Tender For Mod3 Upgradation Mh Works 27020342 10 10 50 SCAFFOLDING WITH MATERIAL ABOVE 20 MTR 2,300 M3 40 BLASTING AND PAINTING 27 TO 10 DISMENTLING OF STRUCTURES 22 TO 30 ERECTION & ALIGNMENT OF STRUCTURES 27 TO 20 FABRICATION OF MS STRUCTURE 27 TO Email : nileshkumar.shah@amns.in Contact : Name : Nilesh Shah Item Details : Scope of Work: Mod3 Dump pipe replacement; platform <(>&<)> Discharge hopper Fabrication ,Erection with its Supporting Structure. Scope of Work - contractor: 1. Dismantling of old Hopper <(>&<)> dump pipes from tail end of 3F1.56 <(>&<)> 3F1.56-1 <(>&<)> its support structure. 2. Fabrication of structure and Hopper including Landing platforms-8 nos, Hoppers, Supporting Structure, Handrail Etc 3. Fabrication of Dump pipe (including transition Duct, Pipe etc) 4. Scaffolding installation for required job as per AMNS standard 5. Erection of all Structure including Landing platforms-8 nos, Hoppers, Supporting Structure, Handrail Etc 6. Erection of Dump pipe (including transition Duct, Pipe etc) 7. Shifting of all scraps to scrap point 8. Manpower for shifting of plates, channels, beams, pipes etc from store/marshaling yard 9. All required tools (Lifting belt, Chain blocks, spanners etc), cutting set, welding machine etc are considered in contractor scope of supply. 10. Sand Blasting <(>&<)> Painting – Primer, intermediate and Finish coat shall be in contractor’s scope. 11. Surface Preparation – Remove all rust and scale by shot blasting. 12. Primer Coat – One coat of epoxy zinc rich primer. Average DFT value35-40 microns. First primer coat should apply within 4-6 hours after shot blasting. 13. Intermediate coat – One coat of epoxy coating re-inforced with MIO. Average DFT value 80-100 microns. 14. Finish Coat – Two coats of epoxy finish paint compatible to the primer and intermediate coat. Average DFT value 30-40 microns. 15. The all three type of paint should be from the same vendor. Total thickness of paint should be minimum 220 microns. 16. Paint <(>&<)> necessary consumables are in contractor scope. 17. All tools <(>&<)> consumables for painting work are considered in contractor scope of supply. 18. Deputation of Skilled manpower with Supervisor <(>&<)> Safety supervisor HSE Instruction for contractor: 1. All necessary PPE for contractor’s manpower (including Safety Helmet, Safety Shoes, Safety Glasses, Boiler suit, Dusk Mask, Ear plugs etc) are under contractor scope. 2. Medical test, Workman Policy/Insurance for contractors manpower are under contractor scope. 3. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 4. Vendor must ensure availability of sufficient buses/vehicles to for transportation of their associates inside plant premises. 5. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. 6. Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Page 2 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118367 Date 07.08.2024 Submission Date 14.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Roopesh Kumar Contact Email ROOPESH.KUMAR@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. 7. Required competent manpower with height pass (approved by AMNS) to be arranged by contractor whenever work at height is to be performed. 8. Contractor shall start the work only after proper risk assessment is done, implement all safety requirement mentioned risk assessment and work permit is given 9. Contractor must follow AMNS work permit procedure. 10. Contractor shall depute supervisor who is at least having 1 year industrial experience and be able to pass test for permit holder at site. 11. Contractor Supervisor (who will be Permit holder) must be at site during job execution 12. Contractor shall use only third party certified lifting tools like lifting belts, chain block, slings, wire rope etc. AMNS Scope of work 1. Crane, Hydra, manlifter etc required for dismantling, shifting, Fabrication and erection will be in contractor’s scope 2. Required structure items (Beams, Plates, Channel, Angles, pipes etc) will be provided by AMNS 3. Required shutdown will be arranged by AMNS Item Note : 2 27020342 20 20 10 DISMENTLING OF STRUCTURES 5 TO 20 FABRICATION OF MS STRUCTURE 5 TO 30 ERECTION & ALIGNMENT OF STRUCTURES 5 TO 40 BLASTING AND PAINTING 5 TO Email : nileshkumar.shah@amns.in Contact : Name : Nilesh Shah Item Details : Scope of Work - contractor: 1. Conveyor 3F3.01 to be lifted by 200~400 mm as per suit at site condition 2. Cutting of old short post, fabrication and erection of short post to match lifted conveyor profile. 