Tender For Supply Of Item 2000157549 10 10 10 SHIFTING, FAB AND EREC OF CHEQURED PLATE 50 TO 20 DISMANTLING & REMOVAL OF PLANT STRUCTURE 50 TO Email : AMAR@myamns.in Contact : Name : AMAR Item Details : VENDOR SCOPE: 1. Vendor will shift the material from yard to Site Location. (intimate one day before for hydra requirement) 2. Damaged Checker plate removal and new checker plate fixing as per existing floor. 3. Damaged checker plates will be cut into small sizes (below 1000*1000) shifted /Loaded in Damper for scrap. 4. After Getting the Order the vendor must complete the job as per AMNS timeline. 5. Vendor will remove the checker plate on phase manner with proper guarding as per AMNS guideline. 6. New Chequered plate will be fixed with Stiffener in bottom side and full welded. 7. Vendor will fix the net in bottom for safety measure. 8. In case of any problem in support structure, it will be rectified / replaced. 9. Toe Guard and handrailing removed during chequered plate removal will be re-fixed as per AMNS guideline. 10. All Workman ship will carry work at Height Pass. 11. Vendor will fix the lifeline 12. ALL PPE, consumables like gases, wire brush, grinding wheels, gas cutting nozzles are contractor 13. All tool and tackles are contractor scope. 14. Welding machine, grinding m/c, chain block and gas cutting are contractor scope. 15. PPEs including COVID 19 PPEs (face shield, goggles, nose mask, hand gloves, sanitizer) to be provided to associates. 16. All hospitality (breakfast, tea, lunch, snacks, dinner, and individual soap) is under vendor scope. 17. Full body medical check-up (valid for six months) is under vendor scope. 18. Full body safety harness with double harness must be used. 19. COVID -19 test to be done as per AM/NS instruction. 20. Manpower total transportation is under vendor scope (to be provided at site location as decided by AM/NS Engineer). 21. Vendor will use Safety Net (Metallic) and Lifeline at floor along with floor Guarding during plate replacement time. 22. Vendor will depute a supervisor on continue basis who will be a permit holder as AMNS requirement. 23. As this job is to be done in Plant running then step by step replacement will be done as per AMNS clearance. 24. As Job is to be done during plant running, so Housekeeping of floor must be done on daily basis due to manpower movement and All opening will be properly guarded. (A) SAFETY Movement of Manpower / Associates at our Hazira Site. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. Ø Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Ø Vendors to ensure safe transportation of their associates from their place of residence to respective. work location in the plant and back. The movement of persons inside the Page 2 of 4 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000122199 Date 17.10.2024 Submission Date 28.10.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Nayana Padhiar Contact Email Nayana.Padhiar@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details plant by foot/bicycle/two wheelers is prohibited. Other Terms: Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. (B) Statutory <(>&<)> General requirements: 25. Owner / Site in-charge compulsory attend monthly department contractor meeting. 26. Need to maintain attendance system for all manpower and supervisors as per company rules, more than 9 days duty not allowed. 27. No manpower allowed to duty more than 16 hours per day. 28. Regular inspection <(>&<)> vehicle checklist to be maintained by all equipment operators and submitted monthly. 29. All equipment’s need to available in fit and fine condition at Corex site. 30. When billing, submit scrum report of operator for attendance verification. 31. Vendor must have technical and operational competence to provide required services. 32. Vendor must have work experience in heavy industries such as large steel plant, cement, mining or port operations. 33. Vendor must comply with all relevant local, state regulations, including health and safety standards. 34. Vendor must have sufficient fleet to allocate sufficient resources, including manpower, equipment, to meet plant requirements. (C) PENALTY Specific Penalty for nonperformance by vendor and must be cardinally measured. 1. A penalty will be imposed in case of noncompliance with HSE norms <(>&<)> Non-conformity of Work. 2. Violation of any safety norms will be penalized to the contractor. 3. Sleeping case of associates with penalty of minimum amount decided by PHSE if same case repeated the associates will be Suspended or terminated by Furnace in charges/Operation Head/HOD. 4. Misbehavior of Contractor associate with area Engineers/manager will be Penalized/ Suspended or terminated by Area in charges/Maintenance Head/HOD. 5. Violation of Company Traffic Rules will be penalized. 6. As per Management Directive, transport / movement of associates to <(>&<)> fro for Plant should be mandatorily in 4 Wheelers and Buses. Bicycles and Two wheelers are strictly not allowed. AMNS SCOPE: • AMNS will provide the Hydra, Permit, Co monitor, water, illumination, and Power connections. Item Note : 2 2000159729 10 20 10 ERECTION OF STRUCTURE 30 TO 20 FABRICATION OF STRUCTRE 50 TO Email : AMAR.DHOK@AMNS.IN Contact : Name : Amar Dhok Item Details : VENDOR SCOPE: 1. Vendor will shift the material from yard to Site Location. (intimate one day before for hydra requirement) 2. Job will be assigned by AMNS engineer. 