E-Tender For Rate Contract For Fabrication / Erection Work And Material Supply For U. N. Mehta Institute Of Cardiology & Research Centre-1 G.I. Sheet Plain Isi Standard Make. 18 Swg 2 G.I. Sheet Plain Isi Standard Make 20 Swg 3 G.I. Sheet Plain Isi Standard Make 22 Swg 4 Wire Guage Of 56Mm Square And 3 Mm Thick Jali Isi Standard Make 5 M.S. Weld Mesh Jali 3Mm Thick 25 X 50 Sqar Isi Standard Make 6 G.I. Hexagonal Chicken Mesh Jali Isi Standard Make 7 G.I. Chain Link Jali 12 / 14 / Gauge Isi Standard Make 8 G.I. Wire Gauge Of 0.71Mm Jali To 16X26 Guage ( Mosquito Proof ) Isi Standard Make 9 M.S. Flat, Equal Angle & Unequal Angle Of Tata, Jindal Kamdhenu Brand 10 M.S. Channel, Joints, Tee, Gusset Plate, Girder Etc. Of Tata, Jindal Kamdhenu Brand 11 M.S Square / Rectangle / Circular Tube / Pipe 2Mm Thick. Of Any Size Tata, Jindal Kamdhenu Brand 12 0.8Mm Thick Corrugated G.I. Sheet Class-3, Isi Standard Make 13 0.8Mm Thick Semi-Circular G.I. Sheet Class-3, Isi Standard Make 14 G.I. Seam Bolts And Nuts All Size Mix, Isi Standard Make 15 G.I. Plain Washer All Size Mix , Isi Standard Make 16 G.I. Bitumen Washer All Size Mix, Isi Standard Make 17 G.I. J Or L Hooks All Size Mix, Isi Standard Make 18 Corrugated A. C. Sheet - Isi Standard Make 6Mm Thick 19 Corrugated A. C. Sheet - Isi Standard Make 8Mm Thick 20 Plain A.C. Sheet 5Mm Thick Everest / Isi Standard Make 21 Frp Plain Sheet Isi Standard Make 2Mm Thick Plain / Design 22 Frp Corrugated Isi Standard Make 2Mm Thick Plain / Design 23 Frp Corrugated Isi Standard Make 3Mm Thick Plain / Design 24 Poly Carbonate Grid Base 5Mm Thick Sheet Of Any Color Standard Make 25 M.S Chequered Plate ( 2Mm To 8Mm Thick ) Isi Standard Make 26 S.S 304 Plain / Chequered Plate ( 2Mm To 8Mm Thick ) Isi Standard Make 27 S.S. 304 Flat, Equal Angle & Unequal Angle Of Isi Standard Make 28 S.S 304 Square / Rectangle / Circular Tube / Pipe 2Mm Thick. Of Any Size Isi Standard Make 1 Welder With Necessary Welding Machine And Cutting Set With All Required Tools Tackles Per Day , 8 Hours 2 Helper With Required Tools. For Per Day , 8 Hours 3 Rigger With Required Tools. For Per Day , 8 Hours 4 Welder With Necessary Welding Machine And Cutting Set With All Required Tools Tackles For Ss Works Per Day , 8 Hours 5 Providing Hydra Machine / Crane With Skill Operator, Inclusive Fuel For Operation, For Any Fabrication Work And Relevant Work Up To 15 Ton For Per Day 8 Hours. 1 Providing, Fabricating And Erecting Steel Beam , Column, Truss, Angles, Pipe, Rods, Sheet Etc Of Tata, Kamdhenu, Zindal, Essar ( Arcelormittal Nippon Steel India ) For Misc. Work Welded, In Built Up Sections, Framed Work Including Cutting, Hoisting, Fixing In Position If Required Machine Sheet Bending And Applying A Priming Coat Of Red Lead Paint. Using Beams Column And Any Shape And Design Given By The Engineer Incharge. 2 Providing, Fabricating And Erecting S.S 304 Angles, Pipe, Rods, Sheet Etc Of Isi Standard Make For Misc. Work Welded, In Built Up Sections, Framed Work Including Cutting, Hoisting, Fixing In Position If Required Machine Sheet Bending Using Any Shape And Design Given By The Engineer Incharge 3 Prov. And Fixing In Position Collapsible Steel Shutters Of Tata, Jindal Kamdhenu Brand With Vertical Channels 20 X 10 X 2Mm Braced With Flat Iron Diagonals 20 X 5Mm Size With Top And Bottom Rails Of T Iron 40X40x6 Mm With 35Mm Dia. Steel Pulleys Complete With Bolts, Nuts, Locking Arrangements, Stoppers Handles Incl. Applying A Priming Coat Of Red Lead Paint And Any Shape And Design Given By The Engineer Incharge 4 