3. Modification of stingers to match conveyor new profile 4. Lifting of tail pulley to match new profile of conveyor. 5. Modification of receiving chute and its skirting arrangement 6. Removal of hoods in modified conveyor area 7. Fabrication and installation of pulley guards 8. Shifting of all material to work site will be in contractor scope. 9. Shifting of all scraps to scrap point 10. Manpower for shifting of plates, channels, beams, pipes etc from store/marshaling yard 11. All required tools (Lifting belt, Chain blocks, spanners etc), cutting set, welding machine etc are considered in contractor scope of supply. 12. Sand Blasting <(>&<)> Painting – Primer, intermediate and Finish coat shall be in contractor’s scope. 13. Surface Preparation – Remove all rust and scale by shot blasting. 14. Primer Coat – One coat of epoxy zinc rich primer. Average DFT value35-40 microns. First primer coat should apply within 4-6 hours after shot blasting. 15. Intermediate coat – One coat of epoxy coating re-inforced with MIO. Average DFT value 80-100 microns. 16. Finish Coat – Two coats of epoxy finish paint compatible to the primer and intermediate coat. Average DFT value 30-40 microns. 17. The all three type of paint should be from the same vendor. Total thickness of paint should be minimum 220 microns. 18. Paint <(>&<)> necessary consumables are in contractor scope. 19. All tools <(>&<)> consumables for painting work are considered in contractor scope of supply. 20. Deputation of Skilled manpower with Supervisor <(>&<)> Safety supervisor HSE Instruction for contractor: 1. All necessary PPE for contractor’s manpower (including Safety Helmet, Safety Shoes, Safety Glasses, Boiler suit, Dusk Mask, Ear plugs etc) are under contractor scope. Page 3 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118367 Date 07.08.2024 Submission Date 14.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Roopesh Kumar Contact Email ROOPESH.KUMAR@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 2. Medical test, Workman Policy/Insurance for contractors manpower are under contractor scope. 3. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 4. Vendor must ensure availability of sufficient buses/vehicles to for transportation of their associates inside plant premises. 5. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. 6. Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. 7. Required competent manpower with height pass (approved by AMNS) to be arranged by contractor whenever work at height is to be performed. 8. Contractor shall start the work only after proper risk assessment is done, implement all safety requirement mentioned risk assessment and work permit is given 9. Contractor must follow AMNS work permit procedure. 10. Contractor shall depute supervisor who is at least having 1 year industrial experience and be able to pass test for permit holder at site. 11. Contractor Supervisor (who will be Permit holder) must be at site during job execution 12. Contractor shall use only third party certified lifting tools like lifting belts, chain block, slings, wire rope etc. AMNS Scope of work 1. Crane, Hydra, manlifter etc required for dismantling, shifting, Fabrication and erection will be in contractor’s scope 2. Required structure items (Beams, Plates, Channel, Angles, pipes etc) will be provided by AMNS 3. Required shutdown will be arranged by AMNS Item Note : 3 27020342 40 30 20 FABRICATION OF MS STRUCTURE 15 TO 10 DISMENTLING OF STRUCTURES 8 TO 40 BLASTING AND PAINTING 8 TO 30 ERECTION & ALIGNMENT OF STRUCTURES 15 TO Email : nileshkumar.shah@amns.in Contact : Name : Nilesh Shah Item Details : Contractor’s Scope of Work 1. Replacement of various Chutes in Mod-3 conveyor. 2. Fabrication <(>&<)> erection of required Chutes as per suit at site 3. Shifting of all material to work site will be in contractor scope. 4. Shifting of all scrap material to scrap point will be in contractor scope. 5. All required tools <(>&<)> consumables (Lifting belt, Chain blocks, spanners, cutting set, welding machine, or any other tools required for fabrication <(>&<)> erection) are considered in contractor scope of supply 6. Sand Blasting <(>&<)> Painting – Primer, intermediate and Finish coat shall be in contractor’s scope. 