Auction Sale Of Condemned , U / S, Abandoned Staff Qtr At Jrs ( Unit : 02 Nos. ) , Aml ( 20 Units ) , Vdh ( 04 Units ) , Nvs Units 13 Units ) , Bim ( 01 Unit ) Under Jurisdiction Of Sse Works I Pl , Lot Comprises Of 1 ] Brick Masonry Qty: 97.834 Cum, 2 ] Rcc Slab: 35.42 Sqm , 3 ] Wooden Door 28 Nos. = 57.92 Sqm ) , Of Various Sizes Such As : I ) 1.00 X 2.00 ( 10Nos ) . Ii ) 1.90X 1.05 : 16 Nos., Iii ) 1.00X 2.00 : 02 Nos. 4 ] Wooden Window: ( 19 Nos = 25.30 Sqm ) Of Various Sizes Of Various Sizes : I ] 0.9X 1.2 , Qty : 09 Nos. Ii ] 1.34X 1.05, Qty: 08 Nos. , Iii ] 0.9X 1.2, : 02 Nos. 5 ] Ac Sheets: 378 Sqm, 6 ] Rails 69 Lbs : 220.836 Rm, 7 ] Rails 52 Kg : 14.4 Rm, 8 ] G.I. Sheet 2X10x6 Mm: 120 Sqm . Mode Of Delivery By Lot, To Be Sale On As And Where Is Basis, Note: 1 ] Purchasers Are Requested To See Site / Qtrs . Before Bidding. 2 ] Whole Structures To Be Dismantled By The Purchaser And After Clearing / Disposing Off All Debris From Railway Premises, Purchaser Will Be Allowed To Take Delivery Of His Material. 2 ] The Items And Material Lying Outside The Building Boundary Line Are Not A Part Of A Auction .3 ] Electric Wires And Other Materials Lying Inside The Building Shall Be Handed Over To Custodian By Purchaser During Dismantling Structure. 4 ] While Dismantling The Structure Care Should Be Taken That Adjacent Building, Common Walls And Other Common Members Should Not Be Damaged. 5 ] The Structure Above Ground Level Is To Be Considered For Auction. Excavation Below Ground Level Is Not Allowed. 6 ] All Safety Majors Should Be Taken By Purchaser To Avoid Any Unusuall At Works Site. 7 ] Barricading / Protection Shall Be Provided By Purchaser To Avoid Any Accident., 8 ] If Any Accident / Unusuall Occurs At Work, Purchaser Alone Will Bare Full Responsibility And Railway Officials Will Not Be Responsible For Such Unusuall Happening. 9 ] During Dismantling Work Safety Of Running Tracks, Railway Property & Railway Staff As Well Has His Own Labor Should Be Ensured By Purchaser And Dismantling Work Shall Be Carried Out With Full Safety Measures Of Working Staff And Others, 10 ] Fdp 80 Days.