Auction Sale Of Scrap Condemned And Unserviceable Released/Abandoned Railway Buildings [1] Annd Stn- (1) Qtr No. E/97 Type 3 Unit-1 (2) Qtr No. 103 Type 1 Unit-4, (3) Qtr No. 101 Type 2 Unit-2, (4) Qtr No. 191 Type 1 Unit-2, (5) Qtr No. 185 Type 1 Unit-2, (6) Qtr No. 209 Type 1 Unit-6, (7) Qtr No. 242 Type 1 Unit-4, (8) Qtr No. 294 Type 2 Unit-2.[2] Vda Stn- (1) Qtr No. T/16 Type 2 Unit-2, (2) Qtr No. E/20 Type 1 Unit-2, [3] Borsad Stn- (1) Qtr No. E/25 Type 2 Unit-1.[4] Ptd Stn- (1) Qtr No. E/15 Type 1 Unit-2,(2) Qtr No. E/17 Type 1 Unit-2, (3) Qtr No. E/20 Type 1 Unit-6, (4) Qtr No. P&S 63 Type 1 Unit-2, (5) Qtr No. P/62 Type 2 Unit-4, (6) Qtr No. 6/E Type 1 Unit-7, (7) Qtr No. E/2/A Type 1 Unit-1, (8) Qtr No. T/7 Type 1 Unit-8, (9) Electric Office Unit-1,(10)Pump House Unit-1, (11) Loco Shed Unit-1, [5] Cby Stn- (1) Qtr No. T/3 Type 1 Unit-2,(2) Qtr No. T/4 Type 1 Unit-2. Total 67 Units. Total Material Rcc Work 110.076 Cum, Brick Work 1375.33 Cum, Pvc Tank 366 Kg, Wooden Frame In Off Size 536.94 Sqm, Wooden Rafter/Beam 310.43 Cum, Frp Door 1.5 Sqm, Ci Pipe 1153.8 Kg, Rails 67858 Kg, Ms Material ( As Per Dm Sheet) 19095.108 Kg, Ac Sheets 1268.59 Sqm, Manglore Tiles 2910 Nos. [6] Annd Stn- (1) Qtr No. T/10 Type 1 Unit-10, (2) Qtr No. L/102 Type 1 Unit-8, (3) Qtr No. M/106 Type 1 Unit-2, (4) Qtr No. M/275 Type 1 Unit-4, (5) Qtr No. El/118 Type 1 Unit-1, (6) Qtr No. T/29 Type 1 Unit-16, (7) Qtr No. W/115 Type 2 Unit-1,(8) Qtr No. E/260 Type 1 Unit-18, (9) Qtr No. E/237 Type 1 Unit-3, [7] Bjw Stn- (1) Qtr No. T/2 Type 1 Unit-7, (2) Qtr No. T/3 Type 2 Unit-1, [8] Vda Stn- (1) Qtr No. E/59 Type 1 Unit-1, [9] Ptd Stn- (1) Qtr No. E/7 Type 1 Unit-4, (2) Qtr No. El/4 Type 1 Unit-12, (3) Qtr No. L/8 Type 3 Unit-1, (4) Qtr No. T/1 Type 2 Unit-1, , [10] Tba Stn- (1) Qtr No. E/3 Type 3 Unit-1, (2) Qtr No. T/17 Type 1 Unit-4, (3) Qtr No. E/2 Type 1 Unit-1, [11] Agci Stn- (1) Qtr No. T/1 Type 2 Unit-3,[12] Kryr Stn- (1) Qtr No. E/11 Type 1 Unit-9,Total 108 Units .Total Stone Work 27.68 Cum, Rcc Work 355.464 Cum, Brick Work 2249.63 Cum, Pvc Tank 1588.54 Kg, Wooden Frame In Off Size 996.87 Sqm, Wooden Rafter/Beam 26.56 Cum, Frp Door 108.56 Sqm, Ci Pipe 202.6 Kg, Gi Sheets 528.2, Rails 96438.019 Kg, Ms Material (As Per Dm Sheet) 30050.59 Kg, Ac Sheets 2922.83 Sqm, Manglore Tiles 3050 Nos.[13] Add Stn- (1) Qtr No. E/14 Type 1 Unit-7,[14] Vda Stn- (1) Qtr No. E/1 Type 1 Unit-9, [15] Annd Triangle- (1) Qtr No. El47(A,B) Type 1 Unit-2, (2) Qtr No. E129(A,B) Type 1 Unit-2, (3) Qtr No. M-274(A,B) Type 2 Unit-2, [16] Annd B/W 5-6 - (1) Pump House And Old Sse Power Office Unit-1. [17] Annd Stn- (1) Qtr No. T/59 Type 4 Unit-1, [18] Bjw Stn- (1) Qtr No. T/14 Type 1 Unit-1, [19] Annd Stn- (1) Pump Room Unit-1, (2) Brick Masonery Oh Tank Unit-1, (3) Oh Rcc Tank Unit-1, [20] Svl Stn- (1) Old Rcc Tank Unit-1, (2) Old Shed Gda Side Unit-1,(3) Bridge Store Shed Unit-1, (4) Qtr No. 61 Type 1 Unit-1, [21] Krca Yard- (1) Old Brick Masonery Water Tank Unit-1, (2) Rcc Oh Tank (Cap. 1.25 Lac. Ltr.) Unit-1, [22] Bjw Stn- (1) Pannel (A) Unit-1, (2) Pannel (B) Unit-1,[23] Rno Stn- (1) Pannel (A) Unit-1,(2) Pannel (B) Unit-1, [24] Cby Stn- (1) Qtr No. T/38-A,B Type 1 Unit-2,(2) Qtr No. T/5-A,B,C Type 1 Unit-3, (3) Store Room Unit-1, (4) Running Room Unit-1,.Total 45 Units. Total Rcc Work 415.285 Cum, Brick Work 1798.61 Cum, Wooden In Off Size 503.06 Sqm, Wooden Rafter/Beam 117.77 Cum, Rails 66311.93 Kg, Ms Material (As Per Dm Sheet)32703.72 Kg,Ac Sheet 391.45 Sq Meter, Manglor Ties 3550 Nos,Pvc Tank 31 Kg, Wooden Doors And Windows 19.35 Kg, Lead 10 Kg, Ci Pipe 4092.07 Kg, Frp Doors 6.27 Sq Meter, Gi Sheet 7.26 Sq. Meter, Aluminium 278.49 Kg. Delivery- As A Lot. Custodian: Sse Works Annd. Fdp 80 Days.. Total Units In Lots 220 Units.Reclaimed Items By Sse Works Annd Aluminium 278.49 Kg And Lead 10 Kg.

