Online Quotation For Annual Rates For The Items Of M & R Works Of Dam, Canals / Structures Etrc ( Completed Items ) For The Year 2023-24-1 Dismantling Stone / Brick Masonry & Stacking Of Useful And Unuseful Material From The Dismantled Materials As Directed Etc Complete. ( Regional Sor-2021-22, Pg44 It 2 ) ( A ) In Cement Mortar ( B ) In Lime Mortar 2 Romoveming Plaster Including Racking Out Joints 20Mm Deep Etc Complete. . ( Regional Sor-2021-22, Pg44 It 5 ) ( A ) Cement Plaster ( B ) Lime Plaster 3 Removing Cement Pointing Including Racking Out Joints 20Mm Deep Etc Complete. . ( Regional Sor-2021-22, Pg44 It 6 ) 4 Dismantling The Rubble Pitching Including Sorting Out Stacking Of Useful Materials At Site Upto Lead 200 Mt.Measureable Conditions Including Removing The Rubbish As Directed Etc. Complete. ( Regional Sor-2021-22, Pg45 It 9 ) ( A ) 23 Cm Thick Pitching ( B ) 30 Cm Thick ( C ) 45 Cm Thick ( D ) 60 Cm Thick 5 Dismantling Of Rcc Work Viz. Slab, Beam, Lintel, Barrel, Staircase, Etc. Including Removing The Steel From The Dismantled Portion Without Damage To Reinforcement Sorting And Stacking Of Useful And Unuseful Material From The Dismantled Material As Directed Etc Comp.. ( Regional Sor-2021-22, Pg44 It 7 ) 6 Excavation In All Sort Of Strata And Formations Incl. Depositing The Unuseful Excavated Stuff As And Where Directed Incl Sorting And Stacking Useful Materials As Directed Upto 200 Mt Lead And All Lift Etc. Complete Incl. Dewatering. ( Regional Sor-2021-22, Pg 19 It 1 ) A ) In Overburden Incl. Hard Murrum. B ) In Soft Rock. C ) In Hard Rock. 7 Excavation In All Sort Of Strata And Formations Incl. Depositing The Unuseful Excavated Stuff As And Where Directed Incl Sorting And Stacking Useful Materials As Directed Upto 30 Mt Lead Etc. Complete Incl. Dewatering. ( Depth 0 To 3.0 Mt ) ( For All Type Canal & Foundation Trenches Of C.D. Works ) ( Regional Sor-2021-22, Pg22 It 1 ) ( A ) In Overburden Incl. Hard Murrum. ( B ) In Soft Rock. ( C ) In Hard Rock. ( D ) In Bhat Rock 8 Excavation In All Sort Of Strata And Formations Incl. Depositing The Unuseful Excavated Stuff As And Where Directed Incl Sorting And Stacking Useful Materials As Directed Upto 30 Mt Lead Etc. Complete Incl.Dewatering. ( Depth 3.0 To 6.0 Mt ) ( For All Type Canal & Foundation Trenches Of C.D. Works ) ( Regional Sor-2021-22, Pg 22 It 2 ) ( A ) In Overburden Incl. Hard Murrum. ( B ) In Soft Rock. ( C In Hard Rock. ( D ) In Bhat Rock 9 Providing & Laying In Position Controlled Cement Concrete Using Cement Sand & Crushed Metal Aggregate By Machine Mix Incl. Necessary Formworks , Compaction By Mechanical Vibrator Curing As Directed With All Lead And Lift Etc Complete. Excluding The Cost Of Steel . For Foundation Concrete ( Regional Sor-2021-22, Pg6 It 4 ) ( A ) Concrete Grade M-10 And Msa-40Mm ( Graded ) ( B ) Concrete Grade M-10 And Msa-80Mm ( Graded ) ( C ) Concrete Grade M-15 And Msa-40Mm ( Graded ) ( D ) Concrete Grade M-15 And Msa-80Mm ( Graded ) 10 Providing & Laying In Position Controlled Cement Concrete Using Cement Sand & Crushed Metal Aggregate By Machine Mix Incl. Necessary Formworks, Compaction By Mechanical Vibrator Curing As Directed With All Lead And Lift Etc Complete. Excluding The Cost Of Steel. Training Wall, Side Wall And General Purpose.. ( Regional Sor-2021-22, Pg7 It 7 ) ( A ) Concrete Grade M-15 And Msa-40Mm ( Graded ) ( B ) Concrete Grade M-15 And Msa-80Mm ( Graded ) ( C ) Concrete Grade M-20 And Msa-40Mm ( Graded ) ( D ) Concrete Grade M-20 And Msa-80Mm ( Graded ) Page-8 11 Providing & Laying In Position Controlled Cement Concrete Using Cement Sand & Crushed Metal Aggregate By Machine Mix Incl. Necessary Formworks Compaction By Mechanical Vibratoer Curing As Directed With All Lead And Lift Etc Complete. Excluding The Cost Of Steel. ( Regional Sor-2021-22, Pg7 It 8 ) ( I ) For Bucket And End Sill Etc ( A ) Concrete Grade M-20 And Msa-40Mm ( Graded ) ( B ) Concrete Grade M-20 And Msa-80Mm ( Graded ) ( C ) Concrete Grade M-25 And Msa-40Mm ( Graded ) ( D ) Concrete Grade M-25 And Msa-80Mm ( Graded ) ( Ii ) For Ogee Crest, U / S And D / S Face Skin Concrete ( E ) Concrete Grade M-20 And Msa-40Mm ( Graded ) ( F ) Concrete Grade M-20 And Msa-80Mm ( Graded ) ( G ) Concrete Grade M-25 And Msa-40Mm ( Graded ) ( H ) Concrete Grade M-25 And Msa-80Mm ( Graded ) ( Iii ) For Pier Concrete ( I ) Concrete Grade M-20 And Msa-40Mm ( Graded ) ( J ) Concrete Grade M-20 And Msa-80Mm ( Graded ) ( K ) Concrete Grade M-25 And Msa-40Mm ( Graded ) ( L ) Concrete Grade M-25 And Msa-80Mm ( Graded ) ( Iv ) For Conduits & Gallaries, Shafts And Similar Works ( M ) Concrete Grade M-20 And Msa-20Mm ( Graded ) ( N ) Concrete Grade M-20 And Msa-40Mm ( Graded ) ( O ) Concrete Grade M-25 And Msa-20Mm ( Graded ) ( P ) Concrete Grade M-25 And Msa-40Mm ( Graded ) 12 Prov. & Laying In Position Cement Concrete Using Cement , Sand And Crushed Metal Coarse Aggregate By Mass And Machine Mix For Pcc / Rcc Including Necessary Formworks Compaction By Vibrator, Curing As Directed With All Lead & Lift Etc Complete. ( Excluding Cost Of Steel ) For .Body Wall, Apron, Training Wall, Side Wall, Splay Wall, Key Wall, Cut Of Wall Etc.Regional Sor-2021-22, Pg19 It 4 ) 4 / A ) Concrete 1:3:6 And Msa-40Mm ( Cement Level 220 Kg / Cum ) 4 / B ) Concrete 1:3:6 And Msa-80Mm ( Cement Level 200 Kg / Cum ) 4 / C ) Controlled Concrete Grade M-15 And Msa-40Mm 4 / D ) Controlled Concrete Grade M-15 And Msa-80Mm 4 / E ) “Nominal Mix” Conc. Grade 1:2:4 And Msa-40Mm 4 / F ) “Nominal Mix” Conc. Grade 1:2:4 And Msa-80Mm 13 Prov. & Laying In Position Nominal Mix Cement Concrete Using Cement, Sand And Crushed Aggregate By Mass And Machine Mix For C.C. Work Incl. Necessary Formworks Centering Scaffolding Compaction By Mechanical Vibrator, Curing As Directed With All Lead & Lift Etc Complete ( Regional Sor-2021- 9 A Concrete 1:3:6 And Msa-40Mm ( Cement Level 220 Kg / Cum ) B Concrete 1:3:6 And Msa-80Mm ( Cement Level 200 Kg / Cum ) C Concrete Grade 1:2:4 And Msa-40Mm D Concrete Grade 1:2:4And Msa-80Mm 14 Providing, Cutting, Bending, Binding And Fixing In Position As Per Drawing H.Y.S.D. Bar Reinforcement For R.C.C. Works And Anchor Bars Incl Cost Of Black Annealed 16 To 18 Bwg M.S.. Wire Etc.Complete With All Lead And Lift.. ( Regional Sor -2021-22, Pg8 It 11 ) 15 Providing And Laying Uncoursed Rubble Masonry In Cement And Sand Mortar By Mass And Machine Mixing Incl Use Of Header And Bond Stones Etc And Incl Scaffolding And Finishing To Required Shape And Batter End Steps Etc As Per Drawing And Racking Out The Joints, Curing Etc Complete In All Respect.For All Lead & Lift. ( Regional Sor-2021-22, Pg8 It 13 ) A ) In C.M. 1:5 For Foundation And Super Structure. B ) In C.M. 1:3 For Super Structure. 16 Providing And Laying Brick Masonry Using Locally Available Traditional ( 2Nd Class ) Bricks And Cement Mortar By Mass Incl Striking Out Joints, Curing, Finishing And Scaffolding Etc. Complete. A ) In C.M. 1:5 For All Lead And Lift.. ( Regional Sor-2021-22, Pg9 It 15 ) ( 16B ) Providing And Laying Fly Ash Brick Masonry Using Comman Burnt Fly Ash Bricks Having Strenght Not Less Than 35 Kg / Sq.Cm. In Cement Mortar By Mass Incl Striking Out Joints, Curing, Finishing And Scaffolding Etc. Complete. A ) In C.M. 1:5 For All Lead And Lift.. ( Regional Sor-2021-22, Pg9 It 15B ) 17 Cement Plaster 20Mm Thick In Single Coat To Stone Masonry In C.M. 1:3 Incl Finishing, Curing, Scaffolding Etc Complete. ( Regional Sor-2021-22, Pg9 It 16 ) A ) Upto 6.0 Mt Height B ) Above 6.0 Mt. Height 18 Cement Plaster 15Mm Thick In Single Coat To Brick Masonry In C.M. 1:3 Incl. Finishing, Curing, Scaffolding Etc Complete. ( Regional Sor-2021-22, Pg9 It17 ) A ) Upto 6.0 Mt Height B ) Above 6.0 Mt. Height 19 Cement Plaster 12Mm Thick In Single Coat To Cc / Rcc / Masonry Work In C.M. 1:3 Including Finishing Curing Scaffolding Etc Complete. . ( Regional Sor-2021-22, Pg9 It 18 ) Page-10 10 A ) Upto 6.0 Mt Height B ) Above 6.0 Mt. Height 20 Sand Face Type Cement Plaster 20Mm Thick In Two Coat ( I ) Backing Coat 12Mm Thick In C.M. 1:3 And Ii ) Finishing Coat 8Mm Thick In C.M. 