Tender For Step-6 Balance Mechanical Job 7021427 10 10 10 Duct Erection 60 TO 20 Blind Fab.and Ere. 10 TO 30 Truss Erection 45 TO 40 Bucket Elevator Fab. & Ere. 10 TO 50 Damper Dismatling 3 NO 60 De-slagging sys. duct & hood Fab. 40 TO 70 De-slagging sys. duct & hood Ere. 40 TO 80 Conveyor chain erection 600 M 90 Bucket installation 300 NO 100 elevator chain erection 65 M Email : poojan.patel1@amns.in Contact : Name : Poojan Patel Item Details : Scope of work for Duct/hood Fabrication Job Description: • Clearing site and preparation for Fabrication. • Shifting the material from stores, to and from shifting to blasting yard, cutting to size, Leak-proof welding. • Complete fabrication as per the drawing. • Visual preparation, by finishing, grinding extra material, Dimensional inspection and report preparation. • Visual inspection, Dimensional Inspection and Inspection report signup of the material to be done before final shifting to sand Blasting yard <(>&<)> from sand blasting yard to site/temporary storage area. • Shifting material from temporary storage area to erection site. Scope: • AMNS will provide material required for the fabrication like plate, sheet. • Duct Rolling/forming/shaping machine required is in the scope of contractor. • Welding machine, cutting set, all tools tackles, jigs and fixtures, Pressure testing equipment, measurement equipment will be in the scope of contractor. • All consumables like but not limited to welding rod, Gas for cutting grinding wheel will be in the scope of contractor. • Contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by AMNS) required for the job. • Use e-7018 welding electrodes for all welding jobs. • Dimensional tolerances (including bending, twisting, skewing, wave tolerances) of more than ±2 mm are not allowed for duct fabrication. • Duct and hood fabrication to be done as per the drawings and requirement of the AM/NS site-in-charge. Scope of work for duct erection <(>&<)> connection with existing system. Job description: • Clearing site and preparation for Erection. • Shifting the material from stores, to and from sand blasting yard, loading, and unloading of the Material, cutting to size, Leak proof welding. • As AM/NS is supplying the fabricated duct portion so there is a hance of mismatch, contractor must consider correcting any mismatch in their scope of work and there will not be any additional claim given. • Complete erection as per the drawing. In-case of any mismatch, correction, during erection the correction/matching will be in the scope of the contractor (No extra claim), Site painting by brush (after welding and grinding of the erected assembly will be done by contractor. • Visual preparation, by finishing, grinding extra material, Dimensional inspection, and report preparation. • Visual inspection, Dimensional Inspection and Erection Inspection report sign-up • Shifting the final product remains to Stores or location as per the requirement. Scope: • Welding machine, cutting set, all tools’ tackles, jigs and fixtures, Pressure testing equipment, measurement equipment will be in the scope of contractor. Page 2 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000117825 Date 31.07.2024 Submission Date 08.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details • All consumables like but not limited to welding rod, Gas for cutting grinding wheel will be in the scope of contractor. • Contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by AMNS) required for the job. • Blind fabrication and erection as per drawing/sketch wherever required is in the scope of the contractor. • Old damper internal butterfly-flaps dismantling in the existing duct is in the scope of the contractor. • Leak proof welding to be done. • Connection of erected ducts with the existing system through proper fitting is in the scope of contractor. • Use e-7018 welding electrodes for all welding jobs. Scope of work for Structure/Truss Erection Job Description: • Clearing site and preparation for Erection. • Shifting the material from stores, to and from sand blasting yard, loading and unloading of the Material, cutting to size, Edge pr eparation, Leak proof welding. • Complete erection as per the drawing. In-case of any mismatch, correction, during erection the correction/matching will be in the scope of the contractor, Site painting by brush (after welding and grinding of the erected assembly will be done by contractor. • Visual preparation, by finishing, grinding extra material, Dimensional inspection, and report preparation. • Proper leveling <(>&<)> alignment to be done. 5 mm level, 1mm horizontal <(>&<)> lateral alignment. • Visual inspection, Dimensional Inspection and Erection Inspection report sign-up • Shifting the final product remains to Stores or location as per the requirement. Scope: • Welding machine, cutting set, all tools tackles, jigs and fixtures, Pressure testing equipment, measurement equipment will be in the scope of contractor. • All consumables like but not limited to welding rod, Gas for cutting grinding wheel will be in the scope of