Tender Notice

46642773

Western Railway

Indian


Gujarat

December 18, 2024

Key Value

Ref. Documents

Ref. Documents

Ref. Documents

To Download Tender Document Click on the below link

Auction Sale Of Scrap Condemned And Unserviceable Released/Abandoned Railway Buildings [1] Annd Stn- (1) Qtr No. E/97 Type 3 Unit-1 (2) Qtr No. 103 Type 1 Unit-4, (3) Qtr No. 101 Type 2 Unit-2, (4) Qtr No. 191 Type 1 Unit-2, (5) Qtr No. 185 Type 1 Unit-2, (6) Qtr No. 209 Type 1 Unit-6, (7) Qtr No. 242 Type 1 Unit-4, (8) Qtr No. 294 Type 2 Unit-2.[2] Vda Stn- (1) Qtr No. T/16 Type 2 Unit-2, (2) Qtr No. E/20 Type 1 Unit-2, [3] Borsad Stn- (1) Qtr No. E/25 Type 2 Unit-1.[4] Ptd Stn- (1) Qtr No. E/15 Type 1 Unit-2,(2) Qtr No. E/17 Type 1 Unit-2, (3) Qtr No. E/20 Type 1 Unit-6, (4) Qtr No. P&S 63 Type 1 Unit-2, (5) Qtr No. P/62 Type 2 Unit-4, (6) Qtr No. 6/E Type 1 Unit-7, (7) Qtr No. E/2/A Type 1 Unit-1, (8) Qtr No. T/7 Type 1 Unit-8, (9) Electric Office Unit-1,(10)Pump House Unit-1, (11) Loco Shed Unit-1, [5] Cby Stn- (1) Qtr No. T/3 Type 1 Unit-2,(2) Qtr No. T/4 Type 1 Unit-2. Total 67 Units. Total Material Rcc Work 110.076 Cum, Brick Work 1375.33 Cum, Pvc Tank 366 Kg, Wooden Frame In Off Size 536.94 Sqm, Wooden Rafter/Beam 310.43 Cum, Frp Door 1.5 Sqm, Ci Pipe 1153.8 Kg, Rails 67858 Kg, Ms Material ( As Per Dm Sheet) 19095.108 Kg, Ac Sheets 1268.59 Sqm, Manglore Tiles 2910 Nos. [6] Annd Stn- (1) Qtr No. T/10 Type 1 Unit-10, (2) Qtr No. L/102 Type 1 Unit-8, (3) Qtr No. M/106 Type 1 Unit-2, (4) Qtr No. M/275 Type 1 Unit-4, (5) Qtr No. El/118 Type 1 Unit-1, (6) Qtr No. T/29 Type 1 Unit-16, (7) Qtr No. W/115 Type 2 Unit-1,(8) Qtr No. E/260 Type 1 Unit-18, (9) Qtr No. E/237 Type 1 Unit-3, [7] Bjw Stn- (1) Qtr No. T/2 Type 1 Unit-7, (2) Qtr No. T/3 Type 2 Unit-1, [8] Vda Stn- (1) Qtr No. E/59 Type 1 Unit-1, [9] Ptd Stn- (1) Qtr No. E/7 Type 1 Unit-4, (2) Qtr No. El/4 Type 1 Unit-12, (3) Qtr No. L/8 Type 3 Unit-1, (4) Qtr No. T/1 Type 2 Unit-1, , [10] Tba Stn- (1) Qtr No. E/3 Type 3 Unit-1, (2) Qtr