1:2 Including Finishing Curing Scaffolding Etc Complete. ( Regional Sor-2021-22, Pg9 It 20 ) A ) Upto 6.0 Mt Height B ) Above 6.0 Mt. Height 21 Cement Pointing In C.M.1:3 To Stone Masonry After Racking Out Joints 20Mm Deep Incl Scaffolding Watering And Curing Etc Complete. . ( Regional Sor-2021-22, Pg10 It 22 ) * A ) Upto 6.0 Mt Height B ) Above 6.0 Mt Height 22 Cement Pointing In C.M.1:2 To Stone Masonry After Racking Out Joints 20Mm Deep Incl.Scaffolding Watering And Curing Etc Complete. . ( Regional Sor-2021-22, Pg10 It 23 ) * A ) Upto 6.0 Mt Height B ) Above 6.0 Mt Height 23 Painting Two Coats Of Synthetic Enamel Paint, One Intermediate Coat Of 40 Micron Thickness And One Finishing Coat Of 40 Micron Thickness Of Approved Shade On Steel Surface To Give An Even Shade Including Cleaning The Surface Of All Dirt, Dust, Corrosion And Other Foreign Matter Without Damaging Existing Paint Etc Complete As Per Specification ( For Reviver Coat Paint ) . ( Regional Sor-2021-22, Pg37 It 9 ) 24 Painting Two Coats Of Alluminum Paint, One Intermediate Coat Of 20 Micron Thickness And One Finishing Coat Of 20 Micron Thickness On Steel Surface To Give An Even Shade Including Cleaning The Surface Of All Dirt, Dust, Corrosion And Other Foreign Matter Without Damaging Existing Paint Etc Complete. ( For Reviver Coat Paint ) ( Regional Sor-2021-22, Pg37 It 10 ) 25 Painting Two Coats Of Coal Tar Based Black Epoxy Paint, One Intermediate Coat Of 150 Micron Thickness And One Finishing Coat Of 150 Micron Thickness On Steel Surface To Give Even Shade Including Cleaning The Surface Of All Dirt, Dust, Corrosion And Other Foreign Matter Without Damaging Existing Paint And With Cost Of All Materials, Labour, Tools, Consumables, Scaffolding Safety Measures Etc Complete. For Gates And Embedded Parts, Plateform, Girder And Or As Directed By Engineer In Charge. ( For Reviver Coat Paint ) . ( Regional Sor-2021-22, Pg37 It 11 ) 26 Finishing Wall With Weather Proof Exterior Emulsion Paint On Wall Surface ( Two Coats ) To Give An Required Shape Even Shade After Thoroughly Brushing The Surface To Remove All Dirt, And Remains Of Loose Powdered Materials.Etc Complete ( R & B Sor 2021-22, It. No.19.127, It. Code- Page-11 19031, Ch.19 ) 27 Applying Two Coats Of Putty & Two Coats Of Primer Of Approved Brand And Manufacture On New Wall Surface To Give An Even Shade Including Thoroughly Brushing The Surface Free From Mortar Dropping And Other Foreign Matter And Sand Papered Smooth. ( R & B Sor 2021-22, It.Code-19032, Ch.19 ) 28 Distempeing ( Two Coats ) With Oil Bound Distemper Of Approved Brand And Manufacture And Of Required Shade On Wall Surfaces To Give An Even Shade, Over And Including A Priming Coat With Distemper Primer Of Approved Brand And Manufacture After Thoroughly Brushing The Surface Free From Mortar Dropping And Other Foreign Matter And Also Including Preparing The Surface Even And Sand Papered Smooth. ( R & B Sor-2021-22, It.No.18.44, It.Code-18021, Ch.18 ) 29 Wall Painting ( Two Coats ) With Plastic Emulsion Paint Of Approved Brand And Manufacture On Undecorated Wall Surface To Give An Even Shade Including Throughly Brushing The Surface Free From Mortar Droppings And Other Foreign Matter And Sand Papered Smooth. ( R & B Sor-2021-22, It.No.18.57, It.Code-18031, Ch.18 ) 30 P & L 24 X 24 Vitrified 8 Mm Thick Tile Flooring Over 20 Mm ( Average ) Base Of Cement Mortar 1:6 ( 1 Cement: 6 Coarse Sand ) On New Surface Or Fixing On Existing Flooring By Adhesive Material Including Dismentaling Of Existing Flooring And Jointed With Color Cement Slurry Including Finised With Flush Pointing & Cleaning The Surface Etc. Complete For Antiskit ( R & B Sor-2021-22, It.Code-14021A, Ch.14 ) 31 Providing And Laying White Glazed Tiles 6Mm Thick In Skrting Risers Of Steps And Dedo On 10Mm Thick Cement Plaster 1:3 ( 1-Cement : 3-Coarse Sand ) And Jointed With White Cement Slurry ( R & B Sor-2021-22, It.No.14.32, It. Code-14009 Aa, Ch.14 ) 32 Providing And Fixing Pre-Cast Rubber Dye / Steel Dye Inter Locking Concrete Block 60Mm Thick With Grade Of Concrete M300 Pnumatic Compressed / Vibrated Mechanically And As Per Approved Design Confirming To Is 15658 : 2006 Including 35 Mm Sand Layer For Leveling And Filling The Joint With Sand In Proper Line And Level As Per Guidelines Of Irc : Sp 63-2018 Etc. Complete.. ( R & B Sor-2021-22, Pg.95 Item Code 14033 ) 33 Providing And Laying Broken Chine Mosaic Flooring For Terrace Using 12 Mm To 20 Mm Broken Pieces Of Glazed Tiles To Be Laid Over Cement Mortar 1:3 To Plain Or Slope And To Be Tempered To Bring Mortar Creme Out Upto Surface Using White Cement Including Rounding Off Junctions And Extending Them Upto 15 Cm Along The Wall, Clearing With Water And Oxalic Acid Etc. As Directed. ( R & B Sor-2021-22, It.Code-14035, Ch.14 ) 34 Providing And Laying Dry Rubble Stone Pitching Without Base , Inverted Filter / Murrum Bedding And Header Stone Including Hand Packing & Trimming & Dressing Slopes Etc Complete.. ( Regional Sor-2021-22, Pg3 It 16 ) A ) 15 Cms Thick Stone Pitching B ) 23 Cms Thick Stone Pitching 35 Earth Work In Embankment From Borrow Pits In All Sort Of Soil And Soft Murrum Or Other Suitable Strata As Directed Incl Breaking Clods And Dressing To The Design Section With Lead As Under And All Lift Incl.Site Clearance Etc Comp. For All Canal Capacity & Without Rolling And Watering ( Regional Sor-2021-22, Pg22 It 4 ) A ) 0 To 30 Mt Lead B ) 30 To 200 Mt Lead C ) 200 To 1000 Mt Lead 36 Compaction Of Earth Work In Embankment In Layers Of 15 To 23 Cms At Omc To Required Dry Density Incl Necy Rolling With Vibratory Rollers Of 10 To 12 Tones Capacity. ( Regional Sor-2021-22, Pg23 It 5 ) 37 Spreading The Murrum In Uniform Layer With All Lift & As & Where Directed Etc. Complete. . ( Regional Sor-2021-22, Pg37 It 7 ) 38 Dry Rolling Of Earth Work With Light Rollers Of Upto 2.0 Tonnes Capacity As Directed With All Lift Etc Complete. . ( Regional Sor-2021-22, Pg23 It 6 ) 39 Prov. & Laying In Position Controlled Cement Concrete Using Cement, Sand And Crushed Aggregate By Mass And Machine Mix For C.C Work In Canal Lining Incl. Necessary Formworks Centering Scaffolding Compaction By Plate Vibrator, Curing As Directed With All Lead & Lift Etc Complete Incl Dressing The Bed And Trimming The Canal Section If Required And Minor Filling With Murrum / Earth As Per Site Condition To The Correct Profile, Incl Providing Bitumen Joints As Per Drawing And Specified Interval. ( Without Using Paver Machineries. ) ( Regional Sor-2021-22, Pg27 It 25A ) B ) For 10Cms Thick Cast-In-Citu Canal Lining In M-15 Grade Of Conc.With Msa-20Mm Without Sleepers. D ) For 7.50Cms Thick Cast-In-Citu Canal Lining In M-15 Grade Of Conc.With Msa-20Mm Without Sleepers. 40 Clearing The Silt From Canal / Drain Bed By Digging The Same To The Required Bed Level And Gradient Including Depositing The Excavated Earth Regularly On Spoil Bank For Utilizing The Same For Preparing The Bund After Bracking The Clods As And Where Directed For Lead Upto 30 Mt And Lift As Under. ( Excluding Weed Cutting ) . ( Regional Sor-2021-22, Pg 36 It 1 ) A ) Depth 0 To 3.0 Mt B ) Depth 3.0 To 6.0 Mt C ) Depth 6.0 To 9.0 Mt D ) For Every Additional 3.0 Mt Lift 41 Clearing The Shrubs Like Akadas, Weed, And Other Vegetation Including Depositing The Same Out Side And Burning Etc. Complete From Canal Bed & Both Side Slopes And Upto Outer Toe Of The Bank. ( For Canal And Drains ) . ( Regional Sor-2021-22, Pg36 It 2 ) A ) Upto 0.56 Cumecs B ) Above 0.56 To 7.0 Cumecs C ) Above 7.0 Cumecs 42 Desilting Of Various Structures Of Canal And Distribution System Including Depositing The Same As Directed With All Lift And Lead For Canal Syphone, Air Vent, Turn Out Kundies Etc Complete. ( Excluding Weed Cutting ) ( Regional Sor-2021-22, Pg36 It 3 ) 43 Jungle Clearance Of Specified Category And Bushes For Canal / Dam Work As Directed With Depositing Material Etc Complete. ( Excluding Tree Of Grith Above 0.5 Mt ) . ( Regional Sor-2021-22, Pg 36 It 5 ) A ) Upto 2 Year Old A ) For Light Dence B ) For Medium Dence C ) For Heavy Dence B ) More Than 2 Year Old