contractor. • Contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by AMNS) required for the job. • Use e-7018 welding electrodes for all welding jobs. Scope of work for Bucket Elevators Fabrication Job Description: • Clearing site and preparation for Fabrication. • Shifting the material from stores, to and fro shifting to blasting yard, cutting to size, Leak-proof welding. • Complete fabrication as per the drawing. • Visual preparation, by finishing, grinding extra material, Dimensional inspection and report preparation. • Visual inspection, Dimensional Inspection and Inspection report signup of the material to be done before final shifting to sand Blasting yard <(>&<)> from sand blasting yard to site/temporary storage area. • Shifting material from temporary storage area to erection site. Scope: • AMNS will provide material required for the fabrication like plate, sheet. • Bending of the plates for troughs fabrication is in the scope of contractor. • Bending machine required for fabrication is in the scope of contractor. • Welding machine, cutting set, all tools tackles, jigs and fixtures, Pressure testing equipment, measurement equipment will be in the scope of contractor. • All consumables like but not limited to welding rod, Gas for cutting grinding wheel will be in the scope of contractor. Page 3 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000117825 Date 31.07.2024 Submission Date 08.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details • Contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by AMNS) required for the job. • Use e-7018 welding electrodes for all welding jobs. • Hole drilling to be done as per the drawing. • Dimensional tolerances (including bending, twisting, skewing, wave tolerances) of more than ±2 mm are not allowed for elevators fa brication. Scope of work for Erection of Conveyor Chain, Bucket Elevator, Chain <(>&<)> Bucket for Bucket Elevator. Job description: • Clearing site and preparation for Erection. • Shifting the material from stores, to and from sand blasting yard, loading, and unloading of the Material, cutting to size, Edge p reparation, Leak proof welding. • Complete erection as per the drawing. In-case of any mismatch, correction, during erection the correction/matching will be in the scope of the contractor, Site painting by brush (after welding and grinding of the erected assembly will be done by contractor. • Visual preparation, by finishing, grinding extra material, Dimensional inspection and report preparation. • Proper leveling <(>&<)> alignment to be done. 5 mm level, 1mm horizontal <(>&<)> lateral alignment. • Visual inspection, Dimensional Inspection and Erection Inspection report sign-up. • Shifting the final product remains to Stores or location as per the requirement. Scope: • Welding machine, cutting set, all tools tackles, jigs and fixtures, Pressure testing equipment, measurement equipment will be in the scope of contractor. • All consumables like but not limited to welding rod, Gas for cutting grinding wheel will be in the scope of contractor. • Contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by AMNS) required for the job. • Use e-7018 welding electrodes for all welding jobs. • Conveyor Chain to be inserted / erected as per the requirement on conveyors. • Erection of Bucket elevator as per the drawing to be done. • Buckets to be fitted as per the requirement on the elevator chain. • Bucket elevator chain erection to be done as per the requirement. Interconnecting Chute (Connection from bucket elevator to top common conveyor and elevtor to bottom common conveyor) fabrication and erection. Scope of work for Sandblasting <(>&<)> Painting • Clearing site and preparation for Sandblasting and Painting. • Shifting the material from stores, to and from sand blasting yard, loading and unloading of the Material. • Complete Sandblasting and Painting as per the specifications. After sandblasting one coat of primer <(>&<)> 2 coats of paint to be applied. • Inspection will be done and certification of the proper sandblasting to be signed by AMNS. Painting /Primer Application shall be only started after the Sand Blasting Certification signed by AMNS. • Inspection will be done and certification of the proper Painting/ Primer Application to be signed by AMNS. Painting /Shifting the material shall be only started after the Sand Blasting Certification signed by AMNS. • Shifting the final product /paint remains to Stores or location as per the requirement. • AMNS will provide required amount of Paint, Thinner, Primer. • All Equipment like Compressor, painting gun, Hoses and Sand Blasting equipment, all tools-tackle for lifting and shifting, Packing, Support, jigs and fixtures, measurement equipment will be in the scope of contractor. Page 4 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000117825 Date 31.07.2024 Submission Date 08.