Approved Make To Give An Even Shade After Proper Removal Of Existing Paint By Power Brushing Or Suitable Method And Clearing Of Surface Free From Foreign Materials. No Separate Charges Shall Be Paid For Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity. Upto 5 Meter Height Pole Upto 6 Meter Height Pole 6.1 Meter To 9 Meter Height Pole 9.1 Meter To 11 Meter Height Pole Instrumentation 110 Removal, Refilling & Re-Installation Of Co2 Gas Cylinders Used For Flooding System Of Water Capacity: 68 Liter Including To & Fro Transportation. ( Co2 Refilling Shall Be Carried Out Thru Peso Approved Vendor Only ) . No Separate Charges Shall Be Paid For Manpower, Tools & Tackles, Lifting Equipments Used During This Activity. 111 Removal, Refilling & Re-Installation Of Clean Agent ( Fm200 / Fk-1-2-3 ) Gas Cylinders Used For Flooding System Of Water Capacity: 80 Liter Including To & Fro Transportation. ( Clean Agent Refilling Shall Be Carried Out Thru Peso Approved Vendor Only ) . No Separate Charges Shall Be Paid For Manpower, Tools & Tackles, Lifting Equipments Used During This Activity. 112 Ofc-24 / 48 Fiber Jointing At Pit Location By Preparation Of Fiber, Removal Of The Sheath, Cleaning Of The Fiber, Fixing The Fiber To The Ftc With Proper Clamping / Ties. Numbering Of The Fiber Using Ferrules, Splicing The Fiber To The Pigtail, Proper Routing Of The Fiber In The Cassette. Proper Closure Of The Cassette, Connecting The Pigtail To The Adapter, And Marking The Same, For 1-24 / 48 Fibers Joints. Job Include Fault Finding & Identification Using Otdr. End To End Testing Of Fibres After Jointing And Submission Of Report. Incase Of Unacceptable Db Loss At Repair Joint Same Needs To Be Rectified With-Out Any Cost Implication To Owner. Final End To End Otdr Test Shall Be Carried-Out For All 24 / 48 Fibres & Submit The Report Without Any Cost Implication To Owner. No Separate Charges Shall Be Paid For Manpower, Instruments, Transportation Used During This Activity. Visit For Fault Finding & Final Testing Shall Be Considered As One Visit Only. Complete Link Testing End To End With Power Source, Laser Source, Otdr Meter Working With 1310 Nm And 1550 Nm From Both End Including Pigtails, Patch Cord For Testing. Submission Of All 24 Core Otdr Traces Between Two Terminals Or Across The Joints. Pit Excavation & Back-Filling Included & No Extra Charge Shall Be Paid. Jointing Enclosure For 24 / 48 Core Fiber Cable Shall Be Supplied By Contractor. 113 Removal And Re-Installation Of Ultrasonic Meter Of Size Mentioned Below. No Separate Charges Shall Be Paid For Manpower, Consumables, Lifting Equipments, Valve Operations, Tools & Tackles Used During Execution Of This Activity. Gasket Shall Be Supplied By Owner At Designated Store. 4 8 10 114 Removal And Re-Installation Of Turbine Flow Meter Of Size Mentioned Below. No Separate Charges Shall Be Paid For Manpower, Consumables, Lifting Equipments, Tools & Tackles Used During Execution Of This Activity. Gasket Shall Be Supplied By Owner At Designated Store. 3 4 115 Removal And Re-Installation Of Rotary Positive Displacement ( Rpd ) Meter Of Size Mentioned Below. No Separate Charges Shall Be Paid For Manpower, Consumables, Lifting Equipments, Tools & Tackles Used During Execution Of This Activity. Gasket Shall Be Supplied By Owner At Designated Store. 2 116 Removal And Re-Installation Of Flow Control Valve Of Size Mentioned Below. No Separate Charges Shall Be Paid For Manpower, Consumables, Lifting Equipments, Tools & Tackles Used During Execution Of This Activity. Gasket Shall Be Supplied By Owner At Designated Store. 