A ) For Light Dence B ) For Medium Dence C ) For Heavy Dence 44 Maintenance Of Earthan Dam By Cleaning The Slope Of E.Dam Within The Dam Boundary Incl.Gutter ( Drains ) By Removing The Bushes, Shrubs, Girth And Small Trees Including Depositing The Materials As And Where Directed Up To 50 Mt. Lead And All Lift Etc. Complete. ( Throughout The Year ) . ( Regional Sor-2021-22, Pg37 It 6 ) 45 Cleaning The Canal Bed And Both Side Slopes ( In Muddy Condition ) Scrapping Out The Shovel, Pine, Luies, Kadusalo And Other Vegetation By Means Of Manual Including Silt And Depositing The Same Up To Lead Of 30Mt. And All Lift Etc Complete. ( Regional Sor-2021-22, Pg39 It 19 ) 46 Extra Lead Charges For Transporting The Borrow Area / Excavated Usable Materials For Earthen Dam Beyond The Basic Lead Of 1.0 Km Up To 5.0 Km For Each Additional Km Or Part There Of Inclusive Of All Lift Etc Complete.. ( Regional Sor-2021-22, Pg2 It 9 ) Page-14 47 Dewatering For Earthen Dam And Allied Works, Foundation Areas, Pits, Trenches Etc Incl Cost Of Pumping Machineries, Pipe Lines, Labours Diesel / Electricity / Dg Set, Etc Complete. . ( Regional Sor-2021-22, Pg4 It 30 ) 48 Providing & Fixing Outlets Gates For Canal Including All Material, Labour, Fabrication Transportation Fixing To Site Of Work With All Lead & Lift Including One Coat Of Primer And Two Coat Of Epoxy Anticorrsive Paint As Directed Including Handle & Locking Arrangements Etc. Complete. ( Regional Sor-2021-22, Pg38 17 ) 49 Providing & Fixing H.R. & C.R. Gates For Canal Including All Materials , Labours, Fabrication Transporting Fixing To Site Of Work All Lead & Lift Including One Coat Of Primer And Two Coats Of Oil Painting As Directed Including Square Threaded Screw, Bearing, Nuts, Handles, And Locking Arrangements Etc. Complete.. ( Regional Sor-2021-22, Pg 39 It 18 ) 50 Providing Epoxy Plaster 6 To 8Mm Min.Thickness Incl Filling Of All Pot-Holes / Ditches With Epoxy Mortar Upto Req. Depth By Using Resin:Hardner:Aggregates Confirming To Is-9162 In Proportion 0.7:0.3:6.5, By Weight On Exposed Damaged Old And Rough Surface Of Spillway / Canal Strs With Proper Application Of Necy Primer Coat Of Resin And Hardener In Proportion Of 2:1 By Weight Confirming To Is-9197 To Give Proper Bond Between Old Surface And Epoxy Plaster Incl Necessary Cleaning, Cheeping Of Old Surface Incl Scaffolding, Tools Bars For The Job With Labour Incl All Lead And Lift Etc Complete In All Condition Dry And Wet.. ( Regional Sor-2021-22, Pg35 It 25 ) 51 Providing Service For Security Of Canal System And Maintaining Smoothly Irrigation Water Distribution Including Operating Canal Regulators And Outlets In Suitable Shifts / Round The Clock As Per Instruction Of Engineer In Charge.. ( Regional Sor-2021-22, Pg42 It 39 ) 52 Providing And Laying Rcc Np-2 Pipe For Chute On Rear Slope Incl Excavation And Back Filling, Jointing Prior With Collars, Curing Etc Complete In C.M. 1:1. ( Regional Sor-2021-22, Pg4 It 23 ) ( A ) 225Mm Dia Pipe ( B ) 300Mm Dia Pipe ( C ) 450Mm Dia Pipe 53 Filling The Empty Bag Filled With Good Selected Earth Or Sand Including Stitching And Laying Or Stacking As And Where Directed With All Lead And Lift Etc. Complete.. ( Regional Sor-2021-22, Pg37 It 8 ) 54 Providing Murrum Including Spreading The Same And Dressing The Side Slope & Top Surface In Required Grade And Camber With Lead Upto 5.0Km Etc Complete. ( Regional Sor-2021-22, Pg39 It 22 ) Page-15 55 Back Filling With Selected Earth Brought From Out Side Borrow Area , Or From Excavated Useful Material Including Watering Ramming, Consolidation With Pneumatic Temping And All Lead And Lift Etc Complete. ( Regional Sor-2021-22, Pg.12 It 43 ) 56 Suppliying Of Graded Stone Aggregate Of Following Sizes ( For W.B.M. Road ) ( 1 ) Hand Broken Stone Aggregate 25Mm To 90Mm Size. ( R& B S.O.R-2021-22, ., It.No.26.5, It.Code. 26011A, Ch.26 ) 57 Suppliying Of Graded Stone Aggregate Of Following Sizes ( For W.B.M. Road ) ( 2 ) Hand Broken Stone Aggregate 40 Mm To 63 Mm Size. ( R& B S.O.R. -2021-22, , It.No.26.5, It.Code.26011B, , Ch.26 ) 58 Spreading The Stone Aggregate For Rolling And W.B.M. Including Filling The Interstices To Required Camber And Gradient ( Excluding Spreading Of Blindage ) ( Ii ) 40Mm To 63Mm Size Aggreagates ( H.B. ) ( R& B S.O.R-2021-22, ., It.No.26.2, It.Code.26018 A, Ch.26 ) Spreading The Stone Aggregate For Rolling And W.B.M. Including Filling The Interstices To Required Camber And Gradient ( Excluding Spreading Of Blindage ) ( Iii ) 25Mm To 50Mm Size Crushed Stone ( R& B S.O.R. -2021-22, , It.No.26.2, It.Code.26018 B, Ch.26 ) 59 Course Aggregate ( Black Stone Crushed Metal ) ( Regional Sor-2021-22, Pg 49 It 6 ) ( I ) 40.00 To 63 .00 Mm ( Ii ) 40.00Mm ( Iii ) 20.00Mm ( Iv ) 10.00 To 20.00 Mm ( V ) 6.00 To 10.00 Mm 60 Rolling And Consolidation Of Soling Including Filling In Depression Which Occur During The Process, With Power Roler 8 Tonne To 12 Tonne. ( R & B Sor--2021-22, , It. No.26.76, Code-26021, Ch.26 ) 61 Box Cutting The Road Surface To Proper Slope And Camber For Making A Base For Road Work Including Removing The Excavated Stuff And Depositing On The Road Side Slope As Directed Upto 50Mt.Lead. ( R & B Sor-2021-22, -, It Code-26B008, Ch.26 ) 62 Hire Charges For Excavator Cum Loader Shawl And Drag Line Incl. Fuel Charges, Oil And All Necessary Materials For Excavation Loading Unloading, Spreading With Upper Clive Cleaner And Incl. All Taxes And Insurance. Etc. Comp. ( Regional Sor-2021-22, Pg 52 It.111 ) 63 Hire Charges For Engaging Tractor With Trailer Driver, Diesel Fuel For Excavation Work, Transportation Of Earth, Murrum, Rubble And Other Materials Etc. For One Shift Of 8 Hour With Insurance And All Taxes Etc Comp. ( Regional Page-16 Sor-2021-22, Pg51 It 104 ) 64 Providing & Laying Dry Rubble Stone Pucca Pitching With Panel ( Of Size Not More Than 10Sqmt ) Of Stone Masonry 45Cm Thick Wall In C.M. 1:5, Without Base , Inverted Filter And Header Stone But With 10 Cms Thick Murrum Layer ( For Base ) Incl Hand Packing And Trimming And Dressing Slopes Etc. ( Regional Sor-2021-22, Ch.1, Pg.3 It .19 ) A ) 45 Cms Thick Stone Pitching With Pointing In C.M.1:2 B ) 30 Cms Thick Stone Pitching With Pointing In C.M.1:2 C ) 23 Cms Thick Stone Pitching With Pointing In C.M.1:2 65 Quaring, Transporting & Spreading Selected Materials From Borrow Area For Raising Of Embankment Work In Casing Zone Section In Uniform Layers Of Specified Thickness ( Up To 23Cm ) As Directed Incl.Dressing Breaking Clods And Rolling At Requisite Moisture Contents To Required Dry Density With Roller Of Suitable Type And Watering At Omc For Lead Upto 1.0 Km And All Lifts Etc Complete.. ( Regional Sor -2021-22, Pg.01 It 07, Ch.1 ) 66 Excavation For Deepening Of Pond / Check Dam Including Trasporting And Spreading The Excavated Material For Raising Of Embankment In Uniform Layer Or As Directed Including Dressing, Breaking Clods Etc For Lead Upto 1 Km And All Lift Without Rolling And Watering Etc Complete. ( Regional Sor-2021-22, Pg42 It 38 67 Providing 40 Mm Thick Guniting In Cement Mortar ( 1:2 ) For Spillway Works By Using Guniting Equipment And Air Compressor And Accessories Incl Finishing, Curing Etc Complete With Cost Of Material And Labours But Excluding Cost Of Irc Fabric Reinforcement With All Lead And Lifts. ( Regional Sor-2021-22, Pg33 It 17 ) 68 Providing And Fixing In Position I.R.C. Fabrics Of Mesh 6X6 & 10 Gauge, Reinforcement With Necessary Nailing In Position, Overlap Etc As Directed With All Lead And Lift Etc Complete. ( Regional Sor-2021-22, Pg33 It 18 ) 69 Providing Fitter Outsource Services For Flood Control Of Dam Etc. ( Regional Sor-2021-22, Pg. No. 50 It.No.33 ) 70 Providing Mason ( 1St Class ) Outsource Services For Flood Control Of Dam Etc. ( Regional Sor-2021-22, Pg. No. 50 It.No.28 ) 71 Providing Carpenter ( 1St Class ) Outsource Services For Flood Control Of Dam Etc. ( Regional Sor-2021-22, Pg. No. 50 It.No.35 ) 72 Providing Painter Outsource Services For Flood Control Of Dam Etc. ( Regional Sor-2021-22, Pg. No. 50 It.No.38 ) 73 Providing Plumber Outsource Services For Flood Control