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details • All consumables like but not limited to Copper slag, Diesel, oil or anything other than (Paint, Thinner or Primer) will be in the scope of contractor. • Contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by AMNS) required for the job. Scope of work for Scaffolding Services • Clearing site and preparation for scaffolding. And handing over site after removal of the scaffolding completely clean. • Shifting the material from stores, loading and unloading of the Material. • Complete scaffolding as per the AMNS instruction manual and will be considered complete after certification from the scaffolding c ertification engineer. • Both side open margin of 150mm will be maintained on all pipes. • Contractor should strictly adhere to the scaffolding standard laid by AM/NS India. • Contractor shall provide pipes and clamps, safety net, rope, aluminum ladders and all material required for making scaffolding. • Scaffolding will be dismantled only after preparation of the erection certification report nd approval from site in-charge. Special Scope of Work for Contractor (Applicable for all Jobs) • AM/NS India will provide plate/sheet, rolled section, Corrugated sheets, Fasteners required for fabrication <(>&<)> Erection of various items. • Primer, Paint <(>&<)> Thinners will be supplied by AM/NS India. • All types of Cranes, Hydra, Trailer, Man-lifter, JCB, Loader (Lifting <(>&<)> Shifting equipment) are in contractor’s scope and aging of the equipment must adhere AM/NS safety guidelines. • All equipment deployed must in be new condition and strictly adhere to guidelines suggested by AM/NS India. Farana F-15 or higher version of hydra must be deployed. • Services required to execute and complete the job in all respect such as but not limited to scaffolding, blasting and painting lifting and shifting, site preparation, mob-demob etc. are in the scope of the contractor, no separate PO line item is generated. Contractor cannot demand any specific additional cost. The cost should include such jobs required to complete the job in all respect. • Bending, rolling, shaping, forming, drilling of plates/sheet for fabrication of various equipment or duct in in the scope of contractor and machines required for bending, rolling, shaping, forming, drilling is also in the scope of contractor. • Scaffolding services/safety net are in contractor’s scope. • Sand blasting <(>&<)> painting is in contractor’s scope. • Alignment <(>&<)> leveling is in contractor’s scope. • Tolerances of more than ±5 mm for level <(>&<)> ±1mm for horizontal <(>&<)> lateral alignment are not allowed. • Material Lifting and Shifting is in contractor’s scope. • Assistance during commissioning is in contractor’s scope. • Final site painting is in contractor’s scope. • Fabrication <(>&<)> erection of platform and access to platform as per the drawing is in contractor’s scope. • Re-welding of weld joints to be done if required after inspection. • Job quantity will be decided by the department/site in charge. • Contractor shall furnish details of subcontractors hired for fabrication, erection, laser cutting, and other manufacturing processes. • Contractor shall furnish details of vendors from which the equipment (crane, trailer etc.) is hired for various job. • Contractor should provide equipment deployment schedule. • Contractor should deploy required amount of skilled manpower to finish the job within the stipulated timeline. Contractor should provide manpower deployment schedule. • Contractor shall complete the job as per the approved specifications, Page 5 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000117825 Date 31.07.2024 Submission Date 08.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details drawings, and as per the direction <(>&<)> satisfaction of AMNS engineer-in-charge. • Contractor shall ensure for housekeeping/cleaning of the area including cleaning /removing the debris/scrap/waste and used material and shifting the same/surplus materials to the location specified or shown by the engineer, area in charge. Bill certification will be only done after complete housekeeping. • Contractor shall ensure safety of his personnel <(>&<)> follow all safety measures prescribed and shall provide for all safety requirements as per the demands of the services rendered at your own cost with all required PPE’s (personal protective equipment). • Contractor shall ensure that all the tools and tackles deployed are certified by competent authority for use in factory. Certificate should be duly valid at all points of time. • HSE requirement - Contractor shall comply with the health, safety and environment policy as laid down by AMNS steel limited. • Penalty will be applicable for violating safety norms as per AMNS policy. • LD will be applicable for not completing the job as per the agreed timeline with Site in-charge. Note 1- The quantities shown in Drawing is for estimation. However, it may increase or decrease depending on the actual requirements. • Billing Strategy – All dimension, level, alignment, inspection etc. reports to be submitted first before raising the measurement sheet. Only Upon the completion of a line item entirely, as per the drawings and satisfaction of site-incharge invoice can be raised.