4 8 10 117 Supply, Laying & Termination Of Pvc Insulated, Frls Outer Sheathed, Pvc Inner Sheathed Instrumentation Cable Voltage Grade 650 / 1100 Volts Of Following Sizes Under-Ground And / Or Pull Through Pipes Including Excavation And Backfilling Etc. Work Includes Excavation Of Trench Of Average 0.5 Meter Wide & Up To 1.2 Meter Depth With All Appropriate Tools & Tackles ( Manual Work Inside Terminals ) . Layer Of Sand Shall Be Of 100 Mm Thick & Brick Layer Shall Be Laid On Cable For Protection And Back Filling Of Trench After Completion Of Work. Work Includes Carting Of Surplus Earth / Debris And Handling / Unrolling Of Cable, Supply Of Aluminium Tags, Lugs, Ferrules, Double Compression Type Ss Glands, Etc, Including Transportation With All Labour And Materials As Per The Specifications, Drawings And Directions Of Engineer-In-Charge . The Insulation Resistance Of Cable Has To Be Checked & Reported Before Commissioning. No Separate Charges Shall Be Paid For Excavation, Backfilling, Manpower, Consumables, Equipments, Tools & Tackles Used During Execution Of This Activity Instrument Cable Upto 1P X 1.5Sqmm Armoured Cable Instrument Cable Upto 2P X 1.5Sqmm Armoured Cable Instrument Cable Upto 6P X 1.5Sqmm Armoured Cable 118 Supply, Fabrication And Installation Of Aluminium Canopy For Field Instruments, Open Path Gas Detectors, Flow Computers. Dimensions Of The Canopy As Per Field Instrument Actual At Site And Instruction As Per Eic 119 Supply & Installation Of Gigl Approved Makes Cooling / Ventilation Fan Along With Safety Grill And Dust Preventor In Control Panel. Size : 4” Axial Fan 220V Ball Baring With Finger Guard Size : 6” Axial Fan 220V Ball Baring With Finger Guard 120 Supply & Replacement Of Door Hinges / Lock In Instrument Local Control Panel / Rtu Panel / Metering Panel Etc. The Job Shall Be Caarried Out By Qualified Instrument Technician / Electrician. 121 Supply And Installation Of Pre Cast Foundation With Metallic Cable Route Marker ( For Instrumentation And Electrical Cables ) . Excavation And Backfilling Are Inclusive Noe Extra Charges Shall Be Paid General 122 Arrangement And Supply Of Water In Tanker / Truck / Lorry 5000 Litres 123 Collection Of Hazardous Wastes Including Used Engine Oil, Gear Oil, Hydraulic Oil , Transformer Oil , Spent Oil, Filter Elements, Grease Contaminated Cotton Waste Etc. From Gigl Stations And Disposal-Off The Same To An Approved Pollution Control Board Vendor By Complying Hazardous Waste ( Management And Handling ) Rules, 1989. 124 Hiring Of Following Equipments For Doing Any Emergency Work With All Required Valid Test Certificates. The Period Of Hiring Will Start After The Equipment Reaches At Site And Ends When Equipment Leaves The Site. Break Down Period Of Equipment Will Not Be Paid. Normal Working Time Per Day Will Be 8 Hrs. Rate For Idle Time Shall Be 50%. Night Is Not Included In Idle Time Except If Works Will Continue In Night. Hiring Rates Is Inclusive Of Diesel, Operators, Maintenance Cost, Loading / Unloading Of Equipments By Hydra / Manual At Site. Dewatering Pump Of Capacity 20Kl With Required Capacity D.G.Set Hydra Of Lifting Capacity 10Mt To 15 Mt Along With Required Wire Ropes & D-Shackle 15Kva Dg Set 30Kva To 45 Kva Dg Set Jcb 125 Schedule Of Rates For Extra Works For Manpower Supply Along With Required Tools Tackles, Consumables And Equipment Qualified Welder Fitter / Grinder Electrician / Wireman Instrument Technician / Tubing Fitter Rigger Helper / Unskilled Labour Plumber Mason Carpenter 126 Supply & Installation Of Dm Water As Per The Requirement At Designated Store. Transportation, Manpower And Containers Are In Contractors Scope. 