7. Surface Preparation – Remove all rust and scale by shot blasting 8. Primer Coat – One coat of epoxy zinc rich primer. Average DFT value35-40 microns. First primer coat should apply within 4-6 hours after shot blasting. 9. Intermediate coat – One coat of epoxy coating re-inforced with MIO. Average DFT value 80-100 microns. 10. Finish Coat – Two coats of epoxy finish paint compatible to the primer and intermediate coat. Average DFT value 30-40 microns. 11. The all three type of paint should be from the same vendor. Total thickness of paint should be minimum 220 microns. 12. Paint <(>&<)> necessary consumables are in contractor scope. 13. All tools <(>&<)> consumables for painting work are considered in contractor scope of supply. 14. Deputation of Skilled manpower with Supervisor <(>&<)> Safety supervisor HSE Instruction for contractor: Page 4 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118367 Date 07.08.2024 Submission Date 14.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Roopesh Kumar Contact Email ROOPESH.KUMAR@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 1. All necessary PPE (including Safety Helmet, Safety Shoes, Safety Glasses, Boiler suit, Dusk Mask, Ear plugs etc) are under contractor scope. 2. Medical test, Workman Policy/Insurance for contractors manpower are under contractor scope. 3. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 4. Vendor must ensure availability of sufficient buses/vehicles to for transportation of their associates inside plant premises. 5. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. 6. Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. 7. Required competent manpower with height pass (approved by AMNS) to be arranged by contractor whenever work at height is to be performed. 8. Contractor shall start the work only after proper risk assessment is done and work permit is given 9. Contractor must follow AMNS work permit procedure. 10. Contractor shall depute supervisor who is at least having 1 year industrial experience and be able to pass test for permit holder at site. 11. Contractor Supervisor (who will be Permit holder) must be at site during job execution 12. Contractor shall use only third party certified lifting tools like lifting belts, chain block, slings, wire rope etc. AMNS Scope of work 1. Crane, Hydra, manlifter etc required for dismantling, shifting, Fabrication and erection will be in contractor’s scope 2. Required structure items (Beams, Plates, Channel, Angles, pipes etc) will be provided by AMNS 3. Required shutdown will be arranged by AMNS Item Note : 4 27020342 50 40 10 DISMENTLING OF STRUCTURES 5 TO 30 ERECTION & ALIGNMENT OF STRUCTURES 5 TO 40 BLASTING AND PAINTING 5 TO 20 FABRICATION OF MS STRUCTURE 5 TO Email : nileshkumar.shah@amns.in Contact : Name : Nilesh Shah Item Details : Scope of Work - contractor: 1. Replacement of various Platforms, support beams, Chequered plates, gratings, Staircase. 2. Fabrication <(>&<)> erection of required Platforms, support beams, Chequered plates, gratings, Staircase as per suit at site 3. Re-Installation of removed old (not damaged) Platforms, support beams, Chequered plates, gratings, Staircase. 4. Shifting of all material to work site will be in contractor scope. 5. Shifting of all scraps to scrap point. 6. Manpower for shifting of plates, channels, beams, pipes etc from store/marshalling yard. 7. All required tools (Lifting belt, Chain blocks, spanners etc), cutting set, welding machine etc are considered in contractor scope of supply. 8. Sand Blasting <(>&<)> Painting – Primer, intermediate and Finish coat shall be in contractor’s scope. 9. Surface Preparation – Remove all rust and scale by shot blasting. 10. Primer Coat – One coat of epoxy zinc rich primer. Average DFT value35-40 microns. First primer coat should apply within 4-6 hours after shot blasting. 11. Intermediate coat – One coat of epoxy coating re-enforced with MIO. Average DFT value 80-100 microns. 12. Finish Coat – Two coats of epoxy finish paint compatible to the primer and intermediate coat. Average DFT value 30-40 microns. 13. The all three types of paint should be from the same vendor. Total thickness of paint should be minimum 220 microns. 