Tender Notice

44527011

Indian


Gujarat

August 08, 2024

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Tender For Step-6 Balance Mechanical Job 7021427 10 10 10 Duct Erection 60 TO 20 Blind Fab.and Ere. 10 TO 30 Truss Erection 45 TO 40 Bucket Elevator Fab. & Ere. 10 TO 50 Damper Dismatling 3 NO 60 De-slagging sys. duct & hood Fab. 40 TO 70 De-slagging sys. duct & hood Ere. 40 TO 80 Conveyor chain erection 600 M 90 Bucket installation 300 NO 100 elevator chain erection 65 M Email : poojan.patel1@amns.in Contact : Name : Poojan Patel Item Details : Scope of work for Duct/hood Fabrication Job Description: • Clearing site and preparation for Fabrication. • Shifting the material from stores, to and from shifting to blasting yard, cutting to size, Leak-proof welding. • Complete fabrication as per the drawing. • Visual preparation, by finishing, grinding extra material, Dimensional inspection and report preparation. • Visual inspection, Dimensional Inspection and Inspection report signup of the material to be done before final shifting to sand Blasting yard <(>&<)> from sand blasting yard to site/temporary storage area. • Shifting material from temporary storage area to erection site. Scope: • AMNS will provide material required for the fabrication like plate, sheet. • Duct Rolling/forming/shaping machine required is in the scope of contractor. • Welding machine, cutting set, all tools tackles, jigs and fixtures, Pressure testing equipment, measurement equipment will be in the scope of contractor. • All consumables like but not limited to welding rod, Gas for cutting grinding wheel will be in the scope of contractor. • Contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by AMNS) required for the job. • Use e-7018 welding electrodes for all welding jobs. • Dimensional tolerances (including bending, twisting, skewing, wave tolerances) of more than ±2 mm are not allowed for duct fabrication. • Duct and hood fabrication to be done as per the drawings and requirement of the AM/NS site-in-charge. Scope of work for duct erection <(>&<)> connection with existing system. Job description: • Clearing site and preparation for Erection. • Shifting the material from stores, to and from sand blasting yard, loading, and unloading of the Material, cutting to size, Leak proof welding. • As AM/NS is supplying the fabricated duct portion so there is a hance of mismatch, contractor must consider correcting any mismatch in their scope of work and there will not be any additional claim given. • Complete erection as per the drawing. In-case of any mismatch, correction, during erection the correction/matching will be in the scope of the contractor (No extra claim), Site painting by brush (after welding and grinding of the erected assembly will be done by contractor. • Visual preparation, by finishing, grinding extra material, Dimensional inspection, and report preparation. • Visual inspection, Dimensional Inspection and Erection Inspection report sign-up • Shifting the final product remains to Stores or location as per the requirement. Scope: • Welding machine, cutting set, all tools’ tackles, jigs and fixtures, Pressure testing equipment, measurement equipment will be in the scope of contractor. Page 2 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000117825 Date 31.07.2024 Submission Date 08.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details • All consumables like but not limited to welding rod, Gas for cutting grinding wheel will be in the scope of contractor. • Contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by AMNS) required for the job. • Blind fabrication and erection as per drawing/sketch wherever required is in the scope of the contractor. • Old damper internal butterfly-flaps dismantling in the existing duct is in the scope of the contractor. • Leak proof welding to be done. • Connection of erected ducts with the existing system through proper fitting is in the scope of contractor. • Use e-7018 welding electrodes for all welding jobs. Scope of work for Structure/Truss Erection Job Description: • Clearing site and preparation for Erection. • Shifting the material from stores, to and from sand blasting yard, loading and unloading of the Material, cutting to size, Edge pr eparation, Leak proof welding. • Complete erection as per the drawing. In-case of any mismatch, correction, during erection the correction/matching will be in the scope of the contractor, Site painting by brush (after welding and grinding of the erected assembly will be done by contractor. • Visual preparation, by finishing, grinding extra material, Dimensional inspection, and report preparation. • Proper leveling <(>&<)> alignment to be done. 5 mm level, 1mm horizontal <(>&<)> lateral alignment. • Visual inspection, Dimensional Inspection and Erection Inspection report sign-up • Shifting the final product remains to Stores or location as per the requirement. Scope: • Welding machine, cutting set, all tools tackles, jigs and fixtures, Pressure testing equipment, measurement equipment will be in the scope of contractor. • All consumables like but not limited to welding rod, Gas for cutting grinding wheel will be in the scope