No. T/17 Type 1 Unit-4, (3) Qtr No. E/2 Type 1 Unit-1, [11] Agci Stn- (1) Qtr No. T/1 Type 2 Unit-3,[12] Kryr Stn- (1) Qtr No. E/11 Type 1 Unit-9,Total 108 Units .Total Stone Work 27.68 Cum, Rcc Work 355.464 Cum, Brick Work 2249.63 Cum, Pvc Tank 1588.54 Kg, Wooden Frame In Off Size 996.87 Sqm, Wooden Rafter/Beam 26.56 Cum, Frp Door 108.56 Sqm, Ci Pipe 202.6 Kg, Gi Sheets 528.2, Rails 96438.019 Kg, Ms Material (As Per Dm Sheet) 30050.59 Kg, Ac Sheets 2922.83 Sqm, Manglore Tiles 3050 Nos.[13] Add Stn- (1) Qtr No. E/14 Type 1 Unit-7,[14] Vda Stn- (1) Qtr No. E/1 Type 1 Unit-9, [15] Annd Triangle- (1) Qtr No. El47(A,B) Type 1 Unit-2, (2) Qtr No. E129(A,B) Type 1 Unit-2, (3) Qtr No. M-274(A,B) Type 2 Unit-2, [16] Annd B/W 5-6 - (1) Pump House And Old Sse Power Office Unit-1. [17] Annd Stn- (1) Qtr No. T/59 Type 4 Unit-1, [18] Bjw Stn- (1) Qtr No. T/14 Type 1 Unit-1, [19] Annd Stn- (1) Pump Room Unit-1, (2) Brick Masonery Oh Tank Unit-1, (3) Oh Rcc Tank Unit-1, [20] Svl Stn- (1) Old Rcc Tank Unit-1, (2) Old Shed Gda Side Unit-1,(3) Bridge Store Shed Unit-1, (4) Qtr No. 61 Type 1 Unit-1, [21] Krca Yard- (1) Old Brick Masonery Water Tank Unit-1, (2) Rcc Oh Tank (Cap. 1.25 Lac. Ltr.) Unit-1, [22] Bjw Stn- (1) Pannel (A) Unit-1, (2) Pannel (B) Unit-1,[23] Rno Stn- (1) Pannel (A) Unit-1,(2) Pannel (B) Unit-1, [24] Cby Stn- (1) Qtr No. T/38-A,B Type 1 Unit-2,(2) Qtr No. T/5-A,B,C Type 1 Unit-3, (3) Store Room Unit-1, (4) Running Room Unit-1,.Total 45 Units. Total Rcc Work 415.285 Cum, Brick Work 1798.61 Cum, Wooden In Off Size 503.06 Sqm, Wooden Rafter/Beam 117.77 Cum, Rails 66311.93 Kg, Ms Material (As Per Dm Sheet)32703.72 Kg,Ac Sheet 391.45 Sq Meter, Manglor Ties 3550 Nos,Pvc Tank 31 Kg, Wooden Doors And Windows 19.35 Kg, Lead 10 Kg, Ci Pipe 4092.07 Kg, Frp Doors 6.27 Sq Meter, Gi Sheet 7.26 Sq. Meter, Aluminium 278.49 Kg. Delivery- As A Lot. Custodian: Sse Works Annd. Fdp 80 Days.. Total Units In Lots 220 Units.Reclaimed Items By Sse Works Annd Aluminium 278.49 Kg And Lead 10 Kg.