14. Paint <(>&<)> necessary consumables are in contractor scope. Page 5 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118367 Date 07.08.2024 Submission Date 14.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Roopesh Kumar Contact Email ROOPESH.KUMAR@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 15. All tools <(>&<)> consumables for painting work are considered in contractor scope of supply. 16. Deputation of Skilled manpower with Supervisor <(>&<)> Safety supervisor HSE Instruction for contractor: a. All necessary PPE for contractor’s manpower (including Safety Helmet, Safety Shoes, Safety Glasses, Boiler suit, Dusk Mask, Ear plugs etc) are under contractor scope. b. Medical test, Workman Policy/Insurance for contractors’ manpower are under contractor scope. c. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. d. Vendor must ensure availability of sufficient buses/vehicles to for transportation of their associates inside plant premises. e. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. f. Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. g. Required competent manpower with height pass (approved by AMNS) to be arranged by contractor whenever work at height is to be performed. h. Contractor shall start the work only after proper risk assessment is done, implement all safety requirement mentioned risk assessment and work permit is given. i. Contractor must follow AMNS work permit procedure. j. Contractor shall depute supervisor who is at least having 1-year industrial experience and be able to pass test for permit holder at site. k. Contractor Supervisor (who will be Permit holder) must be at site during job execution. l. Contractor shall use only third party certified lifting tools like lifting belts, chain block, slings, wire rope etc. AMNS Scope of work 1. Crane, Hydra, man lifter etc required for dismantling, shifting, Fabrication and erection will be in contractor’s scope. 2. Required structure items (Beams, Plates, Channel, Angles, pipes etc) will be provided by AMNS. 3. Required shutdown will be arranged by AMNS.

Tender Notice

44646679

Indian


Gujarat

August 14, 2024

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Tender For Mod3 Upgradation Mh Works 27020342 10 10 50 SCAFFOLDING WITH MATERIAL ABOVE 20 MTR 2,300 M3 40 BLASTING AND PAINTING 27 TO 10 DISMENTLING OF STRUCTURES 22 TO 30 ERECTION & ALIGNMENT OF STRUCTURES 27 TO 20 FABRICATION OF MS STRUCTURE 27 TO Email : nileshkumar.shah@amns.in Contact : Name : Nilesh Shah Item Details : Scope of Work: Mod3 Dump pipe replacement; platform <(>&<)> Discharge hopper Fabrication ,Erection with its Supporting Structure. Scope of Work - contractor: 1. Dismantling of old Hopper <(>&<)> dump pipes from tail end of 3F1.56 <(>&<)> 3F1.56-1 <(>&<)> its support structure. 2. Fabrication of structure and Hopper including Landing platforms-8 nos, Hoppers, Supporting Structure, Handrail Etc 3. Fabrication of Dump pipe (including transition Duct, Pipe etc) 4. Scaffolding installation for required job as per AMNS standard 5. Erection of all Structure including Landing platforms-8 nos, Hoppers, Supporting Structure, Handrail Etc 6. Erection of Dump pipe (including transition Duct, Pipe etc) 7. Shifting of all scraps to scrap point 8. Manpower for shifting of plates, channels, beams, pipes etc from store/marshaling yard 9. All required tools (Lifting belt, Chain blocks, spanners etc), cutting set, welding machine etc are considered in contractor scope of supply. 10. Sand Blasting <(>&<)> Painting – Primer, intermediate and Finish coat shall be in contractor’s scope. 11. Surface Preparation – Remove all rust and scale by shot blasting. 12. Primer Coat – One coat of epoxy zinc rich primer. Average DFT value35-40 microns. First primer coat should apply within 4-6 hours after shot blasting. 13. Intermediate coat – One coat of epoxy coating re-inforced with MIO. Average DFT value 80-100 microns. 14. Finish Coat – Two coats of epoxy finish paint compatible to the primer and intermediate coat. Average DFT value 30-40 microns. 15. The all three type of paint should be from the same vendor. Total thickness of paint should be minimum 220 microns. 16. Paint <(>&<)> necessary consumables are in contractor scope. 17. All tools <(>&<)> consumables for painting work are considered in contractor scope of supply. 