Providing And Fixing Rolling Shutters Of Approved Make Made Of 80Mm Wide M.S. Laths Inter-Locked Together Through Their Entire Length And Jointed Together At The Ends By End Locks Mounted On Specially Assigned Pipe Shaft With Bracket Plates, Guide Channels And Arrangements For Inside And Outside Locking With Push Pull Operation Incl. The Cost Of Hood Cover And Spring Etc. Of Tata, Jindal Kamdhenu Brand Complete. And Any Shape And Design Given By The Engineer Incharge 5 Only Removing Of Fabricated Structural Steel Work Of Any Design And Staking The Same In Reusable Condition As Instructed With All Height, Tools Tacles, Scaffolding Etc Complete 6 Only Erection Of Old Steel Structures As Per Given Design And Modification At All Height Including All Tools Tackles Labours Transportation Up To Work Site Etc. As Instructed By Engineer Incharge 7 Removing And Refixing Of Old Steel Structures With Frp Sheet, Drain Gutter Of Shed As Per Given Design And Refixing After Modification At All Height Including All Tools Tackles, Laboures Transportation Up To Work Site Etc. Excluding Truss And Column Complete As Instructed By Engineer Incharge 8 Providing And Fixing Corrugated G. I. Sheets Of Tata, Zindal, Kamdhenu, Essar ( Arcelormittal Nippon Steel India ) For Its Equivalent For Roofing Fixed With Galvanized Iron J Or L Hooks, Bolts And Nuts 8 Mm Diameter With Bitumen And G.I. Limpet Washer Filled With White Lead Complete Excluding The Cost Of Purlines, Rafters And Trusses. 0.80 Mm Thick Sheet Complete As Instructed By Engineer Incharge 9 Providing And Fixing Ridges Or Hips 600 Mm As Per Given Design Overall In Plain G.I. Sheet Of Tata, Zindal, Kamdhenu, Essar ( Arcelormittal Nippon Steel India ) For Its Equivalent For Fixed With G.I. J Or L Hooks, Holts And Nuts 8 Mm Dia G.I. Limpet And Bitumen Washer Complete. 0.80 Mm Thick Sheet Complete As Instructed By Engineer Incharge 10 Providing And Fixing. Asbestos Corrugated Cement Sheets Of Evarest Or Its Equivalent Make For Roofing Fixed With G.I. Plain And Bitumen Washer Complete Excl. The Cost Of Purlins, Rafters And Trusses Complete As Instructed By Engineer Incharge . 6Mm Thick 11 Providing And Fixing. Plain Asbestos Plain Cement Sheets Of Evarest Or Its Equivalent Make For Roofing Fixed With G.I. Plain And Bitumen Washer Complete Excl. The Cost Of Purlins, Rafters And Trusses Complete As Instructed By Engineer Incharge . 6Mm Thick 12 Providing And Fixing Frp Plain / Design Sheets For Roofing Fixed With Sealant At All Joints Complete Including Sample Approval And Test For No Water Leakages Excluding The Cost Of Purlins, Rafters And Trusses Complete As Instructed By Engineer Incharge 3Mm Thick 13 Providing And Fixing Poly Carbonate Sheets 2Mm Thick For Roofing Fixed With Sealant At All Joints Complete Including Sample Approval And Test For No Water Leakages Including The Cost Of Purlins, Rafters And Trusses Complete As Instructed By Engineer Incharge. 14 Only Fixing. For Roofing Fixed With Sealant Complete Including Sample Approval And Test For No Water Leakages Excluding The Cost Of Purlins, Rafters And Trusses Complete As Instructed By Engineer Incharge. Frp Plain / Design Sheets 15 Only Fixing. For Roofing Fixed With Sealant Complete Including Sample Approval And Test For No Water Leakages Excluding The Cost Of Purlins, Rafters And Trusses Complete As Instructed By Engineer Incharge. Ac / Acc Sheet Roofing 16 Only Fixing. For Roofing Fixed With Sealant Complete Including Sample Approval And Test For No Water Leakages Excluding The Cost Of Purlins, Rafters And