Auction Sale Of Scrap Condemned And Unserviceable Released/Abandoned Structus Building At Station -Utd (Quarter No T/17 Type 1 Unit 1, Quarter No T/18 & 19 Type 1 Unit 4).Station- Kbrb (Quarter No T/25 Type 1 Unit 2, Quarter No E/19,20,21&22 Type 1 Unit 8). Station ? Nd (Quarter No E/102 Type 1 Unit 2, Lc-277 Nd-Gte( Cabin At Lc-277,Service Bld. Unit 1) Station- Gte (Quarter No T/24 Type 2 Unit 1, Quarter No T/25 Type 2 Unit 2).Lc 283 Gte ( Cabin At Lc 283, Service Bld. Unit 1) Gte- Mhd (Quarter At Lc 286 Type 1 Unit 2) Station- Mhd ( Quarter No E/47 Type 1 Unit 2) Lc 296 Kanj ( Cabin At Lc 296, Service Bld. Unit 1).Total Unit- 27.Total Material [ Brick Works 281.66 Cum, Precast/Rcc Slab 358.6 Cum, Wooden & Ms Door Frame In Off Size 49 Nos, Window, Ms Window & Ventilator Frame In Off Size 40 Nos, Wooden Rafter/Beam/ Jaffari 44 Cum, Pvc Doors 21 Nos, Ac Sheet 173.9 Sqm. Rail 30 Lbs/90 R/69 Lbs/82 Lbs & Ms Item (Daniya, Tie Bar, Tie Bar Fencing Flat, 12 Mm Rod, Rail Daniya, Angles, Sheet, Fencing, Parline Angle, Flat, Ms Pipe, C/Yard Door Plate & Flat, Wind Tie Flat, Ismc, Ms Sheet, Stair Case, Isa, Flight Runner Etc.) Total Weight: 10195.66 Kg.].Delivery- As A Lot. Custodian: Sse Works Nd. Note No. [1] Dismantling Up To Ground Level Only. Below Ground Level Is Not Permitted. [2] During Dismantling Purchaser Should Take Necessary Measures To Avoid Any Mishaps. [3] Purchaser Should Insure To Keep A Safety Banner Arround The Work Spot. [4] After Removing /Clearing The Rcc/Bricks Masonary Rubbish From Spots The Delivery Of Wood/Iron Material Will Be Affected. [5] After Delivery The Land Should Be Clear Of All Debris. [6] Free Delivery Period 50 Days. The Lot Details Are As Per Jvr And Measurement Sheet

Tender Notice

46249015

Western Railway

Indian


Gujarat

November 25, 2024

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Auction Sale Of Scrap Condemned And Unserviceable Released/Abandoned Structus Building At Station -Utd (Quarter No T/17 Type 1 Unit 1, Quarter No T/18 & 19 Type 1 Unit 4).Station- Kbrb (Quarter No T/25 Type 1 Unit 2, Quarter No E/19,20,21&22 Type 1 Unit 8). Station ? Nd (Quarter No E/102 Type 1 Unit 2, Lc-277 Nd-Gte( Cabin At Lc-277,Service Bld. Unit 1) Station- Gte (Quarter No T/24 Type 2 Unit 1, Quarter No T/25 Type 2 Unit 2).Lc 283 Gte ( Cabin At Lc 283, Service Bld. Unit 1) Gte- Mhd (Quarter At Lc 286 Type 1 Unit 2) Station- Mhd ( Quarter No E/47 Type 1 Unit 2) Lc 296 Kanj ( Cabin At Lc 296, Service Bld. Unit 1).Total Unit- 27.Total Material [ Brick Works 281.66 Cum, Precast/Rcc Slab 358.6 Cum, Wooden & Ms Door Frame In Off Size 49 Nos, Window, Ms Window & Ventilator Frame In Off Size 40 Nos, Wooden Rafter/Beam/ Jaffari 44 Cum, Pvc Doors 21 Nos, Ac Sheet 173.9 Sqm. Rail 30 Lbs/90 R/69 Lbs/82 Lbs & Ms Item (Daniya, Tie Bar, Tie Bar Fencing Flat, 12 Mm Rod, Rail Daniya, Angles, Sheet, Fencing, Parline Angle, Flat, Ms Pipe, C/Yard Door Plate & Flat, Wind Tie Flat, Ismc, Ms Sheet, Stair Case, Isa, Flight Runner Etc.) Total Weight: 10195.66 Kg.].Delivery- As A Lot. Custodian: Sse Works Nd. Note No. [1] Dismantling Up To Ground Level Only. Below Ground Level Is Not Permitted. [2] During Dismantling Purchaser Should Take Necessary Measures To Avoid Any Mishaps. [3] Purchaser Should Insure To Keep A Safety Banner Arround The Work Spot. [4] After Removing /Clearing The Rcc/Bricks Masonary Rubbish From Spots The Delivery Of Wood/Iron Material Will Be Affected. [5] After Delivery The Land Should Be Clear Of All Debris. [6] Free Delivery Period 50 Days. The Lot Details Are As Per Jvr And Measurement Sheet