Of Dam Etc. ( Regional Sor-2021-22, Pg. No. 50 It.No.39 ) 74 Engaging Unskilled Labour ( Labour Comm. Rate ) ( Zone-1 ) Engaging Unskilled Labour ( Labour Comm. Rate ) ( Zone-2 ) 75 Engaging Semi Skilled Labour ( Labour Comm. Rate ) ( Zone-1 ) Engaging Semi Skilled Labour ( Labour Comm. Rate ) ( Zone-2 ) 76 Providing & Fixing Guard Stone Of Precast C.C. M-15 I.R.C. Standard & Design 75X20x20 Cm. Including White Washing Etc Complete. ( A ) In Earth ( Regional Sor-2021-22, , Ch-8, Page No. 40 It. No.30 ) 77 White Washing With Lime On Wall Surface ( Two Coats ) To Give An Even Shade Including Thoroughly Booming The Surface To Remove All Dirt, Dust; Mortar Drops And Other Foreign Matter. ( R & B Sor-2021-22, It. No. 18.11 Code 18001 ) 78 Providing 1.0 ( One ) Meter Wide Steps In On Rip Rap With Trade 30Cm, 15Cm Rise In Brick Masonry In C.M.1:5 With 23Cm Wide Parapet On Both The Side Incl 10Mm Thick Plaster In C.M. 1:3 On Expose Faces Incl 10Cm Thick Foundation Concrete M-10, As Per Drawing With All Lead And Lift. ( Regional Sor-2021-22, , Chapter-1, Page No. 4 It. No.29 ) 79 Prov. & Laying In Position Nominal Mix Cement Concrete Using Cement , Sand & H.B.Metal By Mass And Machine Mix For Pcc Including Necessary Formworks, Compaction, Raming, Curing As Directed With All Lead And Lift Etc Complete. For Foundation Concrete / Other General Purpose. Concrete ( 1:3:6 ) Metal Size- 63Mm ( Cement Level 220 Kg / Cum ) ( Reg. Sor-2021-22, Ch.5 It. No.2, Pg.19 ) 80 Providing And Fixing In Position 100 / 110 Mm Dia Pvc Pipe Weep Holes In The Retaining Walls / Sidewall / Abt Etc. ( Reg. Sor-2021-22, Ch.5 It. No.12, Pg.20 ) 81 Providing And Laying Dry Rubble Pitching With 20 Cms Gravel / Metal And 20 Cms Sand Layers As Base Of Inverted Graded Filter And Without Header Stone But Incl.Hand Packing Trimming & Dressing Of Slopes Etc Complete. ( Reg. Sor -2021-22, Ch.1 It. No.14, Pg.2 ) ( A ) 30 Cms Thick Stone Pitching ( B ) 45 Cms Thick Stone Pitching ( C ) 60 Cms Thick Stone Pitching 82 Providing And Fixing In Position White Marble Plate Of Size 45 X 45 X 1.8 Cm Incl Ingraving The Letters As Per Drawing / As Directed Etc Complete. ( Reg.Sor-2021-22, . It.17, Ch.5, Pg.21 ) 83 Labour Charges For The Premonsoon Clearing , Servicing, Grease, And Repacing Oil C.D.U., E.D.U. Mechanisum Turnbukle Trunion, Roller, Side Roller, Guide Roller, D.H.U. Gear Boxes, Trunion Buckets Hoist Mechanisum Etc All Other Movable Parts For The Spillway Gates Size 30X20 & D.H.Unit And Replacing Cardum Compond To Wire Rope Etc Complete For Spillway Gates Radial Gate Size 9.14 X 6.10 Mt ( 30 X 20 ) ( Regional S.O.R. -2021-22, - Ch.8, It. 41, Pg.43 ) Radial Gate Size 12.80 X 8.20 Mt ( 41 X 27 ) Radial Gate Size 14.33 X 10.67 Mt ( 47 X 35 ) Vertical Gate Size 9.10 X 3.05 Mt ( 30 X 10 ) Vertical Gate Size 9.10 X 4.50 Mt ( 30 X 15 ) 84 Providing And Laying 60Cm Dia Half Round Cement Pipe For Catch Water Drain And Chute Drain On Berms And Down Stream Slopes Of Earthen Dam Incl Necy Excavation And Back Filling Etc Complete. ( Regional Sor -2021-22, Ch.1 Page No. 3 It. No. 20 ) 85 Providing Painting Writing Sign Board Of Size 400Mmx250mm With Lettering Of 4Cm.Size On Various Canal Structure Including Providing To Prime Coat And Applying Two Coat Of Yellow Oil Paint In Back Ground And Letter Writing In Red Oil Paint, Sign Board Consists The Writing Details Such As Name Of Canal And Its Hydraulic Details ( Ch. Cbl. & Fsl ) Including All Labours And Materials Charges Required Etc Complete. ( Regional S.O.R. -2021-22, - Ch.8, It. 31, Pg.41 ) 86 Providing, Supplying At Site, Laying And Fixing In Position Under Ground, R.C.C Hume Pipe Of Np-2 Class Of Bis Standard Incl Filling The Joints With Cement Mortar 1:1 With Providing Necessary Collars Etc Complete With Inclusive Of Testing With Working Pressure And All Lead And Lift. ( Regional S.O.R. -2021-22, It No. 45 Pg. No. 30 ) ( A ) 150Mm Dia. ( B ) 225 Mm Dia. ( C ) 300 Mm Dia. ( D ) 450 Mm Dia. ( E ) 600 Mm Dia. ( F ) 750 / 800 Mm Dia. ( G ) 900 Mm Dia. ( H ) 1100 Mm Dia. ( I 1200 Mm Dia. ( J ) 1500 Mm Dia. 87 Prov. And Laying In Position Controlled Cement Concrete Using Cement, Sand And Crushed Aggregate By Mass And Machine Mix For R.C.C / Cc Work Including Necessary Formworks Centering Scaffolding Compaction By Vibrator, Curing As Directed With All Lead & Lift Etc Complete Excluding The Cost Of Reinforcement For Plinth Course & Coping A ) Concrete Grade M-15 And Msa-20Mm ( Regional S.O.R. -2021-22, It No. 13 Pg. No. 24 ) 88 Providing & Fixing Boundry Stone Of Precast C.C. M-15 I.R.C. Standard & Design 75X20x20 Cm. Including White Washing Etc Complete. ( A ) In Earth ( Regional Sor-2021-22, Ch-8, Page No. 40 It. No.30B ) 89 Providing And Fixing Odinary Kilometer Stone Precast C.C. 1:2:4 Including Necessary Reinforcement As Per I.R.C. Type Design In C.C. 1:4:8 Including Letter And Paints Etc Complete ( O.D.Road & Village Road Type ) ( Regional Sor, -2021-22, Ch-8, Page No. 40 It. No.30C ) 90 Cleaning Of The Spillway Gates, Leaf Arms, Tonion And Its Assembly, Foot Bridge, Dhu Etc Ones Per Month, Throughout The Year.With Necessary Material, Equipment, Scaffolding Etc Complete . Radial Gate Size 9.14 X 6.10 Mt ( 30 X 20 ) . ( Reg. S.O.R-2021-22, . It No. 37 Pg No. 42 ) Radial Gate Size 12.80 X 8.20 Mt ( 41’ X 27’ ) Radial Gate Size 14.33 X 10.67 Mt ( 47’ X 35’ ) Vertical Gate Size 9.10 X 3.05 Mt ( 30’ X 10’ ) Vertical Gate Size 9.10 X 4.50 Mt ( 30’ X 15’ ) 91 Providing Service For Security Of Canal System And Maintaining Smoothly Irrigation Water Distribution Including Operating Canal Regulators And Outlets In Suitable Shifts / Round The Clock As Per Instruction Of Engineer In Charge. ( Reg. S.O.R-2021-22, . It No. 39 Pgno. 42 ) 92 Cleaning Of The Hoeny Comb / Female Wasp, From Dam , Spillway Gates, Its Assembly, Foot Bridge , Plateform, H.R.Gates , & Canal Structures, & Buildings &Any Other Structures One Times Of Heonycomb One No. ( Reg. S.O.R-2021-22, . It No. 40 Pgno. 42 ) 93 Labour Charses For The Clearing , Serviving And Applying Grease To Stem Rod With Clams, Screw Rod, Gear Box With Replacing Oil & All Other Movable Parts For Hr Gate All Size Etc. For H.R. Gates. ( Reg. S.O.R. -2021-22, It No. 42 Pgno. 43 ) 94 Providing And Fixing Pre-Cast Concrete Kerb Stone Of Gray Cement Based Concrete Block 30Cm Length, 30Cm Height And 15Cm Thick Of M250 Grade Concret As Per Approved Design And Including Excavation For Fixing In Proper Line And Level, Filling The Joint With C:M 1:3 ( 1Cement:3Fine Sand ) Etc Complete. ( R&B S.O.R-2021-22, . Pg No 95, Code No.14032 ) 95 Finishing Wall With Weather Proof Exterior Emulsion Paint On Wall Surface ( Two Coats ) To Give An Required Shape Even Shade After Thoroughly Brushing The Surface To Remove All Dirt, And Remains Of Loose Powdered Materials.Etc Complete ( R&B S.O.R. -2021-22, Page-20 Pg No 107, Code No.19031 ) 96 Providing Murrum Including Spreading The Same And Dressing The Side Slope & Top Surface In Required Grade And Camber With Lead Upto 10.0 Km Etc Complete. ( As Per Ra-1 ) 97 Providing And Fixing 1.20 Metre High Fencing With 2.0 Metre Long M.S.Angle Posts 40Mm X 40 Mm X6 Mm And Oil Painting 3 Coats Fixed At 2.5 Mt, C / C. With Five Horizontan Lines And Two Diagonals Of Galvanized Steel Barbed Wire Weighting 9.38 Kg. Per 100 Metre, Strained And Fixed To Posts With G.I, Staples Including Fixing The Postsin Ground With 0.5 M X 0.5.M X 0.5 M. Block In C.C1:5:10 Etc Complete. ( R&B S.O.R. -2021-22, Pg No 117, Code No.22001 ) 98 Jcb-80-Excavation Machine ( Reg. S.O.R. -2021-22, It No.102 Pgno. 51 ) 99 Tractor With Trailer ( 40 Bhp &3.0 Cum Capacity ) ( Reg. S.O.R. -2021-22, It No.104 Pgno. 51 ) 100 Providing & Laying In Position Nominal Mix Cement Concrete Using Cement Sand & Crushed Metal Aggregate By Machine Mix Incl. Necessary Formworks, Compaction By Mechanical Vibrator Curing As Directed With All Lead And Lift Etc Complete. Excluding The Cost Of Steel. Training Wall, Side Wall And General Purpose.. Concrete Grade M20 And Msa-20Mm ( As Per Ra-2 )

Tender Notice

40521199

Narmada Water Resources

Indian


Gujarat

