Tender For 2000143080-280_Replacement Of Rail (Crane,Ltc,Stc)For Smp-1 1 2000143080 280 10 10 REPLACEMENT OF RAILS 740 M Email : bhavik.prajapati@amns.in Contact : Name : Bhavik Prajapati Item Details : REPLACEMENT OF RAIL (CRANE,LTC,STC) Sr. No.,,Descriptions,, 1,,Tools & tackles shifting from designated area to Crane LT rail in RS Bay.,, 2,,Safety tool box talk relates to the Crane LT rail like Cleaning, cutting, lifting & rigging, rail changing, welding & dust dumping activities.,, 3,,CR120 rail to be shifted from workshop to required location with hydra.,, 4,,New rail to be shifted from 0 level to crane level with Service hoist ,, 5,,New rail to be shifted with help of manpower to exact location where the old rail has to be removed.,, 6,,Provide the mechanical stopper on LT rail to prevent the further movement of crane while work under progress.,, 7,,Ensure the DSL is kept isolated. Remove the rail clamps on both sides.,, 8,,Remove the fish plate on both sides of the joints and ensure freeness of the rail. ,, 9,,Shift the old rail aside and take the new rail in position with the help of manpower.,, 10,,Check the alignment of the rail and joint. If required, glozing must be done on end to match the joint.,, 11,,Provide the rail clamp and tighten the clamp bolts.,, 12,,Provide the fish plate in joint and tighten the fish plate bolts.,, 13,,Shift the old rail to designated place with HAFA service hoist & HYDRA.,, 14,,Remove prepared scaffolding, if any. Ensure no loose material lying on crane, Walkway & Working area.,, 15,,Shift the removed Equipment / Scrap to designated repair area / Scrap Area. Ensure proper housekeeping near working area after job completion.,, 16,,Adhere the Standard Maintenance Practice (SMP/SOP) of respective Crane Assembly Replacement,, ,, IMPORTANT NOTE:,, ,, ,, ,, ,, ,, ,, ,, a.,,Use all the PPE required at SMP1 (FRP Helmet, FRP Jacket, Safety shoe, Safety goggles, Safety hand gloves and Nose mask). Safety is vendor’s responsibility. AMNSI will explain hazards in the job during TBT / HIRAC discussion. Vendor has to monitor behaviour of associates periodically from HSE point of view and ensure required correction. All the associate must have height pass. Height pass will be issued by AM/NS safety department. ,, b.,,Consumable + Welding m/c + Cutting set + Tools + Tackles + Housekeeping will be in vendors scope.,, ,, c.,,Above procedure demonstrated for 160/320T cranes LT rails and for 260 cranes & LTC rail change procedure may differ.,, d.,,Use E-7018 welding electrodes for all the welding jobs.,, ,, ,, ,, d.,,Shift the removed Equipment / Scrap to designated repair area / Scrap Area. Ensure proper housekeeping near working area after job completion.,, ,, e. ,,Movement of Manpower / Associates at our Hazira Site. 1. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 2. Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. Other Terms: Associate has to undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass.,, ,, f.,,Penalty for non-compliance: Penalty will be recovered from the monthly payment if vendor is not able to achieve required service levels as mentioned below: - If vendor will delay in job execution / equipment refurbishment as per plant requirement. Job to be carried out anytime (24X7, 365Days). - If vendor does not deploy the required specified quantity & quality of manpower as per RFQ or a person deployed is not reporting to the duty. - While normal duty hours are 8 per day, more than 16 hours continuous duty is not allowed on any day. - If safety violation during job execution. Minimum 3% penalty will be applicable on a monthly bill value. Penalty in two consecutive months will make contractor eligible for either termination of contract or penalty more than 10%.,, Item Note :

Tender Notice

40600749

Indian


Gujarat

November 20, 2023

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Tender For 2000143080-280_Replacement Of Rail (Crane,Ltc,Stc)For Smp-1 1 2000143080 280 10 10 REPLACEMENT OF RAILS 740 M Email : bhavik.prajapati@amns.in Contact : Name : Bhavik Prajapati Item Details : REPLACEMENT OF RAIL (CRANE,LTC,STC) Sr. No.,,Descriptions,, 1,,Tools & tackles shifting from designated area to Crane LT rail in RS Bay.,, 2,,Safety tool box talk relates to the Crane LT rail like Cleaning, cutting, lifting & rigging, rail changing, welding & dust dumping activities.,, 3,,CR120 rail to be shifted from workshop to required location with hydra.,, 4,,New rail to be shifted from 0 level to crane level with Service hoist ,, 5,,New rail to be shifted with help of manpower to exact location where the old rail has to be removed.,, 6,,Provide the mechanical stopper on LT rail to prevent the further movement of crane while work under progress.,, 7,,Ensure the DSL is kept isolated. Remove the rail clamps on both sides.,, 8,,Remove the fish plate on both sides of the joints and ensure freeness of the rail. ,, 9,,Shift the old rail aside and take the new rail in position with the help of manpower.,, 10,,Check the alignment of the rail and joint. If required, glozing must be done on end to match the joint.,, 11,,Provide the rail clamp and tighten the clamp bolts.,, 12,,Provide the fish plate in joint and tighten the fish plate bolts.,, 13,,Shift the old rail to designated place with HAFA service hoist & HYDRA.,, 14,,Remove prepared scaffolding, if any. Ensure no loose material lying on crane, Walkway & Working area.,, 15,,Shift the removed Equipment / Scrap to designated repair area / Scrap Area. Ensure proper housekeeping near working area after job completion.,, 16,,Adhere the Standard Maintenance Practice (SMP/SOP) of respective Crane Assembly Replacement,, ,, IMPORTANT NOTE:,, ,, ,, ,, ,, ,, ,, ,, a.,,Use all the PPE required at SMP1 (FRP Helmet, FRP Jacket, Safety shoe, Safety goggles, Safety hand gloves and Nose mask). Safety is vendor’s responsibility. AMNSI will explain hazards in the job during TBT / HIRAC discussion. Vendor has to monitor behaviour of associates periodically from HSE point of view and ensure required correction. All the associate must have height pass. Height pass will be issued by AM/NS safety department. ,, b.,,Consumable + Welding m/c + Cutting set + Tools + Tackles + Housekeeping will be in vendors scope.,, ,, c.,,Above procedure demonstrated for 160/320T cranes LT rails and for 260 cranes & LTC rail change procedure may differ.,, d.,,Use E-7018 welding electrodes for all the welding jobs.,, ,, ,, ,, d.,,Shift the removed Equipment / Scrap to designated repair area / Scrap Area. Ensure proper housekeeping near working area after job completion.,, ,, e. ,,Movement of Manpower / Associates at our Hazira Site. 1. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 2. Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. Other Terms: Associate has to undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass.,, ,, f.,,Penalty for non-compliance: Penalty will be recovered from the monthly payment if vendor is not able to achieve required service levels as mentioned below: - If vendor will delay in job execution / equipment refurbishment as per plant requirement. Job to be carried out anytime (24X7, 365Days). - If vendor does not deploy the required specified quantity & quality of manpower as per RFQ or a person deployed is not reporting to the duty. - While normal duty hours are 8 per day, more than 16 hours continuous duty is not allowed on any day. - If safety violation during job execution. Minimum 3% penalty will be applicable on a monthly bill value. Penalty in two consecutive months will make contractor eligible for either termination of contract or penalty more than 10%.,, Item Note :