3. After Getting the Order the vendor must complete the job as per AMNS timeline. 4. After replacement / erection / fabrication of assigned job, old scarp material to be kept in designated area s per AMNS engineer instructions. 5. Vendor will fix the net for safety measure according to job. 6. In case of any problem in support structure, it will be rectified / Page 3 of 4 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000122199 Date 17.10.2024 Submission Date 28.10.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Nayana Padhiar Contact Email Nayana.Padhiar@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details replaced. 7. Toe Guard and handrailing removed during job and re-fixed as per AMNS guideline. 8. All Workman ship will carry work at Height Pass according to job. 9. Vendor will fix the lifeline according to job - Vendor will use Safety Net (Metallic) and Lifeline at floor along with floor Guarding during plate replacement time. 10. ALL PPE, consumables like gases, wire brush, grinding wheels, gas cutting nozzles are contractor. 11. All tool and tackles are contractor scope. 12. Welding machine, grinding m/c, chain block and gas cutting are contractor scope. 13. PPEs including COVID 19 PPEs (face shield, goggles, nose mask, hand gloves, sanitizer) to be provided to associates. 14. All hospitality (breakfast, tea, lunch, snacks, dinner, and individual soap) is under vendor scope. 15. Full body medical check-up (valid for six months) is under vendor scope. 16. Full body safety harness with double harness must be used. 17. COVID -19 test to be done as per AM/NS instruction. 18. Manpower total transportation is under vendor scope (to be provided at site location as decided by AM/NS Engineer). 19. Vendor will depute a supervisor on continue basis who will be a permit holder as AMNS requirement. 20. As this job is to be done in Plant running then step by step replacement will be done as per AMNS clearance. 21. As Job is to be done during plant running, so Housekeeping of floor must be done on daily basis due to manpower movement and All opening will be properly guarded. AMNS SCOPE: • AMNS will provide the Hydra, Permit, Co monitor, water, illumination, and Power connections. • Material is in under AMNS Scope. (A) SAFETY Movement of Manpower / Associates at our Hazira Site. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. Ø Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Ø Vendors to ensure safe transportation of their associates from their place of residence to respective. work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. Other Terms: Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. (B) Statutory <(>&<)> General requirements: 22. Owner / Site in-charge compulsory attend monthly department contractor meeting. 23. Need to maintain attendance system for all manpower and supervisors as per company rules, more than 9 days duty not allowed. 24. No manpower allowed to duty more than 16 hours per day. 25. Regular inspection <(>&<)> vehicle checklist to be maintained by all equipment operators and submitted monthly. 26. All equipment’s need to available in fit and fine condition at Corex site. 27. When billing, submit scrum report of operator for attendance verification. 28. Vendor must have technical and operational competence to provide required services. 29. Vendor must have work experience in heavy industries such as large steel plant, cement, mining or port operations. Page 4 of 4 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000122199 Date 17.10.2024 Submission Date 28.10.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Nayana Padhiar Contact Email Nayana.Padhiar@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 30. Vendor must comply with all relevant local, state regulations, including health and safety standards. 31. Vendor must have sufficient fleet to allocate sufficient resources, including manpower, equipment, to meet plant requirements. (C) PENALTY Specific Penalty for nonperformance by vendor and must be cardinally measured. 1. A penalty will be imposed in case of noncompliance with HSE norms <(>&<)> Non-conformity of Work. 2. Violation of any safety norms will be penalized to the contractor. 3. Sleeping case of associates with penalty of minimum amount decided by PHSE if same case repeated the associates will be Suspended or terminated by Furnace in charges/Operation Head/HOD. 4. Misbehavior of Contractor associate with area Engineers/manager will be Penalized/ Suspended or terminated by Area in charges/Maintenance Head/HOD. 5. Violation of Company Traffic Rules will be penalized. 6. As per Management Directive, transport / movement of associates to <(>&<)> fro for Plant should be mandatorily in 4 Wheelers and Buses. Bicycles and Two wheelers are strictly not allowed

Tender Notice

45806258

Indian


Gujarat

October 28, 2024