November 28, 2023

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Online Quotation For Annual Rates For The Items Of M & R Works Of Dam, Canals / Structures Etrc ( Completed Items ) For The Year 2023-24-1 Dismantling Stone / Brick Masonry & Stacking Of Useful And Unuseful Material From The Dismantled Materials As Directed Etc Complete. ( Regional Sor-2021-22, Pg44 It 2 ) ( A ) In Cement Mortar ( B ) In Lime Mortar 2 Romoveming Plaster Including Racking Out Joints 20Mm Deep Etc Complete. . ( Regional Sor-2021-22, Pg44 It 5 ) ( A ) Cement Plaster ( B ) Lime Plaster 3 Removing Cement Pointing Including Racking Out Joints 20Mm Deep Etc Complete. . ( Regional Sor-2021-22, Pg44 It 6 ) 4 Dismantling The Rubble Pitching Including Sorting Out Stacking Of Useful Materials At Site Upto Lead 200 Mt.Measureable Conditions Including Removing The Rubbish As Directed Etc. Complete. ( Regional Sor-2021-22, Pg45 It 9 ) ( A ) 23 Cm Thick Pitching ( B ) 30 Cm Thick ( C ) 45 Cm Thick ( D ) 60 Cm Thick 5 Dismantling Of Rcc Work Viz. Slab, Beam, Lintel, Barrel, Staircase, Etc. Including Removing The Steel From The Dismantled Portion Without Damage To Reinforcement Sorting And Stacking Of Useful And Unuseful Material From The Dismantled Material As Directed Etc Comp.. ( Regional Sor-2021-22, Pg44 It 7 ) 6 Excavation In All Sort Of Strata And Formations Incl. Depositing The Unuseful Excavated Stuff As And Where Directed Incl Sorting And Stacking Useful Materials As Directed Upto 200 Mt Lead And All Lift Etc. Complete Incl. Dewatering. ( Regional Sor-2021-22, Pg 19 It 1 ) A ) In Overburden Incl. Hard Murrum. B ) In Soft Rock. C ) In Hard Rock. 7 Excavation In All Sort Of Strata And Formations Incl. Depositing The Unuseful Excavated Stuff As And Where Directed Incl Sorting And Stacking Useful Materials As Directed Upto 30 Mt Lead Etc. Complete Incl. Dewatering. ( Depth 0 To 3.0 Mt ) ( For All Type Canal & Foundation Trenches Of C.D. Works ) ( Regional Sor-2021-22, Pg22 It 1 ) ( A ) In Overburden Incl. Hard Murrum. ( B ) In Soft Rock. ( C ) In Hard Rock. ( D ) In Bhat Rock 8 Excavation In All Sort Of Strata And Formations Incl. Depositing The Unuseful Excavated Stuff As And Where Directed Incl Sorting And Stacking Useful Materials As Directed Upto 30 Mt Lead Etc. Complete Incl.Dewatering. ( Depth 3.0 To 6.0 Mt ) ( For All Type Canal & Foundation Trenches Of C.D. Works ) ( Regional Sor-2021-22, Pg 22 It 2 ) ( A ) In Overburden Incl. Hard Murrum. ( B ) In Soft Rock. ( C In Hard Rock. ( D ) In Bhat Rock 9 Providing & Laying In Position Controlled Cement Concrete Using Cement Sand & Crushed Metal Aggregate By Machine Mix Incl. Necessary Formworks , Compaction By Mechanical Vibrator Curing As Directed With All Lead And Lift Etc Complete. Excluding The Cost Of Steel . For Foundation Concrete ( Regional Sor-2021-22, Pg6 It 4 ) ( A ) Concrete Grade M-10 And Msa-40Mm ( Graded ) ( B ) Concrete Grade M-10 And Msa-80Mm ( Graded ) ( C ) Concrete Grade M-15 And Msa-40Mm ( Graded ) ( D ) Concrete Grade M-15 And Msa-80Mm ( Graded ) 10 Providing & Laying In Position Controlled Cement Concrete Using Cement Sand & Crushed Metal Aggregate By Machine Mix Incl. Necessary Formworks, Compaction By Mechanical Vibrator Curing As Directed With All Lead And Lift Etc Complete. Excluding The Cost Of Steel. Training Wall, Side Wall And General Purpose.. ( Regional Sor-2021-22, Pg7 It 7 ) ( A ) Concrete Grade M-15 And Msa-40Mm ( Graded ) ( B ) Concrete Grade M-15 And Msa-80Mm ( Graded ) ( C ) Concrete Grade M-20 And Msa-40Mm ( Graded ) ( D ) Concrete Grade M-20 And Msa-80Mm ( Graded ) Page-8 11 Providing & Laying In Position Controlled Cement Concrete Using Cement Sand & Crushed Metal Aggregate By Machine Mix Incl. Necessary Formworks Compaction By Mechanical Vibratoer Curing As Directed With All Lead And Lift Etc Complete. Excluding The Cost Of Steel. ( Regional Sor-2021-22, Pg7 It 8 ) ( I ) For Bucket And End Sill Etc ( A ) Concrete Grade M-20 And Msa-40Mm ( Graded ) ( B ) Concrete Grade M-20 And Msa-80Mm ( Graded ) ( C ) Concrete Grade M-25 And Msa-40Mm ( Graded ) ( D ) Concrete Grade M-25 And Msa-80Mm ( Graded ) ( Ii ) For Ogee Crest, U / S And D / S Face Skin Concrete ( E ) Concrete Grade M-20 And Msa-40Mm ( Graded ) ( F ) Concrete Grade M-20 And Msa-80Mm ( Graded ) ( G ) Concrete Grade M-25 And Msa-40Mm ( Graded ) ( H ) Concrete Grade M-25 And Msa-80Mm ( Graded ) ( Iii ) For Pier Concrete ( I ) Concrete Grade M-20 And Msa-40Mm ( Graded ) ( J ) Concrete Grade M-20 And Msa-80Mm ( Graded ) ( K ) Concrete Grade M-25 And Msa-40Mm ( Graded ) ( L ) Concrete Grade M-25 And Msa-80Mm ( Graded ) ( Iv ) For Conduits & Gallaries, Shafts And Similar Works ( M ) Concrete Grade M-20 And Msa-20Mm ( Graded ) ( N ) Concrete Grade M-20 And Msa-40Mm ( Graded ) ( O ) Concrete Grade M-25 And Msa-20Mm ( Graded ) ( P ) Concrete Grade M-25 And Msa-40Mm ( Graded ) 12 Prov. & Laying In Position Cement Concrete Using Cement , Sand And Crushed Metal Coarse Aggregate By Mass And Machine Mix For Pcc / Rcc Including Necessary Formworks Compaction By Vibrator, Curing As Directed With All Lead & Lift Etc Complete. ( Excluding Cost Of Steel ) For .Body Wall, Apron, Training Wall, Side Wall, Splay Wall, Key Wall, Cut Of Wall Etc.Regional Sor-2021-22, Pg19 It 4 ) 4 / A ) Concrete 1:3:6 And Msa-40Mm ( Cement Level 220 Kg / Cum ) 4 / B ) Concrete 1:3:6 And Msa-80Mm ( Cement Level 200 Kg / Cum ) 4 / C ) Controlled Concrete Grade M-15 And Msa-40Mm 4 / D ) Controlled Concrete Grade M-15 And Msa-80Mm 4 / E ) “Nominal Mix” Conc. Grade 1:2:4 And Msa-40Mm 4 / F ) “Nominal Mix” Conc. Grade 1:2:4 And Msa-80Mm 13 Prov. & Laying In Position Nominal Mix Cement Concrete Using Cement, Sand And Crushed Aggregate By Mass And Machine Mix For C.C. Work Incl. Necessary Formworks Centering Scaffolding Compaction By Mechanical Vibrator, Curing As Directed With All Lead & Lift Etc Complete ( Regional Sor-2021- 9 A Concrete 1:3:6 And Msa-40Mm ( Cement Level 220 Kg / Cum ) B Concrete 1:3:6 And Msa-80Mm ( Cement Level 200 Kg / Cum ) C Concrete Grade 1:2:4 And Msa-40Mm D Concrete Grade 1:2:4And Msa-80Mm 14 Providing, Cutting, Bending, Binding And Fixing In Position As Per Drawing H.Y.S.D. Bar Reinforcement For R.C.C. Works And Anchor Bars Incl Cost Of Black Annealed 16 To 18 Bwg M.S.. Wire Etc.Complete With All Lead And Lift.. ( Regional Sor -2021-22, Pg8 It 11 ) 15 Providing And Laying Uncoursed Rubble Masonry In Cement And Sand Mortar By Mass And Machine Mixing Incl Use Of Header And Bond Stones Etc And Incl Scaffolding And Finishing To Required Shape And Batter End Steps Etc As Per Drawing And Racking Out The Joints, Curing Etc Complete In All Respect.For All Lead & Lift. ( Regional Sor-2021-22, Pg8 It 13 ) A ) In C.M. 1:5 For Foundation And Super Structure. B ) In C.M. 1:3 For Super Structure. 16 Providing And Laying Brick Masonry Using Locally Available Traditional ( 2Nd Class ) Bricks And Cement Mortar By Mass Incl Striking Out Joints, Curing, Finishing And Scaffolding Etc. Complete. A ) In C.M. 1:5 For All Lead And Lift.. ( Regional Sor-2021-22, Pg9 It 15 ) ( 16B ) Providing And Laying Fly Ash Brick Masonry Using Comman Burnt Fly Ash Bricks Having Strenght Not Less Than 35 Kg / Sq.Cm. In Cement Mortar By Mass Incl Striking Out Joints, Curing, Finishing And Scaffolding Etc. Complete. A ) In C.M. 1:5 For All Lead And Lift.. ( Regional Sor-2021-22, Pg9 It 15B ) 17 Cement Plaster 20Mm Thick In Single Coat To Stone Masonry In C.M. 1:3 Incl Finishing, Curing, Scaffolding Etc Complete. ( Regional Sor-2021-22, Pg9 It 16 ) A ) Upto 6.0 Mt Height B ) Above 6.0 Mt. Height 18 Cement Plaster 15Mm Thick In Single Coat To Brick Masonry In C.M. 1:3 Incl. Finishing, Curing, Scaffolding Etc Complete. ( Regional Sor-2021-22, Pg9 It17 ) A ) Upto 6.0 Mt Height B ) Above 6.0 Mt. Height 19 Cement Plaster 12Mm Thick In Single Coat To Cc / Rcc / Masonry Work In C.M. 1:3 Including Finishing Curing Scaffolding Etc Complete. . ( Regional Sor-2021-22, Pg9 It 18 ) Page-10 10 A ) Upto 6.0 Mt Height B ) Above 6.0 Mt. Height 20 Sand Face Type Cement Plaster 20Mm Thick In Two Coat ( I ) Backing