127 Greasing, Oiling, Repairing Of M.S.Rolling Shutters ( Manual Operating ) 128 Installation, And Pre-Commissioning Of Fml Skid With All Required Manpower, Consumable, Equipments, Tools & Tackles Etc. Unloading Of Entire Fml Skid And Installation At Designated Foundation With Proper Alignment And Grouting Of Skid Hook Up With Existing Station Piping With Necessary Gaskets Providing Required Structural Support Pneumatic Testing At 95 Barg  ( N2 Supply, Tested High Pressure Hose, Ss Fittings, Calibrated Pressure Gauge Etc Inclusive ) Calibration Of Psv / Creep Relief Valve Calibration Of Filed Instruments ( Within Fml Skid – Press, Temp, Dp Gauges / Transmitters ) Supply & Installation Of Opgd Pole With Proper Foundation ( Pole Height Max. 6 Mtr Of 6” Dia ) Opgd Instruments Shall Be Supplied By Owner ) , Installation Of Opgd On The Pole Shall Be In Contractor Scope Installation Of Pgd On Structure Support With Proper Cable Termination Installation Of Instrument Panel In Control Room Glanding & Termination Of Cable Laid For Panel / Instruments / Jb / Fixtures Supply Of Armoured Communication Cable Rs485 Laying & Termination Of Communication Rs485 ( Above Ground / Under Ground As Per Requirement-Shall Be Laid In Proper Cable Trench-Req. Excavation / Backfilling / Dressing Between Control Room To Skid Shall Be In Contractor Scope ) Supply Of 3 Core X 2.5 Sq. Mm Armoured Cu Cable For Meter & Heater Laying & Termination Of Individual Run Of 3 Core X 2.5 Sq. Mm Armoured Cu  Cable  For Meter & Heater ( Above-Ground / Under-Ground As Per Requirement - Shall Be Laid In Proper Cable Trench-Req. Excavation / Backfilling / Dressing Between Control Room To Skid Shall Be In Contractor’S Scope ) Supply Of 10 Sq. Mm Cu Earthing Cable From Instruments To Cu Earth Pit Laying & Termination Of 10 Sq. Mm Cu Earthing Cable From Instruments To Cu Earth Pit Supply, Installation, Testing & Commissioning Of Copper Earthing Pit ( Earth Pit Details As Per Relevant Sor ) Providing Gi Earthing ( 50 X 6 Mm Gi Strip ) To Skid From Existing Gi Earth Pit Providing And Installation Of Copper Jumper Of Req. Size ( 10 Sq . Mm ) Supply Of Instrument Cable ( Refer Relevant Sor For Cable Details ) For The Following Instrument Cable Upto 1P X 1.5Sqmm Armoured Cable Instrument Cable Upto 2P X 1.5Sqmm Armoured Cable Laying & Termination Of Individual Run Of Instrument Cable ( Above-Ground / Under-Ground As Per Requirement - Shall Be Laid In Proper Cable Trench-Req. Excavation / Backfilling / Dressing Between Control Room To Skid Shall Be In Contractor’S Scope ) With Panel / Instrument / Fixtures 129 Stencilling & Painting Of Numbers / Letters / Logos / Arrow Etc Including Supply Of Fluorescent / Highlighted Paint / Acrylic Emulsion / Oil Paint Of Approved Brand As Per The Gigl / Gspl Vendor List And Quality Wherever Required As Per Directed By Gigl E-I-C: Area Of The Stencilling & Painting Shall Be Calculated On The Basis Of Length & Width Of Words. 130 Supply And Application Of Good Quality Sun Film Of Isi Mark, Black Colour On Plain Float Glass. 