18. Deputation of Skilled manpower with Supervisor <(>&<)> Safety supervisor HSE Instruction for contractor: 1. All necessary PPE for contractor’s manpower (including Safety Helmet, Safety Shoes, Safety Glasses, Boiler suit, Dusk Mask, Ear plugs etc) are under contractor scope. 2. Medical test, Workman Policy/Insurance for contractors manpower are under contractor scope. 3. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 4. Vendor must ensure availability of sufficient buses/vehicles to for transportation of their associates inside plant premises. 5. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. 6. Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Page 2 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118367 Date 07.08.2024 Submission Date 14.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Roopesh Kumar Contact Email ROOPESH.KUMAR@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. 7. Required competent manpower with height pass (approved by AMNS) to be arranged by contractor whenever work at height is to be performed. 8. Contractor shall start the work only after proper risk assessment is done, implement all safety requirement mentioned risk assessment and work permit is given 9. Contractor must follow AMNS work permit procedure. 10. Contractor shall depute supervisor who is at least having 1 year industrial experience and be able to pass test for permit holder at site. 11. Contractor Supervisor (who will be Permit holder) must be at site during job execution 12. Contractor shall use only third party certified lifting tools like lifting belts, chain block, slings, wire rope etc. AMNS Scope of work 1. Crane, Hydra, manlifter etc required for dismantling, shifting, Fabrication and erection will be in contractor’s scope 2. Required structure items (Beams, Plates, Channel, Angles, pipes etc) will be provided by AMNS 3. Required shutdown will be arranged by AMNS Item Note : 2 27020342 20 20 10 DISMENTLING OF STRUCTURES 5 TO 20 FABRICATION OF MS STRUCTURE 5 TO 30 ERECTION & ALIGNMENT OF STRUCTURES 5 TO 40 BLASTING AND PAINTING 5 TO Email : nileshkumar.shah@amns.in Contact : Name : Nilesh Shah Item Details : Scope of Work - contractor: 1. Conveyor 3F3.01 to be lifted by 200~400 mm as per suit at site condition 2. Cutting of old short post, fabrication and erection of short post to match lifted conveyor profile. 3. Modification of stingers to match conveyor new profile 4. Lifting of tail pulley to match new profile of conveyor. 5. Modification of receiving chute and its skirting arrangement 6. Removal of hoods in modified conveyor area 7. Fabrication and installation of pulley guards 8. Shifting of all material to work site will be in contractor scope. 9. Shifting of all scraps to scrap point 10. Manpower for shifting of plates, channels, beams, pipes etc from store/marshaling yard 11. All required tools (Lifting belt, Chain blocks, spanners etc), cutting set, welding machine etc are considered in contractor scope of supply. 12. Sand Blasting <(>&<)> Painting – Primer, intermediate and Finish coat shall be in contractor’s scope. 13. Surface Preparation – Remove all rust and scale by shot blasting. 14. Primer Coat – One coat of epoxy zinc rich primer. Average DFT value35-40 microns. First primer coat should apply within 4-6 hours after shot blasting. 15. Intermediate coat – One coat of epoxy coating re-inforced with MIO. Average DFT value 80-100 microns. 16. Finish Coat – Two coats of epoxy finish paint compatible to the primer and intermediate coat. Average DFT value 30-40 microns. 17. The all three type of paint should be from the same vendor. Total thickness of paint should be minimum 220 microns. 18. Paint <(>&<)> necessary consumables are in contractor scope. 19. All tools <(>&<)> consumables for painting work are considered in contractor scope of supply. 20. Deputation of Skilled manpower with Supervisor <(>&<)> Safety supervisor HSE Instruction for contractor: 1. All necessary PPE for contractor’s manpower (including Safety Helmet, Safety Shoes, Safety Glasses, Boiler suit, Dusk Mask, Ear plugs etc) are under contractor scope. Page 3 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118367 Date 07.08.2024 Submission Date 14.