Coat 12Mm Thick In C.M. 1:3 And Ii ) Finishing Coat 8Mm Thick In C.M. 1:2 Including Finishing Curing Scaffolding Etc Complete. ( Regional Sor-2021-22, Pg9 It 20 ) A ) Upto 6.0 Mt Height B ) Above 6.0 Mt. Height 21 Cement Pointing In C.M.1:3 To Stone Masonry After Racking Out Joints 20Mm Deep Incl Scaffolding Watering And Curing Etc Complete. . ( Regional Sor-2021-22, Pg10 It 22 ) * A ) Upto 6.0 Mt Height B ) Above 6.0 Mt Height 22 Cement Pointing In C.M.1:2 To Stone Masonry After Racking Out Joints 20Mm Deep Incl.Scaffolding Watering And Curing Etc Complete. . ( Regional Sor-2021-22, Pg10 It 23 ) * A ) Upto 6.0 Mt Height B ) Above 6.0 Mt Height 23 Painting Two Coats Of Synthetic Enamel Paint, One Intermediate Coat Of 40 Micron Thickness And One Finishing Coat Of 40 Micron Thickness Of Approved Shade On Steel Surface To Give An Even Shade Including Cleaning The Surface Of All Dirt, Dust, Corrosion And Other Foreign Matter Without Damaging Existing Paint Etc Complete As Per Specification ( For Reviver Coat Paint ) . ( Regional Sor-2021-22, Pg37 It 9 ) 24 Painting Two Coats Of Alluminum Paint, One Intermediate Coat Of 20 Micron Thickness And One Finishing Coat Of 20 Micron Thickness On Steel Surface To Give An Even Shade Including Cleaning The Surface Of All Dirt, Dust, Corrosion And Other Foreign Matter Without Damaging Existing Paint Etc Complete. ( For Reviver Coat Paint ) ( Regional Sor-2021-22, Pg37 It 10 ) 25 Painting Two Coats Of Coal Tar Based Black Epoxy Paint, One Intermediate Coat Of 150 Micron Thickness And One Finishing Coat Of 150 Micron Thickness On Steel Surface To Give Even Shade Including Cleaning The Surface Of All Dirt, Dust, Corrosion And Other Foreign Matter Without Damaging Existing Paint And With Cost Of All Materials, Labour, Tools, Consumables, Scaffolding Safety Measures Etc Complete. For Gates And Embedded Parts, Plateform, Girder And Or As Directed By Engineer In Charge. ( For Reviver Coat Paint ) . ( Regional Sor-2021-22, Pg37 It 11 ) 26 Finishing Wall With Weather Proof Exterior Emulsion Paint On Wall Surface ( Two Coats ) To Give An Required Shape Even Shade After Thoroughly Brushing The Surface To Remove All Dirt, And Remains Of Loose Powdered Materials.Etc Complete ( R & B Sor 2021-22, It. No.19.127, It. Code- Page-11 19031, Ch.19 ) 27 Applying Two Coats Of Putty & Two Coats Of Primer Of Approved Brand And Manufacture On New Wall Surface To Give An Even Shade Including Thoroughly Brushing The Surface Free From Mortar Dropping And Other Foreign Matter And Sand Papered Smooth. ( R & B Sor 2021-22, It.Code-19032, Ch.19 ) 28 Distempeing ( Two Coats ) With Oil Bound Distemper Of Approved Brand And Manufacture And Of Required Shade On Wall Surfaces To Give An Even Shade, Over And Including A Priming Coat With Distemper Primer Of Approved Brand And Manufacture After Thoroughly Brushing The Surface Free From Mortar Dropping And Other Foreign Matter And Also Including Preparing The Surface Even And Sand Papered Smooth. ( R & B Sor-2021-22, It.No.18.44, It.Code-18021, Ch.18 ) 29 Wall Painting ( Two Coats ) With Plastic Emulsion Paint Of Approved Brand And Manufacture On Undecorated Wall Surface To Give An Even Shade Including Throughly Brushing The Surface Free From Mortar Droppings And Other Foreign Matter And Sand Papered Smooth. ( R & B Sor-2021-22, It.No.18.57, It.Code-18031, Ch.18 ) 30 P & L 24 X 24 Vitrified 8 Mm Thick Tile Flooring Over 20 Mm ( Average ) Base Of Cement Mortar 1:6 ( 1 Cement: 6 Coarse Sand ) On New Surface Or Fixing On Existing Flooring By Adhesive Material Including Dismentaling Of Existing Flooring And Jointed With Color Cement Slurry Including Finised With Flush Pointing & Cleaning The Surface Etc. Complete For Antiskit ( R & B Sor-2021-22, It.Code-14021A, Ch.14 ) 31 Providing And Laying White Glazed Tiles 6Mm Thick In Skrting Risers Of Steps And Dedo On 10Mm Thick Cement Plaster 1:3 ( 1-Cement : 3-Coarse Sand ) And Jointed With White Cement Slurry ( R & B Sor-2021-22, It.No.14.32, It. Code-14009 Aa, Ch.14 ) 32 Providing And Fixing Pre-Cast Rubber Dye / Steel Dye Inter Locking Concrete Block 60Mm Thick With Grade Of Concrete M300 Pnumatic Compressed / Vibrated Mechanically And As Per Approved Design Confirming To Is 15658 : 2006 Including 35 Mm Sand Layer For Leveling And Filling The Joint With Sand In Proper Line And Level As Per Guidelines Of Irc : Sp 63-2018 Etc. Complete.. ( R & B Sor-2021-22, Pg.95 Item Code 14033 ) 33 Providing And Laying Broken Chine Mosaic Flooring For Terrace Using 12 Mm To 20 Mm Broken Pieces Of Glazed Tiles To Be Laid Over Cement Mortar 1:3 To Plain Or Slope And To Be Tempered To Bring Mortar Creme Out Upto Surface Using White Cement Including Rounding Off Junctions And Extending Them Upto 15 Cm Along The Wall, Clearing With Water And Oxalic Acid Etc. As Directed. ( R & B Sor-2021-22, It.Code-14035, Ch.14 ) 34 Providing And Laying Dry Rubble Stone Pitching Without Base , Inverted Filter / Murrum Bedding And Header Stone Including Hand Packing & Trimming & Dressing Slopes Etc Complete.. ( Regional Sor-2021-22, Pg3 It 16 ) A ) 15 Cms Thick Stone Pitching B ) 23 Cms Thick Stone Pitching 35 Earth Work In Embankment From Borrow Pits In All Sort Of Soil And Soft Murrum Or Other Suitable Strata As Directed Incl Breaking Clods And Dressing To The Design Section With Lead As Under And All Lift Incl.Site Clearance Etc Comp. For All Canal Capacity & Without Rolling And Watering ( Regional Sor-2021-22, Pg22 It 4 ) A ) 0 To 30 Mt Lead B ) 30 To 200 Mt Lead C ) 200 To 1000 Mt Lead 36 Compaction Of Earth Work In Embankment In Layers Of 15 To 23 Cms At Omc To Required Dry Density Incl Necy Rolling With Vibratory Rollers Of 10 To 12 Tones Capacity. ( Regional Sor-2021-22, Pg23 It 5 ) 37 Spreading The Murrum In Uniform Layer With All Lift & As & Where Directed Etc. Complete. . ( Regional Sor-2021-22, Pg37 It 7 ) 38 Dry Rolling Of Earth Work With Light Rollers Of Upto 2.0 Tonnes Capacity As Directed With All Lift Etc Complete. . ( Regional Sor-2021-22, Pg23 It 6 ) 39 Prov. & Laying In Position Controlled Cement Concrete Using Cement, Sand And Crushed Aggregate By Mass And Machine Mix For C.C Work In Canal Lining Incl. Necessary Formworks Centering Scaffolding Compaction By Plate Vibrator, Curing As Directed With All Lead & Lift Etc Complete Incl Dressing The Bed And Trimming The Canal Section If Required And Minor Filling With Murrum / Earth As Per Site Condition To The Correct Profile, Incl Providing Bitumen Joints As Per Drawing And Specified Interval. ( Without Using Paver Machineries. ) ( Regional Sor-2021-22, Pg27 It 25A ) B ) For 10Cms Thick Cast-In-Citu Canal Lining In M-15 Grade Of Conc.With Msa-20Mm Without Sleepers. D ) For 7.50Cms Thick Cast-In-Citu Canal Lining In M-15 Grade Of Conc.With Msa-20Mm Without Sleepers. 40 Clearing The Silt From Canal / Drain Bed By Digging The Same To The Required Bed Level And Gradient Including Depositing The Excavated Earth Regularly On Spoil Bank For Utilizing The Same For Preparing The Bund After Bracking The Clods As And Where Directed For Lead Upto 30 Mt And Lift As Under. ( Excluding Weed Cutting ) . ( Regional Sor-2021-22, Pg 36 It 1 ) A ) Depth 0 To 3.0 Mt B ) Depth 3.0 To 6.0 Mt C ) Depth 6.0 To 9.0 Mt D ) For Every Additional 3.0 Mt Lift 41 Clearing The Shrubs Like Akadas, Weed, And Other Vegetation Including Depositing The Same Out Side And Burning Etc. Complete From Canal Bed & Both Side Slopes And Upto Outer Toe Of The Bank. ( For Canal And Drains ) . ( Regional Sor-2021-22, Pg36 It 2 ) A ) Upto 0.56 Cumecs B ) Above 0.56 To 7.0 Cumecs C ) Above 7.0 Cumecs 42 Desilting Of Various Structures Of Canal And Distribution System Including Depositing The Same As Directed With All Lift And Lead For Canal Syphone, Air Vent, Turn Out Kundies Etc Complete. ( Excluding Weed Cutting ) ( Regional Sor-2021-22, Pg36 It 3 ) 43 Jungle Clearance Of Specified Category And Bushes For Canal / Dam Work As Directed With Depositing Material Etc Complete. ( Excluding Tree Of Grith Above 0.5 Mt ) . ( Regional Sor-2021-22, Pg 36 It 5 ) A ) Upto 2 Year Old A ) For Light