of contractor. • Contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by AMNS) required for the job. • Use e-7018 welding electrodes for all welding jobs. Scope of work for Bucket Elevators Fabrication Job Description: • Clearing site and preparation for Fabrication. • Shifting the material from stores, to and fro shifting to blasting yard, cutting to size, Leak-proof welding. • Complete fabrication as per the drawing. • Visual preparation, by finishing, grinding extra material, Dimensional inspection and report preparation. • Visual inspection, Dimensional Inspection and Inspection report signup of the material to be done before final shifting to sand Blasting yard <(>&<)> from sand blasting yard to site/temporary storage area. • Shifting material from temporary storage area to erection site. Scope: • AMNS will provide material required for the fabrication like plate, sheet. • Bending of the plates for troughs fabrication is in the scope of contractor. • Bending machine required for fabrication is in the scope of contractor. • Welding machine, cutting set, all tools tackles, jigs and fixtures, Pressure testing equipment, measurement equipment will be in the scope of contractor. • All consumables like but not limited to welding rod, Gas for cutting grinding wheel will be in the scope of contractor. Page 3 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000117825 Date 31.07.2024 Submission Date 08.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details • Contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by AMNS) required for the job. • Use e-7018 welding electrodes for all welding jobs. • Hole drilling to be done as per the drawing. • Dimensional tolerances (including bending, twisting, skewing, wave tolerances) of more than ±2 mm are not allowed for elevators fa brication. Scope of work for Erection of Conveyor Chain, Bucket Elevator, Chain <(>&<)> Bucket for Bucket Elevator. Job description: • Clearing site and preparation for Erection. • Shifting the material from stores, to and from sand blasting yard, loading, and unloading of the Material, cutting to size, Edge p reparation, Leak proof welding. • Complete erection as per the drawing. In-case of any mismatch, correction, during erection the correction/matching will be in the scope of the contractor, Site painting by brush (after welding and grinding of the erected assembly will be done by contractor. • Visual preparation, by finishing, grinding extra material, Dimensional inspection and report preparation. • Proper leveling <(>&<)> alignment to be done. 5 mm level, 1mm horizontal <(>&<)> lateral alignment. • Visual inspection, Dimensional Inspection and Erection Inspection report sign-up. • Shifting the final product remains to Stores or location as per the requirement. Scope: • Welding machine, cutting set, all tools tackles, jigs and fixtures, Pressure testing equipment, measurement equipment will be in the scope of contractor. • All consumables like but not limited to welding rod, Gas for cutting grinding wheel will be in the scope of contractor. • Contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by AMNS) required for the job. • Use e-7018 welding electrodes for all welding jobs. • Conveyor Chain to be inserted / erected as per the requirement on conveyors. • Erection of Bucket elevator as per the drawing to be done. • Buckets to be fitted as per the requirement on the elevator chain. • Bucket elevator chain erection to be done as per the requirement. Interconnecting Chute (Connection from bucket elevator to top common conveyor and elevtor to bottom common conveyor) fabrication and erection. Scope of work for Sandblasting <(>&<)> Painting • Clearing site and preparation for Sandblasting and Painting. • Shifting the material from stores, to and from sand blasting yard, loading and unloading of the Material. • Complete Sandblasting and Painting as per the specifications. After sandblasting one coat of primer <(>&<)> 2 coats of paint to be applied. • Inspection will be done and certification of the proper sandblasting to be signed by AMNS. Painting /Primer Application shall be only started after the Sand Blasting Certification signed by AMNS. • Inspection will be done and certification of the proper Painting/ Primer Application to be signed by AMNS. Painting /Shifting the material shall be only started after the Sand Blasting Certification signed by AMNS. • Shifting the final product /paint remains to Stores or location as per the requirement. • AMNS will provide required amount of Paint, Thinner, Primer. • All Equipment like Compressor, painting gun, Hoses and Sand Blasting equipment, all tools-tackle for lifting and shifting, Packing, Support, jigs and fixtures, measurement equipment will be in the scope of contractor. Page 4 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000117825 Date 31.07.2024 Submission Date 08.