131 Providing And Fixing Double Action Hydraulic Floor Spring Of Approved Brand ( Dorma Or Equivalent ) And Manufacture ( Conforming To Is: 6315 ) For Aluminium Doors Including Cost Of Cutting Floors As Required, Embedding In Floors And Cover Plates Etc. Complete As Per The Direction Of Eic. 132 Providing And Fixing Mild Steel Bright Polished Nickel Plated Pull Bolt Lock Conforming To Is: 7534 With Necessary Nuts And Screws Etc. Complete 85 Mm X 42 Mm. 133 Providing And Fixing Ss Handles Anodized 125 Mm ( Anodic Coating Not Less Than Grade Ac 10 As Per Is: 1868 ) Transparent Or Dyed To Required Colour Or Shade With Necessary Screws Etc. 134 Providing And Fixing In Position Approved Make Dorma Or Approved Equivalent ) Heavy-Duty Overhead Hydraulic Door Closer With Adjustable Spanners, Screws Etc. Conforming To Is: 3564.Including All Necessary Fixtures Fittings Finishing Etc. All Complete. 135 Repairing Of Floor Spring / Door Closer Of The Rooms Which Includes Replacement Of Internal Parts Etc. 136 Replacement Or Repairing Of Damaged Parts Of Aluminium / Glass Windows / Doors For Smooth Opening And Closing In Control Room Buildings, Guard Room Including Checking Of Alignment, Bearings, Lock, Handle, Sealing, Channel Cleaning, Screws, Tools And Tackles And Labour Charges Etc. All Inclusive. 137 Supply And Installation Of Bakelite Sheet Sheet Upto 10Mm Thick In Doors, Windows As Per Applicable Colour As Per Direction Of Eic. 138 Providing And Fixing Flush Tank Complete With Connection To Sanitary W / C Line. Rate Shall Include All Internal Plumbing Cost Inclusive Of All Necessary Items To Complete The Job As Directed By Engineer – In – Charge 139 Providing & Fixing In Position 15 Mm C.P. Brass Bib Cocks Of Best Quality. Bibcock Valve 140 Providing & Fixing Jet Spray / Hand Faucet – With All Fittings & Fixtures. 141 Removal Of Damaged False Ceiling From The Position And Disposal Of The Same Within A Lead Of 500 Meters And Fixing New False Ceiling Of Mineral Fibre False Ceiling In Place / In Position Of Old Ceiling : By Providing And Fixing Mineral Fibre False Ceiling Of Armstong Or Equivalent With Anodised ( 25 Micron ) Alum Silhouette Grid Framework From Roof Slab At Desired Height In Desired Pattern Including Finishing, Making The Frame Work Perfectly Levelled And Alligned Etc. All Complete. 142 Removal Of Damaged False Ceiling Tiles From The Position And Fixing New False Ceiling Of Mineral Fibre False Ceiling Of 600 X 600 Mm Of Armstong Or Equivalent ( Without Cost Of Suspending Grid Frame Work ) 143 Removal Of Damaged False Ceiling From The Position And Disposal Of The Same Within A Lead Of 500 Meters And Fixing New False Ceiling Of Gypsum In Place / In Position Of Old Ceiling : By Providing , Supplying And Fixing India Gypsum Board Of 12.5Mm Thick ( Plain ) Using All The Farming And Fixing Members / Accesories Of Gypsteel Ultra Supplied By The Manufacturers Igl ( Saint- Gobain Gyproc India ) And Installation Is To Be Done As Per Manufacturers Specification Excluding Painting Rate Shall Be Inclusive For Providing Cut Outs For All Ceiling Light Fixtures Etc As Per Drawing And Approved By Architect / Pmc. ( The Contractor Has To Give Companys ( Igl ) Certification For Performance Of The Product And Installation 144 Water Proofing / Roof Slab Repairing Of Cracks In Old Terraced Roofs. Existing Roof Treatment Will Be Dismantled And App Modified Water Proofing Will Be Provided With Protective Layer Of 35 Mm Thk. P.C.C. ( 1:2:4 ) In Panels Of Maximum Size 1200Mm X 1200Mm Chequered Finish With 24 Swg Chicken