Dence B ) For Medium Dence C ) For Heavy Dence B ) More Than 2 Year Old A ) For Light Dence B ) For Medium Dence C ) For Heavy Dence 44 Maintenance Of Earthan Dam By Cleaning The Slope Of E.Dam Within The Dam Boundary Incl.Gutter ( Drains ) By Removing The Bushes, Shrubs, Girth And Small Trees Including Depositing The Materials As And Where Directed Up To 50 Mt. Lead And All Lift Etc. Complete. ( Throughout The Year ) . ( Regional Sor-2021-22, Pg37 It 6 ) 45 Cleaning The Canal Bed And Both Side Slopes ( In Muddy Condition ) Scrapping Out The Shovel, Pine, Luies, Kadusalo And Other Vegetation By Means Of Manual Including Silt And Depositing The Same Up To Lead Of 30Mt. And All Lift Etc Complete. ( Regional Sor-2021-22, Pg39 It 19 ) 46 Extra Lead Charges For Transporting The Borrow Area / Excavated Usable Materials For Earthen Dam Beyond The Basic Lead Of 1.0 Km Up To 5.0 Km For Each Additional Km Or Part There Of Inclusive Of All Lift Etc Complete.. ( Regional Sor-2021-22, Pg2 It 9 ) Page-14 47 Dewatering For Earthen Dam And Allied Works, Foundation Areas, Pits, Trenches Etc Incl Cost Of Pumping Machineries, Pipe Lines, Labours Diesel / Electricity / Dg Set, Etc Complete. . ( Regional Sor-2021-22, Pg4 It 30 ) 48 Providing & Fixing Outlets Gates For Canal Including All Material, Labour, Fabrication Transportation Fixing To Site Of Work With All Lead & Lift Including One Coat Of Primer And Two Coat Of Epoxy Anticorrsive Paint As Directed Including Handle & Locking Arrangements Etc. Complete. ( Regional Sor-2021-22, Pg38 17 ) 49 Providing & Fixing H.R. & C.R. Gates For Canal Including All Materials , Labours, Fabrication Transporting Fixing To Site Of Work All Lead & Lift Including One Coat Of Primer And Two Coats Of Oil Painting As Directed Including Square Threaded Screw, Bearing, Nuts, Handles, And Locking Arrangements Etc. Complete.. ( Regional Sor-2021-22, Pg 39 It 18 ) 50 Providing Epoxy Plaster 6 To 8Mm Min.Thickness Incl Filling Of All Pot-Holes / Ditches With Epoxy Mortar Upto Req. Depth By Using Resin:Hardner:Aggregates Confirming To Is-9162 In Proportion 0.7:0.3:6.5, By Weight On Exposed Damaged Old And Rough Surface Of Spillway / Canal Strs With Proper Application Of Necy Primer Coat Of Resin And Hardener In Proportion Of 2:1 By Weight Confirming To Is-9197 To Give Proper Bond Between Old Surface And Epoxy Plaster Incl Necessary Cleaning, Cheeping Of Old Surface Incl Scaffolding, Tools Bars For The Job With Labour Incl All Lead And Lift Etc Complete In All Condition Dry And Wet.. ( Regional Sor-2021-22, Pg35 It 25 ) 51 Providing Service For Security Of Canal System And Maintaining Smoothly Irrigation Water Distribution Including Operating Canal Regulators And Outlets In Suitable Shifts / Round The Clock As Per Instruction Of Engineer In Charge.. ( Regional Sor-2021-22, Pg42 It 39 ) 52 Providing And Laying Rcc Np-2 Pipe For Chute On Rear Slope Incl Excavation And Back Filling, Jointing Prior With Collars, Curing Etc Complete In C.M. 1:1. ( Regional Sor-2021-22, Pg4 It 23 ) ( A ) 225Mm Dia Pipe ( B ) 300Mm Dia Pipe ( C ) 450Mm Dia Pipe 53 Filling The Empty Bag Filled With Good Selected Earth Or Sand Including Stitching And Laying Or Stacking As And Where Directed With All Lead And Lift Etc. Complete.. ( Regional Sor-2021-22, Pg37 It 8 ) 54 Providing Murrum Including Spreading The Same And Dressing The Side Slope & Top Surface In Required Grade And Camber With Lead Upto 5.0Km Etc Complete. ( Regional Sor-2021-22, Pg39 It 22 ) Page-15 55 Back Filling With Selected Earth Brought From Out Side Borrow Area , Or From Excavated Useful Material Including Watering Ramming, Consolidation With Pneumatic Temping And All Lead And Lift Etc Complete. ( Regional Sor-2021-22, Pg.12 It 43 ) 56 Suppliying Of Graded Stone Aggregate Of Following Sizes ( For W.B.M. Road ) ( 1 ) Hand Broken Stone Aggregate 25Mm To 90Mm Size. ( R& B S.O.R-2021-22, ., It.No.26.5, It.Code. 26011A, Ch.26 ) 57 Suppliying Of Graded Stone Aggregate Of Following Sizes ( For W.B.M. Road ) ( 2 ) Hand Broken Stone Aggregate 40 Mm To 63 Mm Size. ( R& B S.O.R. -2021-22, , It.No.26.5, It.Code.26011B, , Ch.26 ) 58 Spreading The Stone Aggregate For Rolling And W.B.M. Including Filling The Interstices To Required Camber And Gradient ( Excluding Spreading Of Blindage ) ( Ii ) 40Mm To 63Mm Size Aggreagates ( H.B. ) ( R& B S.O.R-2021-22, ., It.No.26.2, It.Code.26018 A, Ch.26 ) Spreading The Stone Aggregate For Rolling And W.B.M. Including Filling The Interstices To Required Camber And Gradient ( Excluding Spreading Of Blindage ) ( Iii ) 25Mm To 50Mm Size Crushed Stone ( R& B S.O.R. -2021-22, , It.No.26.2, It.Code.26018 B, Ch.26 ) 59 Course Aggregate ( Black Stone Crushed Metal ) ( Regional Sor-2021-22, Pg 49 It 6 ) ( I ) 40.00 To 63 .00 Mm ( Ii ) 40.00Mm ( Iii ) 20.00Mm ( Iv ) 10.00 To 20.00 Mm ( V ) 6.00 To 10.00 Mm 60 Rolling And Consolidation Of Soling Including Filling In Depression Which Occur During The Process, With Power Roler 8 Tonne To 12 Tonne. ( R & B Sor--2021-22, , It. No.26.76, Code-26021, Ch.26 ) 61 Box Cutting The Road Surface To Proper Slope And Camber For Making A Base For Road Work Including Removing The Excavated Stuff And Depositing On The Road Side Slope As Directed Upto 50Mt.Lead. ( R & B Sor-2021-22, -, It Code-26B008, Ch.26 ) 62 Hire Charges For Excavator Cum Loader Shawl And Drag Line Incl. Fuel Charges, Oil And All Necessary Materials For Excavation Loading Unloading, Spreading With Upper Clive Cleaner And Incl. All Taxes And Insurance. Etc. Comp. ( Regional Sor-2021-22, Pg 52 It.111 ) 63 Hire Charges For Engaging Tractor With Trailer Driver, Diesel Fuel For Excavation Work, Transportation Of Earth, Murrum, Rubble And Other Materials Etc. For One Shift Of 8 Hour With Insurance And All Taxes Etc Comp. ( Regional Page-16 Sor-2021-22, Pg51 It 104 ) 64 Providing & Laying Dry Rubble Stone Pucca Pitching With Panel ( Of Size Not More Than 10Sqmt ) Of Stone Masonry 45Cm Thick Wall In C.M. 1:5, Without Base , Inverted Filter And Header Stone But With 10 Cms Thick Murrum Layer ( For Base ) Incl Hand Packing And Trimming And Dressing Slopes Etc. ( Regional Sor-2021-22, Ch.1, Pg.3 It .19 ) A ) 45 Cms Thick Stone Pitching With Pointing In C.M.1:2 B ) 30 Cms Thick Stone Pitching With Pointing In C.M.1:2 C ) 23 Cms Thick Stone Pitching With Pointing In C.M.1:2 65 Quaring, Transporting & Spreading Selected Materials From Borrow Area For Raising Of Embankment Work In Casing Zone Section In Uniform Layers Of Specified Thickness ( Up To 23Cm ) As Directed Incl.Dressing Breaking Clods And Rolling At Requisite Moisture Contents To Required Dry Density With Roller Of Suitable Type And Watering At Omc For Lead Upto 1.0 Km And All Lifts Etc Complete.. ( Regional Sor -2021-22, Pg.01 It 07, Ch.1 ) 66 Excavation For Deepening Of Pond / Check Dam Including Trasporting And Spreading The Excavated Material For Raising Of Embankment In Uniform Layer Or As Directed Including Dressing, Breaking Clods Etc For Lead Upto 1 Km And All Lift Without Rolling And Watering Etc Complete. ( Regional Sor-2021-22, Pg42 It 38 67 Providing 40 Mm Thick Guniting In Cement Mortar ( 1:2 ) For Spillway Works By Using Guniting Equipment And Air Compressor And Accessories Incl Finishing, Curing Etc Complete With Cost Of Material And Labours But Excluding Cost Of Irc Fabric Reinforcement With All Lead And Lifts. ( Regional Sor-2021-22, Pg33 It 17 ) 68 Providing And Fixing In Position I.R.C. Fabrics Of Mesh 6X6 & 10 Gauge, Reinforcement With Necessary Nailing In Position, Overlap Etc As Directed With All Lead And Lift Etc Complete. ( Regional Sor-2021-22, Pg33 It 18 ) 69 Providing Fitter Outsource Services For Flood Control Of Dam Etc. ( Regional Sor-2021-22, Pg. No. 50 It.No.33 ) 70 Providing Mason ( 1St Class ) Outsource Services For Flood Control Of Dam Etc. ( Regional Sor-2021-22, Pg. No. 50 It.No.28 ) 71 Providing Carpenter ( 1St Class ) Outsource Services For Flood Control Of Dam Etc. ( Regional Sor-2021-22, Pg. No. 50 It.No.35 ) 72 Providing Painter Outsource Services For Flood Control Of Dam Etc. ( Regional Sor-2021-22, Pg. No. 