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Tender For Supply Of Item 2000157549 10 10 10 SHIFTING, FAB AND EREC OF CHEQURED PLATE 50 TO 20 DISMANTLING & REMOVAL OF PLANT STRUCTURE 50 TO Email : AMAR@myamns.in Contact : Name : AMAR Item Details : VENDOR SCOPE: 1. Vendor will shift the material from yard to Site Location. (intimate one day before for hydra requirement) 2. Damaged Checker plate removal and new checker plate fixing as per existing floor. 3. Damaged checker plates will be cut into small sizes (below 1000*1000) shifted /Loaded in Damper for scrap. 4. After Getting the Order the vendor must complete the job as per AMNS timeline. 5. Vendor will remove the checker plate on phase manner with proper guarding as per AMNS guideline. 6. New Chequered plate will be fixed with Stiffener in bottom side and full welded. 7. Vendor will fix the net in bottom for safety measure. 8. In case of any problem in support structure, it will be rectified / replaced. 9. Toe Guard and handrailing removed during chequered plate removal will be re-fixed as per AMNS guideline. 10. All Workman ship will carry work at Height Pass. 11. Vendor will fix the lifeline 12. ALL PPE, consumables like gases, wire brush, grinding wheels, gas cutting nozzles are contractor 13. All tool and tackles are contractor scope. 14. Welding machine, grinding m/c, chain block and gas cutting are contractor scope. 15. PPEs including COVID 19 PPEs (face shield, goggles, nose mask, hand gloves, sanitizer) to be provided to associates. 16. All hospitality (breakfast, tea, lunch, snacks, dinner, and individual soap) is under vendor scope. 17. Full body medical check-up (valid for six months) is under vendor scope. 18. Full body safety harness with double harness must be used. 19. COVID -19 test to be done as per AM/NS instruction. 20. Manpower total transportation is under vendor scope (to be provided at site location as decided by AM/NS Engineer). 21. Vendor will use Safety Net (Metallic) and Lifeline at floor along with floor Guarding during plate replacement time. 22. Vendor will depute a supervisor on continue basis who will be a permit holder as AMNS requirement. 23. As this job is to be done in Plant running then step by step replacement will be done as per AMNS clearance. 24. As Job is to be done during plant running, so Housekeeping of floor must be done on daily basis due to manpower movement and All opening will be properly guarded. (A) SAFETY Movement of Manpower / Associates at our Hazira Site. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. Ø Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Ø Vendors to ensure safe transportation of their associates from their place of residence to respective. work location in the plant and back. The movement of persons inside the Page 2 of 4 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000122199 Date 17.10.2024 Submission Date 28.10.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Nayana Padhiar Contact Email Nayana.Padhiar@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details plant by foot/bicycle/two wheelers is prohibited. Other Terms: Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. (B) Statutory <(>&<)> General requirements: 25. Owner / Site in-charge compulsory attend monthly department contractor meeting. 26. Need to maintain attendance system for all manpower and supervisors as per company rules, more than 9 days duty not allowed. 27. No manpower allowed to duty more than 16 hours per day. 28. Regular inspection <(>&<)> vehicle checklist to be maintained by all equipment operators and submitted monthly. 29. All equipment’s need to available in fit and fine condition at Corex site. 30. When billing, submit scrum report of operator for attendance verification. 31. Vendor must have technical and operational competence to provide required services. 32. Vendor must have work experience in heavy industries such as large steel plant, cement, mining or port operations. 33. Vendor must comply with all relevant local, state regulations, including health and safety standards. 34. Vendor must have sufficient fleet to allocate sufficient resources, including manpower, equipment, to meet plant requirements. (C) PENALTY Specific Penalty for nonperformance by vendor and must be cardinally measured. 1. A penalty will be imposed in case of noncompliance with HSE norms <(>&<)> Non-conformity of Work. 2. Violation of any safety norms will be penalized to the contractor. 3. Sleeping case of associates with penalty of minimum amount decided by PHSE if same case repeated the associates will be Suspended or terminated by Furnace in charges/Operation Head/HOD. 4. Misbehavior of Contractor associate with area Engineers/manager will be Penalized/ Suspended or terminated by Area in charges/Maintenance Head/HOD. 5. Violation of Company Traffic Rules will be penalized. 