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Roopesh Kumar Contact Email ROOPESH.KUMAR@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 2. Medical test, Workman Policy/Insurance for contractors manpower are under contractor scope. 3. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 4. Vendor must ensure availability of sufficient buses/vehicles to for transportation of their associates inside plant premises. 5. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. 6. Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. 7. Required competent manpower with height pass (approved by AMNS) to be arranged by contractor whenever work at height is to be performed. 8. Contractor shall start the work only after proper risk assessment is done, implement all safety requirement mentioned risk assessment and work permit is given 9. Contractor must follow AMNS work permit procedure. 10. Contractor shall depute supervisor who is at least having 1 year industrial experience and be able to pass test for permit holder at site. 11. Contractor Supervisor (who will be Permit holder) must be at site during job execution 12. Contractor shall use only third party certified lifting tools like lifting belts, chain block, slings, wire rope etc. AMNS Scope of work 1. Crane, Hydra, manlifter etc required for dismantling, shifting, Fabrication and erection will be in contractor’s scope 2. Required structure items (Beams, Plates, Channel, Angles, pipes etc) will be provided by AMNS 3. Required shutdown will be arranged by AMNS Item Note : 3 27020342 40 30 20 FABRICATION OF MS STRUCTURE 15 TO 10 DISMENTLING OF STRUCTURES 8 TO 40 BLASTING AND PAINTING 8 TO 30 ERECTION & ALIGNMENT OF STRUCTURES 15 TO Email : nileshkumar.shah@amns.in Contact : Name : Nilesh Shah Item Details : Contractor’s Scope of Work 1. Replacement of various Chutes in Mod-3 conveyor. 2. Fabrication <(>&<)> erection of required Chutes as per suit at site 3. Shifting of all material to work site will be in contractor scope. 4. Shifting of all scrap material to scrap point will be in contractor scope. 5. All required tools <(>&<)> consumables (Lifting belt, Chain blocks, spanners, cutting set, welding machine, or any other tools required for fabrication <(>&<)> erection) are considered in contractor scope of supply 6. Sand Blasting <(>&<)> Painting – Primer, intermediate and Finish coat shall be in contractor’s scope. 7. Surface Preparation – Remove all rust and scale by shot blasting 8. Primer Coat – One coat of epoxy zinc rich primer. Average DFT value35-40 microns. First primer coat should apply within 4-6 hours after shot blasting. 9. Intermediate coat – One coat of epoxy coating re-inforced with MIO. Average DFT value 80-100 microns. 10. Finish Coat – Two coats of epoxy finish paint compatible to the primer and intermediate coat. Average DFT value 30-40 microns. 11. The all three type of paint should be from the same vendor. Total thickness of paint should be minimum 220 microns. 12. Paint <(>&<)> necessary consumables are in contractor scope. 13. All tools <(>&<)> consumables for painting work are considered in contractor scope of supply. 14. Deputation of Skilled manpower with Supervisor <(>&<)> Safety supervisor HSE Instruction for contractor: Page 4 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118367 Date 07.08.2024 Submission Date 14.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Roopesh Kumar Contact Email ROOPESH.KUMAR@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 1. All necessary PPE (including Safety Helmet, Safety Shoes, Safety Glasses, Boiler suit, Dusk Mask, Ear plugs etc) are under contractor scope. 2. Medical test, Workman Policy/Insurance for contractors manpower are under contractor scope. 3. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 4. Vendor must ensure availability of sufficient buses/vehicles to for transportation of their associates inside plant premises. 5. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. 6. Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. 7. Required competent manpower with height pass (approved by AMNS) to be arranged by contractor whenever work at height is to be performed. 8. Contractor shall start the work only after proper risk assessment is done and work permit is given 9. Contractor must follow AMNS work permit procedure. 