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details • All consumables like but not limited to Copper slag, Diesel, oil or anything other than (Paint, Thinner or Primer) will be in the scope of contractor. • Contractor shall provide all services inclusive of all equipment, tools <(>&<)> tackles, consumables (other than those specifically mentioned by AMNS) required for the job. Scope of work for Scaffolding Services • Clearing site and preparation for scaffolding. And handing over site after removal of the scaffolding completely clean. • Shifting the material from stores, loading and unloading of the Material. • Complete scaffolding as per the AMNS instruction manual and will be considered complete after certification from the scaffolding c ertification engineer. • Both side open margin of 150mm will be maintained on all pipes. • Contractor should strictly adhere to the scaffolding standard laid by AM/NS India. • Contractor shall provide pipes and clamps, safety net, rope, aluminum ladders and all material required for making scaffolding. • Scaffolding will be dismantled only after preparation of the erection certification report nd approval from site in-charge. Special Scope of Work for Contractor (Applicable for all Jobs) • AM/NS India will provide plate/sheet, rolled section, Corrugated sheets, Fasteners required for fabrication <(>&<)> Erection of various items. • Primer, Paint <(>&<)> Thinners will be supplied by AM/NS India. • All types of Cranes, Hydra, Trailer, Man-lifter, JCB, Loader (Lifting <(>&<)> Shifting equipment) are in contractor’s scope and aging of the equipment must adhere AM/NS safety guidelines. • All equipment deployed must in be new condition and strictly adhere to guidelines suggested by AM/NS India. Farana F-15 or higher version of hydra must be deployed. • Services required to execute and complete the job in all respect such as but not limited to scaffolding, blasting and painting lifting and shifting, site preparation, mob-demob etc. are in the scope of the contractor, no separate PO line item is generated. Contractor cannot demand any specific additional cost. The cost should include such jobs required to complete the job in all respect. • Bending, rolling, shaping, forming, drilling of plates/sheet for fabrication of various equipment or duct in in the scope of contractor and machines required for bending, rolling, shaping, forming, drilling is also in the scope of contractor. • Scaffolding services/safety net are in contractor’s scope. • Sand blasting <(>&<)> painting is in contractor’s scope. • Alignment <(>&<)> leveling is in contractor’s scope. • Tolerances of more than ±5 mm for level <(>&<)> ±1mm for horizontal <(>&<)> lateral alignment are not allowed. • Material Lifting and Shifting is in contractor’s scope. • Assistance during commissioning is in contractor’s scope. • Final site painting is in contractor’s scope. • Fabrication <(>&<)> erection of platform and access to platform as per the drawing is in contractor’s scope. • Re-welding of weld joints to be done if required after inspection. • Job quantity will be decided by the department/site in charge. • Contractor shall furnish details of subcontractors hired for fabrication, erection, laser cutting, and other manufacturing processes. • Contractor shall furnish details of vendors from which the equipment (crane, trailer etc.) is hired for various job. • Contractor should provide equipment deployment schedule. • Contractor should deploy required amount of skilled manpower to finish the job within the stipulated timeline. Contractor should provide manpower deployment schedule. • Contractor shall complete the job as per the approved specifications, Page 5 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000117825 Date 31.07.2024 Submission Date 08.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Ms. Shashimita Gupta Contact Email SHASHIMITA.GUPTA@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details drawings, and as per the direction <(>&<)> satisfaction of AMNS engineer-in-charge. • Contractor shall ensure for housekeeping/cleaning of the area including cleaning /removing the debris/scrap/waste and used material and shifting the same/surplus materials to the location specified or shown by the engineer, area in charge. Bill certification will be only done after complete housekeeping. • Contractor shall ensure safety of his personnel <(>&<)> follow all safety measures prescribed and shall provide for all safety requirements as per the demands of the services rendered at your own cost with all required PPE’s (personal protective equipment). • Contractor shall ensure that all the tools and tackles deployed are certified by competent authority for use in factory. Certificate should be duly valid at all points of time. • HSE requirement - Contractor shall comply with the health, safety and environment policy as laid down by AMNS steel limited. • Penalty will be applicable for violating safety norms as per AMNS policy. • LD will be applicable for not completing the job as per the agreed timeline with Site in-charge. Note 1- The quantities shown in Drawing is for estimation. However, it may increase or decrease depending on the actual requirements. • Billing Strategy – All dimension, level, alignment, inspection etc. reports to be submitted first before raising the measurement sheet. Only Upon the completion of a line item entirely, as per the drawings and satisfaction of site-incharge invoice can be raised.