6. As per Management Directive, transport / movement of associates to <(>&<)> fro for Plant should be mandatorily in 4 Wheelers and Buses. Bicycles and Two wheelers are strictly not allowed. AMNS SCOPE: • AMNS will provide the Hydra, Permit, Co monitor, water, illumination, and Power connections. Item Note : 2 2000159729 10 20 10 ERECTION OF STRUCTURE 30 TO 20 FABRICATION OF STRUCTRE 50 TO Email : AMAR.DHOK@AMNS.IN Contact : Name : Amar Dhok Item Details : VENDOR SCOPE: 1. Vendor will shift the material from yard to Site Location. (intimate one day before for hydra requirement) 2. Job will be assigned by AMNS engineer. 3. After Getting the Order the vendor must complete the job as per AMNS timeline. 4. After replacement / erection / fabrication of assigned job, old scarp material to be kept in designated area s per AMNS engineer instructions. 5. Vendor will fix the net for safety measure according to job. 6. In case of any problem in support structure, it will be rectified / Page 3 of 4 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000122199 Date 17.10.2024 Submission Date 28.10.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Nayana Padhiar Contact Email Nayana.Padhiar@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details replaced. 7. Toe Guard and handrailing removed during job and re-fixed as per AMNS guideline. 8. All Workman ship will carry work at Height Pass according to job. 9. Vendor will fix the lifeline according to job - Vendor will use Safety Net (Metallic) and Lifeline at floor along with floor Guarding during plate replacement time. 10. ALL PPE, consumables like gases, wire brush, grinding wheels, gas cutting nozzles are contractor. 11. All tool and tackles are contractor scope. 12. Welding machine, grinding m/c, chain block and gas cutting are contractor scope. 13. PPEs including COVID 19 PPEs (face shield, goggles, nose mask, hand gloves, sanitizer) to be provided to associates. 14. All hospitality (breakfast, tea, lunch, snacks, dinner, and individual soap) is under vendor scope. 15. Full body medical check-up (valid for six months) is under vendor scope. 16. Full body safety harness with double harness must be used. 17. COVID -19 test to be done as per AM/NS instruction. 18. Manpower total transportation is under vendor scope (to be provided at site location as decided by AM/NS Engineer). 19. Vendor will depute a supervisor on continue basis who will be a permit holder as AMNS requirement. 20. As this job is to be done in Plant running then step by step replacement will be done as per AMNS clearance. 21. As Job is to be done during plant running, so Housekeeping of floor must be done on daily basis due to manpower movement and All opening will be properly guarded. AMNS SCOPE: • AMNS will provide the Hydra, Permit, Co monitor, water, illumination, and Power connections. • Material is in under AMNS Scope. (A) SAFETY Movement of Manpower / Associates at our Hazira Site. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. Ø Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Ø Vendors to ensure safe transportation of their associates from their place of residence to respective. work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. Other Terms: Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. (B) Statutory <(>&<)> General requirements: 22. Owner / Site in-charge compulsory attend monthly department contractor meeting. 23. Need to maintain attendance system for all manpower and supervisors as per company rules, more than 9 days duty not allowed. 24. No manpower allowed to duty more than 16 hours per day. 25. Regular inspection <(>&<)> vehicle checklist to be maintained by all equipment operators and submitted monthly. 26. All equipment’s need to available in fit and fine condition at Corex site. 27. When billing, submit scrum report of operator for attendance verification. 28. Vendor must have technical and operational competence to provide required services. 29. Vendor must have work experience in heavy industries such as large steel plant, cement, mining or port operations. Page 4 of 4 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000122199 Date 17.10.2024 Submission Date 28.10.2024 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Nayana Padhiar Contact Email Nayana.Padhiar@ext.amns.in MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details 30. Vendor must comply with all relevant local, state regulations, including health and safety standards. 31. Vendor must have sufficient fleet to allocate sufficient resources, including manpower, equipment, to meet plant requirements. (C) PENALTY Specific Penalty for nonperformance by vendor and must be cardinally measured. 1. A penalty will be imposed in case of noncompliance with HSE norms <(>&<)> Non-conformity of Work. 2. Violation of any safety norms will be penalized to the contractor. 3. Sleeping case of associates with penalty of minimum amount decided by PHSE if same case repeated the associates will be Suspended or terminated by Furnace in charges/Operation Head/HOD. 4. Misbehavior of Contractor associate with area Engineers/manager will be Penalized/ Suspended or terminated by Area in charges/Maintenance Head/HOD. 5. Violation of Company Traffic Rules will be penalized. 6. As per Management Directive, transport / movement of associates to <(>&<)> fro for Plant should be mandatorily in 4 Wheelers and Buses. Bicycles and Two wheelers are strictly not allowed