10. Contractor shall depute supervisor who is at least having 1 year industrial experience and be able to pass test for permit holder at site. 11. Contractor Supervisor (who will be Permit holder) must be at site during job execution 12. Contractor shall use only third party certified lifting tools like lifting belts, chain block, slings, wire rope etc. AMNS Scope of work 1. Crane, Hydra, manlifter etc required for dismantling, shifting, Fabrication and erection will be in contractor’s scope 2. Required structure items (Beams, Plates, Channel, Angles, pipes etc) will be provided by AMNS 3. Required shutdown will be arranged by AMNS Item Note : 4 27020342 50 40 10 DISMENTLING OF STRUCTURES 5 TO 30 ERECTION & ALIGNMENT OF STRUCTURES 5 TO 40 BLASTING AND PAINTING 5 TO 20 FABRICATION OF MS STRUCTURE 5 TO Email : nileshkumar.shah@amns.in Contact : Name : Nilesh Shah Item Details : Scope of Work - contractor: 1. Replacement of various Platforms, support beams, Chequered plates, gratings, Staircase. 2. Fabrication <(>&<)> erection of required Platforms, support beams, Chequered plates, gratings, Staircase as per suit at site 3. Re-Installation of removed old (not damaged) Platforms, support beams, Chequered plates, gratings, Staircase. 4. Shifting of all material to work site will be in contractor scope. 5. Shifting of all scraps to scrap point. 6. Manpower for shifting of plates, channels, beams, pipes etc from store/marshalling yard. 7. All required tools (Lifting belt, Chain blocks, spanners etc), cutting set, welding machine etc are considered in contractor scope of supply. 8. Sand Blasting <(>&<)> Painting – Primer, intermediate and Finish coat shall be in contractor’s scope. 9. Surface Preparation – Remove all rust and scale by shot blasting. 10. Primer Coat – One coat of epoxy zinc rich primer. Average DFT value35-40 microns. First primer coat should apply within 4-6 hours after shot blasting. 11. Intermediate coat – One coat of epoxy coating re-enforced with MIO. Average DFT value 80-100 microns. 12. Finish Coat – Two coats of epoxy finish paint compatible to the primer and intermediate coat. Average DFT value 30-40 microns. 13. The all three types of paint should be from the same vendor. Total thickness of paint should be minimum 220 microns. 14. Paint <(>&<)> necessary consumables are in contractor scope. Page 5 of 5 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000118367 Date 07.08.2024 Submission Date 14.08.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ Mr. Roopesh Kumar Contact Email ROOPESH.KUMAR@AMNS.IN MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 15. All tools <(>&<)> consumables for painting work are considered in contractor scope of supply. 16. Deputation of Skilled manpower with Supervisor <(>&<)> Safety supervisor HSE Instruction for contractor: a. All necessary PPE for contractor’s manpower (including Safety Helmet, Safety Shoes, Safety Glasses, Boiler suit, Dusk Mask, Ear plugs etc) are under contractor scope. b. Medical test, Workman Policy/Insurance for contractors’ manpower are under contractor scope. c. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. d. Vendor must ensure availability of sufficient buses/vehicles to for transportation of their associates inside plant premises. e. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. f. Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. g. Required competent manpower with height pass (approved by AMNS) to be arranged by contractor whenever work at height is to be performed. h. Contractor shall start the work only after proper risk assessment is done, implement all safety requirement mentioned risk assessment and work permit is given. i. Contractor must follow AMNS work permit procedure. j. Contractor shall depute supervisor who is at least having 1-year industrial experience and be able to pass test for permit holder at site. k. Contractor Supervisor (who will be Permit holder) must be at site during job execution. l. Contractor shall use only third party certified lifting tools like lifting belts, chain block, slings, wire rope etc. AMNS Scope of work 1. Crane, Hydra, man lifter etc required for dismantling, shifting, Fabrication and erection will be in contractor’s scope. 2. Required structure items (Beams, Plates, Channel, Angles, pipes etc) will be provided by AMNS. 3. Required shutdown will be arranged by AMNS.