Trusses Complete As Instructed By Engineer Incharge Gi Sheet Roofing 17 Only Fixing. For Roofing Fixed With Sealant Complete Including Sample Approval And Test For No Water Leakages Excluding The Cost Of Purlins, Rafters And Trusses Complete As Instructed By Engineer Incharge Alluminium Sheet Roofing 18 Only Fixing. For Roofing Fixed With Sealant Complete Including Sample Approval And Test For No Water Leakages Excluding The Cost Of Purlins, Rafters And Trusses Complete As Instructed By Engineer Incharge Poly Carbonate Sheet Roofing 19 Providing And Fixing Plain Asbestos Sheet Of Evarest Or Its Equivalent Make For Lining With Butt Joining And Wood Screws Inclusive Of Frame Work And Cover Fillets Complete As Instructed By Engineer Incharge 6.5 Mm. Thick 20 Providing And Fixing 75 Mm Diameter Pvc Rain Water Spout Of 90Cms. Long Complete. 21 Dismantling Of Sheet Roofing Incl. Ridges, Hips, Valleys, Gutters Etc. Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor. Complete As Instructed By Engineer Incharge G.I. Sheet Roofing 22 Dismantling Of Sheet Roofing Incl. Ridges, Hips, Valleys, Gutters Etc. Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor. Complete As Instructed By Engineer Incharge Ac / Acc Sheet Roofing 23 Dismantling Of Sheet Roofing Incl. Ridges, Hips, Valleys, Gutters Etc. Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor. Complete As Instructed By Engineer Incharge Frp Sheet Roofing 24 Dismantling Of Sheet Roofing Incl. Ridges, Hips, Valleys, Gutters Etc. Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor. Complete As Instructed By Engineer Incharge Alluminium Sheet Roofing 25 Dismantling Of Sheet Roofing Incl. Ridges, Hips, Valleys, Gutters Etc. Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor. Complete As Instructed By Engineer Incharge Poly Carbonate Sheet Roofing 26 Dismantling And Refitting Of Sheet Roofing Incl. Ridges, Hips, Valleys, Gutters Etc. Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge . G.I. Sheet Roofing 27 Dismantling And Refitting Of Sheet Roofing Incl. Ridges, Hips, Valleys, Gutters Etc. Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge Ac / Acc Sheet Roofing 28 Dismantling And Refitting Of Sheet Roofing Incl. Ridges, Hips, Valleys, Gutters Etc. Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge Frp Sheet Roofing 29 Dismantling And Refitting Of Sheet Roofing Incl. Ridges, Hips, Valleys, Gutters Etc. Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge Alluminium Sheet Roofing 30 Dismantling And Refitting Of Sheet Roofing Incl. Ridges, Hips, Valleys, Gutters Etc. Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge Color Coated Sheet Roofing 31 Only Dismantling Of Sheet Roofing Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge . G.I. Sheet Roofing 32 Only Dismantling Of Sheet Roofing Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge. Ac / Acc Sheet Roofing 33 Only Dismantling Of Sheet Roofing Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge. Frp Sheet Roofing 34 Only Dismantling Of Sheet Roofing Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge. Alluminium Sheet Roofing 35 Only Dismantling Of Sheet Roofing Stacking Of Serviceable Materials And Disposal Of Unserviceable Materials With All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge .Poly Carbonate Sheet Roofing 36 Dismantling Steel Work Incl. Dismembering And Stacking The Materials With All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge. 37 Dismantling And Refitting Doors, Windows, Ventilators Etc. ( Wood Or Steel ) Shutters