Wiremesh Interposed In Between Finished Smooth With Joints Between Panels Sealed With Suitable Polyurethane Sealant; Providing Fillets Of 75 Mm Radius With P.C.C. ( 1:2:4 ) At Junctions Of Horizontal And Vertical Surfaces Finished Smooth; Providing 450Mm X 450Mm Khuras ( Rain Water Collecting Pits ) In 1:2:4 Cement Concrete At All Outlets, Levelled Down By Min. 25Mm, Finishing, Curing Etc. All Complete As Per Approved Manufacturers Standard Specifications And Recommendations. Also, Top Surface Shall Be Covered With China Mosaic Flooring 145 Water Proofing / Roof Slab Repairing Of Cracks In Old Terraced Roofs. Existing Roof Treatment Will Be Dismantled And New Brick Bat Koba Water Proofing Will Be Provided With Laying Cement Concrete Using Broken / Brick Bats 25Mm To 100Mm Size With 50% Of Cement Mortar 1:5 ( 1Cement: 5 Coarse Sand ) Admixed With Proprietary Water Proofing Compound Confirming To Is: 2645 Over 20Mm Thick Layer Of Cement Mortar Of Mix 1:5 ( 1 Cement: 5Coarse Sand ) Admixed With Proprietary Water Proofing Compound Confirming To Is: 2645 To Required Slope And Treating Similarly The Adjoining Walls Upto 300Mm Height Including Rounding Of Junctions Of Walls And Slabs. Finishing The Surface With Broken China ( Glazed ) Laid Joint Less With Cement Mortar Of Mix 1:4 ( 1Cement: 4 Coarse Sand ) Admixed With Proprietary Water Proofing Compound Confirming To Is: 2645 And Finally Finishing The Surface With Trowel. Also, Top Surface Shall Be Covered With China Mosaic Flooring 146 Road Transportation Of Gigl Issued Equipments, Materials, Pipes, Skids Etc. From The Point Of Loading To Destination. This Job Including Loading At Issue Location, Un-Loading & Stacking At Designated Location With Tools & Tackles, Equipments, Hydra / Crane, Manpower, Supervision As Per The Directions Of Eic. This Include Interstate Transportation Of Material And All Applicable Taxes ( Toll Etc. ) Charges For Hydra / Crane Along With Operator And Crew Required For Loading And Unloading Shall Be Inclusive Vehicle Such As Utility / Tata 407 / Tata 409 / Truck With Load Carrying Capacity As Given Below Upto 2.5 Mt 2.6 Mt To 4.5 Mt 4.5 Mt To 6 Mt 6.1 Mt To 9 Mt 147 Trailer With Prime Mover-Flat Bed; Trailer Length: 40 Ft With Load Carrying Capacity As Given Below: For Transportation Of Line Pipes Of Double Random Length Upto 10 Metric Ton In Trailer For Transportation Of Line Pipes Of Double Random Length 10.1-18 Metric Ton In Trailer 148 Dismantling & Removing The Existing Installed Equipment Such As Dg Set, Metering Skid, Filter, Filteration Skid, Prs Skid, Pig Barrel, Pig Trolly, Jib Crane, Piping, Electrical / Instrumentation Panel, Valves, Structural Steel Etc. Carefully Including Handling, Loosing The Nuts, Bolt Cutting Etc ( If Required ) And Stacking The Equipments / Material As Directed By Eic. Manpower, Machinery Required Shall Be In Contractors Scope. Item Weight Upto 50 Kg Item Weight Upto 51-150 Kg Item Weight Upto 151-250 Kg Item Weight Upto 251-500 Kg Item Weight Upto 501-1000 Kg Item Weight Upto 1 Ton - 2 Tonnes Item Weight Upto 2-Tonnes- 3 Tonnes 149 Installation Of Equipment Such As Dg Set, Metering Skid, Filter, Filteration Skid, Prs Skid, Pig Barrel, Pig Trolly, Jib Crane, Piping, Electrical / Instrumentation Panel, Valves, Structural Steel Etc. Carefully Including Handling, Erection And Proper Installtion Of The Equipments / Material As Directed By Eic. Manpower, Machinery Required, Shall Be In Contractors Scope. Item