50 It.No.38 ) 73 Providing Plumber Outsource Services For Flood Control Of Dam Etc. ( Regional Sor-2021-22, Pg. No. 50 It.No.39 ) 74 Engaging Unskilled Labour ( Labour Comm. Rate ) ( Zone-1 ) Engaging Unskilled Labour ( Labour Comm. Rate ) ( Zone-2 ) 75 Engaging Semi Skilled Labour ( Labour Comm. Rate ) ( Zone-1 ) Engaging Semi Skilled Labour ( Labour Comm. Rate ) ( Zone-2 ) 76 Providing & Fixing Guard Stone Of Precast C.C. M-15 I.R.C. Standard & Design 75X20x20 Cm. Including White Washing Etc Complete. ( A ) In Earth ( Regional Sor-2021-22, , Ch-8, Page No. 40 It. No.30 ) 77 White Washing With Lime On Wall Surface ( Two Coats ) To Give An Even Shade Including Thoroughly Booming The Surface To Remove All Dirt, Dust; Mortar Drops And Other Foreign Matter. ( R & B Sor-2021-22, It. No. 18.11 Code 18001 ) 78 Providing 1.0 ( One ) Meter Wide Steps In On Rip Rap With Trade 30Cm, 15Cm Rise In Brick Masonry In C.M.1:5 With 23Cm Wide Parapet On Both The Side Incl 10Mm Thick Plaster In C.M. 1:3 On Expose Faces Incl 10Cm Thick Foundation Concrete M-10, As Per Drawing With All Lead And Lift. ( Regional Sor-2021-22, , Chapter-1, Page No. 4 It. No.29 ) 79 Prov. & Laying In Position Nominal Mix Cement Concrete Using Cement , Sand & H.B.Metal By Mass And Machine Mix For Pcc Including Necessary Formworks, Compaction, Raming, Curing As Directed With All Lead And Lift Etc Complete. For Foundation Concrete / Other General Purpose. Concrete ( 1:3:6 ) Metal Size- 63Mm ( Cement Level 220 Kg / Cum ) ( Reg. Sor-2021-22, Ch.5 It. No.2, Pg.19 ) 80 Providing And Fixing In Position 100 / 110 Mm Dia Pvc Pipe Weep Holes In The Retaining Walls / Sidewall / Abt Etc. ( Reg. Sor-2021-22, Ch.5 It. No.12, Pg.20 ) 81 Providing And Laying Dry Rubble Pitching With 20 Cms Gravel / Metal And 20 Cms Sand Layers As Base Of Inverted Graded Filter And Without Header Stone But Incl.Hand Packing Trimming & Dressing Of Slopes Etc Complete. ( Reg. Sor -2021-22, Ch.1 It. No.14, Pg.2 ) ( A ) 30 Cms Thick Stone Pitching ( B ) 45 Cms Thick Stone Pitching ( C ) 60 Cms Thick Stone Pitching 82 Providing And Fixing In Position White Marble Plate Of Size 45 X 45 X 1.8 Cm Incl Ingraving The Letters As Per Drawing / As Directed Etc Complete. ( Reg.Sor-2021-22, . It.17, Ch.5, Pg.21 ) 83 Labour Charges For The Premonsoon Clearing , Servicing, Grease, And Repacing Oil C.D.U., E.D.U. Mechanisum Turnbukle Trunion, Roller, Side Roller, Guide Roller, D.H.U. Gear Boxes, Trunion Buckets Hoist Mechanisum Etc All Other Movable Parts For The Spillway Gates Size 30X20 & D.H.Unit And Replacing Cardum Compond To Wire Rope Etc Complete For Spillway Gates Radial Gate Size 9.14 X 6.10 Mt ( 30 X 20 ) ( Regional S.O.R. -2021-22, - Ch.8, It. 41, Pg.43 ) Radial Gate Size 12.80 X 8.20 Mt ( 41 X 27 ) Radial Gate Size 14.33 X 10.67 Mt ( 47 X 35 ) Vertical Gate Size 9.10 X 3.05 Mt ( 30 X 10 ) Vertical Gate Size 9.10 X 4.50 Mt ( 30 X 15 ) 84 Providing And Laying 60Cm Dia Half Round Cement Pipe For Catch Water Drain And Chute Drain On Berms And Down Stream Slopes Of Earthen Dam Incl Necy Excavation And Back Filling Etc Complete. ( Regional Sor -2021-22, Ch.1 Page No. 3 It. No. 20 ) 85 Providing Painting Writing Sign Board Of Size 400Mmx250mm With Lettering Of 4Cm.Size On Various Canal Structure Including Providing To Prime Coat And Applying Two Coat Of Yellow Oil Paint In Back Ground And Letter Writing In Red Oil Paint, Sign Board Consists The Writing Details Such As Name Of Canal And Its Hydraulic Details ( Ch. Cbl. & Fsl ) Including All Labours And Materials Charges Required Etc Complete. ( Regional S.O.R. -2021-22, - Ch.8, It. 31, Pg.41 ) 86 Providing, Supplying At Site, Laying And Fixing In Position Under Ground, R.C.C Hume Pipe Of Np-2 Class Of Bis Standard Incl Filling The Joints With Cement Mortar 1:1 With Providing Necessary Collars Etc Complete With Inclusive Of Testing With Working Pressure And All Lead And Lift. ( Regional S.O.R. -2021-22, It No. 45 Pg. No. 30 ) ( A ) 150Mm Dia. ( B ) 225 Mm Dia. ( C ) 300 Mm Dia. ( D ) 450 Mm Dia. ( E ) 600 Mm Dia. ( F ) 750 / 800 Mm Dia. ( G ) 900 Mm Dia. ( H ) 1100 Mm Dia. ( I 1200 Mm Dia. ( J ) 1500 Mm Dia. 87 Prov. And Laying In Position Controlled Cement Concrete Using Cement, Sand And Crushed Aggregate By Mass And Machine Mix For R.C.C / Cc Work Including Necessary Formworks Centering Scaffolding Compaction By Vibrator, Curing As Directed With All Lead & Lift Etc Complete Excluding The Cost Of Reinforcement For Plinth Course & Coping A ) Concrete Grade M-15 And Msa-20Mm ( Regional S.O.R. -2021-22, It No. 13 Pg. No. 24 ) 88 Providing & Fixing Boundry Stone Of Precast C.C. M-15 I.R.C. Standard & Design 75X20x20 Cm. Including White Washing Etc Complete. ( A ) In Earth ( Regional Sor-2021-22, Ch-8, Page No. 40 It. No.30B ) 89 Providing And Fixing Odinary Kilometer Stone Precast C.C. 1:2:4 Including Necessary Reinforcement As Per I.R.C. Type Design In C.C. 1:4:8 Including Letter And Paints Etc Complete ( O.D.Road & Village Road Type ) ( Regional Sor, -2021-22, Ch-8, Page No. 40 It. No.30C ) 90 Cleaning Of The Spillway Gates, Leaf Arms, Tonion And Its Assembly, Foot Bridge, Dhu Etc Ones Per Month, Throughout The Year.With Necessary Material, Equipment, Scaffolding Etc Complete . Radial Gate Size 9.14 X 6.10 Mt ( 30 X 20 ) . ( Reg. S.O.R-2021-22, . It No. 37 Pg No. 42 ) Radial Gate Size 12.80 X 8.20 Mt ( 41’ X 27’ ) Radial Gate Size 14.33 X 10.67 Mt ( 47’ X 35’ ) Vertical Gate Size 9.10 X 3.05 Mt ( 30’ X 10’ ) Vertical Gate Size 9.10 X 4.50 Mt ( 30’ X 15’ ) 91 Providing Service For Security Of Canal System And Maintaining Smoothly Irrigation Water Distribution Including Operating Canal Regulators And Outlets In Suitable Shifts / Round The Clock As Per Instruction Of Engineer In Charge. ( Reg. S.O.R-2021-22, . It No. 39 Pgno. 42 ) 92 Cleaning Of The Hoeny Comb / Female Wasp, From Dam , Spillway Gates, Its Assembly, Foot Bridge , Plateform, H.R.Gates , & Canal Structures, & Buildings &Any Other Structures One Times Of Heonycomb One No. ( Reg. S.O.R-2021-22, . It No. 40 Pgno. 42 ) 93 Labour Charses For The Clearing , Serviving And Applying Grease To Stem Rod With Clams, Screw Rod, Gear Box With Replacing Oil & All Other Movable Parts For Hr Gate All Size Etc. For H.R. Gates. ( Reg. S.O.R. -2021-22, It No. 42 Pgno. 43 ) 94 Providing And Fixing Pre-Cast Concrete Kerb Stone Of Gray Cement Based Concrete Block 30Cm Length, 30Cm Height And 15Cm Thick Of M250 Grade Concret As Per Approved Design And Including Excavation For Fixing In Proper Line And Level, Filling The Joint With C:M 1:3 ( 1Cement:3Fine Sand ) Etc Complete. ( R&B S.O.R-2021-22, . Pg No 95, Code No.14032 ) 95 Finishing Wall With Weather Proof Exterior Emulsion Paint On Wall Surface ( Two Coats ) To Give An Required Shape Even Shade After Thoroughly Brushing The Surface To Remove All Dirt, And Remains Of Loose Powdered Materials.Etc Complete ( R&B S.O.R. -2021-22, Page-20 Pg No 107, Code No.19031 ) 96 Providing Murrum Including Spreading The Same And Dressing The Side Slope & Top Surface In Required Grade And Camber With Lead Upto 10.0 Km Etc Complete. ( As Per Ra-1 ) 97 Providing And Fixing 1.20 Metre High Fencing With 2.0 Metre Long M.S.Angle Posts 40Mm X 40 Mm X6 Mm And Oil Painting 3 Coats Fixed At 2.5 Mt, C / C. With Five Horizontan Lines And Two Diagonals Of Galvanized Steel Barbed Wire Weighting 9.38 Kg. Per 100 Metre, Strained And Fixed To Posts With G.I, Staples Including Fixing The Postsin Ground With 0.5 M X 0.5.M X 0.5 M. Block In C.C1:5:10 Etc Complete. ( R&B S.O.R. -2021-22, Pg No 117, Code No.22001 ) 98 Jcb-80-Excavation Machine ( Reg. S.O.R. -2021-22, It No.102 Pgno. 51 ) 99 Tractor With Trailer ( 40 Bhp &3.0 Cum Capacity ) ( Reg. S.O.R. -2021-22, It No.104 Pgno. 51 ) 100 Providing & Laying In Position Nominal Mix Cement Concrete Using Cement Sand & Crushed Metal Aggregate By Machine Mix Incl. Necessary Formworks, Compaction By Mechanical Vibrator Curing As Directed With All Lead And Lift Etc Complete. Excluding The Cost Of Steel. Training Wall, Side Wall And General Purpose.. Concrete Grade M20 And Msa-20Mm ( As Per Ra-2 )