Incl. Chowkhats, Architraves, Holdfastess And Other Attachment Etc. Complete And Stacking Them Within All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge . Not Exceeding 3 Sq. M. In Area 38 Dismantling And Refitting Doors, Windows, Ventilators Etc. ( Wood Or Steel ) Shutters Incl. Chowkhats, Architraves, Holdfastess And Other Attachment Etc. Complete And Stacking Them Within All Lead And Lift For All Floor Complete As Instructed By Engineer Incharge Exceeding 3 Sq. M. In Area 39 Providing And Fixing G.I. 12 / 14 Gauge Wire Fencing With 2.00 Metre Long M.S. Angle Posts 40Mm X 40Mm X 6Mm And Oil Painting 3 Coats, Fixed At 2.5 Mt. C / C With Five Horizontal Lines And Two Diagonals Of Galvanized Steel Barbed Wire Weighing 9.38 Kg. Per 100 Metre, Strained And Fixed To Posts With G.I. Staples, Incl. Fixing The Post In Ground With 0.5M.X 0.5M.X0.5M. Block In C.C. 1.5:10 Etc. Complete As Instructed By Engineer Incharge 1.20 Mtr Height 40 Providing And Fixing G.I. 12 / 14 Gauge Wire Fencing With 2.00 Metre Long M.S. Angle Posts 40Mm X 40Mm X 6Mm And Oil Painting 3 Coats, Fixed At 2.5 Mt. C / C With Five Horizontal Lines And Two Diagonals Of Galvanized Steel Barbed Wire Weighing 9.38 Kg. Per 100 Metre, Strained And Fixed To Posts With G.I. Staples, Incl. Fixing The Post In Ground With 0.5M.X 0.5M.X0.5M. Block In C.C. 1.5:10 Etc. Complete As Instructed By Engineer Incharge 1.50 Mtr Height 41 Providing And Fixing 1.20 Metre High Chain Link Fencing With 2.00 Metre Long M.S. Angle Posts 40Mm X 40Mm X 6Mm And Oil Painting 3 Coats, Fixed At 2.5 Mt. C / C With Five Horizontal Lines And Two Diagonals Of Galvanized Steel Barbed Wire Weighing 9.38 Kg. Per 100 Metre, Strained And Fixed To Posts With G.I.Staples, Incl. Fixing The Post In Ground With 0.5M.X 0.5M.X0.5M. Block In C.C. 1.5:10 Etc. Complete Complete As Instructed By Engineer Incharge 1.20 Mtr Height 42 Providing And Fixing 3 Mm Thick Frp Sheet ( Any Colour And Any Design ) Shed With Garden Net Or Bamboo Or Different Design, Material Used For Frp Sheet Is Vecro-Tax Choped Mat And Roof Light Resin. Vertical Pipe Size Will Be 3” X 3” Square M.S. Pipe ( 18 To 20 Gauge ) Not More Than 15’ C / C, Structure 1.5” X 1.5” Square M.S. Pipe ( 18 To 20 Gauge ) At 2’X2’ Square Pattern. Including Necessary Fittings And Fastening, Three Coats Of Enamel Paint To Pipe, Fiber Rain Water System Channel Or Pipe Up To 100Mm Diameter Complete As Instructed By Engineer Incharge Fiber Shed 43 Providing And Fixing Of Partition Tobe Made From 10 Mm Thick Cement Fiber Sheet On Bothside Of Skeleton, Skeleton Will Be Made From 40 X 20 And 20 X 20 Mm M.S. Tube Section Overall Thickness Of Parition Will Be 100 Mm To 200 Mm As Per Site Situation Complete As Instructed By Engineer Incharge. 44 Colour Coated Roofing : Providing And Fixing Of Roofing Tobe Made From Colour Powder Coated Tata Make Sheet With S.D.S.T. Screw On Existing Structure Complete As Instructed By Engineer Incharge . 45 Pvc U.V. Stabilise Roofing : Providing And Fixing Of Roofing Tobe Made From 1.3 Mm Thick U.V. Stabilise Pvc Corrugated Sheet With S.D.S.T. Screw On Existing Structure Complete As Instructed By Engineer Incharge . 46 Providing And Fixing Weld Mess Jali In Ventilation Window With Necessary Fitting With Screw / Welding Etc. Complete As Instructed By Engineer Incharge 47 Providing And Fixing G.I. Mosquito Jali In Ventilation, Window, Door Or Any Other Structure Etc. With Necessary Fitting Complete As Instructed By Engineer Incharge
Tender Notice
43063014
Indian
Gujarat
April 29, 2024
Key Value
15 Lakhs
15 Lakhs
15 Lakhs