Weight Upto 50 Kg Item Weight Upto 51-150 Kg Item Weight Upto 151-250 Kg Item Weight Upto 251-500 Kg Item Weight Upto 501-1000 Kg Item Weight Upto 1 Ton - 2 Tonnes Item Weight Upto 2-Tonnes- 3 Tonnes 150 Providing Fixing, Testing And Commissioning In Position Uv Stabilised Pvc Swr Pipe Of Supreme, Finolex, Kisan Or Prince Make As Per Is:13592 Class-B, Including Excavation Incase Of Under Ground And Jointing With Tee Shaped Rubber Seal Ring Confirming To Is : 5383 & With Pvc Adhesive Solvent, Including Fitting Like Elbows, Collors, Tees, Unions, Couplers, Reducers, Enlargers, Bends And All Other Required Fittings For Water Facility Inside Terminal 15Mm Dia 20Mm Dia 25 Mm Dia 151 Supply, Installation, Testing And Commissioning Of Gunmetal, Male Or Female Threaded Isolation Valve ( Handle Valve ) , Confirming To Is 778, Pn 1.0, With Necessary Specials, Unions, Nipple Etc., To Complete The Job. ( For External / Internal Work ) 20Mm Dia 25 Mm Dia 50 Mm Dia 152 Cleaning Of Septic Tank / Sever / Mud Pit With Its Associated System Including Removal Of Sock / Mud, Dewatering, Removal Of Chocking If Any, Debris And Disposal Of The Same To The Distance Of 10 Km, Cleaning With Fresh Water Including Tools / Tackels / Transportation / Material / Labour Etc., 153 Construction Of Slab For Soak Pit Including Tools / Tackels / Transportation / Material / Labour Etc., 154 Construction Of Soak Pit Including Tools / Tackels / Transportation / Material / Labour Etc., Hse Refilling Of Co2 155 Refilling Of Co2 2 Kg Cylinders 156 Refilling Of Co2 4.5 Kg Cylinders 157 Refilling Of Co2 Gas Cartridge 180 Gms 158 Refilling Of Co2 Gas Cartridge 1 Kg 159 Refilling Of Co2 Gas Cartridge 2 Kg Other Items 160 Operating Cap - Dcp 161 Operating Cap With Safety Valve -Dcp 162 Pvc Discharge Hose - 9 Kg Dcp 163 Pvc Discharge Hose - 75 Kg Dcp 164 Shutoff Nozzle 75 Kg Dcp 165 Safety Clip With Chain - Dcp 166 Rubber Cap Washer - Dcp 167 Rubber Bush, Screw & Washer - 9 Kg Dcp 168 Inner Container - 10 Kg Dcp 169 Wall Brackate - 10Kg Dcp 170 Rubber Guard For Nozzle - Dcp 171 Pressure Gauge For Abc Fire Extinguishers 172 Trolley Wheel Set - 75 Kg Dcp 173 Sticker ( Dcp 75 Kg, Co2 2 / 4.5 Kg, Dcp 9 Kg, Abc 9 Kg ) 174 Connecting Hose - 75 Kg Dcp 175 Spring Loaded Safety Valve - Dcp 176 Dcp Powder 177 Brass Operating Cap Assembly - Dcp 9 Kg 178 Abs Plastic Siphon Tube Upto 9 Kg Dcp 179 Ss Mad Safety Lock Pin - Dcp 9 Kg 180 Abc Powder With N2 Pressurization In Each Cylinder 181 Discharge Hose With Horn 1 Mtr For Upto 4.5 Kg Co2 182 Discharge Horn - 4.5 Kg 183 Locking Pin 184 Locking Holder 185 Neck Handle Wit Rubber Clip - Co2 186 Wall Brackate - Co2 187 Valve - Co2 188 Rubber Handle ( Hose Between Horn ) Co2 189 Ms Nipple ( Hose Between Horn ) Co2 190 Supply Of Acrylic Sheet For Tagging 191 Painting Of Co2 2 Kg Cylinders 192 Painting Of Co2 4.5 Kg Cylinders 193 Hydro Test & Refilling Of Co2-2 Kg Fire Extinguisher 194 Hydro Test & Refilling Of Co2-4.5 Kg Fire Extinguisher 195 Refilling Of Scba Set Cylinder Pest Control 196 Honeycomb Treatment 197 Diluting And Injecting Chemical Emulsion For Post-Constructional Anti-Termite Treatment ( Excluding The Cost Of Chemical Emulsion ) :Along External Wall Where The Apron Is Not Provided Using Chemical Emulsion at 7.5 Litres / Sqm Of The Vertical Surface Of The Substructure To A Depth Of 300Mm Including Excavation Channel Along The Wall & Rodding Etc. Complete:With Chlorpyriphos / Lindane E.C. 20% With 1% Concentration